Public tenders for electrical in Bonn-nordrhein-westfalen Germany

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!
ElectricalGermanybonn-nordrhein-westfalen

Bundesstadt Bonn: 66-247465: 2017-005 Annual contract Repair of electric motors on the sewage treatment plants and pumping stations in Bonn

Bundesstadt Bonn, Referat Vergabedienste | Published June 7, 2017
cpvs
31110000, 50532100

City of Bonn, 10-242012, buying 5 trucks with electric drive category N1 (2.0 to 2.2 tons) as a three-way tipper and box, divided into 3 lots

Bundesstadt Bonn, Referat Vergabedienste | Published January 11, 2017  -  Deadline February 1, 2017
cpvs
34144900

1 / BIUD / W0036 - supply of green electricity via RLM-off points for the property of the Ministry of Defense (1st and 2nd Base).

Bundesamt für Infrastruktur, Umweltschutz und Dienstleistungen der Bundeswehr | Published March 15, 2016
Winner
RheinEnergie AG
cpvs
65310000

The Federal Republic of Germany, represented by the Federal Ministry of Defence, represented by the Federal Office for infrastructure, environmental protection and services of the Bundeswehr, Fontaine trench 200, 53123 Bonn, (hereinafter referred to as Customer) wrote for selected delivery points of electricity supplies from renewable energy sources (green power) Europe in the open method of. Detailed specifications and other contract documents could be requested by e-mail at the above contact point.

Bonn, 10-255229, purchase of 4 passenger cars with electric drive (model VW E-Up) for the vehicle pool (optional four others in the following year)

Bundesstadt Bonn, Referat Vergabedienste | Published August 24, 2017  -  Deadline September 27, 2017
cpvs
34144900

Architectural services for buildings

Bundesamt für Bauwesen und Raumordnung in Vertretung der Bundesanstalt für Immoblienaufgaben | Published March 11, 2017  -  Deadline April 18, 2017
cpvs
71221000

See II.2.4 - Description of the procurement.

Information section:

There is not a single monument exists but the preservation orders should be preserved from urban and architectural reasons.

Subsequent remediation tasks are the subject of the proposed assignment:

- Basic energy rehabilitation based on the EnEV 2013

- Reacting the accessibility and inclusion (A-and transformation of lifts, barrier-free development, entry and conversion of the disabled toilets etc.)

- Building Ecology / Sustainable Building by the review system Sustainable Building (BNB), analogous application of the Guidelines for Sustainable Building (LFNB)

Premises (renovation of offices, sanitary rooms, kitchens, meeting and function rooms, etc., paint, flooring, suspended ceilings, etc.)

- Largely renewing the electrical and plumbing installation for meeting the current regulations, component replacement

- Fire safety upgrade

BGF, houses 18-19-20 14 100 meters 2

Project costs (net) KG 200-400: 13.5 million EUR

8th)

The contract covers:

The steps to be concluded contract would cover the whole HOAI image including RBBau-section ES-Bau in EW construction quality.

1-9, HOAI § 33ff;

Rating System for Sustainable Building (BNB);

- Benefits safety and health (SiGeKo).

9).

However, a legal right to the transfer of all services does not exist.

Refurbishment work

Studierendenwerk Bonn AöR | Published December 24, 2016  -  Deadline January 31, 2017
cpvs
45453100

Type and scope of performance:

Schadstoffsanierungs- and gutting work.

- Other. Clearance operations, disposal of Altinventars, sanitary facility - site equipment with accommodation and sanitary containers, construction road, building elevator, and Baustromverteilung Baubeleuchtung - facade scaffolding, approximately 6 200 meters 2 - Expansion of approximately 5 000m 2 Screed with styrofoam sound insulation -. / Rehabilitation device including bulkheads, air purifiers (UHG and Others 2 x 40 000 m³ / h, 4-chamber personnel locks and material locks according TRGS 519, H-suction equipment -. Construction and reassembly of window systems, approximately 850 m² - removal of PCB-containing joint sealants, about 6 000m - about 2 600 meters permanently elastic sealing of joints - removal of asbestos-containing fillers in Trockenfräsverfahren and subsequent cleaning in high-pressure water-milling process with integrated extraction, about 20 000m 2 - Concrete cutting work in asbestos-black area (shaft wall openings), 1200 m² - removal of the entire ventilation, drinking water and heating pipes and the electrical distribution and sewerage - Div. KMF-pipe insulation - about 7 000 m² of fine cleaning -. Disposal services among others 500 tonnes of asbestos-containing materials, including equipment for the digital signature of hazardous wastes and means of waste management gem. eANV.

Refurbishment work

Studierendenwerk Bonn AöR | Published April 12, 2017
Winner
Firma Linkamp GmbH
cpvs
45453100

Type and scope of performance:

Schadstoffsanierungs- and gutting work.

• General. Clearing work, disposal of Altinventars, sanitary facilities • site equipment with accommodation and sanitary containers, construction road, construction hoist, Baustromverteilung and Baubeleuchtung • facade scaffolding, approximately 6 200 m2 • Expansion of approximately 5 000 m2 floor with styrofoam sound insulation • / rehabilitation facility incl. Sealings, air cleaning equipment (UHG ia 2x 40 000 m3 / h, 4-chamber personnel locks and material locks gem. TRGS 519, H-vacuums • expansion and reassembly of window systems, about 850 m2 • removal of PCB-containing joint sealants, approximately 6000 m • approximately 2,600 m permanently elastic sealing of joints • removal of asbestos-containing fillers in Trockenfräsverfahren and subsequent cleaning in high-pressure water-milling process with integrated extraction, about 20 000 m2 • concrete cutting work in asbestos-black area (shaft wall openings), 1 200 m2 • remove the complete vent - drinking water and heating pipes and the electrical distribution and - lines • Div. KMF pipe insulation • approximately 7 000 m2 fine cleaning • waste management services, among others 500 tonnes of asbestos-containing building materials according incl. equipment for digital signature of hazardous wastes and establishment of waste management. eANV

Installation of cable laying

Bundesstadt Bonn, Referat Vergabedienste | Published April 1, 2016  -  Deadline May 10, 2016
cpvs
45314310, 45311100, 31213300, 31321200, 32521000

SGB ​​223,328th

Electrical and Computer Engineering

The Theodor-Litt-secondary school and the Gottfried-Kinkel-Realschule in 53129 Bonn are merged to Bonn Fifth Secondary School. For this purpose an existing sports field with locker and gym building, a science building and another gym Gottfried Kinkel school were demolished on the site.

In the area of ​​the former sports field, the new three-story part 1 is built with the new administration, a cafeteria, library, natural science classes, and underground parking.

This is combined with a 2-storey classroom wing (part 3).

In place of the demolished Gymnasium Gottfried Kinkel-school a new, usable as a meeting place with 600 people, Dreifachsporthalle built. (Part 2).

Electrically the site is powered by an existing substation in the Theodor-Litt-secondary school (part 5).

The want to create electro technical and IT system basically consists of the following services:

- About 42 000 m of cables and wires in halogen-free versions;

- 15 pcs Elektroverteilungen as freestanding and wall-mounted distributor;.

- Approximately 1 000 meters cable trays and mesh cable trays;

- Approximately 1 450 pcs lights in LED technology, partly with daylight regulation;.

. - 2 pcs ELA systems with approximately 240 speakers;

- 1 unit fire alarm system in accordance with DIN 14675 for component 2;.

- 1 pc voice alarm system in accordance with VDE 0833-4 for part 2;.

- 3 pcs safety light handling units with approximately 325 security and RZ lights;.

- 7 computer cabinets with about 1 500 meters fiber optic cable and about 24 000 m of copper cable;

- 1 pc video surveillance system with recording for the school grounds..

Insulation work

Universitätsklinikum Bonn | Published January 28, 2016  -  Deadline March 8, 2016
cpvs
45320000, 45261420, 44130000, 45112000, 45262311, 45312310, 31216100, 45262520, 45262522, 45223220, 45261400

The University Hospital Bonn built on the Venusberg, the new parent-child center. The new building will replace the stock in the city center and summarizes the functions of obstetrics and paediatrics. It realized 172 beds, including 13 beds of the pediatric intensive care. 2 neonatal stations, 3 stations of Pediatrics, the stations of obstetrics and maternity cases, and an oncology care with day hospital are provided. The parent-child center has 4 operating rooms and 4 delivery rooms and on outpatient obstetrics and pediatrics. The new building is a six-storey concrete frame with 11 787 m 2 Usable area built is planned with supporting facade, has a gross floor area of ​​25 946 m 2 and a gross volume of 106 188 m 3 , The building height is 19.64 m above ground level, with the roof panels 23.23 m. The building has a tripartite with 3 glazed courtyards and has a basement, which is used primarily for functional and storage areas. The facade has an insulated lining and preceding that maintenance catwalks with accent colors, sun protection panels made of coated metal. The interior is done in dry construction. The roof is greened by building code requirements and provided with a photovoltaic system. The new building has to be less than 20 percent in 2009, the requirements of the EnEV. Completion is planned for 2018th

Under an open tender will initially be entrusted the performance of the structural work. To a lesser extent other services of different trades are (earthworks, masonry, demolition and dismantling work, insulation work, Grundleitungs- and drainage works, lightning protection, electrical equipment shell, repainting and Estricharbeiten) included.

Emergency lighting equipment

Bundesamt für Bauwesen und Raumordnung, in Vertretung des BMUB | Published October 6, 2017  -  Deadline November 8, 2017
cpvs
31518200

Federal Ministry for the Environment, Nature Conservation, Construction and Nuclear Safety in Bonn

Electrical Engineering 2. BA.

Renewal lighting and safety lighting, exchange ceiling loudspeaker, cable network

Building power supply including building lighting

1 pc. Central unit (without battery system), 1 pc. Lower station E30, 103 pcs. Monitoring units, 103 pcs.

Exit sign / safety lights

21 pcs. Bollard lights, 125 pcs. LED ceiling mounted lights, 57 m LED light strip

2,000 m NHXH-J E30 to 3 x 2.5 mm 2 .

5,000 m NYM-J to 5 x 2.5 mm 2 .

3 000 m telecommunication line

82 pcs. Installation speaker

1 500 m lines 3 x 1.5 mm 2 up to 5 x 6 mm 2

150 m Installation cable 2 x 2 x 0,8 mm

16 St.Printing indicator

1 pc disabled call system

30 pcs. LED strip lights, 10 pcs. LED recessed spotlights.

Design and execution of research and development

Eisenbahn-Bundesamt | Published May 11, 2017  -  Deadline June 27, 2017
cpvs
73300000

In order to be able to estimate the impact of the requirements from the projected course of climate change on technical regulations, it is first necessary to identify the sections on which possible changes can be made. To this end, all structural subsystems of the railway system are to be investigated in areas where problems can be expected as a result of a change in the status quo. For this purpose, a superficial summary of the influencing parameters to be investigated (chapter 7.1 of the service description) has already been drawn up, according to which the investigation is to be carried out.

Once the relevant bodies have been identified, a qualitative assessment is to be made as to how much a change will have and how much action will be needed if other weather parameters are to be expected in the future. The overriding goal is the adaptation of the regulations in order to be able to use the plants and operating units created on this basis as long as possible and safely.

Lot 1: Infrastructure (civil engineering, superstructure and building construction, railway transitions)

The details of the required service can be found in Appendix 1 to the contract - service description.

2. Lot: Power and Safety:

Electrical engineering, signaling, control and fuse systems, telecommunication systems

The details of the required service can be found in Appendix 1 to the contract - service description.

3. Lot: Vehicles:

Traction units, freight wagons, dangerous goods wagons

Details of the required service can be found in Annex 1 to the contract - Service description.

Architectural, engineering and planning services

Bundesstadt Bonn, Referat Vergabedienste | Published May 24, 2017  -  Deadline June 21, 2017
cpvs
71240000

Architects and engineering as a general planner for the planning of an old and nursing home as a replacement building

With 80 full-station seats.

Location of the construction site: Gudenauer Weg 140, 53127 Bonn,

First, the object planning, according to Fig. DIN 276 Cost groups 300 and 400, (basic determination, preliminary design and design planning, Lph. 1-3). There is no legal right to order additional service phases. The Contractor can not derive any further remuneration claims or claims for damages from the step-by-step assignment.

Generalplaner power:

Object size: max. 4240.00 m2 for the living and usable area of ​​the Alten- und Pflegeheim KG, EG, 1.OG and 2.OG.

The current requirements of the MGEPA NRW are to be applied or implemented 100% at the Planúng as well as during the realization of the replacement building.

detailes:

Object planning building (performance phase 1 - 9)

Technical planning of construction and development (performance phases 1 - 9)

Structural design, structural fire protection

Technical planning, equipment groups 1-8 (performance phase 1 - 9)

Fassadenplanung

Heat protection planning and energy balance

Preventive fire protection, construction of a fire protection concept.

Building acoustics.

Room acoustics.

Technical planning of outdoor systems (performance phase 1 - 9)

Specialist interior design including equipment (performance phase 1 - 9)

Planning and coordination between the specialists, such as structural planning, house engineering planning, development planning, technical planning for the outdoor installation and equipment, heating, ventilation, plumbing, electrical, building physics, security and health coordination, energy conception and other specialist companies and stakeholders in the construction, responsibility of the interfaces as well as Acceptance of liability for all planning services.

Industrial machinery

Deutsche Forschungsgemeinschaft e. V., Zentrale Beschaffungsstelle | Published May 2, 2015  -  Deadline May 28, 2015
cpvs
42000000

Specifications: 2 dilution refrigerator systems General requirements - The systems should allow conducting experiments at temperatures of <10 1 10 30 100 400 mk under the use of superconducting magnet coils, with a maximum space in field temperature levels, k pot and mixing chamber are available must which allows installation anchoring thermal electric filters amplifier components allowed according to different cabling. - two cryostat systems follow this independent represents -. dry-mixing system, main argument system decision, time that is needed basic after heating room again based on (10 mk) cool all especially systems. required 3he-4he mixtures should be listed optional. designed optionally between standard solenoid or 3d vector magnetic (specification see below) able choose. specifications: base temperature: ≤ design allow for sample cooling controls range adjust simultaneous usage coils. when removing capacity ≥ ĩw demonstrated at an operating mk. stability mk: ± mk;> 100 mK: ± 1% thermal bridge to be brought into the system from room temperature to the base temperature range. 10 cm above and / or below the mixing chamber. It is therefore necessary that options are given with guaranteed vibration characteristics in the offers. - For the study to be performed to a sample chamber in the central field / homogeneity region of the superconducting magnet with a floor area of ​​at least 1 cm2 and a height of 3 cm are available. - The minimum requirements for the system wiring are: - 4 x 18 twisted-pair copper superconductor cable with Fischer connector nano at room temperature and standard or micro D connectors in the TT range. - 4 x semi-rigid coaxial cable (cube or Nb) specified for f ≥ 18 GHz with low-temperature grade -20 / -30 dB attenuators, thermally coupled to the specified temperature levels. - When not in use, all external connections must be provided with radiation shields and screening caps. Optional magnetic system to system I: The magnet system includes the solenoid (s) and power supply unit. . i superconducting solenoid with a magnetic field of at least 10 T - field homogeneity: 1% over the sample volume (see above) - Desirable: An optional offer for a system of sample rotation in the magnetic field 3D Vector magnet system - Vertical coil (z-axis) Central flux density for 4.2 K: 6-9 Tesla - Horizontal coil pair (x- and y-axis) central flux density of 4.2 K: 1 Tesla - 1% of field homogeneity over the sample volume. System II: (wet) 3He-4He dilution refrigerator with standard liquid 4He cooling The system is designed to provide maximum space above the mixing chamber for the installation of electrical filters and amplifier components. System Specifications: - mixing chamber base temperature: ≤ 10 mK - When removing cooling capacity ≥ 400 ĩW demonstrated at an operating temperature of 100 mK. - Available free space on the mixing chamber (plate): 700 cm2 with a free height of 5 cm. - For the study to be performed to a sample chamber in the central field / homogeneity region of the superconducting magnet with a floor area of ​​at least 1 cm2 and a height of 3 cm are available. - Are the minimum requirements for the system wiring: - 2 x 18 twisted-pair copper superconductor cable with Fischer connector at room temperature and standard nano- or micro-D connector in the TT range. - 2 x semi-rigid coaxial cable (cube or Nb) specified for f ≥ 18 GHz with low-temperature grade -20 / -30 dB attenuators, thermally coupled to the specified temperature levels. - When not in use, all external connections must be provided with radiation shields and screening caps. Optional magnetic system to system II: i superconducting solenoid with a magnetic field of at least 10 T - field homogeneity:. 1% over the sample volume - Desirable: An optional offer for a system of sample rotation in the magnetic field 3D Vector magnet system - Vertical coil (z-axis ) central flux density of 4.2 K: 6-9 Tesla - Horizontal coil pair (x- and y-axis) central flux density for 4.2 K: 1 Tesla