Public tenders for electrical in Germany

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!
ElectricalGermany

Lawn, park or sports-ground mowers

Landeshauptstadt München, Direktorium – HA II, Vergabestelle 1, Abt. 4 | Published October 27, 2017  -  Deadline December 6, 2017
cpvs
16311100, 16510000

Purchase of three equipment carriers for the hangmower and attachments:

- lot 1: purchase of a carrier for the hang-mower operation with attachments,

- Lot 2: purchase of a carrier for the hang-mower operation with attachments,

- lot 3: purchase of a carrier for the hang-mower operation,

- lot 4: purchase of a mowing trailer / mowing container as an attachment to a carrier carrier.

In addition, the use as a winter service vehicle is provided with a corresponding snow plow and for cleansing with leaf blowers.

Purchase of a carrier for the hangmower with attachments

including the following:

GG. of 3,000 kg to 3,800 kg

- suitable for use with numerous attachments

55 kW

- Four-wheel steering

- Hydraulic system

- hydrostatic drive

- Front and rear mounting space

- elctrical sickle mower and snow plow as attachments.

Purchase of a carrier for the hangmower with attachments

including the following:

GG. of 3,000 kg to 3,800 kg

- suitable for use with numerous attachments

55 kW

- Four-wheel steering

- Hydraulic system

- hydrostatic drive

- Front and rear mounting space

- Flail mower as an attachment.

Purchase of a carrier for the hang-mower operation

including the following:

GG. of 3,000 kg to 3,800 kg

- suitable for use with numerous attachments

55 kW

- Four-wheel steering

- Hydraulic system

- hydrostatic drive

- Front and rear mounting space

- Flail mower as an attachment.

Purchase of a mowing trailer / mowing container as attachments to equipment carriers

- suitable for mounting on equipment carriers for the slope mowing operation

2.5 m 3

1 800 mm

- Drive via PTO shaft of the device carrier.

Altes Jugendgästehaus - kitchen furniture

Zentrale Vergabestelle Wolfenbüttel | Published August 28, 2017  -  Deadline September 14, 2017
cpvs

The three-storey building was built in the old town of Wolfenbüttel as a military camp in the middle of the 18th century The old Jugendgästehaus is an important monument to the history of the Wolfenbüttel garrison, and since 1983 it has been listed as a group of buildings according to § 3.2 NDSchG in this monument topography (Kitchen) L = approx. 3.35 m2 kitchen area L = approx 3.70 m2 kitchen area L = approx 4.00 m1 kitchen area L = approx Approx. 3.60 m1 pcs. Kitchen line L = approx. 3.85 m1 pcs. Kitchen line L = approx. 3.40 mElectrical appliances / installation p 8 pcs. Refrigerator as a common refrigerator7 pcs. Refrigerator9 pcs. Built-in dishwasher8 pcs. Cooker8 pcs. Built-in oven8 pcs. Extractor hood exhaust8 pcs. Washing machine
Nov 13, 2013
Nov 22, 2013

Vocational School II, refurbishment, 1st BA - Air conditioning systems / building automation To perform are: Los Ventilation / Refrigeration / Building Automation New ventilation, refrigeration and building automation for BBS Kaiserslautern, replacement construction of the component Benzinoring. Description of the construction project. The replacement building the component Benzinoring to be built as a passive house. The building is therefore to build airtight and a blower door test (limit airtightness 0.6 h-1) to perform. To ensure the ventilation of rooms, ventilation systems are installed. Going off of the ventilation unit the individual rooms are accessed via an air duct system. For penetrations through ceilings or walls with fire regulations fire dampers, which are switched onto the building control system, installed. In the electrical equipment rooms, the room temperature must not exceed the maximum values, so they are cooled. For the acquisition of the control, management and monitoring tasks a free programmable DDC controller is used. Efficient operation of industrial installations is enabled by cross-discipline control algorithms. Ventilation installation services: 1 Central supply and exhaust air unit about 17 500 m³ / h with heat recovery installation in roof space 5th floor, with introduction crane. 2 Central supply and exhaust air unit approximately 7800 m³ / h with heat recovery and heating, suitable for kitchen ventilation, roof installation in Central 5th floor, with introduction crane. 3 Central supply and exhaust air unit approximately 6 200 m³ / h with heat recovery and heating, roof installation in Central 5th floor, with introduction crane. 4 Central supply and exhaust air unit approximately 1 400 m³ / h with heat recovery installation in roof space 5th floor, with introduction crane. 5 Central supply and exhaust air unit approximately 1 600 m³ / h with heat recovery and heating, ceiling device, installed in the false ceiling. 6 Supply and exhaust fans, duct installation, for 75 m³ / h (2 pieces) and 100 m³ / h (2 pieces). 7 Outdoor air and exhaust air tower for 100 m³ / h, altitude 2000 m above ground blades, galvanized steel, painted. 8 Outdoor air and exhaust air tower for 1 600 m³ / h, altitude 2000 m above ground blades, galvanized steel, painted. 9 Air duct, PP, diameter up to DN 400, 35 m, buried in the ground. 10th Air duct, galvanized sheet steel, edge lengths up to 2,00 m, about 2 100 m². 11th Spiral duct, galvanized sheet steel, diameter up to DN 400, about 1000 m². 12th Air duct, galvanized sheet steel, diameter up to DN 250, suitable for kitchen exhaust, approx 100 m². 13th Spiral duct, galvanized sheet steel, suitable for kitchen exhaust, edge lengths up to 2,00 m, about 10 m. 14th Civil engineering services on site. Capacities Cooling: 1 Multi Split system 16 kW with 5 indoor units and refrigerant line 15 to DN 100 m. Building services automation: 1 Building automation with intrusion HVAC systems (devices, fire dampers, system with 5 heating circuits). 2 Intrusion of building automation to the existing building management system of the City of Kaiserslautern.

Stadtverwaltung Kaiserslautern, Stabsstelle IV.1 – Vergabestelle Bau | Published November 13, 2013  -  Deadline November 22, 2013
cpvs
45331200, 45331210

See II.1.1).

Works for complete or part construction and civil engineering work

Stadtwerke Itzehoe GmbH | Published January 10, 2017
cpvs
45200000, 45210000, 45110000, 45300000, 45310000

The structural measures are divided into four areas: Common area, indoor and outdoor pools and a sauna.

These are the VE: earthworks, carcass work, tiles and screed work, light metal facades, frames and interior doors, Curtain Wall, Trockenbauarbeiten, partitions and lockers, site equipment, scaffolding, demolition, plumbing work, heating work, Ventilation work, electrical work and lightning protection, swimming pool technology, MSR technology and landscaping works.

The VE from the award of Block 2 are later posted and published.

Lot 1 - VE 302 Earthworks:

160m construction road in the field (B: 3-4 m) manufacture + chat + zurückbauen.

09/01/2017 - 01/30/2018.

Lot 2 - VE 313 structural work:

Swimming pools and water tanks in waterproof concrete, inside and out.

Amounts: 1 indoor children's pool 30 m 2 , 1 outdoor children's pool 100 m 2 , 1 outdoor wading pool 544 m 2 , 2 outdoor water reservoir 300 m 3 + 230 m 3 , 1 cold plunge pool.

Planned execution date: sections in 4 stages.

02/01/2018 - 04/30/2018.

Lot 3 - VE 324 Tiled and Screed works:

Tile, flooring and waterproofing in swimming pool, sauna and outdoor pool amounts 2 300 meters 2 Floor, 2 350 m 2 Floor seal 2600 m 2 Floor tiles, 1100 m 2 Wall tiles, 2 250 m 2 Beck tiles Planned execution date: sections in 4 stages.

Phase 1 indoor pool: floor tiles + 01/07/2017 - 31/12/2017, Phase 2 Outdoor pool: outdoor pools tiling: 01.03.2017 - 31.05.2018, Bauabschnitt 3 Indoor FZB: 01.02.2018 - 10.31.2018, Bauabschnitt 4 sauna, pool changing rooms UG: 02/01/2018 - 10/31/2018.

Lot 4 - VE 326 Alloy facades:

Exterior window facades aluminum windows elements, exterior doors, interior elements with different requirements made of aluminum.

Quantities: 600 m 2 Exterior facades, 350 m 2 Interior elements, window 17 Front door elements, 13 internal door elements Planned execution date: sections in 4 stages.

Phase 1 indoor pool: floor tiles + 01/07/2017 - 31/12/2017, Phase 2 Outdoor pool: outdoor pools tiling: 01.03.2017 - 31.05.2018, Bauabschnitt 3 Indoor FZB: 01.02.2018 - 10.31.2018, Bauabschnitt 4 sauna, pool changing rooms UG: 02/01/2018 - 10/31/2018.

Lot 5 - VE 329 frames and interior doors:

Fittings amounts: 55 Inside door elements Planned execution date: sections in 3 phases,

Phase 1 indoor pool: 01.05.2017 - 01.31.2018, Bauabschnitt 3 Indoor FZB: 01.02.2018 - 10.31.2018, Bauabschnitt 4 sauna, pool changing rooms UG: 02/01/2018 - 10/31/2018.

Lot 6 - VE 338 Curtain Wall:

Fiber cement.

Planned execution date: sections in 2 phases,

August 2017 construction phase 4 sauna, pool changing rooms UG: 02/01/2018 - 10/31/2018.

Lot 7 - VE 339 Trockenbauarbeiten:

Drywall ceilings and walls in swimming pool, sauna and swimming pool locker amounts: 2000 m 2 Aluminium panel ceilings, 300 m 2 Boards ceiling, 2 250 m 2 Ceilings, 50 m 2 Plasterboard ceilings, 500 m 2 Drywall walls Planned execution date: sections in 3 phases,

Phase 1 indoor pool: 01.05.2017 - 01.31.2018, Bauabschnitt 3 Indoor FZB: 01.02.2018 - 10.31.2018, Bauabschnitt 4 sauna, pool changing rooms UG: 02/01/2018 - 10/31/2018.

Lot 8 - VE 346 partitions and lockers:

Sanitary partitions and lockers in compact HPL for pool, sauna and swimming pool in several phases.

590 lockers, 120 safe-deposit boxes, reacting 100 cabinets, 70 dressing rooms, 200 m 2 Trennwandanlagen for changing rooms, showers and toilets Planned execution date: sections in 3 phases,

Phase 1 indoor pool: 01.05.2017 - 01.31.2018, Bauabschnitt 3 Indoor FZB: 01.02.2018 - 10.31.2018, Bauabschnitt 4 sauna, pool changing rooms UG: 02/01/2018 - 10/31/2018.

Lot 9 - VE 391 site equipment:

Construction and sanitary containers up + entertained.

Planned execution date: sections in 4 phases, beginning 01.05.2017 - 31.12.2018 Total completion.

Lot 10 - VE 392 Scaffolding:

Indoor and outdoor stands with associated component protection.

2018 space frame: 06/01/2018 - 09/30/2018.

Lot 11 - VE 394 demolition:

Demolition of suspended ceilings, walls, flooring and tiling and fixtures.

Demolition improvements (wall, ceiling, flooring, fixtures, furniture, windows, doors, etc.) 4 500 m 2 Floor space in the building, demolition of: 1 outdoor splash pool ca.111 m 2 , 3 650 meters 2 Pfl

Construction work for school buildings

Stadt Ludwigsburg, vertreten durch den Fachbereich Hochbau- und Gebäudewirtschaft | Published December 2, 2016
cpvs
45214200, 45223220, 45262520, 45262300, 45223500, 45261410, 45410000, 45343100, 45331100, 45331210, 45332000, 45332200, 45332400, 45315100, 45311200, 45316000, 45312100, 45314320, 45314000, 45312310, 31682210, 39141000, 39711200, 39221000, 45324000, 45421146, 45421141, 45262100, 44910000, 44114200, 45422100, 45422000, 45261210, 45261211, 45261300, 45441000, 45421132, 45443000, 45212190, 45421144, 45262670, 44221220, 45421111, 45421131, 45321000, 45442100

Renovation of a primary school consisting of buildings Year 1909 and 1953, and construction of a new cafeteria with care spaces in 2 phases

Phase 1: Building renovation Year 1909 BGF 1 421 m 2 , BRI 4606 m 3 and construction BGF 2 191 m 2 , BRI 9600 m 3

Phase 2: Building renovation Year 1953 BGR 2 511 m 2 , BRI 7675 m 3

Estimated construction (all lots / trades):

Start of construction: Juni.2017

Completion of construction: September 2020th

Rohbauarbeiten August Lämmle-Schule Ludwigsburg - expanding full-day / fire protection measures

Creating new construction, BRI 9600 m 3 .

3000 m 3 , Duct work, conversions in existing buildings.

Implementation of Dachabdichtungsarbeiten August Lämmle-Schule Ludwigsburg - expanding full-day / fire protection measures

970 m 2 roof

Roof insulation, roof insulation, roof greening, paving, roofing system.

Implementation of fire protection spray plaster works August Lämmle-Schule Ludwigsburg - expanding full-day / fire protection measures

1960 m 2 Inventory ribbed ceilings Fire protection spray plaster applied.

Heating systems, central heating, heating installation August Lämmle-Schule Ludwigsburg - expanding full-day / fire protection measures

250 m metal composite pipe of DN 15-DN 20

4500 m carbon steel pipe from DN 15 - DN 80

radiator

CHP

2 100 m thermal insulation of exposed heating pipes

800 m Thermal insulation of heating pipes in installation shafts with laminated aluminum sheathing

180 m fire insulation of rock wool

1 000 meters of insulation exposed heating pipes with plastic coating.

Ventilation systems August Lämmle-Schule Ludwigsburg - expanding full-day / fire protection measures

10 000 m 3 /H

6000 m 3 /H

500 m 3 /H

800 m 3 /H

1 000 meters ventilation ducts around

2000 m 2 Ventilation pipes square

1800 m 2 Armaflex duct insulation

200 m 2 Insulation with mineral wool for ventilation duct

800 m 2 Insulation with mineral wool for ventilation pipes

65 m 2 L90 fire protection clothing.

Implementation of sanitary engineering August Lämmle-Schule Ludwigsburg - expanding full-day / fire protection measures

500 m waste water pipes

lifting plant

about 800 m water pipes stainless steel from DN 12-DN40

350 m water pipes Multilayer pipe of DN 12 DN 32

WC and accessories.

Vanity and accessories.

Schulwaschtisch- and accessories.

Urinal and accessories.

Shower and accessories.

Disabled Vanity conditioning.

Disabled toilet facility.

400 m Thermal insulation of exposed cold water pipes with plastic coating

600 m Thermal insulation of exposed cold water pipes with flexible hose insulation

360 m waste water pipes

120 m rainwater pipes

250 m fire insulation of rock wool.

Implementation of electrical engineering with power, communication and information technology systems, lightning protection August Lämmle-Schule Ludwigsburg - expanding full-day / fire protection measures

Main / sub distributions

850 m gutters / pipes / channels

21 500 m cable and wires

19 "cabinets

10 500 m phone / data lines

420 St KNX / EIB subscriber

Switch / Outlet

lighting Equipment

Emergency lighting system / Substations

SAA / ELA facility

1 St. external lightning protection system

PV system.

Implementation of the building automation and control technology August Lämmle-Schule Ludwigsburg - expanding full-day / fire protection measures

The complete construction of the MSR technology of the trades heating, ventilation and sanitation.

3 cabinets,

20 to be driven valves

95 field devices.

3 ISP systems.

Implementation of the plaster and stucco August Lämmle-Schule Ludwigsburg - expanding full-day / fire protection measures

Distribution kitchen

4 refrigerators,

1 Combi steamer Crested

1 through dishwasher with hood

15 m table systems

1 disposal cooler

Accessories.

Installation elevators August Lämmle-Schule Ludwigsburg - expanding full-day / fire protection measures

200 m 2 Planking slanted roof

190 m 2 Basement ceiling insulation.

Gerüstbauarbeiten August Lämmle-Schule Ludwigsburg - expanding full-day / fire protection measures

3460 m 2 up scaffolding.

Implementation of Betonwerksteinarbeiten August Lämmle-Schule Ludwigsburg - expanding full-day / fire protection measures

Production and installation of 50 St. sandblasted precast columns

Installation and finishing trades.

Capio Deutsche Klinik Büdingen GmbH | Published July 31, 2013  -  Deadline September 11, 2013
cpvs
45000000, 51000000

Trade 1: Roof covering and roof sealing works Submission on: 11.9.2013 execution period: January 2014 - May / June 2014 approximately 1,080 sqm Roofing from bituminous membrane and mineral fiber insulation approx 260 m Attica head design made of aluminum sheet metal union 2: Window and facade work Submission on: 11/09/2013 Execution time: December 2013 to March 2014 90 pcs. Aluminum clad wood windows in different sizes 3 pcs. Window bands in post and beam construction, 67 pcs. Sunshades as awning 3 pcs. Sectional union 3: Wärmedämmverbundsystem Submission on: 11/09/2013 Execution time: March 2014 - End of May 2014 approximately 1,850 m² thermal insulation system of external walls, insulation thickness: 180 mm union 4 Estricharbeiten Submission on: 11.09.2013 etappe1: Construction period: March 2014 to June 2014 approximately 3,000 m² cement screed, floating floor Stage 2: Design Period: May 2015 - October 2015 approximately 1,300 m² cement floor, floating floor trade 5 Trockenbauarbeiten Submission on: 11/09/2013 Section 1: Execution time: December 2013 - February 2014 approximately 4,000 m² GK walls F0 - F90 A 1,600 m² furrings about 140 pcs. Frames and doors 3.500 m ² Outgoing. Cover F0 - F30 Stage 2: Execution Time: February 2015 - January 2016 1,500 m² plasterboard walls F0 - F90 A 2,000 m² furrings about 145 pcs. Frames and doors Suspended approximately 3,350 m². Cover F0 - F30 union 6: Electrical installation Submission am 11.09.2013 execution time: January 2014 - January 2016 40 pcs. Distributions approximately 150,000 m of cable and wires 8,000 pcs. Installation equipment (switches and outlets) 1,600 pcs. Lamps 1 pcs. Extension of the light call by about 160 new members, including wiring and equipment 1 pcs. Extension of the elec. Sound system by approximately 500 participants, including new wiring and equipment 1 pcs. Extension antenna system by approximately 100 additional participants including wiring and equipment 1 pcs. Extension of the fire alarm system at about 400, total detector including cabling and equipment 400 pcs. IT outlets including computer cabling and computer distributors. about 110 pcs. Hospital room installation units approx 10 pcs. Advanced study areas (eg, MRI, CT, X-ray) Dismantling of 1,600 pcs. Installation equipment, ca, 700 pcs. Lights, 70,000 m installation cable trade 7: sewage, water, gas plants Submission on: 11/09/2013 Section 1: Execution time: January 2014 - Februr 2015 - about 370 m dismantling drinking water line up to DN 50 - 220 m dismantling sewers from Cast and HT to DN 150 - 40 St. dismantling objects - 1450 m sewers up to DN 150 cast - 150 St. fire protection insulation shells sewers up to DN 150 - 30 m pipe heating - 15 St . Flat roof drains - about 2950 m water pipes made of stainless steel to DN 50 - 90 St. valves up to DN 50 - about 24 pc manual circulation regulating valves up to DN 25 - approx 57 pcs automatic floor-circulation regulating valves up to DN 25 - 180 pcs wall valves up to DN 25 - 65 up to DN 50 flow divider St - approx 16 pcs temperature measurement devices and Vollstromabsperrventile to DN 25 with motor drive - 170 St. fire protection insulation shells supply lines to DN 80-57 St. washbasins with installation element - 3 pcs disabled washbasins with installation element - 45 pcs toilet with installation element - 3 pcs disabled toilets with installation element - 33 pcs shower facilities - 12 pcs care combinations - 2 pcs sink - approximately 42 St . diamond drill holes in walls and ceilings wall hydrant system: - 1 piece Nass-/Trockenstation - 7 pcs deep drainage - 3 pcs and Breather - 11 pcs Hose systems - approximately 100 m of pipe, galvanized steel up to DN 50 - 80 m of pipe, galvanized steel DN 65 - DN 80 Section 2: Execution Time: February 2015 - December 2016 - 2,000 m dismantling drinking water line up to DN 50 - about 665 m dismantling sewers cast or HT to DN 150 - 100 St . dismantling objects - 900 m sewers cast to DN 150 - 100 St. fire protection insulation shells sewers up to DN 150 - 5 m pipe heating - 3,500 m water pipes made of stainless steel to DN 50 - 90 St. shut-off valves up to DN 50 - about 24 pc manual circulation regulating valves up to DN 25 - 80 St. automatic floor-circulation regulating valves up to DN 25 - 240 pcs wall valves up to DN 25 - 70 St. flow divider to DN 50 - 10 pcs temperature measurement devices and Vollstromabsperrventile to DN 25 with motor drive - 150 St. fire protection insulation shells supply lines up to DN 80 - 57 pcs washbasins with installation element - 2 pcs disabled washbasins

Value contracts for civil engineering and installation services in the gas, water, electric, sewage treatment, power supplies and public works in the field of district heating and accident and Troubleshooting: Lot 1 - civil engineering u. Installation services including house connections in the area of ​​Magdeburg and the community Gerwisch for SWM and its subsidiaries in accordance with Appendix A. Lot 2 general-u. Problems arising in the area of ​​Magdeburg and the community Gerwisch for SWM and its subsidiaries in accordance with Appendix A. Lot 3 - Tipping-u. Installation services for water, power connections in the field of water supply statutes Zweckverbandes County Beautiful Beck (TM). Lot 4 general-u. Problems arising in the field of water supply statutes Zweckverbandes County Beautiful Beck (TM).

Städtische Werke Magdeburg GmbH & Co. KG (SWM) | Published October 29, 2013  -  Deadline November 28, 2013
cpvs
65100000

Civil engineering and installation services in the gas, water, electric, sewage treatment, power supplies and public works in the field of district heating and accident and troubleshooting.

Structural shell work

Deutsche Rentenversicherung Bund Zentraler Einkauf für Bauleistungen | Published March 8, 2017  -  Deadline April 12, 2017
cpvs
45223220, 45113000, 45111000, 45262500, 45262100, 45260000, 45262300

9385 Advanced structural work.

Implementation of the measures is carried out in six phases during operation.

Main action:

Site equipment:

2 185 m 2 Site equipment - major and minor surfaces;

340 m site fence - major surface / side surfaces / relocation.

Baustromverteiler for main site equipment:

Water supply sanitary containers;

2 piece container for construction management;

1 piece sanitary containers;

1 piece frame position for access building with stairway and hoist with converting each construction phase;

2 730 m 2 Precautions floor with OSB / hardboard / PE-coated cardboard;

120 m 2 Bautenschutzwände - wooden structure / implement;

100 m 2 existing furniture protect with OSB plates;

protect 40 rooms existing furniture in rooms;

protect 557 piece door panels / expand / store / install.

Demolition work:

4660 m 2 Cancel Light suspended ceilings;

3500 m 2 with demolition mineral wool;

Open 800 pieces plaster ceiling - 40 x 40 cm;

270 m 2 various GK walls / front shells / Verkofferungen;

730 m 2 ceramic wall tiles;

221 piece of ground sanitary cells 51 x 51 cm made of reinforced concrete, with concrete pot and ground finish;

30 m 2 Screed surfaces in very small quantities.

Site equipment:

2990 m 2 areas;

12 t Disposal KMF-containing materials;

6 t waste materials containing KMF - underground storage.

Masonry and demolition work:

10 items Doorways new in Stahlbeton¿ or masonry wall;

201 m 2 Masonry installation shafts, small areas;

165 pieces finished lintels - d = 11.5 cm, 17.5 cm, 24 cm;

160 pieces inspection doors, 60 x 60 cm, in F30, in masonry wall;

800 m Installation slots lift.

Carcass double garage:

Construction of a double garage with foundation, ice wall, tent roof construction made of wood, tile roofing, with Estricharbeiten, with coating work, exterior plaster, exterior, electrical sectional size of the garage 42 m 2 :

Roofing:

126 pieces renewal / replacement of existing pitched roof hoods, size DN 100, 125, 160, 200;

150 m 2 associated scaffolding work for the accessibilities with converting the scaffolding.

Maintenance:

Plaster work;

780 m Installation slots b = 25 cm 2 , 50 cm 2 ;

5 m 2 Screed works, floating;

100 m 2 Preparing ground.

Railway construction works

DB Netz AG (Bukr 16) | Published February 21, 2017  -  Deadline April 27, 2017
cpvs
45234100

diving; Engineering, railway facilities, platforms

main works

Site roads and access roads):

Surfaces vacate and nursery eliminate 37 000 m 2 ;

BE-areas and access roads in unbound fixing 43 000 m 2 ;

6000 m²;

4250 m 3;

5500 m³;

2700 m²;

8000 m²;

32 St .;

600 m.

Tipping:

20 St .;

100 St .;

5300 m;

8000 m³;

6500 m³;

22 000 m³;

17 500 m³;

5000 m.

Underground cable laying:

11 000 m.

superstructure:

7400 m;

Dismantling turnout: 13 pieces;

Dismantling Track closure: 2 pieces;

7140 m;

Mounting points: 11 pieces;

Installation Track closure: 1 piece;

Bauzeitlich: 1 Bauweiche;

100 m.

Engineering Structures:

Railroad Overpass km 9,360 + road trough - Portitzer Street;

6.00 m;

12 500 m²;

12 000 m³;

30 000 m³;

17 500 m³;

7000 m³;

4500 m³;

5500 m³;

300 m²;

Railroad Overpass km 9,087 - walk;

175 m

1400 m²;

3600 m³;

3 900 m³;

1 150 m³;

900 m³;

2000 m³;

1200 m³;

200 m²;

415 m.

Platforms:

Demolition of 2 platforms using conventional construction methods and a provisional platform;

Equipment;

Length = 160 m; Effective length 155m;

Nominal height = 55cm platform edge.

machine-technical installations:

New passenger lift as Bahnsteigzuwegung;

Construction of 2 lifting plants for rainwater drainage;

Next See II.2.4).

See also II.1.4)

Command and control technology:

20 000 m

5 St.

16 St.

HL signal: 1 St.

20 St.

Electrical Equipment, 50Hz:

50 St.

6 St.

3 St.

Ehwa: 3 St.

CBI: 1 St.

9 500 m

NEA OLA: 3 St.

Telecommunication equipment:

Fire alarm system

- Fire alarm system and the required modules

cabling

Burglar alarm system and access control

- Control panel with the necessary modules

cabling

Alarm system MAS90

- 19 '' - system cabinet and necessary components

Stations in the track area

Telephone pillar G80

430 m FB cable 2 DA

transmission technology

- 19 '' - system cabinet with the necessary components

Optical telecommunication cables

11 000 m fiber optic cable

Cu telecommunication cables

1800 m F cable 34 ''

1 400 m F-cable 104 ''

1000 different cables

48V DC power supply

- 19 '' - system cabinet with the necessary components

Passenger information systems

masts

video equipment

Outdoor cabinet with the necessary components

IP cameras

6 cable

ticket vending machine

FAA and Entwerter zurückbauen, store and rebuild

dismantling

zurückbauen Stw indoor plant

zurückbauen Basa-indoor unit

zurückbauen 3000 m cable

- Adjustments TK jobs BZ Leipzig and Notbedienplatz UZ Leipzig Messe

Telephone connections zurückbauen.

Construction work for halls of residence

Studierendenwerk Paderborn AöR | Published March 11, 2017  -  Deadline March 24, 2017
cpvs
45214700, 45262100, 45421132, 45223220, 45443000, 45262320, 45431000, 45432100, 45442100, 45324000, 45422000, 45262670, 90911200, 45311200, 45331000, 45232460, 45312310

Studierendenwerk Paderborn intends to existing buildings Vogeliusweg 17,19,21 in 33100 Paderborn conversion and perform modernization measures.

Furthermore, the outer shell is energetically renovated.

Scaffolding work on the façade;

Scaffolding work in the stairwell.

T. with air inlets;

Apartment entrance doors and smoke doors.

The main focus are the following work in the house 17, 19, 21, perform,

Demolition work on interior and exterior walls,

Demolition of window and door systems,

Demolition in floor and ceiling areas,

Excavation in the base area and for Underground drainage,

Masonry and concrete work mainly in small areas,

Innenputzarbeiten,

Sealing work on the base plate and in the base area,

Underground drainage.

The main focus are the following work in the house 17, 19, 21 run,

Demolition of existing curtain wall high-pressure laminate press plates with substructure and insulation,

Substructure and insulation, as well as clothing from fiber cement cladding panels,

Exterior window sills made of aluminum,

Reconstruction and renovation of the existing drainage downspouts.

The main focus are the following work in the house 17, 19, 21, perform,

Floating cement screed,

Anarbeiten at outbreak sites.

The main focus are the following work in the house 17, 19, 21, perform,

Floor and wall tiles in sanitary areas,

Floor tiles in staircases,

Interior window sills made of natural stone.

Focus on the following work in the house 17,19,21, execute

Supply and laying of linoleum flooring in the hallways

and vinyl flooring in the living rooms of students.

Baseboards.

The main focus are the following work in the house 17, 19, 21, perform,

Demolition of wallpaper,

Texturing,

Painting work,

Painting.

The main focus are the following work in the house 17, 19, 21, perform,

Drywall stud walls, facings and Verkofferungen,

Insulation and foil,

Interior doors, entrance doors,

Fire doors,

Letterbox systems.

Focus on the following work in the house 23 to be executed:

Insulation and foil.

The main focus are the following work in the house 17, 19, 21, perform,

Reconstruction and adaptation of the staircase façade made of steel,

Customizing inventory glazing elements,

adapt and renew RWA system.

Building cleaning after construction completion indoors and windows.

Electrical installation in homes.

Commissioning valves, insulation of pipes and fittings installations according to ENEV and DIN 1988,

Flat stations for decentralized water supply,

Insulation of pipe and fitting installations according to ENEV,

Fire protection of pipe penetrations through fire protection-classified walls / ceilings.

Renovation of the ventilation installation with:

Exhaust fans,

900 m ventilation pipes made of galvanized folded spiral,

Insulation of piping installations in the roof against condensation,

Central fans are installed on the roof.

Fire protection of pipe penetrations through fire protection-classified walls / ceilings.

Rehabilitation of sanitary installations with:

1 000 meters Drainage pipes made of plastic,

1 400 m drinking water pipes made of stainless steel,

Sanitary items (sink, shower toilet)

Insulation of pipe and fitting installations according to ENEV and DIN 1988,

Fire protection of pipe penetrations through fire protection-classified walls / ceilings.

The 4 separate freestanding building received a new facade, so that the lightning discharges must be replaced.

On the pitch roofs PV are - equipment installed, so that the existing external lightning protection system,

must be adapted or upgraded accordingly.

Construction work for airports

Flughafen Berlin Brandenburg GmbH | Published December 21, 2016  -  Deadline January 16, 2017
cpvs
45235100, 45112000, 45235310, 45235320, 45231100, 45311000, 45233120, 45232453, 45111100, 34997200

Furthermore, decentralized soil filter systems and a stormwater retention tanks are meant for drainage of accumulating rainwater storage channels built.

The construction project also includes inter alia the establishment of electrical equipment incl. The adaptation of the existing control of the manufacturer Honeywell firing technology and the necessary in this part of adjustments to the current inventory of the lighting systems of Schönefeld airport.

All taxiways are to be produced in asphalt construction.

Most of the work takes place airside under §8 LuftSiG instead.

Weight data are approximate values):

Road equipment:

- 40 000m 2 New aircraft movement areas in concrete construction;

- 80 000m 2 New air traffic areas and shoulder in asphalt construction;

- 1 000m drainage channels;

- 8 500m 2 New service roads in asphalt construction;

- 130 000m 3 Earthworks (mineral and topsoil);

- 85 000m 2 grassing;

- 2 000m drainages;

Drainage systems / ground filter:

- 500m New drainage pipes up to DN 400;

- 2 500m New drainage pipes up to DN 2000;

- 1 500 New Drainageleitrungen ≤ DN 400;

New manholes up to DN 1500;

New Tangential;

New manhole chambers;

Rainwater retention basins V = 570 m 3 in Ortbetonweise;

Stormwater pumping station Qp 100 l / s;

Coalescence Nominal size NS 100;

Collecting tank V = 330 m 3 DN 2000;

- 12 000m 3 Excavation for leach;

- 11 000m 2 Laying of HDPE film for leach;

- 11 000m 3 Supply / installation of filter material for leach;

- 1 200m 3 Supply / installation of versickerungsfähigem ground for leach;

Civil engineering works / civil engineering for airport-related equipment:

Cable manholes;

- 5 000m cable ducts / -trassen (DN 110 / DN 150);

- 4 500m line for Shaft drainage DN 150;

New manholes up to DN 1500;

- 8 000m secondary piping;

Airport-specific systems:

Apron lighting masts;

Taxiway edge lights and signs;

- 10 000m MV and LV cables;

- 7 500m Outdoor cables;

- 30 000m primary cable lighting;

Sensor loops;

Lighting system control unit with transformer and control unit for a circuit;

Video cameras outdoors;

Supply and disposal:

Cable manholes;

- 550m New cable protection pipes / -trassen (DN 110 / DN 150);

- 450m penstocks TW / AW to DN 400;

- 100m relaying district heating pipe (2 x DN 300/500);

Upgrading manholes;

- 600m sewage line DN 200;

Demolition / deconstruction:

- 17 500m 2 Traffic areas;

- 90m drainage channels;

Manholes up to DN 600;

- 600m pressure water pipes up to DN 600;

- 300m Airport security fence;

- 100m aboveground district heating pipeline;

Manholes;

- 150m of underground media channel;

- 100m water pipeline DN 300;

- 600m sewage line DN 200;

Others:

- Marking work;

- Site clearing / relocating lines;

- I & C technology;

- Adapting existing control systems;

switchgear;

- Adaptation of temporary security fences.

Plumbing and sanitary works

Stadt Bergisch Gladbach | Published March 22, 2017  -  Deadline April 26, 2017
cpvs
45330000, 45331000, 45331200

Supply and installation of ventilation and air conditioning.

Major construction work Ventilation systems

AHU kitchen.

The system supplies the kitchen, the output area and the adjacent kitchen Outbuildings

including the social sector with supply and exhaust air.

Main features:

- Indoor installation

- Supply and extract fan

8500 m 3 /H

400Pa

- Heat recovery double crossflow ca 70%

- SFP value 3 or better

- EC fans

22 ° C

- VDI 6022 execution

- VDI 2052 compliant

AHU Mensa

The system supplies the canteen with supply and exhaust air.

Main features:

- Indoor installation

- Supply and extract fan

6000 m 3 /H

600Pa

70%

- SFP value 3 or better

- EC fans

22 ° C

- VDI 6022 execution

AHU WC North

The system supplies the toilet areas north with supply and exhaust air.

Main features:

- Outdoor installation

- Supply and extract fan

2200 m 3 /H

600Pa

70%

- SFP value 3 or better

- EC fans

15 ° C

- VDI 6022 execution

AHU WC South

The system supplies the toilet areas south with supply and exhaust air.

Main features:

- Outdoor installation

- Supply and extract fan

3 200 m 3 /H

250Pa

70%

- SFP value 3 or better

- EC fans

15 ° C

- VDI 6022 execution

AHU ventilation laboratories

The system supplies the laboratories with supply and exhaust air.

Main features:

- Outdoor installation

- Separate units supply and exhaust

- Supply central unit on the roof

2200 m 3 /H

400Pa

- Remove the outside air F7

- SFP value 3 or better

- EC fan

22 ° C

- VDI 6022 execution

- Exhaust air fan with sound-absorbing roof PPs

2200 m 3 /H

400Pa

- No heat recovery

AHU Central machine / Aula

The system supplies the Hall and all adjoining rooms in floors with supply and exhaust air.

Main features:

- Outdoor installation

- Supply and extract fan

37 000 m 3 /H

500Pa

70%

- SFP value 3 or better

22 ° C

- VDI 6022 execution

AHU classrooms

29 decentralized ceiling built-in appliances.

Main features:

- Indoor installation suspended ceiling

- Supply and extract fan

190-850 m 3 /H

250Pa

- EC fans

70%

- Electrical battery

Air duct system

4400 m 2 Air duct system consisting of galvanized air duct to 2 500 mm edge length.

2200 m 2 Air duct system consisting of galvanized duct up to 315 mm diameter.

outlets

600 ventilation outlets in the form of poppet valves, ventilation grilles, swirl diffusers

and projection screens.

Fire protection

200 fire dampers in the form of round and rectangular fire dampers.

control devices

150 volume flow controller in constant or variable execution.

Air Split systems

2 indoor units and 2 outdoor units for cooling rooms.

Construction work

Förderverein Freie Waldorfschule München Südwest e. V. | Published March 22, 2017
cpvs
45000000, 45214200, 45212222, 45422000, 45262500, 71000000, 45262310, 45112700

The measure consists of 2 phases:

BA 1:

Construction of a gymnasium with administrative wing, the temporarily for classrooms (total 4 pcs) to be used

1 000 meters 2

1 600 + 900 = 2 500 m 2

BA 2:

Planning and construction of a new class tract for grades 5 to 13 and a theater hall incl. All necessary ancillary rooms.

The measure consists of 2 phases

BA 1:

outdoor facilities

BA 2:

outdoor facilities

Planning services in accordance with HOAI for building, structural engineering, technical equipment for different work phases

BA 1:

1 000 meters 2

1 600 + 900 = 2 500 m 2

BA 1 and BA 2:

3600 m 2

9 awarding Regulation (VgV) to divide:

80% -Kontingent and thus "European procurement" (in brackets: figure for planned announcement, subject to change):

Baumeisterarbeiten (March 2017), Electrical Engineering (March 2017), carpenters (April 2017), Roofers / green roof (April 2017), plumbing (April 2017), heating (April 2017), window / exterior doors (May 2017), wooden facade (May 2017), plastering (Mai 2017), drywall / acoustic (Mai 2017), measurement and control technology (Mai 2017), ventilation (Mai 2017), Technical insulating works (Mai 2017), communication and info technical equipment (Mai 2017), Flooring, Exteriors

20% -Kontingent and thus "national procurement":

Drainage / supply lines (March 2017), Scaffolding (april 2017), Spengler (april 2017), thermal insulation system (Mai 2017), interior doors (June 2017), fire doors (June 2017), screed, sports flooring, tiles, painter, master key system, Staircase , baffle, fitted sports equipment, curtain.

The measure consists of 2 phases

BA 1:

outdoor facilities

BA 2:

Work for construction of a new class tract / technical classes for grades 5 to 13, a theater hall and waldorf specific spaces

outdoor facilities

Planning services in accordance with HOAI for building, structural engineering, technical equipment for different work phases

BA 1:

800 m 2

BA 1 and BA 2:

3600 m 2

9 awarding Regulation (VgV) to

divide:

80% -Kontingent and thus "European procurement" (in brackets: figure for planned announcement, subject to change):

Baumeisterarbeiten (March 2017), electric (March 2017), carpenters (april 2017), Roofers / green roof (april 2017), sanitation (april 2017), heating

(April 2017), window / exterior doors (Mai 2017), wooden facade (Mai 2017), Plastering (Mai 2017), drywall / acoustic (Mai 2017),

Measuring and control technology (Mai 2017), ventilation (Mai 2017), communication and technical equipment info (Mai 2017), flooring, outdoor plants

20% -Kontingent and thus "national procurement":

Drainage / supply lines (March 2017), Scaffolding (april 2017), Spengler (april 2017), thermal insulation system (Mai 2017),

Interior doors (June 2017), fire doors (June 2017), screed, sports flooring, tiles, painter, master key system, Staircase, baffle,

Installation exercise equipment, curtain.

Engineering services

Max-Planck-Gesellschaft, GV-Bauabteilung | Published March 21, 2017  -  Deadline April 19, 2017
cpvs
71300000

Engineering services in the field of electrical engineering for technical offices of the General Administration of the Max Planck Society at the Max Planck Institutes in various locations in the Federal Republic of Germany.

More further and important information about to be awarded planning services (the contract) are described in section II.2.4) of the EU announcement.

The complete version of the text is available in the lot 1 zip folder as an attachment "II.2.4) Description of procurement Lot 1" under https://extranet.mpg.de/sites/ausschreibungen/Bau/01212/default.aspx after entering the following credentials : Username: vwmpg \ ausschr01212 and password: gr3TS6NC available free of charge.

The contractual services are geared to §§ 53-56 HOAI.

The measures are carried out normally during operation.

In that regard, the Max Planck Society places in this award procedure not only important that the applicant can demonstrate a profound knowledge in the field of laboratory planning, but also experience in the implementation of maintenance and repair work during operation feature.

The services to be provided must comply with the generally accepted rules of technology and meet all the necessary requirements of economy, energy efficiency and sustainability.

The specific requirements for the provision of services may make it necessary to frequently and / or are shortly to request the client to coordination meetings on the spot or in Munich.

The full text version is available in Lot 2 zip file as an attachment "II.2.4) Description of procurement Lot 2" under https://extranet.mpg.de/sites/ausschreibungen/Bau/01212/default.aspx after entering the following credentials : Username: vwmpg \ ausschr01212 and password: gr3TS6NC available free of charge.

The contractual services are geared to §§ 53-56 HOAI.

The measures are carried out normally during operation.

In that regard, the Max Planck Society places in this award procedure not only important that the applicant can demonstrate a profound knowledge in the field of laboratory planning, but also experience in the implementation of maintenance and repair work during operation feature.

The services to be provided must comply with the generally accepted rules of technology and meet all the necessary requirements of economy, energy efficiency and sustainability.

The specific requirements for the provision of services may make it necessary to frequently and / or are shortly to request the client to coordination meetings on the spot or in Munich.

The full text version is available in Lot 3 zip file as an attachment "II.2.4) Description of procurement Lot 3" under https://extranet.mpg.de/sites/ausschreibungen/Bau/01212/default.aspx after entering the following credentials : Username: vwmpg \ ausschr01212 and password: gr3TS6NC available free of charge.

The contractual services are geared to §§ 53-56 HOAI.

The measures are carried out normally during operation.

In that regard, the Max Planck Society places in this award procedure not only important that the applicant can demonstrate a profound knowledge in the field of laboratory planning, but also experience in the implementation of maintenance and repair work during operation feature.

The services to be provided must comply with the generally accepted rules of technology and meet all the necessary requirements of economy, energy efficiency and sustainability.

The specific requirements for the provision of services may make it necessary to frequently and / or are shortly to request the client to coordination meetings on the spot or in Munich.

The full text version is available in Lot 4 zip file as an attachment "II.2.4) Description of procurement Lot 4" under https://extranet.mpg.de/sites/ausschreibungen/Bau/01212/default.aspx after entering the following credentials : Username: vwmpg \ ausschr01212 and password: gr3TS6NC available free of charge.

The contractual services are geared to §§ 53-56 HOAI.

The measures are carried out normally during operation.

In that regard, the Max Planck Society places in this award procedure not only important that the applicant can demonstrate a profound knowledge in the field of laboratory planning, but also experience in the implementation of maintenance and repair work during operation feature.

The services to be provided must comply with the generally accepted rules of technology and all erfo

Secondary school construction work

Freie und Hansestadt Hamburg, FB SBH | Schulbau Hamburg | Published January 28, 2017  -  Deadline February 28, 2017
cpvs
45214220, 45311000, 45331000, 45332400

On the school grounds are 8 buildings.

The building site area for the preliminary measure to reach over the schoolyard entrance in Ladenbeker way. 13

Driving on the playground surface should be avoided.

There may be no building materials and tools unattended unloaded or stored in the schoolyard.

Electric KG440:

- Renovation of a school building with classrooms, staff rooms and technical rooms.

- The inventory low voltage distribution, which serves for the electrical supply of the entire school complex will be redeveloped.

- The formation of the low-voltage distribution skin occurs in the ELT-building connection room in the basement.

The vast laying is carried on cable trays, 400m power cable from NYCWY 5x16 mm² to 4x35SM16.

The classrooms and teachers rooms are fed from the respective floor distributor.

17 000 m low voltage installation cables of 3x1.5 to 5x6 mm².

- Cable tray cable tray to 500/60 mm 400 m, cable collection holder to 70 lines 1 000 pieces.

45 m.

50 m.

120 pieces, for lighting only the assemblies are to be offered.

20 circuits,

50 escape sign luminaires and 170 security lights in LED technology.

- Lightning protection and Erdungsanalgen, lightning protection class 3, 410m fishing lines in aluminum.

Heating Central:

- The heating headquarters in class house 2 supplies the entire school with heat.

- The heating panel is advertised separately and is not a subject of this invitation.

Heat distribution:

- In principle, should the horizontal inventory lines remain in the object, because they are in good standing.

- The Class House 2 (yellow house) has 4 crate bays.

The existing heating pipes in 2 bays to be dismantled and replaced.

There are heating pipes in the basement and in crawl spaces available.

- The lines of the former gymnasium that are out of service, should be dismantled.

The lines between the heating unit and the expansion vessels are intended for dismantling.

- The insulation of the existing heating lines composed of artificial mineral fibers.

This insulation should be professionally dismantled, discharged from the building and disposed of properly.

- All non-visible heating pipes get new insulation.

- All strands of horizontal distribution obtained shutoff valves in the flow and differential pressure regulator in the return.

350 m black steel pipes up to DN 65 + fittings and insulation of rock wool - disassemble and assemble.

Dismantle 45 piece radiator and mount,

Dismantle 205 piece thermostatic valves with thermostatic heads and mount,

disassemble and assemble 205 pieces lockshields.

30 floor drains.

- The water is heated directly at the point of consumption by electric water heater (3.5 kW).

- Drinking water installations:

10 UP-off valves,

5 electric water heater,

4 automatic hygiene flushing and renewing the home port.

- Drainage installation:

330 m sound-absorbing sewage pipe to DN 150 + moldings, Schwitzwasserdämmung,

5 Roof vent,

24 floor drains.

- Rainwater installation:

60 m sound-absorbing sewage pipe to DN 150 + moldings.

- Fire protection:

15 pcs. for drinking water pipes and

15 pcs. for drainage lines.

- Number of sanitary objects:

36 WASHDOWN WC,

23 urinals,

25 washbasins and

13 sinks velvet wall installation.

- Number of valves:

25 pillar taps (cold or hot / cold water),

12 outlet valves, 24 device connector valves, angle valves 40,

3 outdoor taps and connection of 3-site kitchen sinks.

Telecommunications KG450:

- Renovation of a school building with classrooms, staff rooms and technical rooms.

- The inventory computer system will be expanded in scope remediation.

A patch cabinet is in the basement and the other patch cabinet is in the EC.

- The data double doses are to be executed as a duct about 30 pieces.

- For the disabled toilet, a disabled toilet set is planned.

- The Electroacoustic plant is located in the entrance center, therefore 2 hochpaarige cables are fed into the H building.

- In the building are planned H 2 E30 housing for A / B speaker circuits.

- In the building H circa 14 A / B speaker circuits are planned for alerting and 3 loudspeaker circuits for Pausengong.

For Pausengong about 55 speakers are provided.

- The alarm system is also available in input center.

A total of 14 house alarm buttons are provided.

Total 3 pieces.

4600 m communication lines of 2x2x0.8 mm 2 to 4x2x0,8 mm 2 and 3 000m

Architectural, construction, engineering and inspection services

GESOBAU AG | Published July 25, 2015
Winner
Senator. Die Project Management Service GmbH
cpvs
71000000, 71242000, 71244000, 71245000, 71246000, 71247000, 71248000

The GESOBAU plans to carry out a complex restructuring and modernization in the occupied state in their House Group WHG 246, 247 and WHG WHG 258 in Berlin-Wilmersdorf. The House groups include buildings with the following addresses: 61, 63 in 10719 Berlin; 17 in 10719 Berlin; 17 in 10777 Berlin. 61, 63 in 10719 Berlin: 1794 m2. Follow-up services as well as a structural renovation of the baths according GESOBAU standard provided. In addition, a restructuring of the base lines is provided. The project envisages the vacancy modernization (renovation electrical installations, new coverings for walls, ceilings, floors, revision of the doors) of 20% of the apartments after GESOBAU standard. Bicycle bracket; Way dump). 1,383,000 EUR gross assumed. WHG 247 - Meineckestr.17 in 10719 Berlin: 339 m2. Follow-up services as well as a structural renovation of the baths according GESOBAU standard provided. In addition, a restructuring of the base lines is provided. The entrance area is to be upgraded. Bicycle bracket; Way dump). Some years ago, a modernization concept with inventory has already been created, which is usable in parts. 1,304,344 EUR gross assumed. 17 in 10777 Berlin: It is a 5-storey house with front temporal founder wing from 1903. 369 m2. Follow-up services as well as a structural renovation of the baths according GESOBAU standard provided. In addition, a restructuring of the base lines is provided. The entrance area is to be upgraded. Bicycle bracket; Way dump). 1,265,774 EUR gross assumed. The services to be provided is: A: basic services: (1) Building design in accordance with § 34 HOAI, Annex 10, LP 1-9; (2) Technical equipment in accordance with § 55 HOAI, Annex 15, LP 1-9: - gas, water and sewerage, fire extinguishing systems, - heat exchangers and water heating systems, - air-conditioning systems, - power installations, - telecommunications and information technology systems, - Conveyors, where necessary, - other assets, as appropriate. (3) Structural design in accordance with § 51 HOAI, Annex 14, LP 1-6; (4) in accordance with § 39 HOAI free plants, plant 11, LP 1-9. B: Special services: Community areas, including drawing representation and photo documentation, - coordination of all those involved in planning, - tenant support with the following priorities:. * Participation in tenants' meetings with project idea * announcement of the start of construction in all the affected tenants in coordination with the client, * Coordination of customization required tenants dates * Premature punctual announcement of all tenants interests, * holding of tenant office hours incl. the technical tenant support, * Collecting rent reduction justified circumstances, * correspondence with tenants in consultation with the AG (legwork to requests, insurance claims, other litigation, etc.), * Maintain a tenant-friendly construction state. - Necessary preparatory work for the announcement and billing modernization services (tenant concrete); after GESOBAU standard template: - Development of energy concepts for each building based on the currently applicable energy saving regulations, proof of reduction of CO2; Statements of the energy passport after EnEV, at the beginning of the concept phase, design phase and project completion, KfW funds), the optimal promotion is to identify - Ornithological monitoring: assessment and ornithological opinion, official claims are not made and the determination of measures - creating a building thermography for all façades, before and after modernization, - submit area calculations, when planning insulation measures with the requirements of individual KfW programs are examined and each necessary measures to the contractor to check the efficiency. - Publication of the tender documents on the Senate platform - tender the required maintenance contracts as an appendix to the LV's, - submission of monthly cash outflow by the 28th of the month as specified by the contracting authority, - coordinating the installations of the utility meter heating, hot and cold water through a by GESOBAU bound companies, purpose employee the contractor has to be appointed, - Processing of warranty defects (LP9) centrally over the GESOBAU internal SAP system to which the planner receives access via the Internet for this, - handling the entire project in a set up by the GEOSBAU virtual project room, - invoice processing using a digital workflow. From Gesobau access is provided. C: consulting services: - Building Physics 1.2 Services of LP 1-7 required under the restructuring measures to be implemented to the extent of the project in accordance with § 3 HOAI, plant. Review, advising, Bid Inv

Agricultural machinery

Bundeswehr-Dienstleistungszentrum | Published June 27, 2015  -  Deadline July 22, 2015
cpvs
16000000

Specifications: Model Number: Material term; WP 103000 Allradschlepper <60 2 4 6 8 12 20 38 50 60 65 70 111 148 180 540 km h from kw. general: 1.1 application: used in buildings the army as a carrier vehicle for auslegemäger (8 m) summer operation all of bwdlz zweibrücken and spreader snow plow winter ammunition depot eft hellendorf. usps device are shown italics underlined. 1.2 general technical organizational demands: it calls observance compliance with - relevant din vg i en standards; vde regulations; accident prevention regulations professional trade association (vbg); law on equipment (equipment product safety act (gpsg)). 1.3 obligations subcontractors: is contractor not manufacturer, so he has to oblige subcontractor (manufacturer) comply provided these terms reference demands. requirements: 2.1 main features: h: four-wheel steering. construction area: centered seating position; front rear pto; stepless transmission; hydraulic lowering level rear; full-fledged passenger seat; engine: 6-cylinder; hp rated power exhaust tier iv final turbocharger; intercooling. attachment areas: rear: kn lift capacity; top link via buttons fenders o pto four speeds; a-ausschalterfür at fender; remote valves free oil return switch linkage draft head carriage automatic trailer coupling (pin diameter: mm). front: municipal anbauplatte category transfer gear structure space behind cabin: building framework communal appliances hydraulically three sides tiltable metal platform herausnahmbaren quadrangle optimum visibility suspension: full suspension chassis stabilizers axles handling abs hydrostatic steering speed-dependent wheel control five different modes (front hundegang- synchronous al delayed wheel) tires, r30 m vorderachsverriegelung clean mulch workplace: heated air-sprung driver's seat swivel right ° left climate size door mirrors windscreen window led worklight additional armrest glaring touchscreen display driving functions wiper system sunshade lighting lap driver storage compartment cooling function optional equipment: one set devices balls two separate supplies transmission attachments inside view mirror forward reverse lever v supply cab signal socket electrical loads and speed information Rundumleuchte yellow 12 V socket at the rear · Complete spare weight for rear platform with adequate locking or other 1200 kg) Nut for wheel nuts 29 mm Two front cameras and a rear view camera, because the porch after StVO is exceeded picture window in the roof for better monitoring of the tools on the road - Wall and hedge trimmer) Finish: RAL 2011, municipal orange 2.2 Technical Documentation 2 operating / instruction manual with maintenance instructions 2 Replacement Parts List 2 lists the service centers, the written materials accompanying the delivery in a clear plastic folder. 2.3 Marking In addition to the type label the unit is permanently "BUND" and marked "Mat". The additional labeling should be carried close to the nameplate. 2.4 Workshop service / spare parts The Contractor must ensure the time and demand guarantee with original spare parts and repair services and for this purpose to ensure the supply of spare parts for at least 10 years starting from the receipt of the delivery item to the recipient as part of a nationwide system of ServicestationenNertragswerkstätten in the recipient country. A list of ServicestationenNertragswerkstätten be submitted at tender with. 2.5 Instruction thieves servant sin

Industrial machinery

Deutsche Forschungsgemeinschaft e. V., Zentrale Beschaffungsstelle | Published May 2, 2015  -  Deadline May 28, 2015
cpvs
42000000

Specifications: 2 dilution refrigerator systems General requirements - The systems should allow conducting experiments at temperatures of <10 1 10 30 100 400 mk under the use of superconducting magnet coils, with a maximum space in field temperature levels, k pot and mixing chamber are available must which allows installation anchoring thermal electric filters amplifier components allowed according to different cabling. - two cryostat systems follow this independent represents -. dry-mixing system, main argument system decision, time that is needed basic after heating room again based on (10 mk) cool all especially systems. required 3he-4he mixtures should be listed optional. designed optionally between standard solenoid or 3d vector magnetic (specification see below) able choose. specifications: base temperature: ≤ design allow for sample cooling controls range adjust simultaneous usage coils. when removing capacity ≥ ĩw demonstrated at an operating mk. stability mk: ± mk;> 100 mK: ± 1% thermal bridge to be brought into the system from room temperature to the base temperature range. 10 cm above and / or below the mixing chamber. It is therefore necessary that options are given with guaranteed vibration characteristics in the offers. - For the study to be performed to a sample chamber in the central field / homogeneity region of the superconducting magnet with a floor area of ​​at least 1 cm2 and a height of 3 cm are available. - The minimum requirements for the system wiring are: - 4 x 18 twisted-pair copper superconductor cable with Fischer connector nano at room temperature and standard or micro D connectors in the TT range. - 4 x semi-rigid coaxial cable (cube or Nb) specified for f ≥ 18 GHz with low-temperature grade -20 / -30 dB attenuators, thermally coupled to the specified temperature levels. - When not in use, all external connections must be provided with radiation shields and screening caps. Optional magnetic system to system I: The magnet system includes the solenoid (s) and power supply unit. . i superconducting solenoid with a magnetic field of at least 10 T - field homogeneity: 1% over the sample volume (see above) - Desirable: An optional offer for a system of sample rotation in the magnetic field 3D Vector magnet system - Vertical coil (z-axis) Central flux density for 4.2 K: 6-9 Tesla - Horizontal coil pair (x- and y-axis) central flux density of 4.2 K: 1 Tesla - 1% of field homogeneity over the sample volume. System II: (wet) 3He-4He dilution refrigerator with standard liquid 4He cooling The system is designed to provide maximum space above the mixing chamber for the installation of electrical filters and amplifier components. System Specifications: - mixing chamber base temperature: ≤ 10 mK - When removing cooling capacity ≥ 400 ĩW demonstrated at an operating temperature of 100 mK. - Available free space on the mixing chamber (plate): 700 cm2 with a free height of 5 cm. - For the study to be performed to a sample chamber in the central field / homogeneity region of the superconducting magnet with a floor area of ​​at least 1 cm2 and a height of 3 cm are available. - Are the minimum requirements for the system wiring: - 2 x 18 twisted-pair copper superconductor cable with Fischer connector at room temperature and standard nano- or micro-D connector in the TT range. - 2 x semi-rigid coaxial cable (cube or Nb) specified for f ≥ 18 GHz with low-temperature grade -20 / -30 dB attenuators, thermally coupled to the specified temperature levels. - When not in use, all external connections must be provided with radiation shields and screening caps. Optional magnetic system to system II: i superconducting solenoid with a magnetic field of at least 10 T - field homogeneity:. 1% over the sample volume - Desirable: An optional offer for a system of sample rotation in the magnetic field 3D Vector magnet system - Vertical coil (z-axis ) central flux density of 4.2 K: 6-9 Tesla - Horizontal coil pair (x- and y-axis) central flux density for 4.2 K: 1 Tesla

Cultivation and construction Hochschule Bonn-Rhein-Sieg, Sankt Augustin at the sites and the Rhine river.

Hochschule Bonn-Rhein-Sieg c/o Orrick Herrington & Sutcliffe LLP | Published July 29, 2014
Winner
rheform – ImmobilienManagement GmbHKasernenstr. 27Düsseldorf 40213
cpvs
71000000, 71240000, 71300000

The Bonn-Rhein-Sieg intended in more immediate proximity to existing buildings of the university both new construction as well as the cultivation of other buildings on the campuses Sankt Augustin and Rhine river. The design, procurement, construction supervision and property management and documentation should be carried out by the general planner. The aim is a turnkey, ready and energetic quality, efficient, innovative and sustainable implementation. Particular, the client seeks certification in the evaluation system for Sustainable Building Federal Building (NBB); primary goal is the certificate silver. It is therefore a draft expected, especially meets the requirements of the three dimensions "ecological quality", "economic quality" and "Sociocultural and functional quality" as well as the cross-section criteria "technical quality" and "process quality" bill or is designed comparable. The project control power must be oriented toward the realization of this concept. The special feature of the realization of the entire project is the preservation of an uninterruptible possible use of all adjacent buildings. In addition, is the potential extensibility in the foreground, and the flexible use of space. In the course of the model experiment "Distributed Property Management" is also responsible to make the planning, implementation and monitoring of construction activities for the operation of the building, the Hochschule Bonn-Rhein-Sieg. The project manager is therefore exposed to increased requirements because it the responsibilities of the university are transferred. This requires not only increased communication with the departments of the university, but also the ability to understand the structures and operations of the university activities and specific projects to implement. Destination must be a flexible structure that allows timely and competent to solve the issues in implementation of construction projects in coordination with the university. The Contractor shall not at the same time take on general planning and project management services. This means that whilst it can be done in lots 1 and 2, an offer, but can not be offered at the same time on the lot 3. Lot 1: general planning services on campus Sankt Augustin. 1 Construction of an extension with parts of the administration and the departments economy, the Centre for Science and Technology Transfer and space for start-ups with an area of ​​2 175 m² NF 1-6. 2 Construction of a third regional center Sankt Augustin (ZAF) with a total of 803 m² NF 1-6. The ZAF is to provide space for research activities (disciplines: economics, computer science, electrical engineering, mechanical engineering and journalism) and collaborations between universities and companies for innovations and developments as well as for students in research. 3 Expansion of the library on the first floor of around 140 m² NF 1-6. The construction costs are thereby amounted to 300 & 400 to approximately 13 million EUR gross. This lot 1 are general planning performance object planning for buildings and interiors, acc. HOAI 2013 § 34 and outdoor installations HOAI 2013 § § 38, 39 services of specialist planning Technical equipment acc. HOAI 2013 § § 53, 55 services of specialist planning structural engineering gem. HOAI 2013 § § 49, 51 para. 1.2 of Appendix 1 to HOAI (building physics), safety and health by Baustellenverordnung, SIGEKO, occupational safety, ENeV, the fire protection plan and section. 1.4 of Annex 1 to HOAI (Engineering Surveys) - all in the required extent. The planning services are commissioned in stages. Initially intended to take charge of it for the general planning services, the service phases 2-3 or partial services. The phases 4ff. or partial performance thereof will be awarded optional. The awarding the optional power phases determines the client at the time of approval of the budget documents construction. The contractor is not entitled to commission further work phases to upon completion of the phase 2 to 3. The contractor is obligated to fulfill the performance of the commissioned further work phases. The following dates are scheduled: Assignment of the general planner power: approx May 2014 completion of the draft plan until end of October 2014 completion and acceptance of construction project until about December 2016 lot 2:... General planning services on campus Rhine river. 1 Construction of an extension with an area of ​​2080 m² NF 1-6. In the extension to areas of the department 04, 05 (economic, Ang natural sciences) and the BC GmbH and the University are to be generally incorporated, 1690 m² NF 1-6. In addition, further 390 m² NF eliminated 1-6 on the third middle center science Rhine river (ZAF) in the field 05 (Applied Science

Planning performance architecture Max II, 3 BA.

GEWOFAG Wohnen GmbH | Published June 18, 2014  -  Deadline July 24, 2014
cpvs
71200000, 71300000

Planning services architecture for an energetic modernization of seven fully occupied existing buildings with approximately 238 residential units and approximately 8 commercial units in 80636 München. Phases 6 and 8 for buildings and interiors according to § 34 HOAI. Optional: mounting an external elevator to the building in the Pfänderstraße 2 on all floors for barrier-free access to the building. The GEWOFAG Wohnen GmbH in Munich intends to conduct a comprehensive energy modernization measure municipality Neuhausen-Nymphenburg in seven existing buildings in the postal zip code area 80636. The buildings are owned by the GEWOFAG Wohnen GmbH. All Mietwohnblöcke are also during the operational implementation in fully inhabited state. The project area includes the following buildings: - Funker 5-9, with 36 residential units and approximately 1 525.5 m² living space and 1 commercial unit and approximately 13 m² floor space, - Funker 11-15, with 36 residential units and approximately 1564 m² of living space and 2 commercial units and approximately 23 m² floor space, - Held Straße 1-5, with 36 residential units and approximately 1 566.5 m² of living space and 3 commercial units and approximately 35 m² floor space, - Held street 7-13, with 48 residential units and about 2 385 m² living space, - Held 15-17, with 16 residential units and approximately 948.5 m² living space, - and hero Street 19-23, with 36 residential units and approximately 1 729.5 m² living space and 1 commercial unit approx . 9,5 m² of floor space, - Pfänderstraße 2-4, with 30 residential units and approximately 1 249.5 m² living space and with 1 commercial unit and about 30.5 m² of floor space. The buildings were built in 1956 and are not under monument protection. The seven individual buildings are built in typical construction time brick construction with a tiled roof. The entire stock is now connected to district heating. The nature and extent of the structural measures required is specified by the customer. For this, a preliminary study has already been carried out. The aspect of the economy is in the foreground. The following work must be carried out within the framework of the reorganization measure (the list is not exhaustive): - thermal insulation façade - painting, - Insulation bottom basement ceiling - Memory insulation on floor - window replacement, - Concrete repair work on balconies and loggias, - General plumber, locksmith and roofing works, - General tile, natural stone and joinery, - Implementation of general traffic safety measures - fire protection - Staircase railing / other balustrades, - upgrading stairways (painting walls, revision / replacement building entrance and apartment doors) - Mounting central letterbox systems, - Other general maintenance work on the balconies, in the basement and in the stairwell. Following further work will be the same time on the aforementioned buildings executed: - Comprehensive electrical work, replacement of electric lines and distribution units, - replacement of the lighting in common areas, - installation of intercom systems - Comprehensive Sewer Renovation - Conversion to separation system - surface water seepage, - Other general works in the field of building technology. Optional: - growing of a lift to the Pfänderstraße 2 buildings on all floors (five stations): - basement - ground level - EC - 1st floor - 2nd floor - obtaining a building permit for said elevator cultivation taking into account the necessary lead times. The necessary structural work and the erection of the elevator shaft must be made before putting the facade scaffold. The facade scaffolding is expected to set up in February 2016. The design and tender schedule is to be aligned in this regard. Objective of energy-saving renovation is the energy standard for KfW Efficiency House 100, or at the time of application for assistance position comparable KfW Efficiency. The apartments will be not be rehabilitated. The administrative construction (tenant Management) in August 2015. Operating Construction will start in early January 2016. Cultivation of the external elevator, to the extent this occurs, preferred. The operational start of the construction of the external elevator to take place in this case in early October 2015. The completion of the entire project and restoring the grounds must be made by the end of November 2016. The procurement of the necessary exporting commercial contractor via tendering procedures in accordance with the VOB / A. Taking into account the operational commencement of commissioning a commercial contractor by October 2015 is needed to allow time for the pre-construction operational is sufficiently available. With further regard to the required submission periods and other general Bear
Categories
  Germany - Show all countries
Berlin (947)Rostock (577)Magdeburg (416)Munich (331)Schwerin (233)Berlin berlin (167)Niederdorla (158)Augsburg (154)Köln (145)Berlin (138)Frankfurt-on-main (131)Munich (130)Waldeck (126)München (120)Stuttgart (109)Waren (müritz) (108)Zeitz (107)Aachen (102)Dömitz (101)Gardelegen (98)Bielefeld (95)Halle (95)Leuna (93)Hamburg (91)Regensburg (90)Wismar (89)Bonn (88)Düsseldorf (88)Hagenow (88)Münster (85)Ot (83)99091, erfurt (80)Cologne (76)Merseburg (74)Schönberg (73)Lübz (72)Karlsruhe (70)Wei (69)Halberstadt (68)Sch (68)Dorf mecklenburg (67)Bernburg (65)Hansestadt (65)39014 magdeburg; (39114 magdeburg) (61)Naumburg (61)Würzburg (59)Hanover (58)Lutherstadt (57)Dortmund (55)Dessau (54)Freiburg baden-württemberg (54)Grundschule harzblick, heidebreite 10 in wernigerode (54)Stuttgart baden-württemberg (54)Bonn nordrhein-westfalen (51)Chemnitz sachsen (51)Entfällt (51)Jülich nordrhein-westfalen (50)Nürnberg (49)Greifswald (48)Essen nordrhein-westfalen (47)Essen (46)Dresden (45)Freising (45)Köln nordrhein-westfalen (45)Potsdam brandenburg (44)Heilbronn baden-württemberg (43)Duisburg (42)Ingolstadt (42)Zossen (41)Bayreuth (40)Hamburg (39)Aachen nordrhein-westfalen (38)Loitz (38)Braunschweig niedersachsen (37)Erlangen (37)Hannover niedersachsen (37)Klietz (36)Potsdam (36)Darmstadt (35)Krefeld (35)Landshut (35)Burg (34)Hassel (34)Heidelberg (34)M (34)Dresden (33)Iden (33)Wuppertal nordrhein-westfalen (33)Anklam (32)Kassel (32)München bayern (32)Quedlinburg (32)Stralsund (32)Bad (31)Dresden sachsen (31)Düsseldorf nordrhein-westfalen (31)Hamburg hamburg (31)Barby (30)Nuremberg (30)