Call +44 800 9755 164

Public tenders for electrical in Frankfurt-am-main Germany

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!
ElectricalGermanyfrankfurt-am-main

Electrical engineering installation works

DB Netz AG (Bukr 16) | Published April 13, 2017  -  Deadline May 4, 2017
cpvs
45315100

Bf Augsburg - Mobility Hub Augsburg (MDA) - II construction - Production of electrical equipment.

Electrical installation in the area of ​​the hospital (HOST / 007/2017)

Universitätsklinikum Frankfurt | Published April 10, 2017  -  Deadline May 11, 2017
cpvs

Installation-, repair and maintenance work in the field of Elektroinstallation.Der contract is awarded in separate lots. Ie in two lots the same positions and titles are listed. The annual budget is listed in the Form 611.1. Lot 1 is about 2/3 of the budget and for lot 2 1/3 of the budget is allocated. The tender for both lots is possible. However, a maximum of only one lot is awarded each tenderer. Decisive for the Losvergabe is the most economical overall result.

Automotive electrical kits for the field of vehicle training

Kreishandwerkerschaft Hanau | Published April 19, 2017  -  Deadline May 8, 2017
cpvs
80500000

Engineering-design services for traffic installations

DB Netz AG (Bukr 16) | Published April 15, 2017  -  Deadline May 15, 2017
cpvs
71322500

ABS Berlin-Dresden, the second stage of expansion, sections Blankenfelde (a) - Wünsdorf (a) and Elsterwerda (s) - Grossenhain Berliner Bf (s); Planning services.

The construction project 2.Baustufe involves the continuous increase in the speed to 200 km / h in the sections Blank fields (a) - Wunsdorf (a) and Elsterwerda - Großenhain Berlin Bf to Schedule action in these sections are the expansion / renewal of the superstructure, chassis and. engineering structures, equipment with electronic interlocking technology and ETCS equipment of lines with new overhead line systems and telecommunications technologies and the elimination of level crossings. There are interfaces to the first stage of construction which is already being realized, as well as of DB Station & Service AG and DB Energie GmbH.

Creating the preliminary design for the portions 1.1 Blank fields (a) - Rangsdorf (a), 1.2 Rangsdorf (a) - Zossen (a) and 1.3 Zossen (a) - Wunsdorf (a) for the project planning transport systems, object and structural engineering civil engineering structures, railway Technical equipment (15 kV overhead line systems, control and safety systems, telecommunications systems, electrical power systems, electric switch heaters) and in landscape planning services.

Creating the preliminary design for the portion 3 Elsterwerda (e) - Großenhain Berlin station (s) for the project planning transport systems, object and structural engineering civil engineering structures, railway equipment (15 kV overhead line systems, control and safety systems, telecommunications systems, electrical energy systems, electrical switch heaters) and in landscape planning services.

Electrical wiring and fitting work

Stadt Landsberg am Lech | Published April 13, 2017  -  Deadline May 23, 2017
cpvs
45311000, 45311100, 45311200, 45317000

Measurement and control technology for the expansion construction of a middle school with existing supplement.

. Automation stations with operating function 2 unit;

. Three-way valves 8 pieces;

.; 7 heat meter Stk

. Standing cabinets 5 unit;

.; 600 connections lines Stk

2500 m / cable lines;

Identification labels 400;

. Test data point DDC 200 pcs;

. 1 rebuilding inventory cabinet pieces;

. OPC Server 1 pc.

Ancillary works for pipelines and cables

Mainova AG | Published April 15, 2017  -  Deadline May 26, 2017
cpvs
45232000

The Contractor shall, unless otherwise expressly stated in the order letter, to provide all necessary civil engineering and installation works and in related services in accordance with the design requirements of the client.

M. with civil engineering and surface recovery positions including house connection new / renewal: Measures for the electricity, gas, water, heat and all services for the production of home electrical sources within the framework of renewal measures and Netzerweiterungen.sowie for house connections possible Mitverlegung of telecommunication cables and performing interference suppression in the pipe lines.

- The client reserves the right to advertise jobs that are not covered by positions of the standard service specification separately.

The number of framework contracts is limited to 10 or less.

The systematics of the call also is at the discretion of the principal.

The client will depend on the capacity to decide and offer prices and inform the bidders what quantities he tied to a contract as reserved employees and is set as the minimum quantities.

- The client manages its views so that it priority so retrieves agreed with its framework contractors minimum quantities that the reserved for him employees are used as evenly as possible throughout the year.

Here he asks basically the framework contractors in the order of their economy, and asks the nächst- economical framework contractors in case of unavailability.

4 and 5 deviate if:

- are already working on the most economical or a contractual partner one or more current individual contracts;

- It is apparent that a framework agreement partner is already heavily used or not enough holds capacities;

- Framework contractor in the current year has received disproportionately few calls;

4 and 5 deviate;

- If repeated a framework contractor;

- has no available capacity or calls cancels / contradict them, or

- does not comply with appointments, or

- The quality of his performance is criticized

The affected framework contractor can demonstrate to the client, the measures it has taken to avoid a recurrence of violations in the future.

Packages positions for different lengths and dimensions, including civil engineering and surface restoration: measures for the electricity, gas, water, heat and possible Mitverlegung of telecommunications cable.

- The client reserves the right to advertise jobs that are not covered by positions of the standard service specification separately.

The number of framework contracts is limited to 10 or less.

The systematics of the call also is at the discretion of the principal.

The client will depend on the capacity to decide and offer prices and inform the bidders what quantities he tied to a contract as reserved employees and is set as the minimum quantities.

- The client manages its views so that it priority so retrieves agreed with its framework contractors minimum quantities that the reserved for him employees are used as evenly as possible throughout the year.

Here he asks basically the framework contractors in the order of their economy, and asks the nächst- economical framework contractors in case of unavailability.

4 and 5 deviate if:

- are already working on the most economical or a contractual partner one or more current individual contracts;

- It is apparent that a framework agreement partner is already heavily used or not enough holds capacities;

- Framework contractor in the current year has received disproportionately few calls;

4 and 5 deviate;

- If repeated a framework contractor;

- has no available capacity or calls cancels / contradict them, or

- does not comply with appointments, or

- The quality of his performance is criticized

The affected framework contractor can demonstrate to the client, the measures it has taken to avoid a recurrence of violations in the future.

M. including civil engineering and surface recovery positions for SRM street lighting Rhein-Main GmbH for each the period from Monday to Friday 7:00 to 15:30.

- The client reserves the right to advertise jobs that are not covered by positions of the standard service specification separately.

The number of framework contracts is limited to 10 or less.

The systematics of the call also is at the discretion of the principal.

The client will depend on the capacity

17FEI26459 - Hp Stockstadt, Wheelchair expansion of the transport station, construction of electric power plants

Deutsche Bahn AG FEI - Beschaffung Infrastruktur | Published April 12, 2017  -  Deadline May 3, 2017
cpvs

As part of the barrier-free expansion of the transport station in Stockstadt the electrical power system to be rebuilt. The scope includes the construction of counter distribution, lighting distribution, lighting poles, lights, cables and the decommissioning of old plants.

BImA, Federal Police Frankfurt (Oder), House 9 Restoration indoor shooting range, electrical installation RSA

Brandenburgischer Landesbetrieb für Liegenschaften und Bauen (BLB) - Vergabestelle | Published April 6, 2017  -  Deadline May 2, 2017
cpvs
45311100, 45310000, 31521000

  • 1