Call +44 800 9755 164

Public tenders for electrical in Munich Germany

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Electrical fitting work

Staatliches Bauamt München 1 | Published November 30, 2016  -  Deadline January 24, 2017

Electrical installation EDP FM for building primary school, sports hall and kindergarten.

Building installation without lighting for primary school, sports hall and kindergarten.

Emergency lighting incl. Exit sign and emergency lighting and UPS, property's main floor and sub-manifold and their fittings,

For outdoor use for feed and outdoor lighting,

Building main riser and floor lines for electricity, computer, phone, MSR technology and transferring fault, installation equipment,

Verlegesysteme AP and UP for all risers and floor distribution, installation equipment,

Computer network, SHE and Care watch system.

Electrical fitting work

Gewofag Wohnen GmbH | Published December 28, 2016  -  Deadline February 13, 2017

New construction of a residential neighborhood with a total of about 33 200 meters 2 Floor area,

for proportionally 240 apartments, 2 dormitories with 149 WE, 1 Family Centre,

1 daycare 1 tenant fail and a 1-storey underground car park.

- 12 pieces low-voltage main and terminal distributions;

- 5 St. transducer measuring cabinets;

- 40 St. meter cabinets with kWh meter-places;

- 149 St. kWh intermediate meter;

- 48 St. building services / bunk / General distribution;

- 239 St. Housing / cavity wall / E-distributor;

- 239 St. Housing / media distribution;

- 149 St. Apart'hotels / cavity wall / E-distributor;

- 15 000 m Main and risers;

- 150 000. m high and low voltage lines;

- 7000 m Electric. Supply lines for HLSK technique;

- 2 000 m circuit integrity cables E30 / E90;

- 3000 m cable trays;

- 1 000 meters rises races;

- 20 000 St. installing equipment;

- Grounding / potential equalization;

- 2500 St. inputs and cultivation lamp / Downlights / pendant lamps / etc .;

- 300 St. Directive luminaires;

- 1 St. central battery (for emergency lighting);

- 7 St. Sibe- subdistributions with housing in integrity;

- 33 St. mast luminaires around;

- 1 000 meters underground cables outdoors;

- 1 pc fire alarm system, FSD, FIBS;

- 3 St. fire alarm sub-center;

- 1 pc alarm system;

- 1 St. EMA Office (door monitoring);

- 1 pc SAT roof / headend;

- 800 St. SAT Outlets, with cabling;

- 4 St. Units for Beh.-WC emergency call;

- 1 St. induction loop gem. DIN EN 60118-4;

- 15 St. external units;

- 400 St. internal units;

- 50 000. m structured data cabling (for computer / telephony);

- 1200 St. data outlets;

- 20 St. data distribution cabinets or 19 "inch cabinets;

- Fire bulkheads and fire load fairings;

- Acceptance, review documents.

Electrical wiring and fitting work

Katholisches Jugendsozialwerk München e. V. | Published December 16, 2016  -  Deadline January 26, 2017

New youth hostel.

39 900 m circuit services to 4 mm 2 without integrity, 3 600m data cable copper Duplex, 5400 m System Cable Coax u. Cat. 7, 176 data ports, 1400 lighting-tung body, emergency lighting, fire alarm, smoke vent, Telefonanlage-, Medientech-NIK u. Hausgeräte.

Electrical wiring and fitting work

Staatliches Bauamt München 1 | Published December 16, 2016  -  Deadline January 24, 2017

Power supply unit with storage tank.

Replacement generator for grid-connected operation diesel engine coupled to electric generator 800VA

incl. control cabinet, supply and extract air tank, exhaust system and required installation services.

Reconstruction and renovation Edith Stein Gymnasium, Munich

Erzdiözese München & FreisingKdÖR ErzbischöflichesOrdinariat Vergabestelle Bau | Published December 16, 2016  -  Deadline February 2, 2017
Electrical installation

Electricity

Ausschreibende Stelle: Bayerischer Gemeindetag für Auftraggeber der Strombündelausschreibung „Oberfranken, Unterfranken, Normalstrom, öffentliche Auftraggeber“ gemäß Leistungsverzeichnis | Published December 20, 2016  -  Deadline February 9, 2017

Supply of electricity for the buildings and street lighting, the client according to the specifications.

Total: about 4,902,796 kWh / year;

Delivery period: from 01/01/2018 to 31/12/2020.

Supply of electricity for the property of the client according to the specifications.

Total: about 1,531,886 kWh / year,

Delivery period: from 01/01/2018 to 31/12/2020.

Supply of electricity for the buildings and street lighting, the client according to the specifications.

Total: about 576,000 kWh / year,

Delivery period: from 01/01/2018 to 31/12/2020.

Supply of electricity for the property of the client according to the specifications.

Total: about 1,411,655 kWh / year,

Delivery period: from 01/01/2018 to 31/12/2020.

Supply of electricity for street lighting, the client according to the specifications.

Total: about 1,250,704 kWh / year,

Delivery period: from 01/01/2018 to 31/12/2020.

Supply of electricity for the property of the client according to the specifications.

Total: about 132,551 kWh / year,

Delivery period: from 01/01/2018 to 31/12/2020.

Electricity

Ausschreibende Stelle: Bayerischer Gemeindetag für Auftraggeber der Strombündelausschreibung „Oberbayern, Oberpfalz, Schwaben, Niederbayern, Ökostrom, öffentliche Auftraggeber“ gemäß Leistungsverzeichnis | Published December 17, 2016  -  Deadline February 8, 2017

Supply of electricity from renewable energy sources for buildings and street lighting outsourcer according Leistungsverzeichnis:

Total: about 8,865,040 kWh / year;

Delivery period: from 01/01/2018 to 31/12/2020.

Supply of electricity from renewable energy sources for the property of the client according to the service directory:

Total: about 505,448 kWh / year;

Delivery period: from 01/01/2018 to 31/12/2020.

Supply of electricity from renewable energy sources for buildings and street lighting outsourcer according Leistungsverzeichnis:

Total: about 7,558,393 kWh / year;

Delivery period: from 01/01/2018 to 31/12/2020.

Supply of electricity from renewable energy sources for the property of the client according to the service directory:

Total: about 434,071 kWh / year;

Delivery period: from 01/01/2018 to 31/12/2020.

Supply of electricity from renewable energy sources for street lighting outsourcer according Leistungsverzeichnis:

Total: about 367,128 kWh / year;

Delivery period: from 01/01/2018 to 31/12/2020.

Electricity

Ausschreibende Stelle: Bayerischer Gemeindetag für Auftraggeber der Strombündelausschreibung „Mittelfranken, Ökostrom, öffentliche Auftraggeber“ gemäß Leistungsverzeichnis | Published December 16, 2016  -  Deadline February 7, 2017

Supply of electricity from renewable energy sources for buildings and street lighting outsourcer according Leistungsverzeichnis:

Total: approximately 30,683,069 kWh / year.

Delivery period: from 01/01/2018 to 31/12/2020.

Supply of electricity from renewable energy sources for the property of the client according to the service directory:

Total: about 4,220,341 kWh / year.

Delivery period: from 01/01/2018 to 31/12/2020.

Supply of electricity from renewable energy sources for buildings and street lighting outsourcer according Leistungsverzeichnis:

Total: approximately 18,244,722 kWh / year.

Delivery period: from 01/01/2018 to 31/12/2020.

Supply of electricity from renewable energy sources for the property of the client according to the service directory:

Total: about 4,336,238 kWh / year.

Delivery period: from 01/01/2018 to 31/12/2020.

Supply of electricity from renewable energy sources for street lighting outsourcer according Leistungsverzeichnis:

Total: about 3,646,453 kWh / year.

Delivery period: from 01/01/2018 to 31/12/2020.

Supply of electricity from renewable energy sources for the property of the client according to the service directory:

Total: about 235,315 kWh / year.

Delivery period: from 01/01/2018 to 31/12/2020.

Electricity

Studentenwerk München, Anstalt öffentlichen Rechts, vertreten durch die KUBUS Kommunalberatung und Service GmbH | Published December 16, 2016  -  Deadline January 18, 2017

Supply of electricity from renewable energy sources for the delivery year 2018/2019 for the property of the Munich Student Union, about 497,079 kWh / year.

Supply of renewable energy for buildings of the Munich Student Union for the delivery year 2018/2019, about 497,079 kWh / year.

Electricity

Ausschreibende Stelle: Bayerischer Gemeindetag für Auftraggeber der Strombündelausschreibung „Bayern, Ökostrom, Sektorenauftraggeber“ gemäß Leistungsverzeichnis | Published December 24, 2016  -  Deadline February 10, 2017

Supply of electricity from renewable sources for the property / assets of the sector contracting entities under Leistungsverzeichnis

Total: about 3,760,053 kWh / year

Delivery period: 01/01/2018 to 31/12/2020.

Supply of electricity from renewable sources for the property / assets of the sector contracting entities under Leistungsverzeichnis

Total: about 1,287,370 kWh / year

Delivery period: 01/01/2018 to 31/12/2020.

Supply of electricity from renewable sources for the property / assets of the sector contracting entities under Leistungsverzeichnis

Total: about 944,053 kWh / year

Delivery period: 01/01/2018 to 31/12/2020.

Supply of electricity from renewable sources for the property / assets of the sector contracting entities under Leistungsverzeichnis

Total: about 1,515,100 kWh / year

Delivery period: 01/01/2018 to 31/12/2020.

Supply of electricity from renewable sources for the property / assets of the sector contracting entities under Leistungsverzeichnis

Total: about 13,530 kWh / year

Delivery period: 01/01/2018 to 31/12/2020.

Electricity

Ausschreibende Stelle: Bayerischer Gemeindetag für Auftraggeber der Strombündelausschreibung „Bayern, Ökostrom, öffentliche Auftraggeber“ gemäß Leistungsverzeichnis | Published December 24, 2016  -  Deadline February 14, 2017

Supply of electricity from renewable sources for the property of the client according to the specifications.

Total: about 6,000,525 kWh / year;

Delivery period: 01/01/2018 to 31/12/2020.

Supply of electricity from renewable sources for the property of the client according to the specifications.

Total: about 1,222,428 kWh / year;

Delivery period: 01/01/2018 to 31/12/2020.

Supply of electricity from renewable sources for the property of the client according to the specifications.

Total: about 2,961,228 kWh / year;

Delivery period: 01/01/2018 to 31/12/2020.

Supply of electricity from renewable sources for the property of the client according to the specifications.

Total: about 918,669 kWh / year;

Delivery period: 01/01/2018 to 31/12/2020.

Supply of electricity from renewable sources for street lighting, the client according to the specifications.

Total: about 770,959 kWh / year;

Delivery period: 01/01/2018 to 31/12/2020.

Supply of electricity from renewable sources for the property of the client according to the specifications.

Total: about 127,241 kWh / year;

Delivery period: 01/01/2018 to 31/12/2020.

2. S-Bahn route Munich - Bürgerbüro Marienhof, trade expansion

Deutsche Bahn AG FEI - Beschaffung Infrastruktur | Published December 22, 2016  -  Deadline January 30, 2017
Floor about 200 m² on supports, roof terrace 200 m², fire protection elements, electrical installation, lighting system, heating installation, sanitary facilities

Supervision of building work

Staatliches Bauamt München 2 | Published December 20, 2016

When the construction project is the 1st phase construction of the Faculty of Electrical Engineering and Information Technology. There are shifted from the main campus in downtown Munich on the academic and research campus in Garching 5 chairs. For the new building of the Faculty of Electrical Engineering and Information Technology, the object of surveillance is (performance image building) LPH are awarded 6-9.

There are services (service image building to §§33-35 HOAI 2013) will be awarded for the 1st phase of construction of the Faculty of Electrical Engineering and Information Technology. It will be awarded basic services and special services of service phases 6-9. Before the awards cost safety is demonstrated. While the object monitoring an adequate presence on the site is mandatory.

Architectural, construction, engineering and inspection services

Landeshauptstadt München, Baureferat | Published December 22, 2016  -  Deadline January 24, 2017

Engineering services of planning of technical equipment in accordance with § 52 HOAI, Phases 1 - 9, in the investment groups 1-3, 4, 7 and 8, for the renewal of electrical and systems engineering in the field of sludge treatment and sand filter in the sewage treatment plant Gut Marienhof of Munich.

Telecommunications cable and equipment

Autobahndirektion Südbayern | Published December 28, 2016

Operating Hardware after RABT 2006, Galerie Buildings Gilching and Germering.

Operating Hardware after RABT 2006, Galerie Buildings Gilching (length: 522 m) and Germering (length: 972 m);

Power supply, cable routes / wiring, lighting, video surveillance, public address system, fire alarm system, electrical installation company building, tunnel radio digital, control, Uniform user interface (EBO), access to transport and operations center (ITR), fire water (pump station, pressure boosting system).

Engineering services

Innung für Elektro- und Informationstechnik München | Published December 28, 2016  -  Deadline January 25, 2017

The Guild for electrical and information engineering München forgives services Structural engineering LPH 1-6 HOAI §§ 51 and Engineering controls during the performance of the object for the new training center in Munich-Riem.

The project is funded by the Federal Institute for Vocational Education (45%) and the Bavarian Ministry of Economic Affairs and Media, Energy and Technology (30%).

the benefits of structural design are according to the measures. § 51 HOAI and Engineering controls of the object to be charged.

The facilities planning is not part of the order, this will be awarded separately at a specialist's office.

An already approved by the funding provider space and function program is available to the client.

In planning points of ecological criteria catalog of the City of Munich should be observed.

The designed for that purpose and tailored to the requirements of use concept is based on an outline of the workshops and classrooms the following functional areas:

- Reception, course presentation, management, catering supplies;

- Workshops, practical lessons;

- Specialized theoretical lessons;

- Underground car park.

For the plot a supply is provided by district heating.

The cost limit is the basis for the subsequent approval of the grant giver.

The outdoor areas are to be planned according to the specifications of the development plan.

Architectural, engineering and planning services

Staatliches Bauamt München 1 | Published November 30, 2016  -  Deadline January 18, 2017

Project planning building work phases 3-9 §§ 33 ff HOAI, Restoration and Planning (emphasis facades) as part of the overall renovation of the sculpture gallery Munich, Königsplatz 3 80333 München.

The construction costs (cost ceiling) for the façade renovation are estimated at EUR incl. 19% VAT around 3,275,000 million. (Cost group 300 facade).

Honorary parameters: The construction project will be from the client the fee zone III visibility § 35 HOAI assigned.

Project start: March, 2017th

Estimated start: April 2019 expected completion of the repair work is the end of 2020th

It is planned that the restoration work on the facade of the weather conditions should be divided into two phases. First phase: from April 2019 to October 2019 for the southern and northern portico and courtyard facades. Second phase: from March 2020 to October 2020 for the remaining facades.

See also II.1.4) and the tender documents.

Project planning building work phases 3-9 §§ 33 ff HOAI, Restoration and Planning (emphasis facades).

Within this overall redevelopment different building parts or components, such as facades, glazing, sanitation, damp basement and the electrical installations are remediated. The facade renovation includes the renovation of the exterior facades and the renovation of the facades of the courtyard. It is envisaged that the damaged areas that have a loss of substance to follow to rehabilitate conservation practice and to remedy dangers for road safety. The appearance of the sculpture gallery is to be maintained in accordance with the reconstruction.

Architectural, engineering and planning services

Gewofag Wohnen GmbH | Published December 15, 2016  -  Deadline January 19, 2017
BA 

Construction phase of modernization and repair / maintenance according to § 2 HOAI.

All Mietwohnblöcke are during the operational implementation in full inhabited state.

An extensive tenant support is part of the assignment.

The following work is carried out as part of the reorganization measure (the list is not exhaustive):

- First-time thermal facade;

- Painting;

- Initial insulation bottom basement ceiling;

- Storage insulation on floor;

- Full replacement of windows in all units;

- Concrete repair work on balconies and loggias;

- General tinsmith, locksmith and roofing works;

- General tile, natural stone and woodwork;

- Implementation of general traffic safety measures.

o Fire

o staircase railings / other balustrades

- Upgrading staircases (painting walls, revision / replacement house entrance and apartment doors);

- Mounting central letterbox systems;

- Other general maintenance work on the balconies, in the basement and in the staircase.

following any further work on the same time as the aforementioned buildings executed:

- Comprehensive electrical work, renovation of electric lines and distribution units;

- Renewal of the lighting in common areas;

- Installation of intercom systems;

- Comprehensive sewer rehabilitation / reconstruction of mixing on separation system;

- Surface water infiltration;

- Other general work in the field of home automation;

- Complete replanning and renewal of the outdoor facilities.

BA

Architektenleistungen Objektplanung building in accordance with § 34 HOAI a renovation / refurbishment

There is no gradual commissioning provided.

Phases 6, 8

Due to the minimal effort and non-predictability of services required, these will be charged on an hourly basis on proof.

The AG also intends architect transmit Special Services.

Architectural, construction, engineering and inspection services

Landeshauptstadt München, Baureferat | Published December 21, 2016  -  Deadline January 24, 2017

Project planning according to § 34 HOAI, LPH 5-9, for improving the energy efficiency of 3 rows of terraced houses in Strassfeld, 85386 Eching.

Retrofitting of 3 rows of terraced houses with 17 housing units, year 1989

The condominium was built in reinforced concrete wall construction with prefabricated insulated timber panel elements on the longitudinal sides and insulated wooden roof structure with rafters or purlins roof trusses. The façade is covered with a board and batten cladding.

The reorganization measures mainly include:

Dismantling conservatories and facade, install additional insulation.

Renovation facade in ground cover formwork.

Renewal of conservatories.

Dismantling tile roof, install additional thermal insulation.

Renewal of the tile roof.

Replacement doors and windows.

Dismantling of the welfare institutions in the basement, attaching a basement ceiling insulation and new connection of the supply lines.

Connecting the technical ventilation in existing fireplaces.

Establishment of a central boiler room in existing carport for installation of a CHP.

Conversions in existing electrical room.

The construction project includes the following areas:

BRI 7888 m 3

BGF 926 m 2

NF 1 421 m 2 ,

Engineering design services

Staatliches Bauamt München 2 | Published December 30, 2016

In this construction project is a reconstruction in the inventory of treatment tract Klinikum Grosshadern. In the Department of Radiation Oncology of the University Hospital of Munich, Campus Grosshadern, Marchioninistraße 15, 81377 Munich, a magnetic resonance imaging system run radiotherapy system is to be installed.

A delivery of the MR magnet ring (with open Abhängdecke) possible because of its size only by the insertion opening in the nitrogen storage 6K U3 715 and the subsequent passage 6K U3 800th Here, then, the corridor side bunker wall 6I U3 431 must be opened. Pre existing device ONCOR is expanding from room 431 and installed again in the by then reorganized and made-up room 5I U3 441st The installed there Mevatron M is deprecated and will therefore advance dismantled and disposed of.

There are design services (performance image Equipment in accordance with §§ 53 ff. HOAI, medical planning medical major equipment) will be awarded for the amendment of parts of the existing building with high technical requirements. It will be awarded 1-3 and 5-9 in accordance with the enclosed installation "scope" the basic services and special services of the power phases.

Before the awards cost safety is demonstrated. In planning and construction supervision of maintaining hospital operation in adjacent parts of the building has to be considered. The subregion is technically installed (technology content> 50% of the construction costs). The integration of the services of other technically involved therefore is of great importance. The plan is to work in close coordination with the client and the user representatives. While the object monitoring an adequate presence on the site is mandatory.

With the services of medical planning, ventilation and sanitary engineering and electrical engineering specialist consultants are entrusted.