Public tenders for electrical in Buddinge Denmark

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

ELL-07 Recuperation Units.

Danmarks Tekniske Universitet | Published September 11, 2015
Winner
Coromatic A/S
cpvs
31000000

The recuperation units are extensions for the present Spitzenberger and Spies amplifiers at the DTU electrical laboratory and have to be calibrated and controlled in coordination with these. This can only be done by the original manufacturer (Spitzenberger and Spies).

15/08504 - 15/08504 - Establishment of new basic research - DTU Electrical Engineering

Danmarks Tekniske Universitet // CVR:30060946 | Published July 20, 2015  -  Deadline July 29, 2015
cpvs
38000000, 38437000, 42530000

Establishment of four new laboratories cell culture and expansion of existing chemistry laboratory.

Electric motors, generators and transformers

Danmarks Tekniske Universitet — DTU | Published July 12, 2016  -  Deadline August 8, 2016
cpvs

Technical University of Denmark (DTU) is establishing a completely new test facility for testing large structures with focus on wind turbine blades. The Danish Building and Property Agency (Bygningsstyrelsen) is building owner and finances the new building that will house the new test facilities, including reaction blocks and strong floor. The project includes a new 1 600 m2 hall with 3 test stands capable of testing 45m, 25m and 15m blades. Inside the test hall a staff building will be constructed. The staff building will be 2 stories high and will contain control room, workshop, depots, visitor centre and various service facilities. The new test facilities will focus on static and fatigue tests of wind turbine blades. The vision is to establish a unique facility of the highest international standard for research in strength and fatigue of wind turbine blades exposed to complex loading. New advanced test methods will be developed and the research will aim at establishing a better understanding of failure in these large structures. For this new facility DTU is in need of advanced static and fatigue testing solutions for 15 and 45 m wind turbine blades. The total contract value is fixed at 13 000 000 DKK, VAT not included. The contract value is inclusive of customs, duties and all expenses on the part of the contractor. The contract value also comprises the Tenderers fixed price products and services until the static and fatigue testing solutions are delivered, installed, tested and put into operation.

DTU Life Science & Bioengineering - Contract E202-09 - Aquarium Technology.

Danmarks Tekniske Universitet (DTU) | Published May 2, 2015
Winner
Dansk Vandteknologi A/S
cpvs
45000000, 39298800, 45252120, 42912330

The offered contract is part of the construction of a new research and laboratory building - Life Science & Bioengineering - which shall contain a series of supply and distribution systems for aquarium plants for both salt and freshwater. The systems shall consist of a salt-water production plant and two reservoir tanks in soil, which supplies a range of filter units, which in turn serves a wide range of aquariums. The offered contract includes a complete system with excavation, electrical work, pipe work and scads system. The following works and supplies are included in the offered contract (quantities are solely meant as guidelines): — Establishment of three PE-ground tanks with a total of 140 m3. — Up welding on site of 10 piece PE tanks in sizes 2-24 m3 — Coating of 40 m3 concrete tank with PE plates. — Establishment of a 10 piece. drum filters, 5 pcs. bio-filters, UV systems, skimmers, pumps and PE pipe systems. — Electric panels and power systems. — Control and monitoring systems. — Testing and commissioning.

Electric motors, generators and transformers

Danmarks Tekniske Universitet — DTU | Published January 14, 2017
Winner
Moog Industrial Group
cpvs
31100000, 42100000

Technical University of Denmark establishes a new test facility to test large structures with a focus on wind turbine blades. For the new plant has DTU needs for advanced static and dynamic test solutions for 15 and 45 m wind turbine blades. The total contract value is fixed at 13 million DKK VAT not included.

15/09834 - Contract on mechanical changes to PowerLab DK

Danmarks Tekniske Universitet // CVR:30060946 | Published December 21, 2015  -  Deadline February 4, 2016
cpvs
50000000, 51000000

On behalf of DTU PowerLab DK invited to attend the providing price of the lot relating maskinæn-change in PowerLab DK. Mechanical changes include three motor / generator sets, three opposition banks, and one 2 kV switchgear. Offered controllers and HMI for all of the above should, as far as possible, be identical. It includes both mechanical and electrical work in the contract.

Construction work

Danmarks Tekniske Universitet (DTU) | Published December 22, 2015  -  Deadline April 5, 2016
cpvs
45000000, 45214300, 45214600, 45214610, 45300000

The building is located on the DTU campus in Lyngby as part of the overall complex Life Science & Bioengineering. The specific project consists of the construction of new buildings around 8000 m2 spread over 6 floors. The building will accommodate highly classified laboratories and specialized laboratories with containment measures. The basement is partially below ground level, while the basement has a lesser extent than the other floors. Installation contract includes building system consisting of electrical installations, BMS, IT, ABA, ADK, ventilation and plumbing work, as well as technical insulation. Due to the stricter density requirements for the building, there are high demands on the performance of the installations especially in terms. Penetrations and installation of installations in classified areas. The proposed contract offered as large construction incl. building envelope and roofing. After the award is inlaid one optimization and qualification phase of 2 months in which the contractor and the developer must work with its lead consultant on the optimization of the tendered project.

Works 2015 / S 247-448891

Danmarks Tekniske Universitet // CVR:30060946 | Published March 8, 2016  -  Deadline April 5, 2016
cpvs
45000000, 45214300, 45214600, 45214610, 45300000

The building is located on the DTU campus in Lyngby as part of the overall complex Life Science & Bioengineering. The specific project consists of the construction of new buildings around 8000 m2 spread over 6 floors. The building will accommodate highly classified laboratories and specialized laboratories with containment measures. The basement is partially below ground level, while the basement has a lesser extent than the other floors. Installation contract includes building system consisting of electrical installations, BMS, IT, ABA, ADK, ventilation and plumbing work, as well as technical insulation. Due to the stricter density requirements for the building, there are high demands on the performance of the installations especially in terms. Penetrations and installation of installations in classified areas. The proposed contract offered as large construction incl. building envelope and roofing. After the award is inlaid one optimization and qualification phase of 2 months in which the contractor and the developer must work with its lead consultant on the optimization of the tendered project.

Works 2014 / S 244-429059

Danmarks Tekniske Universitet // CVR:30060946 | Published December 18, 2014  -  Deadline January 19, 2015
cpvs
45000000, 45111100, 45262640, 45262660

Works The existing building 201, chemistry building, must henceforth be the administration building in the overall Life Science and Bioengineering complex. The existing building 204 will in future continue to serve as a laboratory and administration building - however the overall Life Science and Bioengineering complex. Building 204 is made up of approximately 5,000 square meters, 1,675 m² basement and 770 m² taghus. Building 201 has corresponding areas. The task is offered as a complete general contracting. The buildings have been detected instances of heavy metals, lead, PCBs, chlorinated paraffins and asbestos. In building 201 must all permanent fixtures (fume hoods, labbænke etc.) removed. All existing installations incl. electrical, chemical drains and gases near the toilet drains and rainwater system must also be removed. There must be carried out demolition of some non-bearing brick walls. In taghuse, existing cladding and insulation removed. In addition, there must be environmental sanitation of surfaces to be worked on. In building 204 must be something fixtures (labbænke) removed. There must be carried out demolition of some non-bearing brick walls. All existing electrical installations and individual extraction points and chemistry drain removal. In taghuse, existing cladding and insulation removed. In addition, there must be environmental sanitation of surfaces to be worked on. Renovation is expected to start in building 204, which may become a little break before renovation can be continued in the building. 201

DTU Life Science and Bioengineering, Building 204 and Building 201, Environmental clean-up and partial demolition.

Danmarks Tekniske Universitet (DTU) | Published December 18, 2014  -  Deadline January 19, 2015
cpvs
45000000, 45111100, 45262640, 45262660

The existing building 201, chemistry building, must henceforth be the administration building in the overall Life Science and Bioengineering complex. The existing building 204 will in future continue to serve as a laboratory and administration building - however the overall Life Science and Bioengineering complex. Building 204 is made up of approximately 5,000 square meters, 1,675 m² basement and 770 m² taghus. Building 201 has corresponding areas. The task is offered as a complete general contracting. The buildings have been detected instances of heavy metals, lead, PCBs, chlorinated paraffins and asbestos. In building 201 must all permanent fixtures (fume hoods, labbænke etc.) removed. All existing installations incl. electrical, chemical drains and gases near the toilet drains and rainwater system must also be removed. There must be carried out demolition of some non-bearing brick walls. In taghuse, existing cladding and insulation removed. In addition, there must be environmental sanitation of surfaces to be worked on. In building 204 must be something fixtures (labbænke) removed. There must be carried out demolition of some non-bearing brick walls. All existing electrical installations and individual extraction points and chemistry drain removal. In taghuse, existing cladding and insulation removed. In addition, there must be environmental sanitation of surfaces to be worked on. Renovation is expected to start in building 204, which may become a little break before renovation can be continued in the building. 201
  • 1