Call +44 800 9755 164

Public tenders for electrical in Braunschweig Germany

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!
ElectricalGermanybraunschweig

Electrical fitting work

Nibelungen-Wohnbau GmbH | Published March 31, 2017  -  Deadline May 2, 2017
cpvs
45311200, 45311100, 45317000

The buildings C3 and C4 are identical and consist of a basement, a ground, 1st, 2nd floor, 3rd floor, 4th floor and a penthouse level.

The wiring and the installations are in the apartments, stairwells and in the basement area partially concealed and partially cable support systems or plumbing tubes.

Installation methods installation are provided already during the construction phase in reinforced concrete walls.

In all apartments a complete electrical installation is installed (switches, sockets, data outlets, fixed device connections, etc.)

In the general area lighting fixtures are installed, as well as the outside of the doorway.

- In the basement, a main distribution counter is mounted.

- In the general area (stairways, corridors, the basement) are installed lighting fixtures, as well as outside of the entrance.

There are automatic circuits by means of motion in all general areas

(Basement, hallways, garbage room, lobby, bicycle and stroller space) is provided.

Diffusers are only installed in the units.

This multimedia router, the apartment with telephone, television and Internet connection is supplied.

- It will install a video intercom system, so that each apartment has its own video intercom.

- In the stairwells safety lighting is realized by means of individual luminaires.

- The electrical installation inside the apartments includes (sockets, switches, data outlets,

Hard device connections, etc.)

- In addition, an electronic sunshade system on the windows is provided.

Electrical fitting work

Nibelungen-Wohnbau GmbH | Published April 13, 2017  -  Deadline May 16, 2017
cpvs
45311200, 45311100, 45317000

In the construction project is the construction of two new building type B1 and type B2, each having 31

Units, of which each 8 accessible units. The buildings C3 and C4 are identical and

consist of a basement, a ground, 1st, 2nd floor and a 3rd floor

The wiring and installations in the apartments, stairwells and in the basement area

be partly concealed and partly cable support systems or plumbing tubes.

In addition to the above types of installation installation are already during the construction phase in reinforced concrete walls

intended.

In all apartments a complete electrical installation is installed (switches, sockets, data outlets,

Hard device connections, etc.)

In the general area lighting fixtures are installed, as well as the outside of the doorway.

- In the basement, a main distribution counter is mounted,

In the common areas (staircases, corridors, basement) -

Lighting equipment installed and the outside of the doorway.

There are automatic circuits by means of motion in all general areas

(Basement, hallways, lobby) are provided.

Diffusers installiert.- Each unit will only be in the units with a fiber optic cable from the service entrance room to the multimedia

Router in the living unit connected. This multimedia router, the apartment is equipped with telephone,

TV and Internet connection provided.

- There is installed an audio intercom, so that each apartment has its own audio intercom,

- The electrical installation inside the apartments includes (sockets, switches, data outlets,

Fixed device connections, etc.).

  • 1