Call +44 800 9755 164

Public tenders for electrical in Tallinn Estonia

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Electrical Distribution Ltd factory-product of integrated capacities 630 kVA and 1000 kVA and their components Purchasing

Elektrilevi OÜ - AARE LOKK | Published December 22, 2016
Procurement object is the standard EVS-EN 62271-202 (IEC 62271: 202) or EN 61330 according to the factory product line and type-tested assembly (assembly substation, distribution point), which includes the components contained in the enclosure and features. The functions and components are located in the enclosure can be, depending on the order: -metallümbrises medium-voltage switchgear, which corresponds to the standard EN 62271-1 and EVS-EN 62271-200. Thermal nimitaluvusvool 16 kA / 1s, rated voltage of 24 kV; -keskpinge mõõtekapp with the instrument transformers and the corresponding abiahelatega; -madalpinge distribution device that meets the standards EN 60439-1 (or EN 61439-2), EN 60439-3, EN 60947-1, rated voltage of 500 V; -keskpinge- and low voltage connections; -abiseadmed and chains; -jaotustrafo room (s) with an oil-bath. Distribution transformers are not included in this volume of procurement; -keskpinge switchgear remote control capability through the SCADA system using IEC 60870-5-104 protocol; -releekaitse and automation equipment, including abitoiteta overcurrent protection, overcurrent protection targeted, MI. Low and / or medium-voltage and medium-voltage distribution devices mõõtekappe be ordered separately, if necessary, goods. Exact specifications issued to qualified applicants in the tender documents. Get a Free set of substations / distribution point of basic parameters -nimipinge and insulation levels Ur: 24 kV 24/50/125 kV; -vastavus standards: EVS-EN 62271-202 (IEC 62271: 202). 2006, or previously developed compact substations / distribution centers must comply with standard EN 61330 and its Annexes A, B and C, all of the requirements set out in the compact substations have not been significant changes; -teenindusviis: väljastkäsitsetav and seestkäsitsetav; -nimivõimsused: 630 kVA, 1000 kVA 2x1000 kVA; -madalpingeseadme nominal voltage and over-voltage class: 500 V, Class IV, or 6 kV; -madalpingeseadme juhistiksüsteem: TN-C.

Electrical Distribution Ltd East 110/10 kV substation 10 kV relay protection trafofiidrite upgrades and RTU exchange (IK0705)

Elektrilevi OÜ - Galina Fadejeva | Published January 20, 2017  -  Deadline February 6, 2017
The tender competition is announced ID 182194 East 110/10 kV substation 10 kV relay protection trafofiidrite renewal and the RTU exchange. The deadline for delivery of works is 20.11.2017. NB: 26/01/2017 Site visit will be held at 10.00, East substation, Linnamäe tee 2c, Tallinn. Contact person is Vitali Bogomolov, Project Manager, tel 526 0482nd

Harju county, Tallinn, Kuklase 16/18 apartment building with electricity supply, LP3059

Elektrilevi OÜ - KATRIN KARU | Published January 20, 2017  -  Deadline January 27, 2017
- Work is carried out according to the project LP3059. NB! After the signing of the agreement to apply for a permit to mine Kommunaalametist immediately. - The assignment must be sent prior to entering 20.3.2017. - If the work reveals the need to change the volume of work, it must be agreed in advance in writing to the Order bidder. - Before the works to contact the project manager, who agree on the time and method of execution of the works. - Work on the transfer of the required documents: 1. Work with the transfer act of Embodiment 2. Figure Geodesy (DWG) 3. Declaration of conformity of electrical installations electrical installations 4. Audit Report 5. 6. Protective earth resistance measurement protocol, pension and potentsiaaliühtlustusjuhtmete perpetuity Control Protocol 7. Protection the implementation of a security protocol for verifying 8. Insulation resistance measurement protocol 9 covered works with photographs 10. Electrical repair scheme (DWG) 11 12. Photos of the transferred work works diary 13. work tasks - Obtain and install a two-tariff system for accounting and prepare Duty - Before the final price of the offer the contractor shall submit necessary to examine the object, the specification of the project, and to compare the amounts specified in the plans and schemes described amounts. The tender must include all the materials, other auxiliary materials, as shown in the specification and plans are not, but which are necessary for performing normal work and normal functioning of the system after construction. Differentials and other inaccuracy, the contract must be known at the time given. The price of the tender submission confirmed by the contractor that all the work is clear and unambiguous, and price offers are also taken into consideration in all related tasks. - The tenderer must sign and return a signing of the contract forwarded no later than 5 working days. In this period the contract signed by the contracting authority seizure of the contracting authority has the right to be treated as RHS § 53 of the successful tenderer for the award of the contract and the refusal of the offer to be withdrawn.

Harju County, Jõelähtme parish Liivamäe village Suurekivi tea and tea Muinaspõllu residential area of ​​electricity supply, LP3016

Elektrilevi OÜ - ANNA MIHKELSON | Published January 2, 2017
Execution of works according to the project. NB! Transformer Substation and Electrical Distribution Ltd is the (supplier stock). Additional Conditions If the work reveals the need to change the volume of work, it must agree with the order submitted. Work on transferring the required documents: 1. Work with the transfer act of Embodiment 2. Figure Geodesy (DWG) 3. Declaration of conformity of electrical installations electrical installations 4. Audit Report 5. 6. Protective earth resistance measurement protocol, pension and potentsiaaliühtlustusjuhtmete perpetuity Control Protocol 7. Protection of implementing security 8. The verification protocol of the insulation resistance measurement protocol 9 transformers and voltage testing / verification shall be 10 minutes of covered works with photographs 11. equipment passes and Estonian käidujuhendid 12. materials and equipment certificates 13 Electricity scheme correction (DWG) 14 Photos delivery to the work of the 15th 16. The record of construction work roles NB Prior to the submission of the final price of the offer, the contractor is required to examine the object, the specification of the project, and to compare the amounts specified in the plans and schemes described amounts. The offer must include all materials, other auxiliary materials, as shown in the specification and plans are not, but which are necessary for performing normal work and normal functioning of the system after construction. Differentials and other inaccuracy, the contract must be known at the time given. Price quotation to the contractor confirms that all the work is clear and unambiguous, and the offer price is also taken into consideration in all related tasks. Any significant changes during the works must agree in writing to the project manager before making any changes.

Electricity

Veeteede Amet | Published December 22, 2016  -  Deadline February 14, 2017

The subject of the framework agreement is the purchase of electricity HD Annex 1 to the consumption areas.

buying electricity

Riigi Kinnisvara Aktsiaselts - Alo Pikk | Published January 2, 2017
buying electricity

Electricity

Riigi Kinnisvara Aktsiaselts | Published January 4, 2017
Buying electricity.

Electricity

Tallinna Tehnikaülikool | Published December 22, 2016  -  Deadline January 31, 2017

Electricity Purchase Tallinn University of taps.

Construction work for electricity power lines

Elektrilevi OÜ | Published January 10, 2017  -  Deadline February 6, 2017

Exercise of the power grid works:

- Preparation of technical solutions,

- Repair and preparing small projects, including the property to use to obtain contracts,

- Maintenance work in connection with the electricity network, including, line maintenance,

- Execution of works, the cost of one order of up to 15 000, together with the materials,

- Liquidation of failures, including the critical events in the low-voltage network management.

The works carried out in payables from 0.23 to 110 kV power network. Procurement areas electricity supply is characterized by tentative specifications are listed in the tender document "2. Add the network technical characteristics."

The works carried out by the supplier in accordance with the transmitted orders and remunerated work positions in the unit price.

The applicant buys the materials used to perform the contract by the contracting authority designated supplier by the contracting authority set prices, excluding the cost of material. The contracting authority will pay for the materials Applicants shall declare the work material acts or invoice / waybill basis.

The contracting authority awards a public procurement contract for each part separately.

Partial renovation of the building of the police station in Haapsalu

Riigi Kinnisvara Aktsiaselts - Agur Maandi | Published January 9, 2017  -  Deadline February 8, 2017
Haapsalu police station 1.korruse partial renovation of the service due to the move to the police station building. Peajaotussüsteemi electrical power system renewal and partial renovation of the main building, a garage with electrical upgrades. Armed rooms at the courtyard entrance gate installation booklet.

Electricity Distribution Ltd. 110kV substation Signup Nuia

Elering AS - Karin Täär | Published January 9, 2017
Construction work in accordance with the tender documents as mentioned below.

Electricity Distribution LLC, line maintenance work

Elektrilevi OÜ - Angela Laine | Published January 12, 2017
The tender is divided into parts (Part 1 and Part 4): 1.1 Part 1 - Kallaste, Tartu land, Jõgeva line corridor maintenance area; 1.2 Part 2 - Paide, Järva-Jaani line corridor maintenance area; 1.3 Part 3 - Roela, Kill and Little Mary along the corridor service area; 1.4 Part 4 - Võru along the corridor service area; Maintenance Contract map regions are at the tender documents, a file named "regional line corridor maintenance card". EXERCISING work within the successful tenderer undertakes to do the following: 2.1, line maintenance work according to the Republic of Estonia, the current legislation and requirements established by the contracting authority. Cutting waste valleys assembly line onto the field edges or cleaning. 2.3 The owner of the immovable Electricity Distribution LLC Form (Landowner notification letter format) for information regarding the work of the exercise and the owner of the immovable special requirements, coordination of cross cutting felled trees, and the collection and handling of logging residues; Getting forest notifications required for the work; 2.5 felled timber to the owner of an immovable or the use of the property to the person entitled failure, unless the property owner or the person entitled to use the property agrees otherwise in writing by the contractor. Company contract shall take effect on the contract. The work is paid for by the contracting authority in accordance with the unit prices of the transmitted orders. The contract is concluded for three years the right to extend the contract of the contracting twice in one year (3 + 1 + 1). If the supplier has submitted a tender with the lowest total cost of more than two participating in the tender, the contracting authority has the right to choose which parts of it according to the contract provider to conclude, on the basis of all the parts of the tender bids the lowest total cost of the whole.

Electricity Distribution LLC Ruhnu diesel power plant fuel tanks Purchase

Elektrilevi OÜ - Galina Fadejeva | Published January 13, 2017  -  Deadline January 24, 2017
Four fuel tanks Purchase of Ruhnu diesel power plant.

Electricity Distribution LLC cameras, GPS devices and car purchase

Elektrilevi OÜ - AARE LOKK | Published January 16, 2017
Electricity Distribution LLC cameras, GPS devices and car purchase.

Electricity Distribution LLC Tõstamaa 35/10 kV substation reconstruction IK0667

Elektrilevi OÜ - Kadri Leopard | Published December 28, 2016
The tender "Tõstamaa 35/10 kV substation 35 kV and 10 kV switchgear reconstruction and to compensate installation maaühendusvoolude" volume contains the following works: 1. Design work: 1.1. Structural part, including. territory design; 1.2. Switchyard building design; 1.3. Primary Design; 1.4. 35 kV and 10 kV switchgear design; 1.5. Maaühendusvoolude compensation design; 1.6. Secondary design; 1.7. Automatic fire and security alarm systems engineering; 1.8. Backup power (battery) design for mechanics and communications equipment. 2. Construction and installation work Substation: 2.1. Switchyard building construction; 2.2. Service road construction, maintenance work; 2.3. Maandusomatarbetrafo installation; 2.4. Installing the bobbin arc; 2.5. Existing transformer repair; 2.6. Linking an existing transformer new distribution device; 2.7. 10 kV switchgear installation; 2.8. 35 kV switchgear installation; 2.9. The new mast with a switching apparatus, 35 kV metal framework tower cleaning and painting; 2.10. All outgoing 35 kV and 10 kV feeder cable lines with the construction of the installation of the cable sleeves and tying the electricity grid; 2.11. Grounding and lightning protection works; 2.12. The reserve supply of equipment. 3. Secondary Installation and setup work. 4. dismantling 4.1. The old 10 kV and 35 kV switchgear demolition, in the disposal, and the dismantling of deposit.

Electricity Distribution Ltd. 110kV substation 110kV Signup Nuia spur line construction

Elering AS - Karin Täär | Published January 9, 2017
Execution of works in accordance with the conditions set out in the tender documents.

Tartu county, Ülenurme parish, hamlet of silicon, Cat Eye residential area of ​​electricity supply (LL2427, IL3765)

Elektrilevi OÜ - Galina Fadejeva | Published January 13, 2017
Execution of works according to the attached project. The deadline for delivery of works 24.3.2017. AJ and the transformer is commissioned by the Electricity Distribution LLC. Before the final price of the offer, the contractor is required to examine the object, the specification of the project, and to compare the amounts specified in the plans and schemes described amounts. The tender must include all the materials, other auxiliary materials, as shown in the specification and plans are not, but which are necessary for performing normal work and normal functioning of the system after construction. Differentials and other inaccuracy, the contract must be known at the time given. The price of the tender submission confirmed by the contractor that all the work is clear and unambiguous, and price offers are also taken into consideration in all related tasks. Before the start of work to inform the work for the owners of the properties concerned by registered letter or a landowner's consent to the signature of the site plan. If the work reveals the need to change the volume of work, it must agree with the order submitted.

Harju County Harku Parish Suurupi, Vääna-Jõesuu and Viti region of 10 kV electricity transfer to 20 kV, IP1247

Elektrilevi OÜ - ANNA MIHKELSON | Published January 16, 2017
Order description: substations 10 / 0.4 kV power transformers replacement of 20 / 0.4 kV power transformers, Hindreku JAJ 20/10 vahetrafo with the dismantling of the noise barrier wall. 0.4 kV kaabellini construction, liitumiskilpide installation of equipment necessary for the replacement of substations. 10 kV overhead line dismantling of 20 / 0.4 kV power transformers supplied (by the Electricity Distribution). NB! Contract volume falls Suurupi-2 medium voltage substation equipment replacement is carried out as a separate project. NB! Suurupi-2 substations to replace the existing power transformers 20/10 / 0.4 kV 630 kVA transformer. Initially, the work will remain on top of 10 kV. Transformers ordered delivery 02.24.2017. This is the deadline for installation of transformers 24.03.2017 Additional conditions: If the work reveals the need to change the volume of work, it must agree with the order submitted. Before the works to contact the project manager, who agree on the time and method of execution of the works. Before the works to connect the automation department and specify the time of execution of the works. Prior to the submission of the final price of the offer, the contractor is required to examine the object, the specification of the project, and to compare the amounts specified in the plans and schemes described amounts. The offer must include all materials, other auxiliary materials, as shown in the specification and plans are not, but which are necessary for performing normal work and normal functioning of the system after construction. Differentials and other inaccuracy, the contract must be known at the time given. Price quotation to the contractor confirms that all the work is clear and unambiguous, and the offer price is also taken into consideration in all related tasks. Any significant changes during the works must agree in writing to the project manager before making any changes. The Contractor shall take into account the storage and safekeeping of power transformers.

Tallinn 7 Silikatsiidi subscription connections medium voltage industrial building construction LP3391, IP2744

Elektrilevi OÜ - Maila Vahtra | Published January 16, 2017  -  Deadline January 24, 2017
Before the works to contact the project manager, who agree on the time and method of execution of the works. Work on transferring the required documents: Work deed of transfer of the electrical conformity Declaration of electrical installations audit report on defense, pension and potentsiaaliühtlustusjuhtmete perpetuity Control Protocol insulation resistance measurement protocol Return metals kaalumiskviitung wiring diagrams correction (DWG) High-voltage measuring set for reconstruction / construction of the Act (V225) Photos of the transferred work Works Work diary of the task. Before the works to connect the automation department and specify the time of execution of the works. Any significant changes during the works must agree in writing to the project manager before making any changes. Losses are deducted from provider to return the tender guarantee its availability. The contracting authority is entitled to all the tenders opening of the tenders or the tender procedure at a later stage, be rejected if the tender amount in excess of the estimated cost of the contract. If the work reveals the need to change the volume of work, it must agree to the Subscriber, and formalize an agreement on the reserve.

Tallinn Mercury 35/6 kV substation Transfer of 6 kV IK0548

Elektrilevi OÜ - Kadri Leopard | Published January 17, 2017
This project has been solved IK0548 Tallinn Mercury 35/6 kV substation Transfer of 6 kV. Long lines, designed with a margin of electric circuits and shown in the specification, the route length of the projections on the volume of work tables. Please pay attention to the comments workloads table! - KP chamber disassembly 1 kmpl; - Installation omatarbetrafode 2 kmpl (omatarbetrafo Elektrilevi hand) - making holes in the substation wall, floor and compacting 1 kmpl; - Installation of cables in substation 1 kmpl; - Use outside of the measuring device 1 kmpl dismounting, mounting a sump + 1 kmpl; - Wooden borders omatarbetrafole 1 kmpl; - KP KP SULAR + Fuses foundation wall / chamber + 2 Installing kmpl; - Veetihendamise mounting system + 1 kmpl. Any significant changes during the works must agree in writing to the project manager before making any changes. If the work reveals the need to change the volume of work, it must agree with the order submitted. During construction, Electrical Distribution Ltd in the Republic of Estonia and the rules relevant regulations and laws and to respect the health, safety and electrical safety requirements and best practice.