The latest gas stoves installed electricity work

Helsingin kaupungin asunnot Oy / c/o Heka-Myllypuro Oy | Published December 15, 2016  -  Deadline January 27, 2017
Yläkiventie 2, Yläkiventie 5, Yläkiventie 8 and 22 Myllypurontie latest gas stoves installed electricity work. New gas boiling 828 pieces and 908 electrical work: in the kitchen. Annexed to the tender documents. Yläkiventie 2, Yläkiventie 5, Yläkiventie 8 and 22 Myllypurontie latest gas stoves installed electricity work. New gas boiling 828 pieces and 908 electrical work: in the kitchen. Yläkiventie 2, Yläkiventie 5, Yläkiventie 8 and 22 Myllypurontie latest gas stoves installed electricity work. New gas boiling 828 pieces and 908 electrical work: in the kitchen. Annexed to the tender documents.

Huutokoski the emergency power of environmental and renovation project of electrical installation works and field level.

Fingrid Oyj | Published January 15, 2017
Hankinnan kohteena ovat Fingrid Oyj:n Huutokosken kaasuturbiineihin perustuvan 6 x 30 MW:n suuruisen varavoimalaitoksen vuonna 2015 käynnistyneeseen ympäristö- ja perusparannushankkeeseen sisältyvä sähkö- ja kenttäinstrumentoinnin asennus urakka, sisältäen mm. seuraavat palvelut: - pienjännite ja instrumentointikaapeloinnit ja hyllyasennukset, - kenttäinstrumentoinnin kenttälaitteet ja niiden asennus, - nykyisten pj-keskusten (6 kpl) ja asennusten purkutyöt, - nykyisten 10 kV kojeistojen (3 kpl) purkutyöt – Optio, - uusien pää- ja omakäyttökeskusten (7 kpl) haalaus ja asennus, - maadoitusjärjestelmät (PE/FE) selkeytys ja laajennus, - ulkoalueen valaistusasennuksia valaistusmastoineen, - ryhmä- ja UPS-keskusten toimitus ja asennus, - kameravalvonnan kaapeleiden veto, - kulunvalvonta- ja murtohälytysjärjestelmien toimittaminen ja asennus, - nykyisten paloilmoitin- ja sammutusjärjestelmien laajennus, - asennettujen piirien koestus ja käyttöönotto. Hankinnan kohteena ovat Fingrid Oyj:n Huutokosken kaasuturbiineihin perustuvan miehittämättömän ja kaukokäynnisteisen sähkötehoiltaan 6 x 30 MW:n suuruisen varavoimalaitoksen vuonna 2015 käynnistyneeseen ympäristö- ja perusparannushankkeeseen sisältyvä sähkö- ja kenttäinstrumentoinnin asennus urakka Hankinnan kohteena ovat Fingrid Oyj:n Huutokosken kaasuturbiineihin perustuvan 6 x 30 MW:n suuruisen varavoimalaitoksen vuonna 2015 käynnistyneeseen ympäristö- ja perusparannushankkeeseen sisältyvä sähkö- ja kenttäinstrumentoinnin asennus urakka, sisältäen mm. seuraavat palvelut: - pienjännite ja instrumentointikaapeloinnit ja hyllyasennukset, - kenttäinstrumentoinnin kenttälaitteet ja niiden asennus, - nykyisten pj-keskusten (6 kpl) ja asennusten purkutyöt, - nykyisten 10 kV kojeistojen (3 kpl) purkutyöt – Optio, - uusien pää- ja omakäyttökeskusten (7 kpl) haalaus ja asennus, - maadoitusjärjestelmät (PE/FE) selkeytys ja laajennus, - ulkoalueen valaistusasennuksia valaistusmastoineen, - ryhmä- ja UPS-keskusten toimitus ja asennus, - kameravalvonnan kaapeleiden veto, - kulunvalvonta- ja murtohälytysjärjestelmien toimittaminen ja asennus, - nykyisten paloilmoitin- ja sammutusjärjestelmien laajennus, - asennettujen piirien koestus ja käyttöönotto.

Petroleum products, fuel, electricity and other sources of energy

KL-Kuntahankinnat Oy | Published January 13, 2017

KL-Kuntahankinnat Oy tenders for fuel tank deliveries to various parts of the Finnish behalf in the customers'.

Municipality of purchases for customers include all Finnish municipalities, federations of municipalities, municipal corporations, universities of applied sciences, as well as municipal or local government subsidiary entities, in which the municipalities and joint municipal authorities are alone or in conjunction with the Community in the municipality of Group Accounting Act (1336/1997), Chapter 1, § 5 For the purposes of Act and the Local Authorities Association and its group companies. The above-mentioned organizations are located in Finland.

Customers can be also through the acquisition of a cooperation of public procurement legislation complying with other organizations. Customers will be notified of the agreement in more detail in the invitation to tender.

Competitive bidding will include a preliminary determination in accordance with the following areas:

- Heating Fuel Oil / Fuel Oil Engine (summer grade)

- Heating Fuel Oil / Fuel Oil Engine (winter grade)

- Diesel Oil (summer grade)

- Diesel oil (winter grade)

- Petrol 95 10,

- Petrol 98 E 5,

- Heavy fuel oil.

According to the preliminary plan will be to choose one supplier, with whom

Kuntahankinnat signs a contract. The contract period is 4 years.

The precise content of the contract may be revised as further customer needs, as well as on the basis of the technical dialogue with suppliers.

KL-Kuntahankinnat arrange to interested suppliers to participate in the so-called. technical dialogue. During the dialogue may be found in businesses and provide drafts of documents for comment.

Tenderers may indicate their interest in dialogue by e-mail to: kilpailutus@kuntahankinnat.fi entitled "Fuel tanker deliveries" 20.1.2017 at the latest.

Plots of district heating pipelines, electricity and others. cables, car heating posts and external lighting of the new paper work

Helsingin kaupungin asunnot Oy | Published January 3, 2017  -  Deadline March 1, 2017
The contract includes the City of Helsinki Housing Ltd / vmy 1208 Tanotorventie 14-16 plots of district heating pipelines, electricity and others. Cables, car heating posts and external lighting renewal of paper work contract documents that the scope and terms of the settlement. The contract includes the City of Helsinki Housing Ltd / vmy 1208 Tanotorventie 14-16 plots of district heating pipelines, electricity and others. Cables, car heating posts and external lighting renewal of paper work contract documents that the scope and terms of the settlement.

Domestic cooking appliances

Helsingin kaupungin asunnot Oy / c/o Heka-Myllypuro Oy | Published December 16, 2016  -  Deadline January 27, 2017

Yläkiventie 2, Yläkiventie 5, Yläkiventie 8 and 22 Myllypurontie latest gas stoves installed electricity work.

New gas boiling 828 pieces and 908 electrical work: in the kitchen.

Annexed to the tender documents.

Kito water cooperative water management and fiber optic network expansion zones 2 and 4

Kitön vesiosuuskunta | Published January 4, 2017  -  Deadline January 26, 2017
Content of the construction work areas 2 and 4, • the necessary piping and cable channel excavation and extraction varied terrain, as a rule, along roads No Maakaivantoa (2m depth) about 16 km, of which approximately 4.5 kilometers take with HDD No Kalliokaivantoa (2m depth) of about 1 km • Directly undershoot of about 500m and beaching 4 pcs • water supply, paineviemäri- and fiber optic network construction • electrical cable protection pipes installation (electricity supply material) • road pavement repair construction after installation and other finishing the optical fiber network includes about 16 km trunk cable, and the same amount of additional cables, 15 distribution cabinet and about 12 plastic and concrete wells. Welding works are not covered contract. The above amounts are estimates and urakkatarjoukset will be asked on the basis of the implementation plans of unit costs and the basis of measurement protocols. Content of the construction work areas 2 and 4, • the necessary piping and cable channel excavation and extraction varied terrain, as a rule, along roads No Maakaivantoa (2m depth) about 16 km, of which approximately 4.5 kilometers take with HDD No Kalliokaivantoa (2m depth) of about 1 km • Directly undershoot of about 500m and beaching 4 pcs • water supply, paineviemäri- and fiber optic network construction • electrical cable protection pipes installation (electricity supply material) • road pavement repair construction after installation and other finishing the optical fiber network includes about 16 km trunk cable, and the same amount of additional cables, 15 distribution cabinet and about 12 plastic and concrete wells. Welding works are not covered contract. The above amounts are estimates and urakkatarjoukset will be asked on the basis of the implementation plans of unit costs and the basis of measurement protocols.

Ruokolahden school, new building

Ruokolahden kunta | Published December 2, 2016  -  Deadline February 1, 2017
Requirements for documents relating to the procurement of civil works are included in the main contract, as defined when placed under the said letter of invitation to plan fully completed, and construction services for the 3.2-page contracts and paragraph 3.3 of the client and the type of separate performances. Site services are YSE 1998 3 according to § inclusive of all construction site waste collection, sorting and transport out of the refuse collection charges. Side-contractors are obliged to separate waste collection containers organized by the main contractor. The main contractor responsible for the work of the purity of the provisional and final cleaning of the site, so that the building is fully ready for use. Site management responsibilities is responsible for the main contractor, who acts as the main implementer. within the limits of the contract between the contractors comply with the procurement documents the contract limit the Annex and YSE 1998 regulations and guidelines. Electricity contract covers construction of electrical work been fully completed according to plan. The contract tube wear all construction Iw in accordance with the plans of the pipes, insulation, fittings and equipment as well as systems to be placed fully completed and fully operational according to plan. Ventilation and building automation contract also covers, in accordance with all the works of ventilation and building automation systems technical work and procurements plans fully reconstituted. The construction project includes a new building, which contains the actual school building and a professional kitchen contained therein, as well as yard work and area of ​​attachment of the document to the extent indicated. New building are firmly attached to Ruokolahden sports hall and the structure of a gateway Ruokolahden preschool. The new building is 6 394 gross m2 and three a total of 74 m2 of cold storage building. The requirements in the contract documents in accordance with the specified