Electrical fitting work

Staatliches Bauamt München 1 | Published November 30, 2016  -  Deadline January 24, 2017

Electrical installation EDP FM for building primary school, sports hall and kindergarten.

Building installation without lighting for primary school, sports hall and kindergarten.

Emergency lighting incl. Exit sign and emergency lighting and UPS, property's main floor and sub-manifold and their fittings,

For outdoor use for feed and outdoor lighting,

Building main riser and floor lines for electricity, computer, phone, MSR technology and transferring fault, installation equipment,

Verlegesysteme AP and UP for all risers and floor distribution, installation equipment,

Computer network, SHE and Care watch system.

Electrical fitting work

Staatliches Bauamt München 1 | Published November 30, 2016  -  Deadline January 17, 2017

Electrical, computer telecommunications building installation.

Building installation without lighting

Emergency lighting system incl. Escape sign u. Security lights and UPS,

Building main five stories, sub distributors and their fittings,

Outdoor cable for power supply, building principal, climb, Stockwerkverteilung- lines Power, IT, telecommunication, transferring fault and control,

Installation equipment, solar protection control,

Verlegesysteme AP and UP for all routes, riser and floor distribution,

EDP ​​/ FM network, intercom system and nurse call system.

Electrical work

GWG Städtische Wohnungsgesellschaft München mbH | Published November 10, 2016

Electrical work

Staatliches Bauamt München 2 | Published November 1, 2016  -  Deadline December 6, 2016

Electrical fitting work

Staatliches Bauamt München 2 | Published October 29, 2016  -  Deadline December 1, 2016
Construction of power installations from low voltage distribution comprising inter alia:

Electrical installation work of heating and other electrical building-equipment

Staatliches Bauamt München 1 | Published November 12, 2016  -  Deadline December 13, 2016

Building automation for the new elementary school (about 1 500 pupils) with kindergarten and sports hall of the European School Munich.

- Nine information centers with automation stations according to DIN EN ISO 16484 (BACnet) with data interface to LON and M-Bus;

- Circumference ca. 1800 physical data points and approximately 3500 communicating data points;

- 20 cabinets with power and control parts;

- A management device consisting of server and client for building management systems;

- A control and monitoring unit for installation in the control cabinet;

- Room automation in accordance with VDI 3813 for about 410 spaces based LON;

- Supply and installation of a bus system for fire dampers of base LON;

- Supply and installation of field devices;

- Cable connections for control and power cables;

- Automation plane network with 19 "rack, including active network components;

- Field-level networks LON and M-Bus;

- Services for automation tasks;

- Services for room automation tasks;

- Services for the management level;

- Detection of the functions and benefits of a trial run by trending, analysis and post-processing optimization;

- 1: 1 data point test;

- Temporary operation with emergency service for 24 weeks;

- Particular requirements for certification according to BNB standard, silver level.

Engineering design services for mechanical and electrical installations for buildings

Staatliches Bauamt München 1 | Published November 19, 2016  -  Deadline December 15, 2016

Planning technical equipment according to § 53 et seq HOAI, work phases 2 to 8. FIG.

Construction of a new hotel building with 528 rentals, Universität der Bundeswehr München.

VAT) according to cost groups (KGR) DIN 276-1: 2008-12:

Expense Cap: 36,189,000 EUR.

KGR 200: 1.9 million EUR,

KGR 300: 19.4 million EUR,

KGR 400: 9.84 million EUR (thereof TGA 8 000 EUR '000),

KGR 500 4 500 000 EUR.

The object is from the client point of view in accordance with § 56 HOAI fee of Zone II for the investment groups

1.1.1 (AWG), 1.1.2 (WVA), 1.1.3 (LTA), and Honorary Zone III for the investment group 1.1.8 (GA) assigned.

3 HOAI for the first - fourth repeat the application.

Planning starts immediately after placing the order,

Start of construction: not later than 10/2018,

. Completion including handover of the building: no later than 06 / 2021st

See also II.4 and tender documents.

The size of the flat land is approximately 55 hectares.

Besides functional areas such as kitchens and learning areas for communal services are to be accommodated.

It is planned that the new buildings of the accommodation buildings in massive construction, possibly to build considering rational production methods from the standpoint of economic construction and favorable operating costs.

In the same context, the need for the two newly built accommodation is recognized.

A summary of the plans for the building design are annexed to the application (see the tender documents and plan assets).

Engineering design services for mechanical and electrical installations for buildings

Staatliches Bauamt München 1 | Published November 26, 2016  -  Deadline December 22, 2016

TGA engineering services according to HOAI §§53ff in the work phases (LP) 1-4 and optional LP 5-9 for the plant groups (EGR) 4; 5.

New 400 accommodation in 4 simple four storey buildings.

Expenses by groups (KGR) DIN 276-1 (including 19 per cent VAT..): 2008-12:

Cost ceiling: EUR 25.29 million;

KGR 200: EUR 680 000;

KGR 300: approximately EUR 15 000 000;

KGR 400: approximately EUR 6 600 000;

KGR 500: approximately EUR 2.95 million;

Which for TGA, AGR 4.5 and KGR 230/440/450/540 3 500 000 EUR.

Honorary parameters:

Honorary zone for all buildings according to § 56 HOAI, from the client perspective: II and III (see specifications).

For the three essentially the same building 3 HOAI the requirements of § 11 shall apply:. For the first and second repeat the percentages of work phases 1 to 6 are reduced by 50 percent.

Planning starts immediately after placing the order.

Construction (preparatory actions): Expected end of 2017th

Completion: expected by mid / end of 2020th

See also II.1.4 and tender documents

Engineering services of technical equipment, investment group power and telegraph and information technology systems to §§ 53-56 HOAI, Phases (LP) 1-3, and optionally with gradual commissioning LP5-9.

On the grounds of the Ernst von Bergmann barracks in Munich new accommodation buildings are to be erected. The new buildings include 400 housing units, each with an associated plumbing (planned size per dwelling approximately 16m 2 ). Based planning is the result of a study carried out in the run-urbanistic study on implementation of 1092 lodging. Subject of this contract is the 1.Bauabschnitt with the implementation of 400 accommodation in 4 simple four storey buildings (see tender documents with plan assets).

Sorting equipment

Fraunhofer Gesellschaft zur Förderung der angewandten Forschung e. V. über Vergabeportal eVergabe | Published December 3, 2016  -  Deadline January 9, 2017

For the highest possible quality recovery of secondary raw materials from WEEE (Waste Electronic and Electrical Equipment) and other complex material flows a sorting is larger than laboratory scale to build on a pilot scale, which allows a practical and on the production scale.

Construction work for commercial buildings

AKDB Anstalt für kommunale Datenverarbeitung in Bayern | Published November 9, 2016  -  Deadline December 7, 2016

Electrical installation.

1Plug-In Hybrid New vehicle with electric u. Gasoline drive the minivan class

Fraunhofer Gesellschaft e.V. | Published November 16, 2016  -  Deadline December 8, 2016
1Plug-In Hybrid New vehicle with electric u. Gasoline drive the minivan class as 4 / 5doors than 1-year lease with 25,000 Km LL .:

Architectural, construction, engineering and inspection services

Landeshauptstadt München, Baureferat | Published December 7, 2016  -  Deadline January 10, 2017

Engineering services of planning of technical equipment in accordance with § 52 HOAI, Phases 1 - 9, in the investment groups 1-3, 4, 7 and 8, for the renewal of electrical and systems engineering in the field of sludge treatment and sand filter in the sewage treatment plant Gut Marienhof of Munich.

The electrical equipment in the sewage treatment plant Gut Marienhof the state capital are over 25 years old and need to be modernized.

In the field of sludge treatment are to look at the medium-voltage switchgear, low-voltage switchgear assemblies, measurement and control systems (measurement, regulation and control engineering), process data technology, telegraph, information and safety systems. Also, the plant engineering is checked and replaced if necessary in this area. The sand filter system on the sewage treatment plant Gut Marienhof is elektotechnisch modernize. The measure the operability and thus the plant availability of the sand filter system is ensured. This is to comply with the monitoring values ​​mandatory. In addition to the fundamental renewal of electrical engineering will also procedural adjustments, and system technology to be implemented in parts renewed.

For this, Engineering services of planning of technical equipment in accordance with § 52 HOAI, Phases 1 - 9 in the investment groups 1-3, 4, 7 and 8 to perform.

Lecture theatre construction work

Staatliches Bauamt München 2 | Published November 19, 2016  -  Deadline December 20, 2016

Restoration of a listed building of the Technical University of Munich with approximately 8 800 m 2 Main floor space.

Auditorium stalls with Quelluftausläßen: 236 pcs .;

Raised floor pedestal design as a bottom: 160 m 2 ;

Electrical panel facility: 1 pcs .;

Projection: 1 pc.

Medical aids

AOK Bayern – Die Gesundheitskasse | Published November 8, 2016  -  Deadline December 9, 2016
AOK Bayern furnishes according to § 33 Social Code Book V (SGB V) towards their United-secured, inter alia, the care with electrostimulation devices of the product subgroup 09:37:01 (low electrical stimulation devices for pain control) and the product type 09.37.02.0, 09.37.02.1, 09.37.02.3 and 09.37.02.4 (low, not EMG-controlled muscle stimulation devices) of aids register under § 139 SGB V. These supply the insured has hitherto by contractors on the basis of § 127 Abs. 1 SGB V.

Flatbed and Tipper trucks

Landeshauptstadt München, Direktorium – HA II – Vergabestelle 1, Abt. 4 | Published November 29, 2016  -  Deadline December 30, 2016

Purchase of truck Three-side tippers with Kommunalhydraulik,

- Lot 1: 4 Truck Dreiseitenkipper (4x2);

- Lot 2:. 4 Delivery and installation of municipal hydraulic systems and various attachments in trucks.

Delivery of 4 truck Three-side tippers (4x2)

- Of a gross vehicle weight of 18 t;

- Suitable for installation of a hydraulic system in accordance with municipal Lot 2;

- Suitable for operating existing or still to be obtained attachments and mounted equipment.

Supply and installation of municipal hydraulic systems and div. Attachments in trucks,

- Built into the truck under Lot 1;

- Einkreishydraulikanlage for the operation of spreaders;

- Div attachments (toolbox, side impact protection, camera system, electrical components, fire extinguishers, etc. pasting.)..

Vocational training services

Handwerkskammer für München und Oberbayern | Published December 6, 2016  -  Deadline January 6, 2017

Amenities following workshops / areas: automotive, electrical, painters, computerized CNC / pneumatic; Classrooms with EDUCenter + whiteboards.

1 St. EDUCenter with 16 notebooks u. Accessories, 1 St. EDUCenter with 12 tablets, and accessories.

1 St. 3D printer incl. Scanner.

6 St. interactive whiteboard with projector.

1 St. demonstration plant Smart Home: Digital current guesthouse / Smart Home control.

1 St. demonstration plant Energy-efficient heating, ventilation and cooling system with connection to Smart Home.

1 St. Station robots MPS® modules.

1 St. 3D colorimeter with Bluetooth.

1 St. automotive emission analysis system;

1 St. Bosch automotive diagnostic system, including tablet.

1 St. diagnostic system for tire pressure monitoring sensor.

Architectural, construction, engineering and inspection services

Innung für Elektro- und Informationstechnik München | Published November 19, 2016  -  Deadline December 19, 2016

The Guild for electrical and information technology Munich awards the achievements Objektplanung building LPH 1-5 HOAI § 34 and Objektplanung Freianlagen LPH 1-5 HOAI § 39 for the construction of the training center in Munich-Riem.

The facilities planning is not part of the order, this will be awarded separately at a specialist's office.

The facilities planning is not part of the order, this will be awarded separately at a specialist's office.

An already approved by the funding provider space and function program is available to the client.

In planning points of ecological criteria catalog of the City of Munich should be observed.

The designed for that purpose and tailored to the requirements of use concept is based on an outline of the workshops and classrooms the following functional areas:

- Reception, course presentation, management, catering supplies;

- Workshops, practical lessons;

- Specialized theoretical lessons;

- Underground car park.

For the plot a supply is provided by district heating.

The cost limit is the basis for the subsequent approval of the grant giver.

The outdoor areas are to be planned according to the specifications of the development plan.

Vocational training services

Handwerkskammer für München und Oberbayern | Published November 16, 2016  -  Deadline December 16, 2016

Amenities following workshops / areas: automotive, electrical, painting, metal, expansion (carpenters), Plumbing / Heating / Air, classrooms with IT.

2 St. 3D TVs.

1 St. Beamer.

1 St. PC diagnostic solution (vehicle).

1 St. Toughpad for diagnostic station (vehicle).

3 St. voltage stabilizer for charging systems (automotive).

2 St. Panel PC for digital workshop manuals (motor vehicles).

1 St. workshop LED lighting with KNX.

1 St. plotters with cutting function.

1 St. 3D printer.

1 St. 3D-Scanner incl. Software.

1 St. 5-axis CNC milling machine.

1 St. CNC lathe.

1 St. connect components in building technology for control via DDC.

37 St. Notebook.

1 St. mobile 3D laser scanner.

Architectural, engineering and planning services

Staatliches Bauamt München 1 | Published November 30, 2016  -  Deadline January 18, 2017

Project planning building work phases 3-9 §§ 33 ff HOAI, Restoration and Planning (emphasis facades) as part of the overall renovation of the sculpture gallery Munich, Königsplatz 3 80333 München.

The construction costs (cost ceiling) for the façade renovation are estimated at EUR incl. 19% VAT around 3,275,000 million. (Cost group 300 facade).

Honorary parameters: The construction project will be from the client the fee zone III visibility § 35 HOAI assigned.

Project start: March, 2017th

Estimated start: April 2019 expected completion of the repair work is the end of 2020th

It is planned that the restoration work on the facade of the weather conditions should be divided into two phases. First phase: from April 2019 to October 2019 for the southern and northern portico and courtyard facades. Second phase: from March 2020 to October 2020 for the remaining facades.

See also II.1.4) and the tender documents.

Project planning building work phases 3-9 §§ 33 ff HOAI, Restoration and Planning (emphasis facades).

Within this overall redevelopment different building parts or components, such as facades, glazing, sanitation, damp basement and the electrical installations are remediated. The facade renovation includes the renovation of the exterior facades and the renovation of the facades of the courtyard. It is envisaged that the damaged areas that have a loss of substance to follow to rehabilitate conservation practice and to remedy dangers for road safety. The appearance of the sculpture gallery is to be maintained in accordance with the reconstruction.

Construction work for college buildings

Staatliches Bauamt München 2 | Published November 19, 2016  -  Deadline December 15, 2016

Intending awarding benefits: State Building Authority Munich 2, TUM Garching, renovation of the chemistry building in Garching 2.BA, Place of performance: Lichtenbergstr. 4, Garching.

Intended main benefits:

Demolition and disposal of:

Components made of / with Asbest1), gem. TRGS 519:

- Fire dampers containing asbestos, about 3 pieces;

- Fire doors with asbestos board in the lock box, about 3 pieces;

- Asbestos Cable Channels Promabest in drywall, about 110 m.

Components made of / with "old mineral wool" 2), KMF, carcinogenic, gem. TRGS 521:

- Pipe insulation on pipelines, about 370 m;

- Insulation in drywall, about 1 200 meters 2 ,

Other dismantlement, demolition and disposal:

- Wall coverings and facings gypsum, about 500 m 2 ;

- Room and hallway walls plaster, about 1 200 meters 2 ;

- Masonry, about 65 m 2 ;

- Flooring carpet, approximately 425 m 2 ;

- Lighting ceiling lights, about 250 pieces;

- Pipelines steel and plastic, approximately 900 m;

- Electrical installations, Complete;

- Various laboratory and built-in furniture;

- Various clearing work;

- Other furnishings, such as cabinets, tables, chairs.

1) In the aforementioned demolition are the protective measures in accordance with TRGS 519, asbestos

Demolition, reconstruction or maintenance work must be observed.

2) In the aforementioned demolition are the protective measures in accordance with TRGS 521, demolition,

to consider renovation or maintenance work with old mineral wool (expertise

required). This is to "old mineral wool," Artificial mineral fibers, carcinogenic

Category 2 to TRGS 905th