Call +44 800 9755 164

Public tenders for electrical in Paderborn Germany

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Electrical fitting work

Stadt Paderborn | Published October 28, 2015
cpvs
45311200

Zentrales Erschließungselement Königsplätze – Elektrik.

Gymnasium Pelizaeus BT B Rehabilitation Fire damage; Electrical engineering / computer technology

GMP Paderborn | Published April 26, 2017  -  Deadline May 23, 2017
cpvs

Part B of the Gymnasium Pelizaeus has been severely damaged by water in a fire event. To eliminate the damage, the electrical engineering in the left part is 100% renewed, on the right to about 85%. Distribution, ELA system, safety lighting, structured cabling; General lighting. The work is done in two construction sections, first the left part, then the right part after completion.

Electrical testing of portable appliances

Universität Paderborn | Published November 16, 2016  -  Deadline December 9, 2016
cpvs
50532000, 50711000, 71630000

Electrical fitting work

Stadt Paderborn | Published December 1, 2015  -  Deadline January 20, 2016
cpvs
45311200, 45312310

Main distribution, EDP - Networks, security lighting, PA system, lighting, burglar alarm system.

Installation of smoke alarms; Electrical work

GMP Paderborn | Published October 25, 2016  -  Deadline November 16, 2016
cpvs

Rehabilitation gymnasium My work; Electrical installation

GMP Paderborn | Published January 10, 2017  -  Deadline January 26, 2017
cpvs

21 Gymnasium lamps LED, 43 LED downlights, 16 presence detector, Notlichtzentrale 7Ah with 12 lights, 1 subsidiary, 12 PA speakers, ca 1250m lines

TH GS Karl Retrofitting; Electrical installation

GMP Paderborn | Published September 2, 2016  -  Deadline September 28, 2016
cpvs

Dismantling of 21 Gymnasium lighting, supply and installation of 10 Gymnasium lamps, Notlichtpiktogrammleuchten, presence detectors and Lautsprechern.Lieferung and installation of about 300 cables and wires

GES Friedrich von Spee 2.BA; Electrical work

GMP Paderborn | Published March 23, 2017  -  Deadline April 13, 2017
cpvs

General lighting, security lighting, computer equipment, inclusion rooms, electro-acoustic system, fire alarm system. It should be noted that the bidders and their subcontractors and distributors of workers must submit the necessary commitments in accordance with §§ 4, 18 and 19 Tvgg NRW.

School Schloss Neuhaus 2 BA; Electrical works, lightning protection.

Stadt Paderborn | Published March 5, 2016
Winner
Elektro Löhr
cpvs
45311200, 45312310

Main distribution, EDP - Networks, security lighting, PA system, lighting, burglar alarm system.

Electricity

Kreis Paderborn | Published January 19, 2017
Winner
ENNI Energie & Umwelt Niederrhein GmbH
cpvs
09310000, 09300000

The circle Paderborn and eight kreisangehorige municipalities write the supply of electricity for the delivery period 1.1.2017 to 31.12.2019 from the option to extend the contract period by one year in open procedures by GWB.

The competition's overall volume amounts to approx. 22.8 GWh / a (1100 delivery points). The award is divided into 3 lots.

This lot includes 57 power measured delivery points with an annual electricity consumption of approximately 12 000 000 kWh.

This lot includes 874 delivery points without power measurement with an annual electricity needs of about 7.2 million kWh. It should be noted that the power supply for 181 delivery points of the city Büren can only be added to the 01/01/2018.

This lot includes 171 delivery points for street lighting with an annual electricity consumption of approximately 3 500 000 kWh.

Electricity

Kreis Paderborn | Published October 18, 2016  -  Deadline November 22, 2016
cpvs
09310000

This lot includes 171 delivery points for street lighting with an annual electricity consumption of approximately 3 500 000 kWh.

Electricity

Stadt Paderborn | Published April 28, 2015  -  Deadline May 7, 2015
cpvs
09310000

Elektrizität

Electricity

Stadt Paderborn | Published August 1, 2015
Winner
BeSte Stadtwerke GmbH
cpvs
09310000

Tendering the supply of electricity to the delivery points of the city of Paderborn with delivery beginning 01/01/2016, divided into 4 lots, a total of approximately 19.9 GWh annually.

VB; Composite award package 301 421, Paderborn Hbf W. 50, 124, 125, 141, 142; Lippstadt W. 38, 41; Benninghausen W. 5,

Deutsche Bahn AG FEI - Beschaffung Infrastruktur | Published March 10, 2017  -  Deadline April 6, 2017
cpvs

Approximately 470m Geo-textile, 8 points (6x190, 2x500), about 96 m of track renewal (IH), accompanying works LST, electrical engineering and assurance services. Conversion method conventionally.

Electricity distribution and related services

Westfalen Weser Netz GmbH | Published February 15, 2017
Winner
IT2 Solutions AG
cpvs
65300000

Procurement of services for payroll.

Construction work for halls of residence

Studierendenwerk Paderborn AöR | Published March 4, 2017  -  Deadline March 20, 2017
cpvs
45214700, 45211310, 45332300, 45332200, 45331210, 45431000, 45421146, 45332400, 45315100, 45331000, 45442110, 45421141, 45421111, 45421131, 45432100

Reconstruction of 24 community kitchens in the hall of residence to individual apartments and renovation of the remaining 161 individual apartments by installing prefabricated bathrooms (strand way), heating, electrical, drywall, interior doors, painting and flooring work.

The construction project will be carried out strand manner.

This breaks down as follows:

2 weeks require prefabricated bathrooms, then the prefabricated bathrooms technicians go to the next train,

1 week fine electric installation, floor, painter and interior doors.

The removal can be made in advance.

The bathrooms of student rooms are designed as a complete turnkey system with floor and wall tiles and all plumbing and electrical systems and plumbing objects.

The supply and discharge lines of the strands also be rehabilitated.

The sewers are created in plastic.

The thermal insulation of the pipes is based on valid ENEV.

The heating of the bath via a Heizungspaneel, connecting cables from copper.

The residential unit is a water sub-metering is provided.

Central fans are installed on the roof.

The equipment of the bathrooms is executed according to the plan.

The construction work will be carried out continuously as.

This setzensich as follows:

2 weeks require prefabricated bathrooms then go Fertigbadmonteure the next train.

1 week fine electric installation, soil painter and interior door work

This is part of the contract.

17 area distribution; 260 lamps)

260 Security + escape sign luminaires.

Replacement of low voltage distribution in the basement.

All installations in the rooms to be renewed.

The construction work will be carried out continuously as.

This breaks down as follows:

2 weeks require prefabricated bathrooms, then the Fertigbadmonteure go to the next strand.

1 week fine installation electrical, floor, painting and interior door work.

There is the possibility of dismantling the pre-fabricated bathrooms.

This is part of the contract.

Students rooms are equipped with a ceiling radiant heating system.

The insulation is done according to applicable EnEV.

The construction work will be carried out continuously as.

This breaks down as follows:

2 weeks require prefabricated bathrooms, then the Fertigbadmonteure go to the next strand.

1 week fine installation electrical, floor, painting and interior door work.

There is the possibility of dismantling the pre-fabricated bathrooms.

This is part of the contract.

All inner wall surfaces (stairway walls included) of the residence received a new coat of paint.

The ceiling in the room, students will receive a new coat of paint.

The construction work will be carried out continuously as.

This breaks down as follows:

2 weeks require prefabricated bathrooms, then the Fertigbadmonteure go to the next strand.

1 week fine installation electrical, floor, painting and interior door work.

There is the possibility of dismantling the pre-fabricated bathrooms.

This is part of the contract.

The existing suspended ceilings in the corridors are replaced by new ones.

The construction work will be carried out continuously as.

This breaks down as follows:

2 weeks require prefabricated bathrooms, then the Fertigbadmonteure go to the next strand.

1 week fine installation electrical, floor, painting and interior door work.

There is the possibility of dismantling the pre-fabricated bathrooms.

This is part of the contract.

In the new and the existing drywall steel frames are installed.

The construction work will be carried out continuously as.

This breaks down as follows:

2 weeks require prefabricated bathrooms, then the Fertigbadmonteure go to the next strand.

1 week fine installation electrical, floor, painting and interior door work.

There is the possibility of dismantling the pre-fabricated bathrooms.

This is part of the contract.

The hallways get new baseboards.

Students rooms are equipped with a new floor covering.

The construction work will be carried out continuously as.

This breaks down as follows:

2 weeks require prefabricated bathrooms, then the Fertigbadmonteure go to the next strand.

1 week fine installation electrical, floor, painting and interior door work.

There is the possibility of dismantling the pre-fabricated bathrooms.

This is part of the contract.

VB; Paderborn Hbf-Benhausen + GRI; SE2 Paderborn-Benhausen; Paderborn W4, 6; package 301420

Deutsche Bahn AG FEI - Beschaffung Infrastruktur | Published January 10, 2017  -  Deadline February 13, 2017
cpvs

Approximately 6102m track, about 1630m complete ballast renewal, about 1060m formation rehabilitation, approximately 2657m Geo-textile, about 435m deep drainage, approximately 96m² railway crossing, about 38 bridge beams, 2 points (2x500), accompanying works LST, electrical engineering and safety performance , Conversion method conventionally.

Pilot plant 4th purification stage; Mechanical / electro, ozonation

STEB Paderborn | Published November 2, 2016  -  Deadline December 13, 2016
cpvs

Installation of 2 submersible pumps, 50 m pipes (mainly DN 200, W.1.4571), associated pipe heating, ozone generator for ozone amount 1.5 kg O3 / h, reaction tank 50 m³ incl. Pipework / ozone destroyer, Electrical connection of components, metrology. It should be noted that the bidders and their subcontractors and distributors of workers have submitted the necessary commitments in accordance with §§ 4, 18 and 19 Tvgg NRW.

Electricity distribution and related services

Westfalen Weser Netz GmbH | Published May 4, 2016
cpvs
65300000, 65100000, 65200000

Meter installation - services in the network area of ​​Westfalen Weser GmbH network in the electricity, gas and water.

Construction work for halls of residence

Studierendenwerk Paderborn AöR | Published March 11, 2017  -  Deadline March 24, 2017
cpvs
45214700, 45262100, 45421132, 45223220, 45443000, 45262320, 45431000, 45432100, 45442100, 45324000, 45422000, 45262670, 90911200, 45311200, 45331000, 45232460, 45312310

Studierendenwerk Paderborn intends to existing buildings Vogeliusweg 17,19,21 in 33100 Paderborn conversion and perform modernization measures.

Furthermore, the outer shell is energetically renovated.

Scaffolding work on the façade;

Scaffolding work in the stairwell.

T. with air inlets;

Apartment entrance doors and smoke doors.

The main focus are the following work in the house 17, 19, 21, perform,

Demolition work on interior and exterior walls,

Demolition of window and door systems,

Demolition in floor and ceiling areas,

Excavation in the base area and for Underground drainage,

Masonry and concrete work mainly in small areas,

Innenputzarbeiten,

Sealing work on the base plate and in the base area,

Underground drainage.

The main focus are the following work in the house 17, 19, 21 run,

Demolition of existing curtain wall high-pressure laminate press plates with substructure and insulation,

Substructure and insulation, as well as clothing from fiber cement cladding panels,

Exterior window sills made of aluminum,

Reconstruction and renovation of the existing drainage downspouts.

The main focus are the following work in the house 17, 19, 21, perform,

Floating cement screed,

Anarbeiten at outbreak sites.

The main focus are the following work in the house 17, 19, 21, perform,

Floor and wall tiles in sanitary areas,

Floor tiles in staircases,

Interior window sills made of natural stone.

Focus on the following work in the house 17,19,21, execute

Supply and laying of linoleum flooring in the hallways

and vinyl flooring in the living rooms of students.

Baseboards.

The main focus are the following work in the house 17, 19, 21, perform,

Demolition of wallpaper,

Texturing,

Painting work,

Painting.

The main focus are the following work in the house 17, 19, 21, perform,

Drywall stud walls, facings and Verkofferungen,

Insulation and foil,

Interior doors, entrance doors,

Fire doors,

Letterbox systems.

Focus on the following work in the house 23 to be executed:

Insulation and foil.

The main focus are the following work in the house 17, 19, 21, perform,

Reconstruction and adaptation of the staircase façade made of steel,

Customizing inventory glazing elements,

adapt and renew RWA system.

Building cleaning after construction completion indoors and windows.

Electrical installation in homes.

Commissioning valves, insulation of pipes and fittings installations according to ENEV and DIN 1988,

Flat stations for decentralized water supply,

Insulation of pipe and fitting installations according to ENEV,

Fire protection of pipe penetrations through fire protection-classified walls / ceilings.

Renovation of the ventilation installation with:

Exhaust fans,

900 m ventilation pipes made of galvanized folded spiral,

Insulation of piping installations in the roof against condensation,

Central fans are installed on the roof.

Fire protection of pipe penetrations through fire protection-classified walls / ceilings.

Rehabilitation of sanitary installations with:

1 000 meters Drainage pipes made of plastic,

1 400 m drinking water pipes made of stainless steel,

Sanitary items (sink, shower toilet)

Insulation of pipe and fitting installations according to ENEV and DIN 1988,

Fire protection of pipe penetrations through fire protection-classified walls / ceilings.

The 4 separate freestanding building received a new facade, so that the lightning discharges must be replaced.

On the pitch roofs PV are - equipment installed, so that the existing external lightning protection system,

must be adapted or upgraded accordingly.

  • 1