Ville de Differdange | Published January 17, 2017  -  Deadline February 28, 2017

Electromechanical equipment of storm water overflow basin, with among other things a mechanical rake, 2 pumps, 1 gray water pump, 1 choke, flow and level measurement systems, electrical installations, installation for remote control, ...

Los EM Electromechanical Equipment

Elektrizitätswerk der Ortsgemeinde Murg | Published December 27, 2016  -  Deadline February 27, 2017
CPV: 31100000 - Electric motors, generators and transformers,
31200000 - Electricity distribution and control apparatus,
31720000 - Electromechanical equipment,
42110000 - turbines and motors

Supply of equipment and electromechanical equipment (21 lots)

Cte d'agglo orleans val de loire | Published December 28, 2016
This consultation relates to the supply of equipment and electromechanical equipment and will result in a purchase-order framework agreement, mono-awarded, broken down into 21 lots, with or without minimum and maximum value, renewable

Supply of equipment and electromechanical equipment (21 lots).

COMMUNAUTÉ D'AGGLOMÉRATION ORLÉANS VAL DE LOIRE M. Le President Espace Saint Marc 5 place du 6 juin 1944 CS 95801 45058 Orléans - Cedex 1 Tél : 02 38 78 40 30 | Published April 21, 2016
This consultation relates to the supply of equipment and electromechanical equipment and will result in a purchase-order framework agreement, mono-awarded, broken down into 21 lots, with or without minimum and maximum value, renewable.

Electromechanical equipment

Bundesamt für Straßen ASTRA, Abteilung Straßeninfrastruktur Ost, Filiale Winterthur | Published December 9, 2016  -  Deadline January 30, 2017
The traffic management facilities ASTRA Winterthur branch should be adapted and extended the requirements of VM-CH accordingly. 

The scope includes the manufacture, supply, installation and commissioning of 7 new WTA (2 pcs in the GE VI and 5 pcs in the GE VII..) Consisting of the following main components:

- WTA housing,

- WTA-display area,

Local control.

GEVI:

Project Renovation, expansion and new delivery variable message signs (WTA):

Chur) incl. Associated listening control and infrastructure.

Parent components:

- VIS N03 section computer (virtual machine on a new server in WH Mels) containing WTA terms and data points with complete ...

The traffic management facilities ASTRA Winterthur branch should be adapted and extended the requirements of VM-CH accordingly.

The scope includes the manufacture, supply, installation and commissioning of 7 new WTA (2 pcs in the GE VI and 5 pcs in the GE VII..) Consisting of the following main components:

- WTA housing;

- WTA display area;

Local control.

GEVI:

Project Renovation, expansion and new delivery variable message signs (WTA):

Chur) incl. Associated listening control and infrastructure.

Parent components:

- VIS N03 section computer (virtual machine on a new server in WH Mels) containing WTA terms and data points with complete ...

Electromechanical equipment

CEA Grenoble | Published December 23, 2016  -  Deadline January 27, 2017

Providing a test bench.

Provision of coating equipment for a test bench.

Electromechanical equipment

Brüniger + Co. AG | Published January 7, 2017  -  Deadline February 16, 2017

Hydroelectric power plant (Pelton horizontal), Electromechanical devices, control and command system, wiring, control, connection Rservoir Gitziloch and pump system.

Electromechanical equipment

Tiefbauamt Graubünden | Published January 6, 2017  -  Deadline February 14, 2017

Delivery and collection of: Multi tube MR4 (2 km); Profibus (2 km); . Telephony and control cables (10 km); Wireless Cable (1.6 km); div LV cable (4 km). Fiber optic cable sm / mm (10 km); FO cable terminal (62 St.); Mounting wire guidance lighting (90 St.); FO splices including measurements. div. Low power installations in Central and driving space.

Electromechanical equipment

Tiefbauamt Graubünden | Published January 17, 2017  -  Deadline February 21, 2017

NS-electrical installations for tunnel driving space, access zones, cross / safety tunnel, tunnel control centers, Sisto-centers and stacking tank of approx .: cable management system GFK m 1 800; Cable installations 36 000 m; Chandeliers St 400; Traffic signalization St 40; SOS alarm box St. 8

MDI-CSA-0242 - Acquisition of Services for repair and Electromechanical Equipment Conservation Affections the Douro Interior Activity

Águas do Norte, S. A. | Published January 5, 2017  -  Deadline February 14, 2017
MDI-CSA-0242 - Acquisition of Services for repair and Electromechanical Equipment Conservation Affections the Douro Interior Activity

Electromechanical equipment

CiS Forschungsinstitut für Mikrosensorik GmbH | Published January 7, 2017  -  Deadline February 28, 2017

Intelligent development environment for fast and flexible microsensors prototyping IEMP.

By the provision of Civil Works and Electromechanical Equipment Installation Quick Connect EETT La Esperanza, Santa Cruz Norte and Puerto Madryn in full agreement as indicated in files

58 - TRANSENER S.A., 0151/000 - TRANSENER S.A. - COMPRAS | Published December 29, 2016
By the provision of Civil Works and Electromechanical Equipment Installation Quick Connect EETT La Esperanza, Santa Cruz Norte and Puerto Madryn in full agreement as indicated in files

Conducting, monitoring, control and maintenance of water treatment plants arsenic and fluoride in? ATO 1 Northern Lazio Viterbo. conservation, adaptation and improvement of impiantististico heritage. Verify, update and integration of the data base of the electromechanical equipment fringe benefits? ? CIG 675291059E.

Talete Spa | Published December 14, 2016  -  Deadline January 26, 2017
Conducting, monitoring, control and maintenance of water treatment plants arsenic and fluoride in? ATO 1 Northern Lazio Viterbo. conservation, adaptation and improvement of impiantististico heritage. Verify, update and integration of the data base of the electromechanical equipment fringe benefits? ? CIG 675291059E.

Supply of Electromechanical equipment for catering students MKOU "SOSH Njuguna No."

АДМИНИСТРАЦИЯ ОКТЯБРЬСКОГО РАЙОНА | Published October 7, 2016  -  Deadline October 20, 2017
Machine cleaning-cutting 28.93.17.112 PCs 1,00 720,00 720,00 78 78 total: 78 720,00

ZAE around Liege Airport Implementation of a water tank - Electromechanical Equipment

SOWAER Affaires générales - Secteurs spéciaux | Published January 10, 2017
The company governed by these special specifications regarding the supply, installation and commissioning of the electrical and electromechanical of the water reservoir of the AEZ Bierset South.

Maintenance of electromechanical equipment doors and gates - renewable 2017 Year in 2018, 2019 and 2020

LE MANS MÉTROPOLE Le Président Pôle Marchés et Achats Publics CS 40010 - 16 avenue François Mitterrand - Le Condorcet Le Condorcet 72039 Le Mans - 9 Tél : 02 43 47 37 31 - Fax : 02 43 47 37 40 | Published April 22, 2016
This consultation is carried out as part of a command group in accordance with Article 28 of the nº2015-899 Order of July 23, 2015 with the following organizations: - Le Mans Métropole - City of Le Mans Coordinator of the command group is: Le Mans Métropole. This is a framework agreement to purchase orders without minimum and maximum and a trader. As an indication, the estimated amount of orders for one year is: - Le Mans Métropole 10 000 €; - City of Le Mans 20 000 €

Conducting, monitoring, control and maintenance of arsenic and fluoride drinking water plants in ATO 1 Northern Lazio Viterbo. conservation, adaptation and improvement of impiantististico heritage. Verify, update and integration of the data base of the electromechanical equipment fringe benefits "- 675291059E IGC.

TALETE S.P.A. - DIREZIONE SERVIZI | Published December 12, 2016  -  Deadline January 26, 2017

Trenitalia SpA intends to proceed by tender open, fully managed by computer systems, EGPA n. 7277 on entering into an administration agreement concerning the award of a new supply of "Electromechanical equipment for electrical applications" divided into 3 lots: Lot 1 CIG: 688915026D; Lot 2 CIG: 68891534E6; Lot 3 CIG: 68891545B9.

TRENITALIA SPA-Gruppo Ferrovie dello Stato Italiano S.p.A. - DIREZIONE LOGISTICA INDUSTRIALE | Published December 7, 2016  -  Deadline January 31, 2017

1700047 | Sanitation of the town of Clervaux

PMP.LU / S SIDEN - Syndicat Intercommunal de Dpollution des Eaux rsiduaires du Nord (SIDEN) | Published January 12, 2017  -  Deadline March 3, 2017
Station puration Urspelt (2800EH) electromechanical equipment

Qairokkum Hydropower Rehabilitation Project Phase II

 | Published October 25, 2016  -  Deadline October 25, 2017

The Open Joint Stock Company Barqi Tojik (BT) is a 100% state-owned vertically integrated power utility responsible for generation, transmission and distribution of electricity in Tajikistan. BT intends using loan proceeds from the European Bank for Reconstruction and Development (EBRD) and European Investment Bank (EIB) as well as potential funding from the Green Climate Fund (“GCF”) to finance Phase II of the priority rehabilitation program at the Qairokkum hydro power plant.

The Project will complete rehabilitation and modernisation of the Qairokkum HPP, the only power generation facility in the Sugd region of the Northern Tajikistan, following Phase I. The proceeds of the EBRD loan along with the GCF and EIB financing will be used to finance replacement of the remaining four out of six generation units at the Qairokkum HPP, following the planned replacement of two units as part of Phase I. As the procurement process for Phase I is yet to commence the intention is to combine the procurement of all six (6) turbines into one single tender and to procure all at the same time.

The Project will also finance repair of the damaged concrete surfaces, installation of additional safety surveillance equipment, balance of plant and control system and power transformers, together with implementation of improved operational procedures to promote resilience to climatic variability and climate change.

The proposed project with a total cost of about USD 200 million will require the procurement of the following goods, works and services:

  • Supply and Installation of Hydraulic Steel Components, Turbines, Electromechanical Equipment and Power House and Concrete Dam Rehabilitation including civil works.

 

Prequalification for the Contract is expected to commence during autumn of 2016.

Contracts to be financed with the proceeds of a loan from the Bank will be subject to the Bank's Procurement Policies and Rules and will be open to firms from any country. The proceeds of the Bank's loan will not be used for the purpose of any payment to persons or entities, of for any import of goods, if such payment or import is prohibited by a decision of the United Nations Security Council taken under Chapter VII of the Charter of the United Nations or under a law of official regulation of the Purchaser's country.

 

Interested suppliers, contractors and consultants should contact:

 

Mr. Ubaidullo Habibov
Head of PRG ELRP BT
OSHC Barqi Tojik
64, I.Somoni Street, Room 302,
Dushanbe 734026, Republic of Tajikistan
E-mail: elrpbt@gmail.com