Public tenders for electrical in Halle-saale Germany

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Elt - Electrical engineering in 06132 Halle

Hallesche Wohnungsgesellschaft mbH Auftrags- und Vergabestelle | Published June 6, 2018  -  Deadline August 5, 2018
cpvs

Elt - Electrical engineering in 06130 Halle

Hallesche Wohnungsgesellschaft mbH Auftrags- und Vergabestelle | Published June 6, 2018  -  Deadline August 5, 2018
cpvs

Elt - Electrical engineering in 06120 Halle

Hallesche Wohnungsgesellschaft mbH Auftrags- und Vergabestelle | Published June 6, 2018  -  Deadline August 5, 2018
cpvs

6049 - Electrical work for the construction of a nationwide WLAN

Kreis Gütersloh | Published July 10, 2018  -  Deadline August 3, 2018
cpvs

The district of Gütersloh writes: Lines, installation systems and connections for the establishment of a nationwide WLAN and for the equipment of all classrooms with media technology in the vocational college in Halle (Westf.). The tenderer must enter the beginning and the end of the execution. The beginning would be possible from August 2018. However, the measure must be completed by 23.08.2019 at the latest.

ÜBS Modernization of Automotive / Electrical Engineering in 06132 Halle

Handwerkskammer Halle | Published June 28, 2018  -  Deadline July 30, 2018
cpvs

Electrical installation work in 06120 hall

Universitätsklinikum Halle/Saale AöR | Published June 28, 2018  -  Deadline July 25, 2018
cpvs

Electrical installation work - Wolfgang-Borchert-Str. 1-19 in 06126 Hall

Halle-Neustädter Wohnungsgenossenschaft e.G. | Published June 19, 2018  -  Deadline July 5, 2018
cpvs

Electrical installation work - Theodor-Storm-Str. 21-31 in 06126 Hall

Halle-Neustädter Wohnungsgenossenschaft e.G. | Published June 19, 2018  -  Deadline July 5, 2018
cpvs

Electrical installation / electrical equipment animal husbandry

Sachsen-Anhalt Universitätsklinikum Halle | Published May 24, 2018  -  Deadline July 3, 2018
cpvs

Node Hall - ESTW with track plan conversion ESTW equipment Abzw Lighthouse / Kanena) Planning services Update of the Lph 3 and optional Lph 5 and 6/7

Deutsche Bahn AG FEI - Beschaffung Infrastruktur | Published April 20, 2018  -  Deadline May 24, 2018
cpvs
41208000, 41207100, 41202240, 71240000

Planning services (Lph 3 as well as optionally Lph 5 (PT1) and Lph 6/7) for the new construction of ESTW systems in the Lighthouse branch / Kanena branch office, with the following essential measures: - Extension of the ESTW-A Halle-East by LST systems - Dismantling old signal box (type GS II DR) - Adaptation of electrical energy systems (points heaters), overhead line and telecommunications systems - Adaptation of the railway body and track systems for shifting a switch connection hall

Electrical and telecommunications installations

Holm Lischewski | Published March 9, 2018  -  Deadline March 29, 2018
cpvs

Electrical installation (SHL 81-18)

Sachsen-Anhalt Bau- und Liegenschaftsmanagement Sachsen-Anhalt (BLSA) | Published February 21, 2018  -  Deadline March 28, 2018
cpvs

Prison Schwäbisch Hall, renewal of safety technology, engineering services according to Part 4 Section 2 HOAI - Technical Equipment (Electric)

Vermögen und Bau Baden-Württemberg Amt Heilbronn | Published March 1, 2018  -  Deadline March 27, 2018
cpvs

Prison Schwäbisch Hall, renewal of safety technology, engineering services according to Part 4 Section 2 HOAI - Technical Equipment (Electric)

Electrical and telecommunication installations

Holm Lischewski | Published February 15, 2018  -  Deadline March 7, 2018
cpvs

Lot 40 building electricity for the MMZ Halle

Sachsen-Anhalt eVergabe-Portal | Published November 9, 2017  -  Deadline December 8, 2017
cpvs

Electricity supply installations

MMZ Mitteldeutsches Multimediazentrum Halle (Saale) GmbH | Published November 10, 2017  -  Deadline December 8, 2017
cpvs
45315300

Completed in summer 2007, the "Mitteldeutsche Multimediazentrum (MMZ)" at Mansfelder Strasse 56 in Halle (Saale) is a start-up center for the creative and media industry in Saxony-Anhalt. Thanks to its central location, a large number of networks, low-cost rents and modern equipment, it enables start-up companies a basis for their independence. As a result of the extreme flood in June 2013, the MMZ and the building's external equipment were badly damaged. In order to avoid future damage to the building, flood protection measures must be implemented as part of the refurbishment and conversion of the front surface of the building. The scope of this specification is the building electricity supply.

Number:

Building site distribution 150 kW - 1 St.

Building site distributor 60 kW - 4 St.

Building site distribution 40 kW - 8 St.

Building Material Light Distributor - 1 St.,

Wiring construction site - 1 700 m,

Construction site luminaires as linear luminaires - 180 pcs.

Lot 40 building electricity for the MMZ Halle

Sachsen-Anhalt: eVergabe-Portal | Published November 9, 2017  -  Deadline December 8, 2017
cpvs
45315300

Electrical wiring and fitting work

Staatliches Baumanagement Weser-Leine | Published November 9, 2017  -  Deadline December 7, 2017
cpvs
45311000, 45311100, 45311200

Extend and renew the MS and LV switchgear as well as the NEA generators in existing power supply stations.

3 MS switchgear, 3 NS switchgear, 2 NEA units, 4 MS / NS transformers.

electricity supply

Jobcenter Halle (Saale) | Published October 26, 2017  -  Deadline November 16, 2017
cpvs
65300000

The aim of the tender is to conclude a contract for the power supply of the Jobcenters Halle (Saale). The contract is to be concluded for two years, starting on 1 January 2018 and ending on 31.12.2019. Supply of the 4 properties of the Jobcenter Halle (Saale) with a total of 34 metering points (approx. 300,000 kWh / year = 600,000 kWh / 2 years).

Prefabricated constructions

Diakonie-Klinikum Schwäbisch Hall gemeinnützige GmbH | Published September 29, 2017  -  Deadline November 2, 2017
cpvs
45223810, 45223100

This course describes the assembly of the bridging body of the connecting bridge in modular design

45 ° (S-shape)

10.40 x 2.60 x 3.00 m

Installation on customer's steel construction

1 piece Entire construction primed and finished, finished, delivered and assembled

approx. 12 m 2 Wiring brackets on both sides, multi-layered, steel plate coated

1,00 x 1,20 m, tilt, manual

Basic configuration:

28 m 2 Flooring made of wood / wood material

80 m 2 Wall and ceiling construction, panels, insulated

28 m 2 Flooring PVC

Electrical and heating basic equipment: cable, 4 x lamps, 2 x radiators.

39 340 m 3 ,

The building project comprises an intensive care unit with 32 beds, delivery with 4 delivery rooms and a care facility with 26 beds, accommodation and care facilities with 20 beds, public areas such as main entrance and social services, as well as examination and treatment areas.

90 beds, the emergency room, the radiology department as well as medical and emergency rooms.

Construction phase includes a preliminary measure with four construction phases:

- Building site clearance

- Connection bridge between high-rise building and building section 1 in level 03

- Tunnel between nursery school and building section 1 in level U01, elevator front area and main building distributors

This course describes the assembly of the bridging body of the connecting bridge in modular design

45 ° (S-shape)

10.40 x 2.60 x 3.00 m,

Installation on customer's steel construction.

1 piece Entire construction primed and finished, finished, delivered and assembled

approx. 12 m 2 Wiring brackets on both sides, multi-layered, steel plate coated

1,00 x 1,20 m, tilt, manual

Basic configuration:

28 m 2 Flooring made of wood / wood material

80 m 2 Wall and ceiling construction, panels, insulated

28 m 2 Flooring PVC

Electrical and heating basic equipment: cable, 4 x lamps, 2 x radiators.