Public tenders for electrical in Schwbisch-hall Germany

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!
ElectricalGermanyschwbisch-hall

Building maintenance 2017 Schwäbisch Hall (temporary contract), electrical work

Vermögen und Bau Baden-Württemberg Amt Heilbronn | Published August 25, 2016  -  Deadline September 23, 2016
cpvs

Building maintenance 2017 Schwäbisch Hall (temporary contract), electrical work

Rehousing the estate and care Court of Schwäbisch Hall, electrical work

Vermögen und Bau Baden-Württemberg Amt Heilbronn | Published December 15, 2016  -  Deadline January 19, 2017
cpvs

Rehousing the estate and care Court of Schwäbisch Hall, electrical work

Electrical Engineering (SHL 463-17)

Sachsen-Anhalt Bau- und Liegenschaftsmanagement Sachsen-Anhalt (BLSA) | Published August 2, 2017  -  Deadline September 5, 2017
cpvs

Electrical Engineering (SHL 566-17)

Sachsen-Anhalt Bau- und Liegenschaftsmanagement Sachsen-Anhalt (BLSA) | Published September 25, 2017  -  Deadline November 1, 2017
cpvs

Electrical installation (SHL 81-18)

Sachsen-Anhalt Bau- und Liegenschaftsmanagement Sachsen-Anhalt (BLSA) | Published February 21, 2018  -  Deadline March 28, 2018
cpvs

Modernization Emergency power supply (NEA) - electrical installation

Sachsen-Anhalt Leibniz-Institut für Pflanzenbiochemie Halle | Published August 14, 2017  -  Deadline September 4, 2017
cpvs

Electrical and telecommunication systems (SHL 267-17)

ST_BLSA | Published May 19, 2017  -  Deadline June 20, 2017
cpvs

Electrical Engineering / Power Engineering (SHL 385-17)

Sachsen-Anhalt Bau- und Liegenschaftsmanagement Sachsen-Anhalt (BLSA) | Published June 27, 2017  -  Deadline August 1, 2017
cpvs

Electrical Engineering / Power Engineering (SHL 572-17)

Sachsen-Anhalt Bau- und Liegenschaftsmanagement Sachsen-Anhalt (BLSA) | Published September 25, 2017  -  Deadline October 12, 2017
cpvs

Electrical engineering installation works

Diakonie-Klinikum Schwäbisch Hall gemeinnützige GmbH | Published December 14, 2016  -  Deadline January 13, 2017
cpvs
45315100, 45314320, 44112220

The Diakonie-Klinikum Schwäbisch Hall gGmbH is planning to build a 1.Bauabschnittes. This has an area of ​​about 28 000 m of 2 BGF and a BRI of about 119 000 m 3 ,

The construction project involves wards with 335 beds, public areas such as the main entrance and cafeteria, examination and treatment areas as well as the entire supply and disposal (storage, pharmacy, pathology and morgue, laboratory, food supply, changing rooms, laundry supplies etc).

Components of this invitation:

14 pieces active server racks;

4 pieces passive server racks;

8 SideCooler 30 kW;

2 pieces cold aisle enclosures;

1 piece cabinet control system;

100 m² raised floor;

5 piece IP cameras.

14 St. active server racks;

4 St. passive server racks;

8 St. SideCooler 30 kW;

2 St. cold aisle enclosures;

1 St. cupboard control system;

5 St. IP cameras.

100 m 2 Double bottom.

Electrical work, lighting

Jobcenter Halls (Saale) | Published November 18, 2016  -  Deadline December 23, 2016
cpvs

The Job Center Halle (Saale) intended from dem05.12.2016innerhalb his property Neustaedter Passage 1, 3 and 6 in 06122 Halle (Saale), exchange and disposal of all Standardneonleuchtstoffröhren 36 Watt / 58 Watt (4000 pcs.). These are to be exchanged for daylight fluorescent tubes. The work should be completed in the year 2016th

Electrical services

MMZ Mitteldeutsches Multimediazentrum Halle (Saale) GmbH | Published November 26, 2015
Winner
Planungsbüro M + M AG
cpvs
71314100

Completed in the summer of 2007 Mitteldeutsches Multimedia Centre (MMZ) in the Mansfeld Street 56 in Halle (Saale) is a start-up center for the creative and media industry in Saxony-Anhalt. The complex of MMZ located office space for start-ups, Banquet Facilities, classrooms, studios film and audio production and pitches were in the garage. Almost all the building services (heating, electricity and emergency supply, EDP centers, server systems, sprinkler system, elevators, ventilation systems, burglar alarm center and security technology, battery systems and institutions of smoke extraction) was significantly damaged. 1000 m2 planned. For this purpose, the provisions of the development plan must be observed. Building costs estimated. 50 companies and leased to the University. These particularities must be observed during the construction phase.

Verification of electrical equipment

Stadt Halle (Saale), FB Recht, Team Submission | Published February 2, 2017  -  Deadline February 21, 2017
cpvs

Verification of electrical equipment

Stadt Halle (Saale), FB Recht, Team Submission | Published February 2, 2017  -  Deadline February 21, 2017
cpvs

Verification of electrical equipment

Stadt Halle (Saale), FB Recht, Team Submission | Published February 1, 2017  -  Deadline February 21, 2017
cpvs

Framework agreement - review of all portable appliances in

Electrical and telecommunication installations

Holm Lischewski | Published February 15, 2018  -  Deadline March 7, 2018
cpvs

Electrical and telecommunications installations

Holm Lischewski | Published March 9, 2018  -  Deadline March 29, 2018
cpvs

Electrical engineering installation works

Diakonie-Klinikum Schwäbisch Hall gemeinnützige GmbH | Published November 4, 2015  -  Deadline December 10, 2015
cpvs
45315100, 31321000, 45231400, 31127000, 31682300, 31170000, 31200000, 31321700, 31521000, 31625200, 45312100, 31625300, 45312200, 45315300, 34995000

MV switchgear 20 kV 2 St., dry-type transformers S = 1,600 kVA 4 St., MS-wiring 2 280 m, emergency generators S = 800kVA 2 St., UPS systems S = 4 x 40 kVA and S = 60kVA, central battery systems for MS / NSHV 60V / 110V 2 St. and for security lighting 5,5 Ah, BSV-conditioning S = 20 kVA 2 St., NSHV rated current 4000 A and 2500 A, reactive power compensation equipment 2 St., busbar system I = 1600 A length = 650 m I = 800 A length = 580 m, consumption meters with LON-bus interface, the field distributor 5 St., subdistributor 50 St., laying systems with mesh cable trays 2 250 m, cable trays 2300 m, wide span trays 1050 m, Steigetraßen 271 m, Ductwork 700 m, media rails for Berths 380 St., cables and wires of 180 000 m, installation equipment 19 500 St., Building Control KNX installation bus system with 1050 St. participants, interior lights 4338 St., security lights 693 St., Outdoor Lighting 31 St., flight navigation system, external lightning protection roof drip lines 1 250 m, earthing / potential equalization, fire fighting equipment, fire bulkheads for cables 456 St., heat radiator 317 St., raised floors 230 m2, telecom / IT network with fiber optic 2 150 m, Cat7 195 350 m, computer ports 3100 St., 19 "floor distributor 22 St., cabling patient call system 30 000 m, Intercoms with 13 St. stations, KNX clock systems with 15 St., slave clocks fire alarm system with 1750 St. detectors, fire alarm cables 43 300 m, access control system with 16 pc card reader, space observation system with 6 St. cameras, emergency exit door monitoring with 7 St. door terminal, RWA systems 4 St., firefighters BOS radio system.

Electrical power systems design services

MMZ Mitteldeutsches Multimediazentrum Halle (Saale) GmbH | Published September 5, 2015  -  Deadline September 30, 2015
cpvs
71323100

The complex of MMZ located office space for start-ups, Banquet Facilities, classrooms, studios film and audio production and pitches were in the garage. Almost all the building services (heating, electricity and emergency supply, EDP centers, server systems, sprinkler system, elevators, ventilation systems, burglar alarm center and security technology, battery systems and institutions of smoke extraction) was significantly damaged. For this purpose, the provisions of the development plan must be observed. Building costs estimated. These particularities must be observed during the construction phase.

Flood repair depot building machines Engineering Branch Hall - Los 4 electrical work

Wasserstraßen- und Schifffahrtsamt Magdeburg | Published February 2, 2017
cpvs