Electrical machinery, apparatus, equipment and consumables; lighting

Energinet.dk | Published March 18, 2016  -  Deadline March 18, 2016
cpvs

Electrical machinery, apparatus, equipment and consumables; lighting

Electrical machinery, apparatus, equipment and consumables; lighting

Energinet.dk | Published March 3, 2016  -  Deadline March 18, 2016
cpvs

Electrical machinery, apparatus, equipment and consumables; lighting

HCV Peak load Boiler Plant M-02 Electrical boilers.

DONG Energy Thermal Power A/S | Published December 23, 2015  -  Deadline January 28, 2016
cpvs
42161000, 42515000

Design, manufacturing, delivery, installation and commissioning of 2 electrical hot water boilers.

Capacity per boiler (output to district heating system): 30-50 MJ/s.

Electrical capacitors

Energinet.dk | Published November 26, 2016  -  Deadline November 25, 2016
cpvs
31711150

Energinet.dk wants to initiate negotiations regarding capacitors for DC filters on SK1 and SK2 for substation Tjele — 8800 Viborg, Denmark.

Electrical capacitors

Energinet.dk | Published November 8, 2016  -  Deadline November 25, 2016
cpvs
31711150

Energinet.dk wants to initiate negotiations regarding capacitors for DC filters on SK1 and SK2 for substation Tjele — 8800 Viborg, Denmark.

Each filter consists of 48 individually attached

capacitors, lying on galvanised iron platforms, the

individual platforms being potential-wise insulated

using porcelain insulators. Each capacitor is

attached using two 10 x 30 mm hot-dip galvanised

bolts, washers and nuts (to be supplied by the

supplier). Tightening torque: 40 Nm. The main

delivery: Contains 2 x 96 capacitors total 192 pc.

Spare units: The delivery must include 10 units.

Qualification System for Electrical installation Work and supplies at DONG Energy Thermal Power A/S' power plants in Denmark.

Dong Energy Thermal Power A/S | Published November 15, 2014
cpvs
45310000, 51100000, 51000000, 31300000, 31700000

Qualification System for Electrical installation Work and supplies at DONG Energy Thermal Power A/S' power plants in Denmark.

Electrical machinery, apparatus, equipment and consumables; lighting

Energinet.dk (‘ENDK’) | Published January 18, 2017  -  Deadline February 17, 2017
cpvs
31000000, 31200000, 31321300, 31321500, 45231400, 45314310

NGVL and ENDK (the ‘Employers’) are jointly developing an HVDC interconnector between the United Kingdom and Denmark (the ‘Interconnector’). This notice concerns the award of one or more contracts for the detailed design, engineering, procurement, manufacture, installation, construction, testing, commissioning, spares provision, operational handover and maintenance of an interconnector between the UK and Denmark.

The procurement is structured in 7 lots consisting of:

1. lot 1 — HVDC MIND Cables underground UK.

2. lot 2 — HVDC MIND Cables submarine UK.

3. lot 3 — HVDC MIND Cables submarine NL & DE.

4. lot 4 — HVDC MIND Cables submarine DK.

5. lot 5 — HVDC MIND Cables underground DK.

6. lot 6 — HVDC XLPE Cables underground and submarine UK, NL, DE, DK.

7. lot 7 — HVDC VSC Converters UK & DK.

Two HVDC cable poles over a total route length of approximately 55km, forming part of a connection between two HVDC converters (UK and DK) and capable of delivering 1400MW at the receiving end, excluding the underground civils works, as more fully described in the Tender Documents.

Tenderers' submissions must include Transition Joints (as defined in the Tender Documents) to adjacent cable lots allowing interconnection of a final end-to-end solution.

Submissions must include detailed delivery plans/programmes clearly demonstrating how production and installation will be achieved to ensure full commissioning of the Interconnector by December 2022. The Contract also includes a warranty and maintenance period of a minimum of 5 years and a maximum of 10 years.

The HVDC cable technology is 525kV MIND and Tenderers must note that the cable system (cables and accessories, including factory joints and Transition Joints) proposed in their design must have been type tested in accordance with Cigre Electra 189 and 171 before the award of the contract.

Any Tenderer who submits a compliant tender for Lot 1 or Lot 5 must also submit individual compliant tenders for both Lots 1 and 5. Any Tenderer who submits compliant tenders for Lots 2-4 must submit individual compliant tenders for Lots 1-5. Any Tenderer who submits a compliant tender for Lot 6 must also submit compliant tenders for Lots 1-5. In addition to these requirements Tenderers may submit a combined compliant tender for any combination of Lots 1-5. All Tenderers despite the number of lots or combination of lots must provide a submission in respect of transition joints as an option to each Lot. The Employers reserve the right to award (i) Lot 1 and Lot 5 to the same Tenderer or to separate Tenderers; (ii) Lots 1-5 to the same Tenderer or to separate Tenderers or any combination of Tenderers; (iii) a single contract for Lot 6; or (iv) not to award any contract. The Employers reserve the right to award Lots 1 to 5 (whether to the same Tenderer or separate Tenderer or any combination of Tenderers) as an end-to-end solution or to award a single contract for Lot 6 as an end-to-end solution.

Two HVDC cable poles over a total route length of approximately 230km, forming part of a connection between two HVDC converters (UK and DK) and capable of delivering 1400MW at the receiving end as more fully described in the Tender Documents. All installation is included in Lot 2.

Tenderers submissions must include Transition Joints (as described in the Tender Documents) to adjacent cable lots allowing interconnection of a final end-to-end solution.

Submissions must include detailed delivery plans/programmes clearly demonstrating how production and installation will be achieved to ensure full commissioning of the Interconnector by December 2022. The Contract also includes a warranty and maintenance period of a minimum of 5 years and a maximum of 10 years.

The HVDC cable technology is 525kV MIND and Tenderers must note that the cable system (cables and accessories, including factory joints and Transition Joints) proposed in their design must have been type tested in accordance with Cigre Electra 189 and 171 before the award of the contract.

Any Tenderer who submits a compliant tender for Lot 1 or Lot 5 must also submit individual compliant tenders for both Lots 1 and 5. Any Tenderer who submits compliant tenders for Lots 2-4 must submit individual compliant tenders for Lots 1-5. Any Tenderer who submits a compliant tender for Lot 6 must also submit compliant tenders for Lots 1-5. In addition to these requirements Tenderers may submit a combined compliant tender for any combination of Lots 1-5. All Tenderers despite the number of lots or combination of lots must provide a submission in respect of transition joints as an option to each Lot. The Employers reserve the right to award (i) Lot 1 and Lot 5 to the same Tenderer or to separate Tenderers; (ii) Lots 1-5 to the same Tenderer or to separate Tenderers or any combination of Tenderers; (iii) a single contract for Lot 6; or (iv) not to award any contract. The Employers reserve the right to award Lots 1 to 5 (whether to the same Tenderer or separate Tenderer or any combination of Tenderers) as an end-to-end solution or to award a single contract for Lot 6 as an end-to-end solution.

Two HVDC cable poles over a total route length of approximately 195km, forming part of a connection between two HVDC converters (UK and DK) and capable of delivering 1400MW at the receiving end, as more fully described in the Tender Documents. All installation is included in Lot 3.

Tenderers submissions must include Transition Joints (as described in the Tender Documents) to adjacent cable lots allowing interconnection of a final end-to-end solution.

Submissions must include detailed delivery plans/programmes clearly demonstrating how production and installation will be achieved to ensure full commissioning of the Interconnector by December 2022. The Contract also includes a warranty and maintenance period of a minimum of 5 years and a maximum of 10 years.

The HVDC cable technology is 525kV MIND and Tenderers must note that the cable system (cables and accessories, including factory joints and Transition Joints) proposed in their design must have been type tested in accordance with Cigre Electra 189 and 171 before the award of the contract.

Any Tenderer who submits a compliant tender for Lot 1 or Lot 5 must also submit compliant tenders for Lots 1 and 5. Any Tenderer who submits individual compliant tenders for Lots 2-4 must submit individual compliant tenders for Lots 1-5. Any Tenderer who submits a compliant tender for Lot 6 must also submit compliant tenders for Lots 1-5. In addition to these requirements Tenderers may submit a combined compliant tender for any combination of Lots 1-5. All Tenderers despite the number of lots or combination of lots must provide a submission in respect of transition joints as an option to each Lot. The Employers reserve the right to award (i) Lot 1 and Lot 5 to the same Tenderer or to separate Tenderers; (ii) Lots 1-5 to the same Tenderer or to separate Tenderers or any combination of Tenderers; (iii) a single contract for Lot 6; or (iv) not to award any contract. The Employers reserve the right to award Lots 1 to 5 (whether to the same Tenderer or separate Tenderer or any combination of Tenderers) as an end-to-end solution or to award a single contract for Lot 6 as an end-to-end solution.

Two HVDC cable poles over a total route length of approximately 210km, forming part of a connection between two HVDC converters (UK and DK) and capable of delivering 1400MW at the receiving end, as more fully described in the Tender Documents. All installation is included in Lot 4.

Tenderers submissions must include Transition Joints (as more fully described in the Tender Documents) to adjacent cable lots allowing interconnection of a final end-to-end solution. Submissions must include detailed delivery plans/programmes clearly demonstrating how production and installation will be achieved to ensure full commisioning of the Interconnector by December 2022. The Contract also includes a warranty and maintenance period of a minimum of 5 years and a maximum of 10 years.

The HVDC cable technology is 525 kV MIND and Tenderers must note that the cable system (cables and accessories, including factory joints and Transition Joints) proposed in their design must have been type tested in accordance with Cigre Electra 189 and 171 before the award of the contract.

Any Tenderer who submits a compliant tender for Lot 1 or Lot 5 must also submit individual compliant tender for Lots 1 and 5. Any Tenderer who submits compliant tenders for Lots 2-4 must submit individual compliant tenders for Lots 1-5. Any Tenderer who submits a compliant tender for Lot 6 must also submit compliant tenders for Lots 1-5. All Tenderers despite the number of lots or combination of lots must provide a submission in respect of transition joints as an option to each Lot. In addition to these requirements Tenderers may submit a combined compliant tender for any combination of Lots 1-5. The Employers reserve the right to award (i) Lot 1 and Lot 5 to the same Tenderer or to separate Tenderers; (ii) Lots 1-5 to the same Tenderer or to separate Tenderers or any combination of Tenderers; (iii) a single contract for Lot 6; or (iv) not to award any contract. The Employers reserve the right to award Lots 1 to 5 (whether to the same Tenderer or separate Tenderer or any combination of Tenderers) as an end-to-end solution or to award a single contract for Lot 6 as an end-to-end solution.

Two HVDC cable poles over a total route length of approximately 76km, forming part of a connection between two HVDC converters (UK and DK) and capable of delivering 1400MW at the receiving end, excluding the underground civils work, as more fully described in the Tender Documents.

Tenderers submissions must include Transition Joints (as described in the Tender Documents) to adjacent cable lots allowing interconnection of a final end to end solution.

Submissions must include detailed delivery plans/programmes clearly demonstrating how production and installation will be achieved to ensure full commissioning of the Interconnector by December 2022. The Contract also includes a warranty and maintenance period of a minimum of 5 years and a maximum of 10 years.

The HVDC cable technology is 525kV MIND and Tenderers must note that the cable system (cables and accessories, including factory joints and Transition Joints) proposed in their design must have been type tested in accordance with Cigre Electra 189 and 171 before the award of the contract.

Any Tenderer who submits a compliant tender for Lot 1 or Lot 5 must also submit individual compliant tenders for Lots 1 and 5. Any Tenderer who submits compliant tenders for Lots 2-4 must submit individual compliant tenders for Lots 1-5. Any Tenderer who submits a compliant tender for Lot 6 must also submit compliant tenders for Lots 1-5. In addition to these requirements Tenderers may submit a combined compliant tender for any combination of Lots 1-5. All Tenderers despite the number of lots or combination of lots must provide a submission in respect of transition joints as an option to each Lot. The Employers reserve the right to award (i) Lot 1 and Lot 5 to the same Tenderer or to separate Tenderers; (ii) Lots 1-5 to the same Tenderer or to separate Tenderers or any combination of Tenderers; (iii) a single contract for Lot 6; or (iv) not to award any contract. The Employers reserve the right to award Lots 1 to 5 (whether to the same Tenderer or separate Tenderer or any combination of Tenderers) as an end-to-end solution or to award a single contract for Lot 6 as an end-to-end solution.

Two HVDC cable poles over a total route length of approximately 768km, forming part of a connection between two HVDC converters (UK and DK) and capable of delivering 1400MW at the receiving end, excluding the underground civils works but including all submarine installation works, as more fully described in the Tender Documents.

Tenderers submissions must include Transition Joints (as defined in the Tender Documents) to adjacent cable lots allowing interconnection of a final end-to-end solution.

Submissions must include detailed delivery plans/programmes clearly demonstrating how production and installation will be achieved to ensure full commissioning of the Interconnector by December 2022. The contract also includes a warranty and maintenance period of a minimum of 5 years and a maximum of 10 years.

The HVDC cable technology is 525kV XLPE and Tenderers must note that the cable system (cables + accessories, including factory joints and Transition Joints) proposed in their design must have been PQ tested in accordance with Cigre TB 496 and type tested in accordance with Cigre Electra 189 and 171 before the award of the contract.

Any Tenderer who submits a compliant tender for Lot 6 must also submit a compliant tender for Lots 1-5. All Tenderers despite the number of lots or combination of lots must provide a submission in respect of transition joints as an option to each Lot. The Employers reserve the right to award (i) Lot 1 and Lot 5 to the same Tenderer or to separate Tenderers; (ii) Lots 1-5 to the same Tenderer or to separate Tenderers or any combination of Tenderers; (iii) a single contract for Lot 6; or (iv) not to award any contract. The Employers reserve the right to award Lots 1 to 5 (whether to the same Tenderer or separate Tenderer or any combination of Tenderers) as an end-to-end solution or to award a single contract for Lot 6 as an end-to-end solution.

— Design, delivery, installation and commissioning of all electrical equipment for the 1400MW @ +/- 525kV Bipol VSC converter stations in DK and UK — from connection to AC substation to the DC cable termination

— Civil design and works (etc. all required buildings and foundations) in DK and UK.

— Commissioning and testing of the Interconnector

— HVAC cable in the UK

Submissions must include detailed delivery plans/programmes clearly demonstrating how production and installation will be achieved to ensure full commissioning of the Interconnector by December 2022. The Contract also includes a warranty and maintenance period of a minimum of 5 years and a maximum of 10 years.

The Employers reserve the right to award a single contract in respect of Lot 7 or not to award any contract.

Electrical machinery, apparatus, equipment and consumables; lighting

Energinet.dk | Published January 31, 2017  -  Deadline February 17, 2017
cpvs
31000000

Design, engineering, fabrication, delivery, installation and commissioning of one 235 kV, 25 Mvar filter for substation Bjæverskov. Delivery of equipment according to tender material.

Electrical machinery, apparatus, equipment and consumables; lighting

Energinet.dk | Published January 20, 2017  -  Deadline January 17, 2017
cpvs
31000000

Design, engineering, fabrication, delivery, installation and commissioning of one 235 kV, 25 Mvar filter for substation Bjæverskov. Delivery of equipment according to tender material.

Electrical machinery, apparatus, equipment and consumables; lighting

Energinet.dk | Published November 3, 2016  -  Deadline November 16, 2016
cpvs
31000000, 31162000, 51000000, 51111000

In relation to upgrade of the HVDC link KontiSkan 2 at substation Vester Hassing, delivered by ABB Ludvika 1987. The converter transformers for KontiSkan 2 need to be upgraded to increase the lifetime of the transformers of further 20 years.

Energinet.dk wants to initiate negotiations regarding KS 2 — Converter transformers upgrade for substation Vester Hassing.

Purpose:

In relation to upgrade of the HVDC link KontiSkan 2 at substation Vester Hassing, originally delivered by ABB Ludvika in 1987. The converter transformers for KontiSkan 2 need to be upgraded to increase the lifetime of the transformers of further 20 years.

Main deliveries:

The main scope of this tender is to purchase and replace 6 400 kV AC site converter transformer bushings, 6 valve site converter transformer bushings and one neutral converter transformer bushing.

In addition to this, the tenderer shall supply the offer with separated prices for option 2 for:

— 1 extra AC site converter transformer bushings,

— 1 extra valve site converter transformer bushings,

— 1 extra neutral converter transformer bushing.

The tenderer is to supply a supervisor to have responsibility for the complete transformer upgrade.

The services include:

— Repair of Core Clamping in one of the transformers.

— Regeneration, pumping and storing of transformer oil.

— Replacement of gaskets, oil valves (smaller than 2”) and flanges on the transformers and the cooling system.

Expected time schedule:

Delivery of the transformer bushings for the first converter transformer is August 2017 and for the second converter transformer is August 2018.

Installation of transformer bushings and services for the first converter transformer is September 2017 and for the second converter transformer is September 2018.

Electrical machinery, apparatus, equipment and consumables; lighting

Energinet.dk | Published November 22, 2016
Winner
Grid Solutions Denmark
cpvs
31000000, 31210000, 31214000, 45232221

The scope of work include in particular design, fabrication, delivery, installation, inspection, testing and commissioning of one 170 kV, 50 Hz, gas insulated switchgear (GIS) for an offshore substation.

Delivery of equipment is foreseen for Q3 2017. Subject to change of time-plan.

Design, fabrication, inspection, testing, delivery, installation and commissioning of one 170 kV, 50 Hz, gasinsulated switchgear (GIS) for an offshore substation.

Electrical machinery, apparatus, equipment and consumables; lighting

Energinet.dk | Published April 15, 2016
cpvs

Electrical machinery, apparatus, equipment and consumables; lighting

Hot-water boilers

DONG Energy Thermal Power A/S | Published July 2, 2016
Winner
Klagenævnet for Udbud
cpvs

Design, manufacturing, delivery, installation and commissioning of 2 electrical hot water boilers for Svanemølle Power Station in Copenhagen.

Varmtvandskedler 2015/S 248-452943

DONG Energy Thermal Power A/S | Published December 23, 2015  -  Deadline January 28, 2016
cpvs
42161000, 42515000

Design, manufacturing, delivery, installation and commissioning of 2 electrical hot water boilers. Capacity per boiler (output to district heating system): 30-50 MJ/s.

Electrical machinery, apparatus, equipment and consumables; lighting

Energinet.dk | Published March 10, 2015
cpvs
31000000

Delaftale 3

Electrical machinery, apparatus, equipment and consumables; lighting

Energinet.dk | Published February 9, 2017
Winner
Klagenævnet for Udbud
cpvs
31000000

Provision of a framework agreement on batteries, rectifiers, converters and inverters for supply facilities to 132 kV, 150 kV, 220 kV and 400 kV stations, HVDC plants and offshore platforms.

Energinet.dk initiates hereby offering of

Framework Agreement on batteries, rectifiers, converters and

inverters for supply facilities to 132 kV,

150 kV, 220 kV and 400 kV stations, HVDC systems and

off shore platforms.

Liability insurance services

Energinet.dk | Published March 17, 2017
Winner
Lloyds (synd. 1084CSL)
cpvs
66516000

Energinet.dk is procuring third party liability insurance for the company's vast variety of activities: Energinet.dk, the formal Danish TSO, owns the Danish electricity and gas transmission system. Energinet.dk's main task is to maintain the overall short-term and long-term security of electricity and gas supply. Energinet.dk has around 800 employees who are operating, maintaining and developing the Company's domestic electrical transmission grid of approx. 7 000 km, 1 000 km of gas pipelines, 2 gas storage facilities, a number of off-shore transformer platforms shore including export cables and also several large electrical inter-connectors (international electrical integration). The span of activities is frequently and constantly developing as Energinet.dk is trusted with more and more activities within the domestic Danish energy infrastructure.

Third Party Liability Insurance.

Lot 1: 300 000 000 DKK in excess of deductible.

Refer to Instructions to the Tenderers for details. Available on the site listed previously in section I.3 above.

Third Party Liability Insurance (excess).

Lot 2: 1 700 000 DKK in excess of 300 000 000 DKK in excess of deductible.

Refer to Instructions to the Tenderers for details. Available on the site listed previously in section I.3 above.

Third Party Liability Insurance (excess).

Lot 3: 1 500 000 DKK in excess of 1 700 000 DKK in excess of 300 000 000 DKK in excess of deductible.

Refer to Instructions to the Tenderers for details. Available on the site listed previously in section I.3 above.

SKV40 wood chips — UPS.

Dong Energy Thermal Power A/S | Published October 18, 2014  -  Deadline October 31, 2014
cpvs
31154000, 51110000

Background: DONG Energy Thermal Power is building a new district heating production plant (SKV Wood Chips) based on two wood-chip boilers, providing steam for existing steam turbine and/or standalone bypass heat exchanger. The two boilers are envisaged as an add-on to the existing gas fired plant, Skærbækværket. The new biomass fired boilers shall deliver up to 320 MW heat to the district heating system. It is envisaged that the new boiler plant shall have a capacity of maximum 280 MW and the remaining 40 MW will be provided by flue gas condensers. Uninterruptible Power Supply (UPS) equipment: The add-on plant shall be equipped with new emergency power system, UPS and batteries. The emergency power system shall be with full redundancy and placed in separate electrical operating rooms. New main distribution of emergency power system will feed the different contractors sub-distributions, such as boiler and bag house. New emergency power system will be separated to the different contractors sub-distributions, which will be placed in near vicinity to their Works. New emergency power system is planned to be placed in an electrical building at/in the boiler house. The final design of the new emergency power system is not set. Alternative solutions regarding the interface, up- and downstream, of the new emergency power system are investigated. Feed of the UPS will be from the new low voltage distribution, 3-phase 50Hz 400/230 VAC. Prospective short current levels for the new main distribution of low voltage switchgear are Ik > 50 kA. The following values are valid for the distribution of low voltage emergency power system, with earthing system TN-S: — Emergency power distribution 400/230 VAC. Electrical operating rooms will be arranged with measures to control the environment and will be fitted with installation floor.

Boiler installations

DONG Energy Thermal Power A/S | Published March 21, 2017
cpvs
42160000, 42161000, 42162000, 42163000, 42164000, 42165000, 44615100, 44615000, 44621210, 44621220, 44622000, 44622100

The purpose of the project is to replace the electrical superheater belonging to the 98 MW steam boiler, which is backup for the steam supply from Asnaesvaerkets unit 2 and unit 5. The scope of the agreement is basically engineering, manufacturing and shipping of superheater and power modula-tion unit.

The key scope of the supply is an electrical steam superheater and a power modulation units with a heating capacity of approx. 7.5 MW.

The superheater is configured in line after a 98 MW steam boiler, which works as backup for the Asnaes Vaerket unit 2 and unit 5. During normal conditions the steam enters the superheater at approx. 20 bar saturated and lives the superheater with a temperature of approx. 300 deg. C.

The purpose of the project is to increase the steam supply availability as well as to bring down the maintenance costs. Availability is a key word due to the fact that the heat customers requires uninterrupted supply of steam. Following reliability and a ‘service friendly’ configuration of the new superheater is of major importance.

Boiler installations

DONG Energy Thermal Power A/S | Published November 16, 2016  -  Deadline November 29, 2016
cpvs
42160000, 42161000, 42162000, 42163000, 42164000, 42165000, 44615100, 44615000, 44621210, 44621220, 44622000, 44622100

The purpose of the project is to replace the electrical superheater belonging to the 98 MW steam boiler, which is backup for the steam supply from Asnaesvaerkets unit 2 and unit 5. The scope of the agreement is basically engineering, manufacturing and shipping of superheater and power modulation unit.

The key scope of the supply is an electrical steam superheater and a power modulation units with a heating capacity of approx. 7.5 MW.

The superheater is configured in line after a 98 MW steam boiler, which works as backup for the Asnaes Vaerket unit 2 and unit 5. During normal conditions the steam enters the superheater at approx. 20 bar saturated and lives the superheater with a temperature of approx. 300 deg. C.

The purpose of the project is to increase the steam supply availability as well as to bring down the maintenance costs. Availability is a key word due to the fact that the heat customers requires uninterrupted supply of steam. Following reliability and a ‘service friendly’ configuration of the new superheater is of major importance.