Public tenders for electrical in Braunschweig Germany

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!
ElectricalGermanybraunschweig

Electrical

DLR Deutsches Zentrum für Luft- und Raumfahrt e. V., Baumanagement Nord | Published November 15, 2016
cpvs

91 000 58 rehabilitation HV / UV - Electrical DIN VDE 0100 / DIN VDE 0101

Electrical fitting work

Staatl. Baumanagement Braunschweig | Published October 4, 2016
Winner
TU BS – Elektro- und Fernmeldeinstallationsarbeiten
cpvs
45311200

Electrical and telecommunications installation work.

Electrical installation work

Staatliches Baumanagement Braunschweig | Published December 4, 2015
Winner
R + S solutions GmbH
cpvs
45310000, 45316000, 45315100, 45311000

Electrical Equipment.

Electrical installation work

Staatliches Baumanagement Braunschweig | Published August 22, 2015  -  Deadline September 22, 2015
cpvs
45310000, 45316000, 45315100, 45311000

Electrical Equipment.

Electrical fitting work

Staatliches Baumanagement Braunschweig | Published May 25, 2016  -  Deadline June 21, 2016
cpvs
45311200, 45314000

Electrical and telecommunications installation work.

Electrical fitting work

Nibelungen-Wohnbau GmbH | Published March 22, 2017  -  Deadline April 24, 2017
cpvs
45311200, 45311100, 45312310, 45317000

39 housing units, with several commercial areas, doctor's offices and a day care center.

The building consists of A1 KG to 3rd floor, the building A2 including from KG to 7th floor. Underground parking.

The wiring and installations in the apartments, stairwells and in the basement done partly concealed and partly cable support systems or conduits.

In all apartments a complete electrical installation is installed (switches, sockets, data outlets, solid device connections, etc.)

In the housing units only ceiling outlets are installed.

There is installed a door intercom, so that each apartment has its own station.

In Building A2 a fire alarm system is installed in one floor.

- In the basement, a counter and a main distribution NSHV is mounted.

In the housing units only ceiling outlets are provided.

This multimedia router, the housing unit with telephone, TV and network is supplied.

- It will install a door intercom, so that each apartment has its own station.

- In the stairwells safety lighting is realized by means of self-contained luminaires.

- The electrical installation inside the apartments includes (sockets, switches, data outlets, solid device connections, etc.).

- In the basement, 2 meter main distributions and 2 NSHV's are mounted.

In the housing units only ceiling outlets are provided.

This multimedia router, the housing unit with telephone, TV and network is supplied.

- It will install a door intercom, so that each apartment has its own station.

- In the stairwells safety lighting is realized by means of self-contained luminaires.

- The electrical installation inside the apartments includes (sockets, switches, data outlets, solid device connections, etc.)

- In the 3rd floor, a fire alarm system is installed, which acts as an alarm system.

Electrical fitting work

Nibelungen-Wohnbau GmbH | Published March 31, 2017  -  Deadline May 2, 2017
cpvs
45311200, 45311100, 45317000

The buildings C3 and C4 are identical and consist of a basement, a ground, 1st, 2nd floor, 3rd floor, 4th floor and a penthouse level.

The wiring and the installations are in the apartments, stairwells and in the basement area partially concealed and partially cable support systems or plumbing tubes.

Installation methods installation are provided already during the construction phase in reinforced concrete walls.

In all apartments a complete electrical installation is installed (switches, sockets, data outlets, fixed device connections, etc.)

In the general area lighting fixtures are installed, as well as the outside of the doorway.

- In the basement, a main distribution counter is mounted.

- In the general area (stairways, corridors, the basement) are installed lighting fixtures, as well as outside of the entrance.

There are automatic circuits by means of motion in all general areas

(Basement, hallways, garbage room, lobby, bicycle and stroller space) is provided.

Diffusers are only installed in the units.

This multimedia router, the apartment with telephone, television and Internet connection is supplied.

- It will install a video intercom system, so that each apartment has its own video intercom.

- In the stairwells safety lighting is realized by means of individual luminaires.

- The electrical installation inside the apartments includes (sockets, switches, data outlets,

Hard device connections, etc.)

- In addition, an electronic sunshade system on the windows is provided.

Electrical fitting work

Nibelungen-Wohnbau GmbH | Published April 13, 2017  -  Deadline May 16, 2017
cpvs
45311200, 45311100, 45317000

In the construction project is the construction of two new building type B1 and type B2, each having 31

Units, of which each 8 accessible units. The buildings C3 and C4 are identical and

consist of a basement, a ground, 1st, 2nd floor and a 3rd floor

The wiring and installations in the apartments, stairwells and in the basement area

be partly concealed and partly cable support systems or plumbing tubes.

In addition to the above types of installation installation are already during the construction phase in reinforced concrete walls

intended.

In all apartments a complete electrical installation is installed (switches, sockets, data outlets,

Hard device connections, etc.)

In the general area lighting fixtures are installed, as well as the outside of the doorway.

- In the basement, a main distribution counter is mounted,

In the common areas (staircases, corridors, basement) -

Lighting equipment installed and the outside of the doorway.

There are automatic circuits by means of motion in all general areas

(Basement, hallways, lobby) are provided.

Diffusers installiert.- Each unit will only be in the units with a fiber optic cable from the service entrance room to the multimedia

Router in the living unit connected. This multimedia router, the apartment is equipped with telephone,

TV and Internet connection provided.

- There is installed an audio intercom, so that each apartment has its own audio intercom,

- The electrical installation inside the apartments includes (sockets, switches, data outlets,

Fixed device connections, etc.).

Electrical fitting work

Nibelungen-Wohnbau GmbH | Published September 22, 2017  -  Deadline October 24, 2017
cpvs
45311200, 45311100, 45317000

The construction project is the construction of two buildings. Building type D with 18 housing units and type C2 with 32

Units. The building D consists of a cellar floor, a ground floor, 1st floor, 2nd floor and 3rd floor. The building C2 also has a fourth floor and a second floor.

Laying of ducts and installations in apartments, staircases and cellars

partial flush-mounting and partly via cable support systems or installation pipes.

In addition to the above installation methods, installation is already in reinforced concrete walls during the raw construction phase

intended.

In all apartments, a complete electrical installation is installed (switches, sockets, data doses,

Fixed connections, etc.)

In the generally accessible areas, lighting bodies are installed, as well as outside the house entrance.

- A counter main distribution is installed in the basement.

- In the generally accessible areas (stairs, corridors, cellar)

Lighting installed, as well as outside at the home entrance.

Automatic circuits are activated by means of motion sensors in all general areas

(Cellar, corridors, garbage room, foyer, bicycle and baby carriage).

In the residential units, only ceiling outlets are installed. Each residential unit is equipped with a fiber optic cable from the house connection area to the multimedia-

Router in the residential unit. From this multimedia router, the residential unit is equipped with telephone,

Television and Internet connection.

- An audioshop is installed so that each apartment has its own audios.

- The electrical installation within the apartments includes (sockets, switches, data doses,

Fixed connections, etc.).

Electrical fitting work

Nibelungen-Wohnbau GmbH | Published November 25, 2016
cpvs
45311200

In d. Building project is d. Construction of a new building with 32 residential units including 6 disability-WE. The newly constructed building has a KG, a ground floor, 1st floor, 2nd floor, 3rd floor, 4th floor and a penthouse level. The cables ud installations id apartments, stairwell and carried out in the basement partly. Concealed u. Teilw. Cable support systems o. Installation pipes.

The construction project is to be processed according to a strict time schedule details. Possibly More expenses f. Coordination measures or harsh handling a. G. v. Reinigungsarb. in d. own workspaces, unit prices are in d. into account.

All work in this bid document must be carried out in any case id aforementioned construction.

All actions are performed in the uninhabited state.

In building counter main distribution, lighting, multimedia and Intercoms must be installed and ready. Then audit documents fd AG must be made.

Electrical installation with respect to the total measure C2.

Electrical installation work

Handwerkskammer Braunschweig-Lüneburg-Stade | Published October 13, 2016  -  Deadline November 8, 2016
cpvs

TZH Braunschweig - reconstruction and modernization home E - Hamburger Straße 234, 38114 Braunschweig

Electrical installation work

Nibelungen-Wohnbau GmbH | Published March 4, 2017  -  Deadline March 20, 2017
cpvs
45310000

The construction project is the site power supply of a residential complex with 9 separate buildings and 220 residential units.

It is the Grundbaustromversorgung, as well as the Baubeleuchtung to prepare for building the C2, C3, C4, B1, B2 and D.

The lines must be installed on the building site, the Baustromverteiler provided and connected.

The measuring device with a transducer measurement, all required group distribution and the supply of building A1 and A2 are already installed and are not part of this contract.

Electrical and communication technology

Technische Universität Braunschweig, Geschäftsbereich 3 - Gebäudemanagement | Published May 16, 2017  -  Deadline June 6, 2017
cpvs
45315100, 31625200, 45315600

Electricity

Helmholtz – Zentrum für Infektionsforschung GmbH | Published December 23, 2016
Winner
Energie Vertrieb Deutschland EVD GmbH
cpvs
09310000

Conclusion of a contract for the supply of electrical energy for the property from the Helmholtz Centre for Infection Research in the period 1.1.2017 to 31.12.2020.

Supply of electricity incl. Implementation of network usage.

Electrical installation work of heating and other electrical building-equipment

Städtisches Klinikum Braunschweig gGmbH | Published November 28, 2015
Winner
Siemens AG Siemens Deutschland Building Technologies Division
cpvs
45315000, 31682210

At the site Salzdahlumer road following measures are implemented: - Construction of a ward block for general-care, care of the Children's Hospital and the pediatric surgery, for intensive care and intermediate care; - Construction of the Children's Hospital; - Laying of Anesthesiology; - Creation of an abdominal center (Med. Clinic I with endoscopy and general surgery); - Creation of a cardiology center (. HTG Clinic and the Medical Clinic II); - Laying the Eye Clinic and Ear, Nose and Throat Clinic as a basis for the head center; - Laying the accident and plastic surgery; . - Reconstruction of dialysis and the Medical Clinic V; - Creation of a new main entrance (address form); - Extension of the emergency room; - Expansion of the intervention center and creating a night monitoring; - Renovation and expansion of the Central Surgical Department; - Expansion of laboratories, canteen extension about 52 000 m² of gross floor area.

Electrical installation work of heating and other electrical building-equipment

Städtisches Klinikum Braunschweig gGmbH | Published July 30, 2015  -  Deadline September 8, 2015
cpvs
45315000, 31682210

The second section includes implementation measures at the site Salzdahlumer and Celler Straße. In planning a division of the second portion is carried out in the implementation sections 2A and 2B. The main focus carried out renovation and new construction at the site Salzdahlumer road. In section 2B of the renovation and expansion at the site Celler Straße and the conversions in stock at the site Salzdahlumer road done. 2. Realization section construction phase 2A. At the site Salzdahlumer road following measures are implemented: - Construction of a ward block for general care, care of the Children's Hospital and the pediatric surgery, for intensive care and intermediate care; - New construction of the Children's Hospital; - Laying of Anesthesiology; - An abdominal center (Med. Clinic I with endoscopy and general surgery); - Creation of a cardiology center (. HTG Clinic and the Medical Clinic II); - Laying the Eye Clinic and Ear, Nose and Throat Clinic as a basis for the head center; - Laying the accident and plastic surgery; . - Reconstruction of dialysis and the Medical Clinic V; - Creation of a new main entrance (address form); - Extension of the emergency room; - Expansion of the intervention center and creating a night monitoring; - And extension of the Central Surgical Department; - The laboratory; - Extension of the canteen. At the site Celler road will be expanded to a childbirth delivery room. For this purpose, the necessary construction cost groups 200-500 in accordance with DIN 276 are to be awarded. Overall, the construction comprises approximately 52 000 m² of gross floor area. See also point II.2.1).

Instruments for measuring electrical quantities

Technische Universität Braunschweig, Abteilung 22 Wirtschaftsangelegenheiten, Beschaffung, Einkauf | Published August 26, 2016
Winner
CalPlus GmbH NL Scopeshop
cpvs

Lieferung eines Messplatz für ultra-breitbandiges Software-Defined Radio.

Electrical installation work

Städtisches Klinikum Braunschweig gGmbH | Published January 27, 2016
Winner
Bauer Elektroanlagen GmbH
cpvs
45310000

At the site Salzdahlumer road following measures will be implemented:

Construction of a ward block for general-care, care of the Children's Hospital and the pediatric surgery, for intensive care and intermediate care;

New Children's Hospital;

Laying of Anesthesiology;

Creating an abdominal center (Med. Clinic I with endoscopy and general surgery);

Creating a heart center (. HTG Clinic and the Medical Clinic II);

Laying the Eye Clinic and Ear, Nose and Throat Clinic as a basis for the head center;

Laying the accident and plastic surgery;

Reconstruction of dialysis and the Medical Clinic V.

Creation of a new main entrance (address form);

Extension of the emergency room;

Expansion of engagement center and creating a night monitoring;

Renovation and expansion of the Central Surgical Department;

Expansion of laboratories, canteen extension;

approximately 52 000 m² of BG

Electrical installation work

Städtisches Klinikum Braunschweig gGmbH | Published September 5, 2015  -  Deadline October 7, 2015
cpvs
45310000

The second section includes implementation measures at the site Salzdahlumer and Celler Straße. In planning a division of the second portion is carried out in the realization of portions 2A and 2B. The main focus carried out renovation and new construction at the site Salzdahlumer road. In section 2B of the renovation and expansion at the site Celler Straße and the conversions in the inventory at the site Salzdahlumer road done. 2. Realization section construction phase 2A. At the site Salzdahlumer road following measures are implemented: - Construction of a ward block for General Care, Care of the Children's Hospital and the pediatric surgery, for intensive care and intermediate care; - Construction of the Children's Hospital; - Laying of Anesthesiology; - Creation of an abdominal center (Med. Clinic I with endoscopy and general surgery); - Creation of a cardiology center (. HTG Clinic and the Medical Clinic II); - Laying the Eye Clinic and Ear, Nose and Throat Clinic as a basis for the head center; - Laying the accident and plastic surgery; . - Reconstruction of dialysis and the Medical Clinic V; - Creation of a new main entrance (address form); - Extension of the emergency room; - Expansion of the intervention center and creating a night monitoring; - Renovation and expansion of the Central Surgical Department; - Expansion of the laboratory; - Extension of the canteen. At the site Celler road will be expanded to a childbirth delivery room. For this purpose, the necessary construction cost groups 200-500 DIN are to forgive 276th Overall, the construction comprises approximately 52 000 m² of gross floor area. See also point II.2.1).

Electricity

Helmholtz-Zentrum für Infektionsforschung GmbH | Published October 3, 2015  -  Deadline November 16, 2015
cpvs
09310000

Conclusion of a contract for the Helmholtz Centre for Infection Research for supplying electrical power incl. Power usage during the period 1.1.2016 to 31.12.2018.