Call +44 800 9755 164

Public tenders for electrical in Estonia

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!
ElectricalEstonia

Buying electrical installation käidutomingute

Sihtasutus Pärnu Haigla - Este Maidle | Published March 10, 2017
cpvs

Buying electrical installation käidutomingute

The electrical components of the purchase of additional reaalajasimulaatori

Tallinna Tehnikaülikool - Egon Müür | Published March 2, 2017
cpvs

The electrical components of the purchase of additional reaalajasimulaatori

Integrated design and construction of electrical installations

Eesti Energia Aktsiaselts - ROGER PILVIK | Published March 15, 2017  -  Deadline April 17, 2017
cpvs
45310000

The volume of work includes the following: • Basic preparation of a comprehensive project for electrical installations and fiber-optic communications network with the necessary auxiliary equipment; • Integrated electrical installation construction, including: o MV maakaabelvõrgu with the establishment of the necessary connections with; o High-voltage transformer substations with the establishment of binding Elering lülitusalajaamaga; o construction of support facilities; • fiber optic communications network to be built with the necessary services; Comprehensive electrical engineering, and construction will be "turnkey" approach, meaning that all projects are delivered with the necessary equipment in the amount of design work, will be installed, configured, tested, etc. and finally transferred to the contracting authority in the form of tension. Buildings, structures and communications network designed, constructed and handed over to the Client finished form.

Construction of pumping stations and electrical connection of the remote control

Aktsiaselts ELVESO - Andres Aruväli | Published March 27, 2017  -  Deadline April 7, 2017
cpvs
45310000

Remote control center renovation, AS Elveso electrical pumping (21tk) construction, setup and pairing the remote control centers, existing objects the transfer Kaugjuhtimiskekusesse

Electrical work

sihtasutus Põhja-Eesti Regionaalhaigla - ALEKSANDER BAKIROV | Published March 23, 2017  -  Deadline May 3, 2017
cpvs
45310000

The purpose of this contract is the electrical work execution of the Regional Hospital of casings ~ 25 000 m2 of floor area, which is divided into smaller individual objects. Individual objects construction is performed in accordance with the framework agreement and the specific work on the basis of price offers are awarded contracts. By contracting demand and the types of jobs approximate total volumes (all individual objects in total) during the period of validity of the framework agreement set out in the contract documents in table A.

Tartu County Haasvala field Haasvala village located Toominga and willow tea estates joining the electrical grid, LL2563

Elektrilevi OÜ - ANNA MIHKELSON | Published March 28, 2017
cpvs
45310000

Order Description Construction work carried out in accordance with the AS-Stik Electricity LL2563 work projects prepared (attached to the order). Additional requirements before an offer of access to the object on the ground. Additional questions on the subject and the work volumes provided during the procurement. Later pretsentsioone not counted. Before the start of work to inform the work for the owners of the properties concerned by registered letter or a landowner's consent to the signature of the site plan. Take into account the conditions of approval of utilities. In addition to works in the embodiment of the documents transmitted KOV. Electricity Distribution LLC in the present work is transferred to the municipality of transmission of documents fastening. Mounted electrical installations including AJ. breakers must be marked with the contractor in accordance with P346. At least 7 days before the start of work measuring devices to subscribe to the tasks of the project manager. NB! Meters must be in place and the function returned by 05/10/2017! In addition to noting down the route to contact the project manager, who agreed to accept the opening meeting of the works time and way.

Saare County, west of the island municipality, Karida village, Salu Detached joining electrical work project, LP3617

Elektrilevi OÜ - KATRIN KARU | Published March 13, 2017
cpvs
45311000

- Work carried out in accordance with the LP3616 work projects. - If the work reveals the need to change the volume of work, it must agree with the order submitted. - Before the works to contact the project manager, who agree on the time and method of execution of the works. - Before starting work to inform the work for the owners of the properties concerned by registered letter or a landowner's consent to the signature of the site plan. - Obtain and install a two-tariff system for accounting and prepare Duty.

Tallinn Pärnu mnt 554 immovable electricity LP3433

Elektrilevi OÜ - Maila Vahtra | Published March 3, 2017
cpvs
45311000

Also, relay protection, equipment, installation and sedadistus the ELV. Contract volume belongs to the medium voltage switch NALF. If the work reveals the need to change the volume of work, it must agree with the order submitted. Before the works to contact the project manager, who agree on the time and method of execution of the works. Work on transferring the required documents: Work deed of transfer Embodiment Figure Geodesy (DWG) Electrical installation in conformity Declaration of electrical installations audit report for earth resistance measurement protocol Protection, pension and potentsiaaliühtlustusjuhtmete perpetuity Control Protocol Protection of implementing a security protocol for verifying the insulation resistance measurement protocol devices passports and Estonian käidujuhendid wiring diagrams correction (DWG ) Photos of construction work be transferred to the diary of work task. Before the works to connect the automation department and specify the time of execution of the works. Any significant changes during the works must agree in writing to the project manager before making any changes. Losses are deducted from provider to return the tender guarantee its availability. The contracting authority is entitled to all the tenders opening of the tenders or the tender procedure at a later stage, be rejected if the tender amount in excess of the estimated cost of the contract. If the work reveals the need to change the volume of work, it must agree to the Subscriber, and formalize an agreement on the reserve.

Tallinn Narva mnt 9a electricity LP2863, IL2265

Elektrilevi OÜ - Maila Vahtra | Published March 24, 2017
cpvs
45311000

Offer to take into account in making the draft explanatory memorandum to the landowners by the restrictions and the volume of notifications. Offer to take into account when making approvals aggregated landowners restrictions. Any significant changes during the works must agree in writing to the project manager before making any changes. Before the start of work to inform the work for the owners of the properties concerned by registered letter or a landowner's consent to the signature of the site plan. Work on transferring the required documents: the act of delivery Job Performance Chart Geodesy (DWG) Declaration of conformity of electrical installations Protection, pension and potentsiaaliühtlustusjuhtmete perpetuity Control Protocol Amending wiring diagrams (DWG) Photos of construction work be transferred to the diary of work task. Losses are deducted from provider to return the tender guarantee its availability. The contracting authority is entitled to all the tenders opening of the tenders or the tender procedure at a later stage, be rejected if the tender amount in excess of the estimated cost of the contract. If the work reveals the need to change the volume of work, it must agree to the Subscriber, and formalize an agreement on the reserve.

Tallinn, Lasnamäe, Suur-8 industrial building Sõjamäe transverse joining the electricity grid (LP3266)

Elektrilevi OÜ - Angela Laine | Published March 22, 2017
cpvs
45311000

- Organize construction procurement Great Sõjamäe cross eight power stations. - The winning company must submit an application to process the mining license, no later than three working days after the award of the contract. - If the work reveals the need to change the volume of work, it must agree with the order submitted. - Before the works to contact the project manager, who agree on the time and method of execution of the works. - Work on the transfer of the required documents: 1. Work with the transfer act of Embodiment 2. Figure Geodesy (DWG) 3. Declaration of conformity of electrical installations electrical installations 4. Audit Report 5. 6. Protective earth resistance measurement protocol, pension and potentsiaaliühtlustusjuhtmete perpetuity Control Protocol 7. Protection the implementation of a security protocol for verifying 8. Insulation resistance measurement protocol 9 covered works with photographs 10. Electrical repair scheme (DWG) 11 12. Photos of the transferred work works diary 13. work tasks - the contracting authority is entitled to all the tenders opening of the tenders or the tender procedure at a later stage, to reject the case, the award amount in excess of the estimated cost of the contract. - The tenderer must sign and return a signing of the contract forwarded no later than 5 working days. In this period the contract signed by the contracting authority seizure of the contracting authority has the right to be treated as RHS § 53 of the successful tenderer for the award of the contract and the refusal of the offer to be withdrawn. - When the successful tenderer takes a contracting authority for reasons beyond his tender, the contracting authority declares the successful next best offer. The contracting authority has the right to require the successful tenderer to have withdrawn the offer compensation for the withdrawn bid and after the withdrawal of the tender of the successful tender regarding the difference of. Losses are deducted from provider to return the tender guarantee its availability.

6 / 0,69 kV of integrated mobile Outsourcing

Enefit Kaevandused AS - Urmas Janno | Published February 27, 2017
cpvs
31200000

Are bought ten reinforced sheathed movable 400 kVA 6 / 0,69 kV substation set mines to power electrical consumers.

Rapla päästekomando fire safety works execution

Riigi Kinnisvara Aktsiaselts - Alo Pikk | Published March 17, 2017  -  Deadline March 30, 2017
cpvs
45310000, 45421131, 31625200, 31625100

Rapla päästekomando building fire safety works are carried out (a fire work, installation of fire doors, installation of gangways, etc.) and the existing electrical installation for reconstruction.

buying electricity

Tallinna Tehnikaülikool - Egon Müür | Published March 10, 2017
cpvs

buying electricity

Purchases of electricity

Eesti Kunstiakadeemia - ANDRES TAMMSAAR | Published March 16, 2017
cpvs

Purchases of electricity

Western part of the island of Saaremaa municipality Paiküla Bear AJ 35/10 kV, 10 kV installation to compensate maaühendusvoolu IK0755

Elektrilevi OÜ - Kadri Leopard | Published March 16, 2017  -  Deadline April 17, 2017
cpvs
45232220

During construction, guided by the rules of the Electricity Distribution LLC, and the Republic of Estonia from standards and laws and to respect the health, safety and electrical safety requirements and best practice.

West-Viru County Tamsalu parish Kullenga AJ 10 kV installation to compensate maaühendusvoolude IK0757

Elektrilevi OÜ - Kadri Leopard | Published March 16, 2017  -  Deadline April 11, 2017
cpvs
45232220

During construction, guided by the rules of the Electricity Distribution LLC, and the Republic of Estonia from standards and laws and to respect the health, safety and electrical safety requirements and best practice.

Põlvamaa Valgjärve parish Maaritsa AJ 10 kV installation to compensate maaühendusvoolude IK0759

Elektrilevi OÜ - Kadri Leopard | Published March 16, 2017  -  Deadline April 12, 2017
cpvs
45232220

During construction, guided by the rules of the Electricity Distribution LLC, and the Republic of Estonia from standards and laws and to respect the health, safety and electrical safety requirements and best practice.

Paid 330/110/35/10 substation 10 kV and 35 kV installation to compensate maaühendusvoolude IK0760

Elektrilevi OÜ - Kadri Leopard | Published March 16, 2017  -  Deadline April 18, 2017
cpvs
45232220

During construction, guided by the rules of the Electricity Distribution LLC, and the Republic of Estonia from standards and laws and to respect the health, safety and electrical safety requirements and best practice.

West-Viru County Tapa parish Lehtse AJ 10 kV installation to compensate maaühendusvoolude IK0758

Elektrilevi OÜ - Kadri Leopard | Published March 16, 2017  -  Deadline April 11, 2017
cpvs
45232220

During construction, guided by the rules of the Electricity Distribution LLC, and the Republic of Estonia from standards and laws and to respect the health, safety and electrical safety requirements and best practice.

Võrumaa Haanja parish Ruusmäe AJ 10 kV installation to compensate maaühendusvoolude IK0763

Elektrilevi OÜ - Kadri Leopard | Published March 8, 2017
cpvs
45232220

During construction, guided by the rules of the Electricity Distribution LLC, and the Republic of Estonia from standards and laws and to respect the health, safety and electrical safety requirements and best practice. Object visits do not take place.