Electrical fitting work

Staatliches Bauamt Augsburg | Published May 26, 2016  -  Deadline July 12, 2016
cpvs

Electrical installation work

Electrical installation work

Deutsche Rentenversicherung Schwaben, Zentrale Vergabestelle | Published July 5, 2016  -  Deadline August 2, 2016
cpvs

Electrical installation work

Electrical work at traffic signals

Stadt Augsburg | Published December 21, 2016
cpvs

Electrical work at traffic signals

LfU, electrical work / network renewal

Staatliches Bauamt Augsburg | Published October 10, 2016
cpvs

LfU, electrical work / network renewal

Electrical fitting work

Evang. Diakonissenanstalt Augsburg – 3.BA: Neubau Bettenhaus Ost | Published January 14, 2016
Winner
Firma Erhardt und Leimer
cpvs
45311200

As part of the structural measure - reconstruction, modernization and expansion of the hospital in several phases of the Evangelical Diakonissenanstalt Augsburg, in the third phase of construction, the existing bed house Ost is replaced by a new building. The work must be performed while the hospital operating on the premises, which is why an increased circumspection is called for. Trades: electrical work.

Electrical fitting work

Evang. Diakonissenanstalt Augsburg – 3.BA: Neubau Bettenhaus Ost | Published August 29, 2015  -  Deadline October 1, 2015
cpvs
45311200

As part of the structural measure - reconstruction, modernization and expansion of the hospital in several phases of the Evangelical Diakonissenanstalt Augsburg, in the third phase of construction, the existing bed house Ost is replaced by a new building. The work must be performed while the hospital operating on the premises, which is why an increased circumspection is called for. Trades: electrical work.

Electrical fitting work

Stadtwerke Augsburg Holding GmbH, Bau-Einkauf | Published March 14, 2017  -  Deadline April 4, 2017
cpvs
45311200

Electrical work on the gasworks August Wessel Str. 30, 86156 Augsburg for the historic kiln house with a new workshop and catering establishments, and for the installation of a theatrical venue. At the same time an extension is built as a new building for the office's and workshops.

Preliminary be inserted in the course of concreting electric conduits in the concrete parts. These operations must be carried out in sections, according to construction progress.

Electrical fitting work

Stadtwerke Augsburg Holding GmbH, Bau-Einkauf | Published May 4, 2017
cpvs
45311200

Electrical works on the Gaswerkgelände, August-Wessel-Str. 30, 86156 Augsburg for the historical furnace house with new workshop and a gastronomy, as well as for the installation of a theater-theater. At the same time, an extension is being built as a new building for offices and workshops.

In the course of the concreting work, electrically empty pipes are inserted into the concrete parts. This work must be carried out in sections according to construction progress.

Safety tests on about 54,000 electrical equipment

Universität Augsburg, Zentralverwaltung, Ref. III/4 | Published February 13, 2017  -  Deadline March 21, 2017
cpvs

Safety tests on about 54,000 electrical equipment

Engineering design services for mechanical and electrical installations for buildings

Staatliches Bauamt Augsburg | Published August 5, 2016  -  Deadline September 4, 2016
cpvs

Engineering design services for mechanical and electrical installations for buildings

Electrical installation work

Deutsche Rentenversicherung Schwaben, Zentrale Vergabestelle | Published April 27, 2017
Winner
Bolz-Elektrotechnik GmbH
cpvs
45310000

Electrical work 2 (BA 2 and 3).

Dismantling and disposal of approx. 120 luminaires - approx. 5 300 m lines and laying systems Delivery and assembly of - 1 HVT - 7 UVT - approx. 18 000 m Cables and lines - approx. 1 480 m Paving systems - approx - approx. 75 KNX sensors - 2 KNX weather stations including sensors - approx. 1 loudspeaker for the auditorium - 1 auditorium for the auditorium - 1 auditorium for the auditorium - 1 auditorium for the auditorium - approx.

Electrical installation work

Deutsche Rentenversicherung Schwaben, Zentrale Vergabestelle | Published December 30, 2016  -  Deadline January 31, 2017
cpvs
45310000

Electrical work / fire alarm system BA 2 and BA. 3

Dismantling and disposal of approximately 85 smoke detectors

Supply and installation of

- Approximately 1 300 meters fire alarm cables;

- 15 m laying systems with functional integrity;

- Surge protection for about 24 DA;

- 1 fire alarm system, Make: Esser Flex ES;

- 71 detectors with speech segment;

- 11 manual call points;

- 73 intermediate ceiling detectors;

- 7 sirens;

- 6 coupler;

- 2 remote systems;

- About 190 Feuerwehreinsatz cards.

Electrical wiring and fitting work

Staatliches Bauamt Augsburg | Published May 4, 2017
Winner
Zimmerly Elektro GmbH
cpvs
45311000, 45315600

Power supply approx. 1 000 A with metering system

Low voltage switchgear approx. 630 A

Safety lighting with battery capacity approx. 106 Ah

PV plant with approx. 9,9 Kwp

KNX system, solar control, energy monitoring

Approximately 30 units of electrical subdistribution

Approximately 3 900 m flooring systems

Approximately 55 000 m cables and wires

Approximately 1 100 St. Installation equipment

Approximately 1 400 pcs. General lighting

Approximately 100 pcs outdoor lights

Approximately 300 pcs. Of safety lights

Approximately 200 m 2 Fire protection panels.

Electrical

Stadt Augsburg | Published August 28, 2015  -  Deadline September 23, 2015
cpvs

WWTP Augsburg

Acquisition and exploitation of electrical equipment of the hunt group 5 from the Sperrmü ...

Stadt Augsburg | Published October 23, 2015  -  Deadline November 24, 2015
cpvs

Acquisition and exploitation of electrical equipment of the hunt group 5 from the Sperrm ...

Electrical installation work

Deutsche Rentenversicherung Schwaben, Zentrale Vergabestelle | Published December 28, 2016  -  Deadline January 24, 2017
cpvs
45310000

Electrical work BA. 2 and 3

Dismantling and disposal of:

- About 120 lights;

- Approximately 5 300 meters cables and cabling systems.

Supply and installation of:

- 1 HVT;

- 7 UVT;

- About 18 000 m of cables and wires;

- About 1 480m laying systems;

- 80 meters underground systems;

- 450 installation equipment;

- Approximately 316 lights;

- About 77 busvernetzte contained luminaires;

- About 5 external door station;

- 1 Nurse call + bus devices for about 46 rooms;

- About 19 KNX actuators;

- About 67 KNX sensors;

- 2 KNX weather stations including sensors;

- 1 19 "EDP standing cabinet 42U;

- 11 patch panels;

- Approximately 122 duplex connections;

- 1 sound system for lecture hall;

- 1 sound system for the training area;

- 1 beamer for lecture hall;

- 1 smoke ventilation unit;

- About 100 fire barriers of different sizes;

- 30 m Fire resistant cables.

Electrical installation MB. 2

Stadt Augsburg | Published February 24, 2016  -  Deadline April 6, 2016
cpvs
45300000, 45310000

F) dismantling of electrical equipment and low voltage lines and production of hallway wall penetrations during a fire exercise, dismantling about 5 000 m low-voltage lines and 5 000 m of telecommunications / -Schwachstromleitungen, dismantling of about 40 Elektrounter- / small distributor, dismantling of about 550 inventory lights , of which about 300 inventory lighting store for reuse, installation of 500 LED linear luminaires including related digital lighting control, installation of 200 LED recessed downlight, installation of approximately 320 installation equipment, installation of 15 electric sub-distribution boards as wall / and prior distribution, conversion and extension of existing low voltage distribution, installation of approximately 4 500 m cable carrying system for wall and ceiling mounting, installation of approximately 1 200 meters cable tray systems, installation of approximately 15 000 m of low voltage installation cable, 500m transmission line, approximately 700 m cable tray , installation of approximately 24 data distribution cabinets, installation of approximately 1 800 meters LWL data lines, installation of approximately 45 000 m of copper data cables, supply and installation of approximately 1100 data outlets, supply of approximately 130 audio speakers, installation of about 60 projector ceiling Mounts , supply and installation of about 30 square meters control room double bottom, disassembly and assembly of temporaries with approximately 2 000 m of rubber sheathed cable, approximately 750 kg dismantling cable, approximately 650 kg dismantling of switchgear and equipment.

Electrical installation

Stadt Augsburg | Published December 9, 2016  -  Deadline January 20, 2017
cpvs
45311000

Fire Restoration Bebo Wager Vocational Schools I, II, V, VII

Electrical work

Staatliches Bauamt Augsburg | Published November 3, 2016
cpvs

Criminal Justice Building Augsburg

Electrical work

Landkreis Augsburg | Published April 25, 2016  -  Deadline May 19, 2016
cpvs
45311200

Service Building District Office - LED Lighting