Public tenders for electrical in Ostrava-poruba Czech Republic

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Delivery and installation of anti-decubitus mattress 7 pieces, 2 pieces weighing seats, 8pc hospital beds, electric 18ks care beds, 5 pcs mattresses, neonatal resuscitation beds 1pc, 2pc rehabilitation beds "Vojta".

Městská nemocnice Ostrava, příspěvková organizace | Published November 26, 2014
cpvs

The subject of procurement is the supply delivery and installation of anti-decubitus mattresses, weighing chairs, hospital beds, electric bed nursing, neonatal resuscitation beds, rehabilitation beds "Vojta". 18 pcs delivery care beds supply 8 pieces of hospital beds and mattresses 5 ks

Air filters

OKK Koksovny, a.s. | Published November 29, 2016  -  Deadline December 14, 2016
cpvs
42514310, 51500000, 51100000, 45231112

The project "Reconstruction of dedusting technology units sorting coarse and fine screening plants coke OKK, as, Svoboda Coking to reduce fugitive emissions" is an ecological project. The aim of this contract is a significant reduction of fugitive emissions of air pollution operations coarse and fine screening plants coke (HTK, JTK) and at the same time improving the health conditions of its employees. The Contracting Authority intends to increase the efficiency of dust removal of at least 30%, which will reduce the amount of fugitive emissions and traffic HTK JTK of at least 24,500 kg / year. Scope of delivery - complete dismantling of the existing scrubbers, incl. dismantling electric - complete dismantling of the existing exhaust air distribution systems - Installation of new dry scrubbers with output values ​​of dust in the air mass max. 5 mg / m³. - Installation of new exhaust air traffic routes with consistently adding exhaust hood in all places where dust is created - new transport routes equipped with automatically switchable flaps for setting the optimal path of air suction only currently active sites. Paths set according to possible variations based on production needs. - The flaps operate automatically based on the chosen technological routes of transported material connected to the existing control system centers. - Install new control system and instrumentation - Install a new source of compressed air quality needed for regeneration separators. - Install the evacuation of the collected dust - Solve the problem with moisture exhausted air and dust sucked, especially at low outdoor temperatures. - Implement the necessary minor construction work - an optimum coating system - Work will be performed in operation centers - The work process the project documentation, which will include a portion of mechanical, electrical, instrumentation and construction. - The work to deliver all the documents necessary for its safe operation. For more details, see ZD.

Modernization of electrostatic precipitators on Sinter Plant North - technology delivery / Modernization of electrostatic precipitators at the agglomeration Sever - delivery technology

ArcelorMittal Ostrava a.s. | Published August 30, 2016
cpvs

The subject of the public contract is the modernization of electrostatic precipitators at the agglomeration north. It will be made for upgrading existing electrostatic precipitators, which are already 20 years old and therefore outdated and worn. Modernized will internals EO, supply and management. Electrostatic modernization will reduce the consumption of electrical energy for their operation and EO is adjusted so that the vacuum sintering belts may in the future operate with a higher vacuum than it is now. The selected contractor will design and deliver technological equipment and components for modernization projects. The supplier also draw up project documentation, which will be used for the installation of the supplied technology for dismantling work and subsequent operation. Technology supplier will provide supervision during erection, dismantling and commissioning. Selecting a supplier of assembly and disassembly, repair and reinforcement pipe (not the subject of this tender procedure) is performed later only on the basis of other independent technical conditions and according to the project documentation developed by the vendor of choice for technology modernization. A detailed description of the subject of a detailed technical specification in the tender dossier and its annexes. Continued point III.2.3 Technical capacity: b) Affirmation that the contractor is able to deliver complementary technology and equipment with the following parameters: i) dust emissions from one line EO maximum of 250 mg / Nm3 dry gas containing 35% sodium chloride in the entry of dust; ii) the total energy consumption for one new EO system covering all consumption within the interface of the project (in addition to the existing evacuation of dust) is less than 302 kWh / one EO

Air filters

OKK Koksovny, a.s. | Published September 30, 2016  -  Deadline November 28, 2016
cpvs
42514310, 51500000, 51100000, 45231112

The project "Reconstruction of dedusting technology units sorting coarse and fine screening plants coke OKK, as, Svoboda Coking to reduce fugitive emissions" is an ecological project. The aim of this contract is a significant reduction of fugitive emissions of air pollution operations coarse and fine screening plants coke (HTK, JTK) and at the same time improving the health conditions of its employees. The Contracting Authority intends to increase the efficiency of dust removal of at least 30%, which will reduce the amount of fugitive emissions and traffic HTK JTK of at least 24,500 kg / year. Scope of delivery - complete dismantling of the existing scrubbers, incl. dismantling electric - complete dismantling of the existing exhaust air distribution systems - Installation of new dry scrubbers with output values ​​of dust in the air mass max. 5 mg / m³. - Installation of new exhaust air traffic routes with consistently adding exhaust hood in all places where dust is created - new transport routes equipped with automatically switchable flaps for setting the optimal path of air suction only currently active sites. Paths set according to possible variations based on production needs. - The flaps operate automatically based on the chosen technological routes of transported material connected to the existing control system centers. - Install new control system and instrumentation - Install a new source of compressed air quality needed for regeneration separators. - Install the evacuation of the collected dust - Solve the problem with moisture exhausted air and dust sucked, especially at low outdoor temperatures. - Implement the necessary minor construction work - an optimum coating system - Work will be performed in operation centers - The work process the project documentation, which will include a portion of mechanical, electrical, instrumentation and construction. - The work to deliver all the documents necessary for its safe operation. For more details, see ZD.

Air filters

OKK Koksovny, a.s. | Published November 15, 2016  -  Deadline November 29, 2016
cpvs
42514310, 51500000, 51100000, 45231112

The project "Reconstruction of dedusting technology units sorting coarse and fine screening plants coke OKK, as, Svoboda Coking to reduce fugitive emissions" is an ecological project. The aim of this contract is a significant reduction of fugitive emissions of air pollution operations coarse and fine screening plants coke (HTK, JTK) and at the same time improving the health conditions of its employees. The Contracting Authority intends to increase the efficiency of dust removal of at least 30%, which will reduce the amount of fugitive emissions and traffic HTK JTK of at least 24,500 kg / year. Scope of delivery - complete dismantling of the existing scrubbers, incl. dismantling electric - complete dismantling of the existing exhaust air distribution systems - Installation of new dry scrubbers with output values ​​of dust in the air mass max. 5 mg / m³. - Installation of new exhaust air traffic routes with consistently adding exhaust hood in all places where dust is created - new transport routes equipped with automatically switchable flaps for setting the optimal path of air suction only currently active sites. Paths set according to possible variations based on production needs. - The flaps operate automatically based on the chosen technological routes of transported material connected to the existing control system centers. - Install new control system and instrumentation - Install a new source of compressed air quality needed for regeneration separators. - Install the evacuation of the collected dust - Solve the problem with moisture exhausted air and dust sucked, especially at low outdoor temperatures. - Implement the necessary minor construction work - an optimum coating system - Work will be performed in operation centers - The work process the project documentation, which will include a portion of mechanical, electrical, instrumentation and construction. - The work to deliver all the documents necessary for its safe operation. For more details, see ZD.

Completion of unfinished construction "Těšínské Theatre - Small Theatre"

Moravskoslezský kraj | Published April 3, 2015
cpvs
45000000

This is a reconstruction of the former boiler room in the basement of the small theater scene using both the performing arts and organizing social activities. The building is in the original design documents divided into individual objects and operational files as follows: a) SO 01 Těšínské Theatre - Small Stage, building - technical solution (civil works, plumbing, heating, air conditioning, ZOTK, electro - heavy) b) PS 01 to PS 05 Těšínské Theatre - Small Theatre, technological solutions (01 PS Technology Engineering, PS 02 Electrical machinery technology, PS 03 stage lighting, PS 04 and PS 05 Electro-Acoustic Space) Jiří Klimek, authorized architect ČKA 03,332, Na Lukách 34, Ostrava - Stara Bela, 724 00. Further details are given in the tender documents. a) a description needs to be met by meeting procurement (ie. the description needs to properly secure the assigned tasks): The objective is rebuilding former boiler room in the basement of the small theater scene using both the performing arts and organizing social activities. b) a description of the subject contract: see section II.4) c) a description of the relationship between the subject contract and the client's needs (ie. a description of the extent to contribute implementation of the public contract to fulfill the needs of the customer): In the case of non-implementation of a public contract not be fulfilled objective of the project and program Těšínské theater (2 scenes) remains hampered by one stage space. d) the expected due date for a public contract (specific date or time period):

Execution of works under the project "4. Phase transformation Marianum "II

Moravskoslezský kraj | Published February 27, 2015
cpvs

The subject of the tender is the selection of the contractor undertaking construction work under the project "4. Phase transformation Marianum ". The subject of procurement is a change of construction - reconstruction of the building of the school hall B1 at home for people with disabilities involving 3 accommodation units (each unit for 6 persons) with a total capacity of 18 persons and facilities for the performance of social care. The layout is 1.NP in the left part of the solution as three tracts with access to facilities for the performance of personnel (locker rooms and bathrooms. Facilities), technical rooms, and a motivational workshop and three warehouses (one for each apartment). On the right side is located one apartment, from which the entrance to the new solution patio. In 2.NP are located two apartments, mirror oriented to the central central corridor. Flats counted 4 single rooms and one double room, living room with kitchen and dining room, two bathroom with a WC. Part of the new annex providing disabled access main entrance and barrier free access to 2.NP object. Rebuilding the house coup. SO 200 DOZP - lies in separation from the existing interconnection to the school building and the construction and layout editing an existing two-storey building, reinforced concrete frame construction with reinforced concrete hollow core ceilings, with a flat roof with internal temptations as envelope of gas-silicate panels. Edit comprising removing internal walls and non-bearing structures, removal of floors, existing pipelines, removal of the existing staircase. Furthermore, the implementation of the new layout arrangement ie. The new design of the walls mostly drywall, new floors and new wiring (sanitary, electrical, central heating) in replacing windows with additional walling in the thermal insulation of the building envelope contact system and the implementation of the new roof cladding.

Leos Janacek Airport Ostrava, integrated CSU Center

Moravskoslezský kraj | Published December 8, 2014
cpvs

The building is divided into the following construction and engineering and operational units: Building C 03 SO SO Fencing IO 06 01 02 Preparation of the IO Communications, paved areas, el. operated gates IO 03 lights, road signs IO 04 Parking IO IO 06 05 Pavements landscaping, small outdoor architecture IO 07 Outdoor Connection VN IO 08 IO IO 10 09 Substation Spare source IO 11 Main LV IO 12 Main low voltage wiring 13 Water connection IO IO IO supply 15 Fire 16 - 18 Sewer Connection plynuIO rain IO 19 Sewer Wastewater PS 01 measurement and control instrumentation PS 02 Structured cable network, active PS 04 Fire Alarm EPS PS 05 Electrical unsecure. Intrusion alarm and access control system EKV PS 07 CCTV PS 08 PS 10 Local radio integrated system exit, technical system of alarms PS 17 Technology tripping boxing, inventory and fulfillment extinguishing media PS 18 Charging the battery and engine heater in the garage PS 21 Technology divorce pressure. PS 22 air exhaust extraction PS 28 Information System PS 29 PS 30 single time TV and satellite, aerial systems hromosvodný PS 31 PS 32 PS Surge Protection 33 Intelligent Building Management PS 35 Fire fighting equipment is anticipated that the project will be financed by the ERDF under the Regional Operational Programme NUTS 2 Moravia-Silesia (hereinafter "ROP"), Priority Axis 1 - Regional Infrastructure and accessibility, support area 1.2 Development and availability of airport Ostrava

Supply and installation of musical instruments and audio equipment within the project "Modernization of Education and conditions for teaching in art schools"

Moravskoslezský kraj | Published November 7, 2014
cpvs

The subject of the public contract is the supply and installation of musical instruments and audio equipment for a total of 11 art schools founded by the Moravian-Silesian region in the framework of the project "Modernization of Education and conditions for teaching in art schools", sent to 29 calls in the ROP NUTS II Moravia-Silesia 2007- 2013. A public contract is divided into 5 (five) parts under the provision. § 98 PPA. The candidate may submit a bid for one, more or all of the public procurement: 1. Supply and installation of wind instruments and accordion 2. The supply and installation of stringed musical instruments 3. The manufacture, supply and installation of a stringed musical instrument - cimbalom 4. The supply and installation of drums musical instruments 5. The supply and installation of electric musical instruments and audio equipment and tools supplied must be new and unused. Closer in ZD Supply and installation of wind instruments and accordion Supply and installation of stringed musical instruments Manufacture, supply and installation of a stringed musical instrument - cimbalom Supply and installation of percussion musical instruments Supply and installation of electric musical instruments and audio equipment Continued point III.2.3) Technical capacity : For the fourth part of the Public Procurement - Supply and installation of percussion musical instruments: • Delivery of percussion musical instruments, a minimum financial volume of 100.000, - CZK without VAT total for the required three-year period; For the fifth part of the public procurement - Supply and installation of electric musical instruments and audio equipment: • the supply of electrical keyboard and stringed instruments, the minimum financial volume of 200.000, - CZK without VAT total for the required three-year period; • Supplies and audio equipment, and a minimum financial volume of 200.000, - CZK without VAT total for the required three-year period.

Reconstruction of dedusting technology units sorting coarse and fine coke sorting plant

OKK Koksovny, a.s. | Published July 8, 2016
cpvs
42514310

The Contracting Authority intends to increase the efficiency of dust removal of at least 30%, which will reduce the amount of fugitive emissions and traffic HTK JTK of at least 24,500 kg / year. Scope of delivery - complete dismantling of the existing scrubbers, incl. dismantling electric - complete dismantling of the existing exhaust air distribution 5 mg / m3. - Installation of new exhaust air traffic routes with consistently adding exhaust hood in all places where dust is formed according Pathways to determine possible options based on production needs. - The flaps operate automatically based on the chosen technological routes of transported material connected to the existing control system centers. - Install new control system and instrumentation - Install a new source of compressed air quality needed for regeneration separators. - Install the evacuation of the collected dust - Solve the problem with moisture exhausted air and dust sucked, especially at low outdoor temperatures. - Implement the necessary minor construction work - an optimum coating system - Work will be performed in operation centers - The work process the project documentation, which will include a portion of mechanical, electrical, instrumentation and construction. - The work to deliver all the documents necessary for its safe operation Grounds effectiveness of public procurement: The planned target public Contracting Authority plans to increase the efficiency of dust removal of at least 30%, which will reduce the amount of fugitive emissions and traffic HTK JTK of at least 24,500 kg / year. Description of the relationship between the realized public procurement and the planned target proposed solution will be used to reduce dust in the area and thereby improving hygienic conditions not only company employees but all residents of Ostrava. Description alternatives to meet the planned objectives and rationale for the selected alternative public procurement to achieve the objective seems to be appropriate and that the only alternative is to increase the efficiency of dedusting equipment centers are replacing: - Removal of existing scrubbers - Removal of existing exhaust air distribution 5 mg / m3. - Installation of new exhaust air distribution with consistent addition of exhaust hood in all places where it forms a dust description of the extent to affect public order fulfillment of the planned targets planned construction is its purpose to reduce dust emissions (TZZL) into the atmosphere building ecological which improves the environment and work environment to employees operating HTK and JTK OKK and the entire complex and its surroundings. The purpose of use of the technological equipment is to reduce dust emissions into the atmosphere of the new separators to 5 mg / m 3 and increased efficiency of dust removal by at least 30%. Further information justifying the effectiveness of public procurement

The electricity supply in 2016

Ostravské vodárny a kanalizace a. s. | Published November 30, 2015
cpvs

Supply of electricity supply points delegated contracting authority to take over the obligation to draw electricity from the mains. system, including the assumption of responsibility for imbalance for the supplier of the Act. no. 458/2000 Coll. and Decree 541/2005 Coll. as amended.

Electricity and gas

Česká průmyslová zdravotní pojišťovna | Published February 18, 2015
cpvs

The contract is an association of electric power supply (hereinafter "electricity") and gas, including related services, ensuring the transmission, distribution and supply system services contracted amounts of electricity and gas supplier to the contracting authority (hereinafter "Subscriber"), taking responsibility for deviation within the meaning of the Act no. 458/2000 Coll., on business conditions and public administration in the energy sector and amending certain laws (Energy Act), as amended, and Decree no. 541/2005 Coll., on market rules electricity pricing principles for activities of the electricity market operator and execution of certain other provisions of the Energy Act, as amended. The subject also provide access to on-line monitoring of electric energy and gas.

Supply of electricity and gas

Česká průmyslová zdravotní pojišťovna | Published January 9, 2015
cpvs

The contract is combined supply of electricity and gas, including related services, ensuring the transmission, distribution and supply system services contracted amounts of electricity and gas supplier to the contracting authority, taking responsibility for deviations in the sense of Act no. 458/2000 Coll. business conditions and state administration in energy sectors and amending certain acts (Energy Act), as amended, and Decree no. 541/2005 Coll., on the electricity market rules, principles of pricing activity Electricity Market Operator, and implementation of some other provisions of the Energy Act, as amended. The subject also provide access to on-line monitoring of electric energy and gas.

Supply of electricity - February 2015

Česká průmyslová zdravotní pojišťovna | Published December 26, 2014
cpvs

The contract is an association of electric power supply (hereinafter "electricity"), including related services, ensuring the transmission, distribution and supply system services contracted amount of electricity supplier to the contracting authority (hereinafter "Subscriber"), taking responsibility for deviations in the sense Act no. 458/2000 Coll., on business conditions and public administration in the energy sector and amending certain laws (Energy Act), as amended, and Decree no. 541/2005 Coll., on the electricity market rules, principles of prices for activities of the electricity market operator and execution of certain other provisions of the Energy Act, as amended. The subject also provide access to on-line monitoring of electricity consumption.

Supply of electricity and gas

Česká průmyslová zdravotní pojišťovna | Published October 10, 2014
cpvs
09310000

The contract is the supply of electricity, gas and related services for Czech industrial health insurance, and for a fixed period to 31 12th 2016 is the subject of the supply of electricity and related services to the client. The subject of the supply of gas and related services for the client. a) a description of the needs of the course: The need for supply of electricity and gas at the headquarters and selected contact points contracting authority in order to ensure their operation. The contract is the supply of electricity, gas and related services. b) The relationship of the subject and the client's needs: ensuring the supply of electricity and gas will be running a headquarters and selected contact points of the contracting authority. c) Expected Date: 2015 - 2016

Software equipment

TEMEX , spol. s r. o. | Published August 26, 2016
cpvs

The contract is the purchase of software for office work, modeling CAD, CAM system for CNC machines and design software for designing in electrical engineering. Delivery and installation of software, are specified in Annex no. 4 are included and all necessary accessories. Sponsor does not allow partial performance.

Supply of electricity for the Region in 2017

Moravskoslezský kraj | Published July 19, 2016
cpvs

Purchase electricity for 2017 in a centralized manner, ie. For allowance organizations founded by Moravian-Silesian region, for companies founded the Moravian-Silesian Region and the Regional Office for the object MSK.

Electricity and gas for ČPZP

Česká průmyslová zdravotní pojišťovna | Published July 26, 2016
cpvs
09310000

The contract is the combined supply of electricity and gas, including associated services, secure transmission, distribution and system services supply the agreed quantity of electricity and gas supplier to the contracting authority. a) A description of the needs and scope: The contracting authority for the operation of their facilities needs to ensure supply of electricity and gas. The contract is to ensure the supply of electricity and gas. b) The interrelationship object and the client's needs: The realization of the subject of performance (supply of electricity and gas) comes to meet the authority's needs (need for security of supply of electricity and gas to operate objects sponsor). c) Expected Date: 2/2019

Supply of electricity in the LV level

Ostravské komunikace, a.s. | Published March 13, 2015
cpvs

The electricity supply in the LV level (public lighting) Building contracts is physical delivery of electricity from the voltage level NN contracting the taps in the total number specified in Appendix 2. Estimated total supply NN for all taps where the contracting authority is in a planned total amount of 13,002 MWh for the period from 1 4th 2015 to 31. 12. 2015.

Supply of electricity in the LV level

Ostravské komunikace, a.s. | Published December 4, 2014
cpvs
09310000

Procured the supply of electricity in the LV level sponsor for the Ostrava communication, as the taps lighting within the city of Ostrava. Expected amount of subscription for the period from April to December 2015 is set at 13,000 MWh. Public contract is awarded to ensure the supply of electricity for the period from 1 April 2015 to 31 December 2015. The goal is to select the contracting authority under a contract awarded in an open procedure best supplier, and basic evaluation criterion - the lowest bid price. As a means of evaluating the bids will be used electronic auction.