Public tenders for electrical in Lieferstellen-in-merseburg-und-hallesaale Germany

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!
ElectricalGermanylieferstellen-in-merseburg-und-hallesaale

Fitting of Meeting Kommunikationsraeumen in buildings 168/169, Lot 15 Electrical installation

Sachsen-Anhalt: Hochschule Merseburg Dezernat Liegenschaftsverwaltung und Technik | Published August 22, 2016  -  Deadline September 14, 2016
cpvs

Fitting of Meeting Kommunikationsraeumen in buildings 168/169, Lot 15 Electrical installation

Reconstruction and modernization of the Fritz-Haber-Straße 7a in Merseburg, Lot 10 - Electrical Installation

Sachsen-Anhalt Landkreis Saalekreis | Published May 25, 2016  -  Deadline June 15, 2016
cpvs

Reconstruction and modernization of the Fritz-Haber-Straße 7a in Merseburg, Lot 10 - Electrical Installation

Verification of portable electrical appliances

Stadt Frankenthal (Pfalz) | Published December 5, 2017  -  Deadline January 16, 2018
cpvs

Verification of portable electrical appliances

Kreisvolkshochschule Merseburg, expansion basement for media workshop Lot 9 - Electrical Installations

Sachsen-Anhalt Landkreis Saalekreis | Published March 25, 2015  -  Deadline April 22, 2015
cpvs

Kreisvolkshochschule Merseburg, expansion basement for media workshop Lot 9 - Electrical Installations Scope: Single-Batt security lights: 1 pc. Sub-distribution (Wandverteiler): 1 pc. Trunking: about 34 m cables and wires: 400 m Installation Equipment: 30 pcs. Lights: 11 pcs. Intercom: 1 pc. Data outlets (RJ45): 18 pcs. Communication cable (Cat.7): 1.400 m Baustromverteiler: 1 pc.

D - Neustadt / Cunnersdorf, electrical installation

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Dresden 1 | Published September 6, 2017
cpvs

Electrical installation

Renovation Stadium dressing, electrical work

Gebäudemanagement Landau | Published September 22, 2017  -  Deadline October 17, 2017
cpvs
45311200

Electrical installation, DIN 18 382

Tests of stationary electrical systems

TUM Technische Universität München | Published November 13, 2017  -  Deadline December 11, 2017
cpvs

- Repeated tests of stationary electrical equipment and equipment- Lightning protection- Inventory / Labeling RCD's

Installation services of electrical equipment

LBB Niederlassung Landau | Published November 19, 2016
Winner
Buchmann Elektro GmbH
cpvs
51110000

VE01 - electrical installation.

Rehabilitation Halloren- and Salinemuseum - Electrical Planning

Stadt Halle (Saale), FB Recht, Team Submission | Published April 23, 2018  -  Deadline May 22, 2018
cpvs
71000000

Planning of electrical and information technology systems

Cable laying and electrical work

Max-Planck-Institut für Plasmaphysik | Published April 12, 2018  -  Deadline April 26, 2018
cpvs

In the environment of ASDEX Upgrade (torus hall, control room), extensive cable and fiber optic installation work as well as electrical installation work are necessary to put new hardware (ICRH, ECRH, computer technology, diagnostics) into operation.

Electrical, V0258 / 2017 New High School Gröpelingen

Immobilien Bremen | Published March 23, 2017  -  Deadline May 2, 2017
cpvs
31213400

Electrical - Total renovation

Parking lot lighting, electrical installation and Stromversor ...

Autobahndirektion Südbayern | Published September 8, 2016
cpvs

Parking lot lighting, electrical installation and Stromversor ...

Electrical installation work

Landkreis Schwandorf | Published February 23, 2017  -  Deadline April 4, 2017
cpvs
45310000, 45311000, 45311100, 45311200

Vocational School Centre Oskar-von-Miller in Schwandorf remediation main building and part of new construction connecting building

Subsection: electrical installation work.

The District Office Schwandorf intends rehabilitation of the Vocational School Centre Schwandorf fort-out. This concerns the construction phases 3 - 5. This also electrical installation work required, which includes among others the following areas Electric General, IT, security lighting, smoke ventilation systems, PA system and clock system.

Quantity Structure:

Group battery systems approx 6 pieces;

Lighting 300 pieces;

Distributions about 55 pieces;

Lines 100 000 m;

Roads 1,700 m;

Data connections 350 pieces;

RWA systems about 3 pieces;

Speaker about 100 pieces;

Watches about 50 pieces.

Period:

May 2017 - Dec 2020th

Electrical installation work

Landkreis Schwandorf | Published May 26, 2017
Winner
Elektro Hägler GmbH
cpvs
45310000, 45311000, 45311100, 45311200

Construction of a new administrative building instead of the existing one as well as modification of the main building by reduction around a storey and interior modernization with fire protection overwork at the vocational school Schwandorf.

The Landratsamt Schwandorf intends to continue the rehabilitation of the vocational school center Schwandorf. This applies to the construction sections 3 - 5. Electrical installation work is also required for this, which covers, among other things, the following areas: electrical general, EDP, emergency lighting, RWA systems, ELA system and clock system.

Quantity framework:

Group battery systems approx. 6 pieces;

Lighting unit approx. 300 pieces;

Distributions approx. 55 pieces;

Lines approx. 100 000 m;

Trains approx. 1 700 m;

Data connections approx. 350 pieces;

RWA systems approx. 3 pieces;

Speakers approx. 100 pieces;

Watches approx. 50 pieces.

Period:

May 2017 - December 2020.

Electricity

Landkreis Saalekreis, Vergabestelle | Published October 17, 2017
Winner
Ensys GmbH
cpvs
09310000

The object of the tender is the supply of electrical energy for the sampling points of the county district Saalekreis in the period from 1.1.2018 to 31.12.2020. The delivery is requested free delivery points of the customer, ie including the processing of the grid usage.

The tender comprises 64 supply points with a total current requirement of approximately 3 500 000 kWh per year. Detailed information on the individual delivery points as well as the load curves of the systems to be delivered are given in the tender documents.

This lot includes 5 delivery locations with an annual electricity requirement of approximately 751 000 kWh and 23 non-delivery locations with an annual electricity requirement of 904 000 kWh.

This lot consists of 4 deliveries with an annual electricity requirement of approximately 680 000 kWh and 32 non-delivery locations with an annual electricity requirement of 1 160 000 kWh.

Electricity

Landkreis Saalekreis, Vergabestelle | Published May 20, 2017  -  Deadline June 21, 2017
cpvs
09310000

The invitation to tender provides for the supply of electrical energy for the sampling points of the county district Saalekreis in the period from 1.1.2018 to 31.12.2020. The delivery is requested free delivery points of the customer, ie including the processing of the grid usage.

The tender comprises 64 supply points with a total current requirement of approximately 3 500 000 kWh per year. Detailed information on the individual delivery points as well as the load curves of the systems to be delivered are given in the tender documents.

This lot includes 5 delivery locations with an annual electricity requirement of approximately 751 000 kWh and 23 unused delivery points with an annual electricity requirement of 904 000 kWh.

This lot includes 4 deliveries with an annual electricity requirement of approximately 680 000 kWh and 32 non-delivery locations with an annual electricity requirement of 1 160 000 kWh.

Electrical engineering installation works

Kliniken des Landkreises Neumarkt i.d.OPf. Anstalt des öffentlichen Rechts des Landkreises Neumarkt i.d.OPf. Vertreten durch den Vorstand Peter Weymayr | Published October 27, 2017
Winner
OPF GmbH
cpvs
45315100, 42960000, 38570000, 71315000

Building automation according to DIN EN ISO 16484

Supply and assembly of measuring, control and control systems for

Ventilation, heating, refrigeration and plumbing;

Operation and fault reporting of electrical installations

as well as implementation of media counters (heat, cold)

Construction of a complete building automation from the field of the field,

Automation level and management level;

Communication: BACnet / IP (automation and management level)

Physical data points: approx. 1000;

Field level: Field devices with standard signals

3 pcs. ISP (free programmable DDC with I / O modules)

3 pieces of switchgear units

1 management management level (GLT) with management and control functions

Network structure: Fast Ethernet, BACnet over IP

Network cabling: fiber optic (backbone) and TP (automation stations)

Including complete cabling and wiring as well as creating

the software (PID control algorithms, EDE files), regulation and control

Commissioning.

P.

FTZ Saalekreis - New hose and wash tower; Electrical installation

Sachsen-Anhalt Landkreis Saalekreis | Published July 26, 2016  -  Deadline August 23, 2016
cpvs

Electrical engineering installation works

LRA Schwandorf | Published March 18, 2016
Winner
Elektro Hägler GmbH
cpvs
45315100, 45314100, 45213316

Electrical Building Services - high and low voltage systems consisting of:

- About 15 000 m of cables and wires;

- About 7 St. low-voltage power distribution;

- About 28 St. media connection columns;

- 520 St. Lighting;

- 750 m cable support systems;

- 850 m fiber optic lines with transfer components;

- Approximately 2 500 meters EDP cabling distribution and connection components;

- 1 pc Fire Panel;

- 260 St. automatic detectors in loop technology;

- 350 St. KNX components with programming.

Electrical engineering installation works

LRA Schwandorf | Published December 15, 2015  -  Deadline January 26, 2016
cpvs
45315100, 45314100, 45213316

Electrical building services - high and low voltage equipment consisting of: - approximately 15 000 m of cables and wires; - About 7 St. Low voltage subdistribution; - About 28 St. media connection columns; - Approximately 520 St. Chandeliers; - Approximately 750 m cable support systems; - Approximately 850 m fiber optic lines with transfer components; - 2500 m with EDP cabling distribution and connection components; - 1 pc Fire Panel; - 260 St. automatic detectors in loop technology; - 350 St. KNX components with programming; - 1 St. integration of KNX sun protection control for about 160 St. drives; - 1 St. ELA system with about 75 St. speaker; - 1 pc emergency lighting system with about 90 St. emergency lights in LED technology.