Call +44 800 9755 164

Public tenders for electrical in Niederdorla Germany

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

16B20292 - electrical installation - power + low power

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Bautzen | Published August 12, 2016  -  Deadline June 30, 2017
16B20292 - electrical installation - power + low power "Note: The tender documents will be sent to already selected companies This notice is published on the basis of the information obligation imposed by section 19 (5) VOB / A 2012 at the Internet portal we ask of applications in sight because there is.. no entitlement to distribution of documents

Electrical installation work in KRH North townhouse J (KRH-2016-0030)

Klinikum Region Hannover GmbH | Published September 9, 2016  -  Deadline April 21, 2017
Electrical installation work and accompanying work of updating the main power supply, emergency power plant here-NEA in KRH Klinikum Nordstadt Hannover. The work is related to the "on-site" renewal of NSHV-AV / SV execute and coordinate with their own services or those agreed on. Power supply / installation: Electrical installation in remodeling field: - General Electrical Installations with cables, wires laying systems, switch boxes, grounding - proportionately General Lighting / emergency lighting - drilling, fire barriers - Disassembly, temporary

SMI, electrical installation and telecommunications + information Techn. Investment, procurement number: 16B40459

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Dresden 1 | Published August 3, 2016  -  Deadline December 23, 2016
Electrical installation and communication and information technology Notice: The tender documents will be sent to already selected companies. This notice is published in 2012 A due to the information requirements of § 19 (5) VOB / Internet portal. Please refrain from applications, because there is no right to distribution of documents.

Electrical installation (16A50257)

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Dresden 2 | Published August 3, 2016  -  Deadline November 17, 2017
- 1 pc main distribution 5 fields, busbar 400A; - 5 St. distribution boards in AP and UP-execution; - 600 St. installing equipment; - 600 m cables and wires to 4 x 185 mm²; - 6,000 m cables and wires to 5 x 6 mm²; - 1,000 m Low power cables and conductors; - 350 m cable trays, cable ladders; - 900 m LF channels and conduits; - 250 St. lamps; Emergency lighting system; KNX - Building Management Systems for lighting, blind and dimming control;

Electrical installation (16A90182)

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Zwickau | Published August 8, 2016  -  Deadline June 1, 2017
15 m cable duct, about 80 m from trunking 6,000 m cables and wires different. sections 7 pcs. NS sub-manifold 400 pcs. Installation Equipment 100 pcs. Check-mounted luminaires 10 pcs. RZ-contained luminaires 1 pc. BMA with approximately 55 smoke detector, 5 DKM, Manufacturer: Esser 1 pc. EMZ, 2 motion detectors, 1 card reader, Manufacturer: Novar 1 pc. Access control, Manufacturer: Salto 1 pc data network for 205 ports, 2 data cabinets

Electrical work Medium Mühlstraße 1 (SHO-2016-0011)

Stadtverwaltung Hockenheim | Published September 12, 2016  -  Deadline March 24, 2017
1 main distribution for 7 Counter 7 subdistributions 2,000 m cables and wires 190 Installation Equipment Cable Management Systems Lighting Satelitenempfangsanlage intercom

Electrical installations, V0778 / 2016 school Schmidtstraße (V0778 / 2016)

Immobilien Bremen, Anstalt des öffentlichen Rechts | Published August 9, 2016  -  Deadline December 21, 2018
When the construction project is the renovation of an old building, a gymnasium, a school building and a demolition of a mobile construction. The scope of services mainly includes: power installations: 1St. HVT 1,9x1,3x0,27m with count 3 St. UVT 1,25x0,8x0,27m, 3800m cables and wires, 170 St. sockets and switches, 400m slots in concrete, 40 St. fire barriers, 68 St. LED- mounted luminaires, 14 St. draft ball. LED growing lights, 115 St. LED downlights, Sicherheitsbe-lighting system as a central battery system with LED-RZ-lights and LED safety lights, lightning protection system, site power and dismantling services. Low-voltage systems: fire alarm system with 15 automatic detectors St., Electroacoustic system with 63 St. According to speakers, the transmission system with floor standing cabinet 22 HE and 2500m Data Cable Cat7, GA cabling with 900 m control lines.

Acoustic measures in various rooms etc. electrical work, wiring and lights Delivery

Immobilien Bremen, Anstalt des öffentlichen Rechts | Published September 6, 2016  -  Deadline January 31, 2017
Dismantling of the existing lights. Fit new recessed lighting in the ceiling tiles and connect. New wiring for SiBel- and Ela- system mount.

IMBN150178 Sattelhof Burgwall rehabilitation and renovation electrical installation for the establishment of a refugee shelter

Immobilien Bremen, Anstalt des öffentlichen Rechts | Published August 15, 2016  -  Deadline February 3, 2017
1 St. subdistribution; 1 St. distribution expansion; 110st. distribution internals; 120st. Installation equipment; 3700m powerlines, 980m Schwachstromltg .; 100pc. To shine; 1 St. Wanndverteiler data, 22st. Data terminals; 26st. Wireless smoke detector

Electrical work, V0856 / 2016 KuFZ Sweden House Osterholzer Heerstr., Bremen (V0856 / 2016)

Immobilien Bremen, Anstalt des öffentlichen Rechts | Published September 7, 2016  -  Deadline November 10, 2017
1 St. converter measurement; 1 St. HVT building with 75 St. Fire protection switch and 190 St. another built-in appliances; 285 St. Inst. devices and sunscreen and window control means KNX; 7.400m Starkstromltg .; 2,100m Schwachstromltg .; 240 St. lamps; 27 St. radio smoke detector; 1 St. RWA system for two skylights; 1 St. EDP system with 1 pc wall network cabinet and 16 St. data connection points

KiTa Nordring - redevelopment EC + 1st floor - electrical work (91/2016 VOB GML)

Gebäudemanagement Landau (GML) | Published August 5, 2016  -  Deadline December 31, 2016
Type and scope of performance substantially: Power Works -1x main distribution -2x sub-distribution (UV) -2000m powerlines -Kabelkanäle 20m -200 pcs switches / sockets, etc. -34 pcs LED insert lights - 25 pcs Other LED Lights - Telecommunications Installation -1x data cabinet - 16 DV ports -ca. 500m CAT7 cable line

EI & C technology gas compressor station (WV-2016-0045)

Wupperverband | Published August 3, 2016  -  Deadline December 16, 2016
Electrical systems and programming

Electricity and communications technology (BRW GB2-2015-0090)

Bergisch-Rheinischer Wasserverband | Published August 3, 2016  -  Deadline February 3, 2017
For details please refer Leistungsverzeichnis

LVR-Klinik Viersen, UmBauhaus 18, electric (Z2420-2016-0119)

Landschaftsverband Rheinland FB Gebäude- und Liegenschaftsmanagement | Published August 3, 2016  -  Deadline May 31, 2017
In the LVR-Klinik Viersen the house is to be rebuilt 18. The LVR intends following services of the trades power and communications engineering forgive. Gewerk power 1 pc UV-closet 1 St energy meter 1 St. FI / LS 2 pole 10 A 35 m NYCWY 4 x 35 mm² 15 m Cable tray width up to 400 mm 150 St. A holder Metal 1,250 NYM 3 x 1.5 mm² 100 St. off / changeover switch 10 St. sockets with orientation light approx 23 St. Firestop wall opening 40 x 20 cm approx 37 St. ceiling Mounted Gewerk Telecommunications 1 St. compact Set disabled -Toilet 1 St. fire Panel about 168 St. multisensor detector about 13 St. EDP doses

PIN-ELT, new Pinguinanalge Electronics [BL005] (65-2016-00371)

Hochbauamt | Published August 15, 2016  -  Deadline March 2, 2018
Electrical supply of a new animal facility for penguins consisting of outside plant, equipment and buildings Abtrenngehege. From a site supply station technology Building and Abtrenngehege are powered by new sub-distributors. A new lighting system, sound system and Computer cabling are also run. All installations in the animal areas are to be performed in a higher degree of protection.

BBS V, branch Universitätsring 21, IT cabling (FB 24-B-116/2016)

Stadt Halle (Saale), Fachbereich Recht, Team Vergabe Bauleistungen/Bauplanungen | Published August 18, 2016  -  Deadline June 29, 2018
- Dismantling existing Fm- and data lines - dismantling of cable ducts and pipes - supply and installation of approximately 2950 meters of various fiber optic breakout cables - supply and installation of approximately 1400 m of various communication cables - provide about 1200 m installation cable and mount - Delivery and installation electrical conduit including inside and outside corners -. Making fire barriers - supply and installation duct mounting boxes

LVR Clinic Langenfeld, Solingen branch, Conveyors 2 (Z2420-2016-0091)

Landschaftsverband Rheinland FB Gebäude- und Liegenschaftsmanagement | Published August 16, 2016  -  Deadline December 22, 2017
The Rhineland Regional Council (LVR) is planning to build a branch in Solingen. For vertical access to the building a bed lift is provided. The sumps are designed in a single shell in concrete. Therefore, the AG attaches great importance to smooth-running, economical and energy-efficient components in the HVAC systems. The designed for vertical transport of persons and bed lift system must meet these requirements. In addition to a highly efficient, frequency controlled, gearless drive system is in addition a gradual shutdown of the electrical loads in a "standby" - and a "sleep" mode to execute. The elevator control is in the basement, in the storage room installed right next to the elevator shaft. From the storage room there is direct access to the elevator shaft, the fire resistance properties must be closed. 1 St. Machine room-less elevator with 3 stops Bettenaufzug 2000kg, 3 doors, shaft width 2.520mm, shaft depth 3.200mm, pit depth 1300mm, headroom height 4.100mm, head 7.030mm reinforced concrete shaft 1 St. smoke extraction system for passive house with Insulated roof dome 1 St. maintenance contract

Construction container facility (16A60256)

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Leipzig 1 | Published August 3, 2016  -  Deadline February 17, 2017
In the Bundeswehr property of Sergeant Boldt barracks in Leipzig the turnkey construction of a new container system for temporary use is planned as a classroom building. - Overall size of the container facility about 18.00 x 51.00 m - a single-storey building as a compact - 6 classrooms and ancillary rooms (sanitary and technical rooms) zweihüftig to a central corridor (hallway) arranged. - In flexible construction by means of aligned, connected container modules in steel frame construction of self-supporting profile steel frame - the exterior and interior walls are in accordance with the outer sheet clothing, mineral insulation cores. Thermal insulation requirements and interiors, built from plasterboard. - All floor, wall and ceiling finishes are included as well as windows and doors with fire and / or heat insulation requirements and an external sun protection. - Roofing made of galvanized steel trapezoidal sheet above the container, dimensioning and material thickness according to structural requirements, corrosion protected. - Including the creation of the foundation system, the electrical / IT installation and heating, ventilation and sanitary equipment. The scope of services includes the provision of all necessary planning services on the basis of the provided by the principal planning documents as part of a partially functional tender.

Recycling station Borgfeld 1 pc Wohnraumlüftungsgerä 450m³ / h, 8 pcs. Electric supply air; 8 pcs. Room controller; 36 m folded spiral Dn 160-180, 40m ventilation Flexschlauch Fußbodne, 10 pcs poppet valves DN 80-100, 10 pcs K-controller DN 80-100 325m MSR electro wiring, 7 pcs sanitary objects incl. Hygiene devices, 4 pcs installation elements, 96 m copper pipes drinking water DN 12- 32, 40m PP drain pipe

Senator für Umwelt, Bau und Verkehr vertreten durch Immobilien Bremen AÖR | Published September 12, 2016  -  Deadline March 31, 2017
1 pc Wohnraumlüftungsgerä 450m³ / h, 8 pcs. Electric supply air; 8 pcs. Room controller; 36 m folded spiral Dn 160-180, 40m ventilation Flexschlauch Fußbodne, 10 pcs poppet valves DN 80-100, 10 pcs K-controller DN 80-100 325m MSR electro wiring, 7 pcs sanitary objects incl. Hygiene devices, 4 pcs installation elements, 96 m copper pipes drinking water DN 12- 32, 40m PP drain pipe
  • 1