Public tenders for electrical in Hannover Germany

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Electrical work

Region Hannover Team Zentrale Submissionen -30.02- | Published July 11, 2016  -  Deadline August 12, 2016
cpvs

The contractor accepts the test of portable electrical equipment in accordance with § 10 para. 1 operation (BetrSichV) and §§ 5 et seq. Of Accident Prevention Regulation Electrical Equipment (DGUV Note 3) taking into account the usable technical rules for operating safety (TRBS) in 1201 and 1203 for each lot or the entire order.

Electrical fitting work

Gesellschaft für Bauen und Wohnen Hannover mbH (GBH) | Published July 12, 2016  -  Deadline August 16, 2016
cpvs

Electrical installation work

Electrical installation

Vergabestelle hanova | Published April 25, 2017  -  Deadline May 30, 2017
cpvs

Electrical installations with 10 pcs. Of counting cabinets for total 61 counts; 60 St. Subdivisions; Approx. 14500m high - current cables, approx. 3500m low - voltage cables, approx. 2500 pcs Switch and junction boxes; Approx. 1800 pcs. Switches and sockets; 135 lights

Electrical and telecommunications techniques

Gottfried Willhelm Leibniz Universität Hannover Dez.3 Gebäudemanagement / SG 35 | Published January 16, 2017  -  Deadline February 15, 2017
cpvs

Building 3109 Pollutant and fire restoration KG + EG Electrical and Telecommunications Equipment and EC KG Building 3109

Electrical fitting work

Gesellschaft für Bauen und Wohnen Hannover mbH | Published January 8, 2016
Winner
Elektro-Bau Hannover Fritz Böhm GmbH
cpvs
45311200

Electrical works for the new refugee dormitory, social housing Oheriedentrift.

Framework contract for the supply of electrical supplies

Region Hannover Team Zentrale Vergabeangelegenheiten -30.02- | Published May 22, 2017  -  Deadline June 15, 2017
cpvs

Framework contract for the supply of electrical supplies Scope of the service: Framework contract for the supply of electrical supplies to various locations within the Hannover region for the duration of one year.

Electrical work

Region Hannover Team Zentrale Submissionen -30.02- | Published July 22, 2016  -  Deadline August 18, 2016
cpvs

Nature and extent of power, possibly split into lots. Electrical work Supply and installation of emergency equipment for telephony via VoIP - property d Region Hannover Scope: Installation of about 180 pieces emergency telephone with 2 call buttons in 66 locations including the production of the power path. , Supply and installation of 80 pieces uninterruptible power supply with an output of 700 VA. This service is divided into the system and 1.Aufbau 2. Verifying after telephony service.

Installation services of electrical equipment

Stadtwerke Hannover AG | Published December 15, 2015
cpvs
51110000

Project heat storage and electric heaters - subproject Electrical connection.

Electrical installation work

Staatliches Baumanagement Hannover | Published May 16, 2015  -  Deadline June 25, 2015
cpvs
45310000

Conversion Building K15, installation of a central sterilization unit and a data center - Electrical installation Stark & ​​low power..

Repair and maintenance services of electrical building installations

Landeshauptstadt Hannover – Fachbereich Personal und Organisation | Published August 6, 2016  -  Deadline September 8, 2016
cpvs

Repair and maintenance services of electrical building installations

Electrical machinery, apparatus, equipment and consumables; lighting

Stadtwerke Hannover AG | Published July 21, 2016
cpvs
31000000, 31155000

Electrical machinery, apparatus, equipment and consumables; lighting

Electrical fitting work

Gesellschaft für Bauen und Wohnen Hannover mbH (GBH) | Published May 16, 2017  -  Deadline June 12, 2017
cpvs
45311200

The measure consists of 4 separate houses with 4 meter distributions 16-21 residential units. A total of 77 small distributors with 1386 fuse outputs, 77 pushbutton circuits with 234 control buttons, 624 conventional circuits with serial, control and switch-over switches, 2964 socket outlets with folding lid and IP44 quality, 4800 switch sockets deep and flat, 2900m wall slots, 54460m lines Mainly NYY in concrete ceilings.

Electrical installation for the new Heinrich-Böll-Weg building.

Engineering design services for mechanical and electrical installations for buildings

Staatliches Baumanagement Hannover | Published July 30, 2016  -  Deadline August 26, 2016
cpvs

Engineering design services for mechanical and electrical installations for buildings

Repair and maintenance services of electrical and mechanical building installations

Region Hannover | Published December 6, 2014
Winner
WAKO Nord Hannover GmbH Breite Str. 15 Berlin 14199
cpvs
50710000

Testing of portable electrical equipment according. DGUV rule 3. The Contractor shall conduct the initial of portable electrical equipment in accordance with § 10 para. 1 use (s) and §§ 5 et seq. Of the accident prevention regulations electrical equipment (DGUV Rule 3) subject to the usable technical rules for operational safety (TRBS) 1201 and 1203 each for the lot or the entire order. If work is performed under voltage must §§ 6 ff. DGUV to consider Rule 3 §§ 2-3 and accident prevention regulations. The results shall be documented in accordance with § 11 BetrSichV.

Electrical fitting work

infra Infrastrukturgesellschaft Region Hannover GmbH | Published December 7, 2016  -  Deadline February 2, 2017
cpvs
45311200

Electrical equipment and lighting high platform Hauptbahnhof / ZOB & üstra toilet building.

Configuration and connection of 3 distribution cabinets (2 St. -Nebenanlage 1 St-üstra toilet building)

Installation and connection of:

56 lights under shelter roof;

Handrail lighting (60 m LED lines) in the ramp area;

2 lights on lights on mast forward area;

Lighting the benches (7 m LED Mini Profile);

Equipment and lighting (4 lamps) of üstra toilet building;

Supply and installation of the cable system (.. Elt and Bel) 2700 m, FM cable about 1500 m and fiber optic cable 300 m;

Turnkey assembly and connection of new telecommunications;

Device (2 ticket machines, emergency-column, 2 destination displays with the clock);

Performing the functional tests of the circuits as well as all required measurements in accordance with VDE regulations;

Building grounding system;

Check the continuity of the cable ducts.

Tests of portable and fixed electrical installations and equipment in the departments of Geozentrum Hannover.

Bundesanstalt für Geowissenschaften und Rohstoffe | Published October 25, 2014  -  Deadline December 1, 2014
cpvs
50532000

Examination of portable and fixed electrical installations and equipment and a risk assessment for Prüffristenermittlung accordance with the Ordinance on Industrial Safety in the departments of Geozentrum Hannover (GZH). Lot 1: Test of portable and fixed electrical installations and equipment in Hanover and Oyten. Examining only the portable electrical systems and equipment in Celle and Hildesheim. Lot 2: Test of portable and fixed electrical installations and equipment in Clausthal-Zellerfeld and Grubenhagen. Lot 3: Test of portable and fixed electrical installations and equipment in Meppen. Lot 4: Test of portable electrical equipment and operating facilities in Berlin.

Electrical wiring and fitting work

Leibniz Universität Hannover | Published February 26, 2016
Winner
Fa. Bauer Elektroanlagen GmbH
cpvs
45311000, 45315500, 45315600, 45314300, 45316100

New Faculty of Mechanical Engineering in Garbsen, 2 BA,

VE083 Baustromversorgungsanlagen.

College campus with an area NF 22 250 m² 4 Institute building engineering with testing facilities, laboratories, workshops, technical buildings, auditorium and cafeteria building, house for students and dean's office.

Including outdoor facilities: Campus, garages (270), roads and green and retention areas. The construction project will be tendered and awarded in accordance with VOB Part C in about 50 procurement units.

Construction, operation and dismantling of electrical equipment for the site power supply, including Baubeleuchtung and DV connection of site offices / containers.

Electrical wiring and fitting work

Leibniz Universität Hannover | Published October 3, 2015  -  Deadline November 6, 2015
cpvs
45311000, 45315500, 45315600, 45314300, 45316100

New Faculty of Mechanical Engineering in Garbsen, 2 BA; VE083 Baustromversorgungsanlagen. College campus with an area NF 22 250 m² 4 Institute of mechanical engineering building with experimental halls, laboratories, workshops, technical buildings, auditorium and cafeteria building, home for students and dean's office. Including free equipment: Campus, garages (270), roads and green and retention areas. The construction project will be tendered and awarded in accordance with VOB Part C in about 50 award units. Construction, operation and dismantling of electrical equipment for the site power supply, including Baubeleuchtung and DV connection of site offices / containers.

Repair and maintenance services of electrical machinery, apparatus and associated equipment

Region Hannover | Published October 23, 2015
Winner
GMN Gebäudetechnik
cpvs
50532000, 71630000

Testing of portable electrical equipment acc. DGUV provision 3. testing of portable electrical equipment acc. DGUV Rule 3 in 26 region's schools. The Contractor shall provide initial and recurrent testing of portable electrical equipment in accordance with § 10 para. 1 Operational Safety Ordinance (BetrSichV) and §§ 5 ff. The accident prevention regulations electrical equipment (DGUV Rule 3) taking into account the usable technical regulations on industrial safety (TRBS) 1201 and 1203 each for the lot or the entire order.

Repair and maintenance services of electrical machinery, apparatus and associated equipment

Region Hannover | Published June 30, 2015  -  Deadline August 11, 2015
cpvs
50532000, 71630000

Testing of portable electrical equipment acc. DGUV provision 3. testing of portable electrical equipment acc. DGUV Rule 3 in 26 region's schools. The Contractor shall provide initial and recurrent testing of portable electrical equipment in accordance with § 10 para. 1 Operational Safety Ordinance (BetrSichV) and §§ 5 ff. Of the Accident Prevention Regulation Electrical Equipment (DGUV Rule 3) taking into account the usable technical regulations on industrial safety (TRBS) 1201 and 1203 each for the lot or the entire order.