Electrical installation work of heating and other electrical building-equipment

Landkreis Regensburg | Published July 22, 2016
Winner
Kieback & Peter GmbH & Co. KG
cpvs

Heating and other electrical installations in buildings

Electrical services

Landkreis Regensburg | Published March 23, 2017  -  Deadline April 13, 2017
cpvs
71314100

Engineering services for electrical engineering (investment group 4, 5 and 6) in accordance with § 53 HOAI, with work phases 1 to 9 (the power phases are gradually commissioned) for the refurbishment and adaptation of the space program for the school building and the Dreifachsporthalle the Max-Ulrich von woodturning Realschule Regenstauf.

Electrical fitting work

Landkreis Regensburg | Published November 28, 2015  -  Deadline January 19, 2016
cpvs
45311200, 45312100, 45312200, 45314000, 45314320

Electrical installation work.

Electrical fitting work

Studentenwerk Niederbayern Oberpfalz | Published May 11, 2016  -  Deadline June 6, 2016
cpvs
45311200

Subsection: Electrical installation.

Electrical fitting work

Landkreis Regensburg | Published April 19, 2016
Winner
Schmelmer
cpvs
45311200, 45312100, 45312200, 45314000, 45314320

Electrical installation work.

Electrical fitting work

KJF Katholische Jugendfürsorge d. Diözese Regensburg e. V. | Published May 11, 2016
Winner
Elektro Loibl GmbH & Co. KG
cpvs
45311200

Electrical installation.

Electrical fitting work

Studentenwerk Niederbayern Oberpfalz | Published July 9, 2016  -  Deadline August 11, 2016
cpvs
45311200, 45317000, 45312100, 45316000

Electrical installation;

Power and low power;

Fire alarm system;

Lighting systems;

Data network.

Electrical fitting work

Kath. Jugendfürsorge der Diözese Regensburg e. V. | Published February 2, 2017
cpvs
45311200

Electrical installation.

about 20 main distributors / sub-distributors with placement;

about 32 500 meters cables / wires;

approximately 1 400 m laying systems;

about 2 000 units installed equipment;

approximately 23 200 m FM lines / computer cables / antenna cables;

about 9 pieces EDP distributor;

about 1 Each central battery system;

about 1 200 pieces Lighting.

Electrical work.

about 20 main distributors / sub-distributors with placement;

about 32 500 meters cables / wires;

approximately 1 400 m laying systems;

about 2 000 units installed equipment;

approximately 23 200 m FM lines / computer cables / antenna cables;

about 9 pieces EDP distributor;

about 1 Each central battery system;

about 1 200 pieces Lighting.

Electrical fitting work

Barmherzige Brüder gemeinnützige Krankenhaus GmbH | Published April 26, 2016  -  Deadline May 18, 2016
cpvs
45311200, 45311000, 32562300

Gewerk "4060 - Early measure electrical installation"

CPV codes:

45311200-2 (electrical installation work)

45311100-1 (installation of electrical cables)

32562300-3 (fiber optic cable for data transmission)

1 pcs low power distributor

720 m cables / wires (4 x 50 to 4 × 120 mm 2 )

2750m FM lines / fiber optic cables

Basic criteria: VOB

by lot assignment: no

Execution time: 01.07.2016 - 08.05.2016.

Page Number (LVZ 1X): 55 A4.

Electrical fitting work

Katholische Jugendfürsorge der Diözese Regensburg e. V. | Published March 11, 2017  -  Deadline April 4, 2017
cpvs
45311200

Electrical installation.

about 20 main distributors / sub-distributors with placement;

about 32 500 meters cables / wires;

approximately 1 400 m laying systems;

about 2 000 units installed equipment;

approximately 23 200 m FM lines / computer cables / antenna cables;

about 9 pieces EDP distributor;

about 1 Each central battery system;

about 1 200 pieces Lighting.

Electrical fitting work

Landkreis Regensburg | Published March 18, 2017  -  Deadline April 13, 2017
cpvs
45311200

Engineering services for electrical engineering (investment group 4, 5 and 6) in accordance with § 53 HOAI, with work phases 1 to 9 (the power phases are gradually commissioned) for the refurbishment and adaptation of the space program for the school building and the Dreifachsporthalle the Max-Ulrich von woodturning Realschule Regenstauf.

- Net floor area school about 5 000m 2 and Dreifachturnhalle with adjoining rooms about 1 800 square meters,

- Project start expected in June 2017,

- Period Expected 2018-2022.

Engineering design services for mechanical and electrical installations for buildings

Staatliches Bauamt Regensburg | Published April 26, 2016  -  Deadline May 18, 2016
cpvs
71321000

Engineering design services for mechanical and electrical installations for buildings

Electrical fitting work

Landkreis Regensburg | Published February 28, 2017  -  Deadline March 30, 2017
cpvs
45311200, 45312310

Electrical work, PA system, lightning protection, MSR.

Electrical work:

1 piece low voltage distribution;

5 piece subdistributions (standing cabinet);

8 000 m laying systems;

100 m laying systems (integrity);

50 000. m cables and wires 3 x 1.5 to 3 x 4 mm 2 ;

10 000m cables and wires 5 x 1.5 to 5 x 10 mm 2 ;

2000 m cables and wires 5 x 16 to 4 × 120 mm 2 ;

1800 m cable (integrity);

25 000 m communication lines;

5 Pieces EDP cabinets (19 ");

50 000. m computerized management;

2000 m fiber optic cable;

500 pieces Lighting Installation (delivery site);

2 pieces RWA Areas;

19 Pieces media column;

5000 piece installation equipment.

PA system:

1 Each ELA Office;

4 pieces ELA substation;

290 piece speaker (in-ceiling / wall speakers);

2 piece consoles with touch display and gooseneck microphone;

15 000 m communication lines 2 x 2 x 0.8 up to 50 x 2 x 0.8.

Lightning protection work:

590 m Lightning protection round wire;

590 pieces Roof cable holder;

20 fishing rods 1 m;

8 fishing rods 2 m;

6 piece fishing rods 3 m;

2 piece fishing rods 5.50m.

Electrical domestic appliances

Regierung der Oberpfalz, Erstaufnahmeeinrichtung Regensburg | Published December 23, 2016
Winner
Emil Löffelhardt GmbH & Co. KG
cpvs
39710000, 39713200, 39711100, 39711400, 39711110

Delivery of electrical appliances for community accommodation of the Government of Upper Palatinate.

Supply of washing machines on call in the shared accommodation in the district of Upper Palatinate (Delivery period: 1.1.2017 - 31.12.2018, estimated number 410).

Delivery of Fridge-freezers on demand in the shared accommodation in the district of Upper Palatinate (Delivery period: 1.1.2017 - 31.12.2018, estimated number 480).

Supply of electric Standherde on call in the shared accommodation in the district of Upper Palatinate (Delivery period: 1.1.2017 - 31.12.2018, estimated number 400).

Supply of condenser on call in the shared accommodation in the district of Upper Palatinate (Delivery period: 1.1.2017 - 31.12.2018, estimated number 300).

Delivery of table refrigerators on call in the shared accommodation in the district of Upper Palatinate (Delivery period: 1.1.2017 - 31.12.2018, estimated number 340).

Electrical power systems design services

Landkreis Regensburg | Published February 4, 2016  -  Deadline March 8, 2016
cpvs
71323100

Engineering services for electrical engineering (investment groups 4, 5 and 6) in accordance with § 53 HOAI, Phases 3-9 (the power phases are gradually commissioned) for the expansion and renovation of the school Neutraubling, BA I and II.

Electrical fitting work

Landkreis Regensburg | Published May 26, 2017
Winner
Hista Elektro GmbH
cpvs
45311200, 45312310

Electrical works, ELA system, lightning protection, MSR.

Electrical work:

1 pc low-voltage main distribution

5 pieces of subdistributions (base cabinet)

8 000 m paving systems

100 m paving systems (function)

50 000 m cables and wires 3 x 1.5 to 3 x 4 mm 2

10 000 m cables and cables 5 x 1.5 to 5 x 10 mm 2

2 000 m cables and cables 5 x 16 to 4 x 120 mm 2

1 800 m cable (function)

25 000 m telecommunication lines

5 pcs. Computer cabinets (19 ")

50 000 m EDP line

2 000 m optical fiber

500 pieces of light assembly (delivery by customer)

2 pieces of RWA systems complete

19 pieces of media columns

5 000 pieces of installation equipment

PA system:

1 piece ELA control center

4 pcs. ELA lower station

290 pieces loudspeaker (ceiling mount / wall loudspeaker)

2 pcs. Talking stations with touch screen and gooseneck microphone

15,000 m of communications lines 2 x 2 x 0.8 to 50 x 2 x 0.8

Lightning protection work:

590 m lightning protection round wire

590 pieces of roof cable holder

20 pieces of catch rods 1 m

8 pieces of catch rods 2 m

6 pieces of catch rods 3 m

2 pieces of catch rods 5.50 m.

Electrical installation work

Stadt Regensburg, Vergabeamt | Published April 19, 2017  -  Deadline May 23, 2017
cpvs
45310000

All electrical and telecommunications engineering installation. In particular, an emergency power plant with its own unit, development of a new low-voltage network with new distributions NSHV - RI - UV, installation of switches / sockets Surface / flush, lighting equipment, internally bridged fire alarm system, ELA system with connection to the alarm system, construction of a video system.

The whole operation extends over two construction sections, wherein one year takes place installation standstill between the 1st and the 2nd BA BA.

Features of the tender:

Emergency power plant with storage tank

LVMD distribution network AV

LVMD distribution network ESV

GHV multiple distributions

More UV 's

Wires and cables up to 300 mm²

lighting

KNX control

Fire alarm system

ELA facility

IT system

Video intercom.

As directed under II.1.4).

Electrical fitting work

Barmherzige Brüder gemeinnützige Krankenhaus GmbH – München Masterplanung 1. BA | Published August 30, 2016
Winner
K+B E-Tech GmbH & Co. KG
cpvs

Conversion and extension of the Hospital of the Merciful Brothers Munich with intensive care (ICU and

IMC), emergency department (ZNA and ZEA),

Monitoring unit, endoscopy, medical service facilities, management and technology.

A total of approximately 3060 m 2 Usable space consisting of reconstruction in existing and new buildings.

To this end, the following trades were announced:

4060: preliminary measures Measure electrical installation; EU TED / 2016 / S 081-143631.

Electrical fitting work

Barmherzige Brüder gemeinnützige Krankenhaus GmbH | Published May 31, 2016  -  Deadline July 6, 2016
cpvs
45311200, 45315600, 45311100, 31213200, 31518200, 31520000, 44112220, 31620000

Gewerk "4400 - Electrical installation".

CPV codes:

45311200-2 (electrical installation work);

45315600-4 (Low Voltage);

31213200-4 (distribution transformers);

45311100-1 (installation of electric cables);

31518200-2 (emergency lighting systems);

31520000-7 (lamps and light fittings);

44112220-6 (raised floors);

31620000-8 (Electric acoustic and visual signaling devices).

2 pcs. Main distributions;

24 pcs. Subdistributions;

3 pcs. Subdistributions (G2);

30 pcs. Low power distribution;

1 pcs. Compensation 250 kVAr;

1 pcs. UPS 50 kVA;

74 m 2 Double bottom;

111 000 m cables / wires;

4600 m Laying systems / pipes;

4700 pcs. Installation equipment;

109 000 m FM lines / fiber optic cables;

1 150 pcs. Lighting;

17 pcs. Bed rails;

1 pcs. OP-light device.

Computer cabling in fiber optic technology for building connection Cat within buildings;

Sun protection system;

Emergency lighting;

Call system;

Antenna installation;

Clock system;

PA system;

Intercom;

Video system;

Differenzstrommeßsystem.

Basic criteria: VOB.

by lot assignment: no.

Execution time: 44. KW 2016 - 26 KW of 2019.

Page Number (LVZ 1X): 748 A4 (incl. LVZ Preliminary).

Electrical work

Staatliches Bauamt Regensburg | Published March 9, 2017
cpvs

Regensburg University of Applied Sciences