Call +44 800 9755 164

Public tenders for electrical in Copenhagen Denmark

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Electrical domestic appliances

Københavns Kommune, Børne- og Ungeforvaltningen | Published January 10, 2017  -  Deadline February 22, 2017

Copenhagen Municipality Child and Youth Administration hereby offers catering, consulting, service and miscellaneous hardware in EU public procurement.

The products to be used in the municipality's school food stalls (called EAT).

All products are in demand must be supplied.

The tender documents consist of the following documents:

specifications

Appendix A: Draft contract with appendices

Appendix 1: Working clause

Appendix 2: The municipality's CSR requirements

Appendix 3: The municipality's requirements for invoice and statistics.

Appendix B: Requirements specification describing the performance desired

(Being Annex 4 to the contract)

Appendix C: Offer Schedule (being Annex 5 of the contract) must be completed and uploaded in Mercell

Appendix D: Common European tender document ESPD must be completed and uploaded in Mercell

Appendix E: Design Manual.

Plan- ning with hard white goods used in EAT stalls serve food for school children in Copenhagen.

Electricity

Øresundsbro Konsortiet | Published January 19, 2017  -  Deadline February 20, 2017

Øresundsbro Consortium hereby invite to tender in El deliveries. The amount of energy that the buyer is expected to consume approximately 6.5 GWh / year for the entire plant. The gauge represents a relatively uniform load over the day, about 1200-1500 kW. The buyer has a maximum cargo load of 1800 kW. The buyer asks for a partnership to solve the Buyer's needs within the specified area, and a partner who ensures, for the buyer, cost-effective supply of electricity. The buyer asks not only competitive surcharge on the electricity market price but also services that allow the buyer take sensible decisions on price freezes and even counseling to reduce buyer elförbruknig and fixed network charges. Deliveries for supply of electric energy for the general power supply to the Buyer for the contract period. Rates for life and for any extension.

For the connection holds that:

The power supply from the Swedish side is via E.ON Networks Sweden AB's substation at Lernacken.

The power supply from the Danish side via Dong Energy substation at Kastrup.

Additional consumers are given under the heading Delivery Point below.

Power is supplied either from Sweden or Denmark, which provides great reliability. There are UPS systems and there is a backup power plant with a capacity of 2.8 MW.

The delivery does not include consumption of electricity for railway 25kV.

Engineering services

Hofor A/S | Published January 17, 2017  -  Deadline February 15, 2017

Offering includes advice in cross- functional architectural work, surveying works and engineering works for Hofors activities within water, wastewater, district heating, city gas, district cooling, wind and energy production.

The tender is divided into 6 areas of competence (water, sewage, heating / gas / cooling, wind, CHP, all supplies), consisting of a total of 15 lots.

Hofors diverse production and water distribution activities.

Typical tasks will be projecting, regulatory processing, procurement and construction management, including:

- Preparation of analysis, network modeling, EIA, environmental studies, hydraulic studies, project development and project sketches etc.

Tasks can range from ad hoc tasks to overall client advice through all stages

- Construction management including supervision of both small and large 'own' projects

- Project planning, including preparation of preliminary and detailed design

- Body Treatment

- Production of hydraulic and static calculations for utility relocations, construction works, waterworks, well fields and building structures made of concrete and / or steel, envelope etc.

- Risk mapping compared to DDS documented drinking water safety

- Provision of services, purchases and contracts requiring technical knowledge of water supply including electrical work, well fields, water utilities etc.

- Preparation of procurement strategy, contract documents and client perspectives, including advice on procedure, contract form and award criteria, evaluation of prequalification applications and offers, participation in negotiation meetings etc.

- Quality of work, private as well as other advisors

- Assistance in the contracting

- Periodically lending by consultants as 'in-house' consultant tasks in construction management / supervision, project management, project planning etc. at københavns belysningsvæsen.

- Execution of groundwater chemical assessments (both natural and environment-enhancing drugs).

- Construction of water drilling, geotechnical drilling and dewatering.

- Execution of borehole logging incl. data processing and interpretation.

Hofors diverse wastewater activities.

Typical tasks will be projecting, regulatory processing, procurement and construction management, including:

- Preparation of analysis, network modeling, EIA, environmental studies, hydraulic studies, project development and project sketches etc.

Tasks can range from ad hoc tasks to overall client advice through all stages

- Construction management including supervision of both small and large 'own' projects

- Project planning, including preparation of preliminary and detailed design

- Body Treatment

- Production of hydraulic and static calculations for utility relocations, construction works, concrete basins, minor and major pumping stations and building structures made of concrete and / or steel, envelope etc.

- Project of financing climate projects, including the handling of many stakeholders

- Provision of services, purchases and contracts requiring technical knowledge in waste water supply including electrical works, pumping stations etc.

- Preparation of procurement strategy, contract documents and client perspectives, including advice on procedure, contract form and award criteria, evaluation of prequalification applications and offers, participation in negotiation meetings etc.

- Quality of work, private as well as other advisors

- Assistance in the contracting

- Periodically lending by consultants as 'in-house' consultant tasks in construction management / supervision, project management, project planning etc. at københavns belysningsvæsen.

Hofors diverse wastewater activities.

Typical tasks will be analysis and modeling, including:

- Production of hydraulic calculations and model work for sewage and water main roads.

- Adjustment of models and scenario-in models.

Hofors multiform heat, gas and district cooling activities.

Typical tasks will be projecting, regulatory processing, procurement and construction management, including:

- Preparation of analysis, network modeling, water hammer analyzes, EIA, environmental studies, project development and project sketches etc.

- Support for the Business Case calculations and cost estimates in the analysis projects

- Proposals (production and new network connections) for regulatory processing

- Project development and project sketches

Tasks can range from ad hoc tasks to overall client advice through all stages

- Construction management including supervision of both small and large 'own' projects

- Project planning, including preparation of preliminary and detailed design

- Body Treatment

- Production of hydraulic and static calculations for new power lines, utility relocations, construction works, pumping stations and city

  • 1