Call +44 800 9755 164

Public tenders for electrical in Friedrichshafen Germany

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!
ElectricalGermanyfriedrichshafen

Construction work for swimming pool

Stadt Friedrichshafen, vertreten durch Ersten Bürgermeister Dr.-Ing. Stefan Köhler, dieser vertreten durch Stadtbauamt | Published November 2, 2016
Winner
Bäzner Elektro GmbH
cpvs
45212212, 45311200, 45315100, 45315000

Entire electrical installation

Electricity distribution

Landkreis Bodenseekreis | Published August 26, 2015  -  Deadline September 1, 2015
cpvs
65310000

Stromversorgung

Construction work for swimming pool

Stadt Friedrichshafen, vertreten durch Ersten Bürgermeister Dr.-Ing. Stefan Köhler, dieser vertreten durch Stadtbauamt | Published November 14, 2015  -  Deadline December 15, 2015
cpvs
45212212, 45311200, 45315100, 45315000

Entire electrical installation; 0.4 kV; 1 HVT and 7 UVT; approximately 20 000 m of cables and wires; 5600 m low voltage lines; 340 lighting fixtures; 1 PA system; 3 IT distributor.

Electricity distribution

Landkreis Bodenseekreis | Published October 30, 2015
Winner
Stadtwerk am See GmbH & Co. KG
cpvs
65310000

The district Bodenseekreis writes the supply of electricity for the supply of various properties in 6 lots from Europe. Performance period are per lot of 01.01.2016, 00:00 clock until 31.12.2018, 24:00 clock. It is expected per lot give the extension of the contract by 24 months and an additional 12 months option. For all lots the following applies: The power supplied must be for the entire contract period is at least 30% from renewable energy sources originate. From this share of renewable energy in turn must have been produced in plants at least 30% at the time of the delivery start on 01/01/2016 and subsequently to 1.1 respectively. the respective delivery year are not older than 6 years old. The fulfillment of the above requirements for the type of production and the included power generation facilities must be provided upon submission of tenders and during the contract period in accordance with the specifications of the client.

Electricity distribution

Landkreis Bodenseekreis | Published July 15, 2015  -  Deadline August 25, 2015
cpvs
65310000

The district Bodenseekreis writes the supply of electricity for the supply of various properties in 6 lots from Europe. Performance period are per lot of 01.01.2016, 00:00 clock until 31.12.2018, 24:00 clock. It is expected per lot give the extension of the contract by 24 months and an additional 12 months option. For all lots the following applies: The power supplied must be during the term of the contract at least 30% from renewable energy sources originate. From this share of renewable energy in turn must have been produced in plants at least 30% at the time of the delivery start on 01/01/2016 and subsequently to 1.1 respectively. of each delivery year are not older than 6 years old. Compliance with the above requirements for the type of production and the included power generation facilities must be provided upon tender and during the contract period in accordance with the specifications of the client.

Electricity distribution

Landkreis Bodenseekreis Dezernat III/Bau- und Liegenschaftsamt | Published May 20, 2015
cpvs
65310000

Belieferung verschiedener Liegenschaften des Landkreises Bodenseekreis mit Strom.

Multi-dwelling buildings construction work

Städtische Wohnungsbaugesellschaft Friedrichshafen mbH | Published October 17, 2015  -  Deadline November 17, 2015
cpvs
45211340

Lot 1: Carcass work:... Excavation and transport approximately 12 000 m3, Verbauarbeiten about 170 m, Underground drainage 300m, masonry work with thermally insulated and concrete to be filled shell stones about 5 500 m2, reinforced concrete and sealing work underground from WU -concrete approximately 2 400 m3, reinforced concrete floors about 1 000 m3, reinforced concrete internal walls approximately 3 500 m2. Lot 2: The lift equipment: 4 lifts on 5-6 floors, cabin Dimensions L x W 1.10 x 1.40 m, carrying capacity 675 kg, stainless steel surfaces. Lot 3: electrical installation work:.... Distribution 68 pcs, 193 pcs lights, security lighting 115 pcs, RWA systems 4 pcs, switch sockets approximately 2 600 units, intercom with video. Lot 4: Plumbing work: 330 sanit. Facilities with wall system, 5800 m stainless steel pipe DN 12, 4 000m dirty water pipe as soundproof pipe with insulation, 400 meters rainwater pipe as soundproof pipe with thermal insulation. Lot 5: heating equipment installation: 60 radiators, 2 000m black steel pipe DN 15-DN 65 with insulation, 25 000 m of floor heating pipe with accessories, 4 x water heating with hygiene dispensers. Lot 6: Ventilation installation work: 46 domestic ventilation units with heat recovery, 4 basement vents, 4 500m ventilation hose 63 mm, 1 000 meters spiral seam.
  • 1