Public tenders for connectors in Switzerland

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

UW Avegno - High Voltage Cable / Connectors and cable terminations

Swissgrid AG | Published March 8, 2017  -  Deadline February 3, 2017
cpvs

UW Avegno - High Voltage Cable / Connectors and cable terminations

080 260, N04 / 08 Kleinandelfingen - branch Winterthur, congestion, PV connectors Kleinandelfingen / Adlikon MP, REA

Bundesamt für Strassen ASTRA, Abteilung Strasseninfrastruktur Ost, Filiale Winterthur | Published October 11, 2016  -  Deadline August 30, 2016
cpvs

080 260, N04 / 08 Kleinandelfingen - branch Winterthur, congestion, PV connectors Kleinandelfingen / Adlikon MP, REA

080 260, N04 / 08 Kleinandelfingen - branch Winterthur, congestion, PV connectors Kleinandelfingen / Adlikon MP, REA

Bundesamt für Strassen ASTRA, Abteilung Strasseninfrastruktur Ost, Filiale Winterthur | Published June 23, 2016  -  Deadline August 16, 2016
cpvs
71300000

The existing national road between N04-08 Kleinandelfingen and the branch Winterthur will be extended under the program debottlenecking on national roads on the east side with two additional lanes. Simultaneously, the existing system is to be fixed at the perimeter of the national road in this section.
Contract relates for the engineering services as project authors Trassee and civil structures for the project planning phase measures project (MP) and execution (SIA phases 41, 51-53) for the repair of the terminals Kleinandelfingen (incl. UEF In Buck) and Adlikon.
Further details can separate the specification dat. Are taken 27/05/2016.

Shors primary school, BKP 221.1 windows in wood / metal

Bau- und Verkehrsdepartement des Kantons Basel-Stadt, Fachstelle für Submissionen | Published October 15, 2014  -  Deadline November 27, 2014
cpvs
45210000

Facade windows and doors with wood-metal profiles with 3-e glazing including all additional panels, connectors and seals at the building.

Optical Dark Fibres Network Rental, for UNOG (SC 1000179057)

United Nations Secretariat | Published April 14, 2016
cpvs

The United Nations Office at Geneva (UNOG) is a key member of the United Nations family, we facilitate the Organization’s work in the promotion of peace, development and human rights. We build partnerships with civil society, research, academia and other international actors. We nurture mutual respect and understanding through cultural exchange. We preserve the institutional memory and unique heritage of the United Nations, and we reach out to mobilize support for the efforts of our Organization. Across all of these activities, we draw on the unique traditions and spirit of Geneva as a multilateral platform, bringing together different stakeholders and points of view. In the historic setting of the Palais des Nations, we work for a better future for all. Over 10,000 meetings are hosted here every year, each in different ways touching the lives of people across the globe. Whether it is promoting individual rights and empowerment, helping to build peace in fragile communities, advancing disarmament, non-proliferation and arms control, facilitating humanitarian action or building conditions for sustainable development, the discussions and decisions at the Palais des Nations make a difference in the lives of people everywhere. UNOG Procurement is handled by the Purchase and Transportation Section (PTS). For details concerning UNOG, please refer to its website at: www.unog.ch Brief Description of Requirements: UNOG intends to establish a Contract for 3 years + 2 one-year possible extentions, starting on 1 December 2016, for the following: Optical Dark Fibres Network Rental for UNOG. UNOG wishes to renew, improve and expand its Metropolitan Area Network (MAN). The rental of the Optical Dark Fibres represents the backbone of the UNOG MAN. UNOG is seeking a qualified provider for the rental of Optical Dark Fibres. Description of UNOG’s current optical dark fibre links across Geneva, type of connectors and addresses of each building are as follows: UNOG’s Optical dark fibers networks description: From To Number of pairs Palais des Nations (PN) Palais Wilson (PW) 1 Palais des Nations (PN) MIE 1 Palais des Nations (PN) Villa Feuillantines (VF) 1 Palais des Nations (PN) Giuseppe Motta (GM) 1 Palais des Nations (PN) IAV (Varembé) 1 Palais Wilson (PW) Giuseppe Motta (GM) 1 Palais des Nations (PN) CERN 1 CERN SafeHost (SH) 1 MIE SafeHost (SH) 1 Palais des Nations (PN) SafeHost (SH) 1 UNOG must be able to request new fibres or to remove existing fibres without any penalty during the whole duration of the contract. The type of connectors, the UNOG's Optical Dark Fibres Networks Addresses, the Detailed Service Description, etc. will be indicated later in the Solicitation document (ITBS).

IT Consultancy Services for UNISDR (FAST ESP)

United Nations Office at Geneva | Published June 22, 2015  -  Deadline July 6, 2015
cpvs

Objectives UNISDR (United Nations Office for Disaster Risk Reduction) will be improving its Enterprise Search Solution which is currently using FAST Enterprise Search. The FAST ESP Search for solution will be used as a corporate search solution for all UNISDR public and websites and databases. UNISDR is seeking a supplier that  will  provide technical expertise  in implementing the FAST ESP with particular focus in configuring connectors to  data from other applications primarily: MySQL, Drupal and PHP based systems. Scope of Work The following are examples of general activities that will be undertaken: Supplier will analyze the existing data sources (MySQL databases, Drupal, and other websites) in order to define the architecture of the search application, this may involve workshops with the data owners in Geneva. The solution architecture must be documented and submitted to UNISDR for approval. Installation of FAST ESP SEARCH  upgrades on production and staging servers, hosted in Geneva. Configuration of FAST to perform indexation of UNISDR document repositories based on other websites. Implementation of the search user interface, providing options for filtering results based on document source, language, author and other attributes. Implementation of data processing pipelines in line with user’s requirements. Training and support of UNISDR staff in Geneva. Off-site training and support may also be possible.

Construction work

Kanton Solothurn, handelnd durch Bau- und Justizdepartement, Hochbauamt | Published September 23, 2015  -  Deadline October 29, 2015
cpvs
45000000

BKP 236 low-voltage systems: - all low-voltage systems with no deposits in the concrete; - Control cable and connectors for UCT, BMA, EMA, EVAK - complementary piping in false ceilings, AP installations. BKP 272.2 General Metallbauarbeiten (locksmithing): - 100 radiator panels; - Weather protection grille.

SAN arrays

Centrale d'achats et d'ingénierie biomédicale des hôpitaux universitaires Vaud-Genève | Published September 13, 2014  -  Deadline October 20, 2014
cpvs
30233000

Acquisition of a single, inseparable initial batch for HUG, consisting of: - 2 bay storage block consolidation settings (minimum category entry Upper Range) - 2 blocks dedicated storage arrays for backups to disk initial configuration - complete set of software (management and administration, analysis and statistics) - commissioning (including all necessary connectors to existing infrastructure) - documentation (for commissioning and migration from existing) - the recovery of two bays USPS-V - the support and maintenance - ensuring

N13 tunnel Bärenburg SISTO - Lot 1, main lot construction

Ufficio federale delle strade USTRA Filiale Bellinzona divisione Infrastruttura stradale | Published July 6, 2015  -  Deadline September 18, 2015
cpvs
45000000

Crosslinks (QV), and connectors on the tunnel, the creation of the portal stations north and south as well as the new headquarters premises for BSA / ventilation of the tunnel, preparatory work for the fire water supply and the distribution of a ramp with creation of an access road at the northern portal. Not to this offer is the equipment of Sisto and the portal stops by the BSA facilities. QV). This tender includes the following approximate quantities and services. OPERATIONS UNDER TAG: 17,000 m3 2,500 m3 2,500 m3 6,000 St. 500 m 17,300 m2 62 t 1'100 m 1'400 m3. WORKS ON DAY:. 1,400 m3 5,000 m3 43'100 m3 600 m3 420 pcs 120 t 920 m3 1'450 m

Construction work

EDY Toscano AG | Published September 14, 2016  -  Deadline October 24, 2016
cpvs
45000000

New noise barrier along Engadinerstreet in Celerina

Main quantities Baumeisterarbeiten noise barrier:

- Excavation and earthworks 1800 m³,

-Fundamente With manholes d = 50 cm; Depth 2.20 m pcs. 115,

-Fundamente With manholes d = 50 cm; Depth 1.50 m pcs. 200,

Connectors on Kordon retaining walls, bridges pcs. 66,

-concrete 150 m³,

-Stahlträger To. 33,

-Vorgefertigte Concrete boards Stk. 1 150,

-Holzkonstruktion, Wood paneling 150 m²,

-Mineralfaserdämmung 75 m²,

-Verbundsicherheitsglas, Part Preloaded 600 m²,

-length Noise barrier 760 m1.

Construction work

Ufficio Federale delle Strade USTRA — Filiale Bellinzona — Divisione Infrastruttura Stradale | Published July 9, 2015  -  Deadline September 18, 2015
cpvs
45000000

Crosslinks (QV), and connectors on the tunnel, the creation of the portal stations north and south as well as the new headquarters premises for BSA / ventilation of the tunnel, preparatory work for the fire water supply and the distribution of a ramp with creation of an access road at the northern portal. Not to this offer is the equipment of Sisto and the portal stops by the BSA facilities. QV). This tender includes the following approximate quantities and services. Working under day: 17 000 m3; 2500 m3; 2500 m3; 6000 St .; 500 m; 17 300 m2; 62 t; 1100 m; 1400 m3. Works on Day: 1 400 m3 fixed; 5000 m3; 43 100 m3; 600 m3; 420 pcs .; 120 t; 920 m3; 1 450 m;

Operating-theatre devices

Spital STS AG | Published September 24, 2015  -  Deadline October 30, 2015
cpvs
33162100

001 DVE anesthesia (Pos. 1): - The DVE is composed of a media head with various media supplies, to which the mobile ventilators can be connected. (no air Andockund functions) - Integrated into the DVE is a monitor arm for on-site installation of a 21 "-24" screen. 002 DVE surgery (Pos. 2): - The DVE surgery is also only one power head with media connections and 2 Harting connectors for the integration of mobile endoscopy and equipment trolley. - Integrated into the DVE is also a monitor arm for on-site installation of a 21 "- 24" screen. 003 surgical light and monitor arm: - The operating light (2-part light with main and satellite-lamp) and the monitor arm mounted on a central axis through the ventilation ceiling. - The Monitor will be on site stocked with the operator monitor an integrated OP system.

Office and computing machinery, equipment and supplies except furniture and software packages

Cinémathèque suisse | Published August 23, 2016  -  Deadline September 30, 2016
cpvs

The aim is to provide the CS ability to hold perennial and redundantly all of its digital collections. The technology is the LTO tape.

This project consists of:

CS search a comprehensive and scalable solution for sustainable conservation inhouse over 4 years for its digital collections.

The tender is divided into 2 lots:

Lot 1: The project involves the acquisition of a storage library on 2000 LTO tape slots. This library must be equipped with LTO 5 6 Fibre Channel 16 Gb / s and connections required to operate the proposed solution.

The project involves the acquisition of two switches 16 Fiber Channel ports 16 Gb / s and connectors required for proper operation of the proposed solution.

The proposed solution must support Linux (Redhat, CentOS) and Windows Server (2008 and 2012).

Lot 2: the project provides for the acquisition of 1000 LTO tapes 6 (1000 Labelled bands 101001-102000)

All the details regarding these lots are shown in the attached specifications.

F4 materialization RBBS

Bundesamt für Strassen ASTRA, Abteilung Strasseninfrastruktur Ost, Filiale Winterthur | Published March 17, 2016  -  Deadline April 28, 2016
cpvs
34928470

The benefits of this procurement includes the supply and installation of label plates from spatial base reference frame RBBS, the kilometer signs and distance markers on the national road perimeter of ASTRA Filiale Winterthur. The perimeter is divided in the territorial unit VI with the cantons GL / SG / TG ​​and the territorial unit VII with the cantons SH / SZ / ZH.

The services to be provided concerning the manufacture, supply and installation of:
- Kilometer signs (approx. 370 pcs), replacing the kilometer signs on current norm where necessary
- Hektometerfafeln (approx. 2000 pcs), changing the distance markers on current norm where necessary
- RBBS panels (about 3,500 pcs.), Total renovation to current standard
- Required mounting material

The label panels need to be sorted before delivery and collected in packages:
- Sort by section and each section according to the kilometer signs, distance markers, RBBS panels stem axis, RBBS panels ramps and RBBS panels connecting lines
- Packages:
- Sections 28 pcs.
- Factory farms 12 pcs.
- Family axes 6 pcs.
- Connectors 130 pcs.
- Connecting lines 200 pcs.

The delivery and installation is carried out in stages based on these packets

Dismantling and disposal are no longer required Marker Boards

BKP 230 Electrical Installations

Bundesamt für Strassen ASTRA Infrastrukturfiliale Thun | Published October 15, 2014  -  Deadline November 27, 2014
cpvs
45000000

The whole conversion will be implemented in several stages under operation. This is equipped with a measuring device. From the HV respectively the general sub-manifold (UV) for the lighting and general power outlets, power connectors, and systems-UV (workshop, Sole conditioning, gas station, etc.) are fed in the ground and first floor levels. A power factor correction is provided. The proposed lightning protection system (safety net and trap) is connected with this. Mezzanine Surface installed and upstairs and staircase concealed - is generally in the basement. For the photovoltaic system reserve space is provided in the lines and in the main distribution. All lighting fixtures are equipped with LED bulbs The circuit is conventional on / off switches or motion detectors. There are following safety equipment is installed: - Central emergency lighting - Central RWA system - Fire alarm system full protection The building is newly developed by Cablecom. The new HTP (house delivery point) is provided in the basement. TV connections are provided in the cafeteria and multipurpose room. The building is newly developed by Swisscom. The new AV (Amtsverteileier) should be installed in the basement. The entire building is also equipped with wireless. Important: truck-Hall, lavage, workshops and preparation room have a ceiling height of 7m. The listed facilities must be installed on the following areas: 4,200 m2 2'000m2 240m2 1'800m2 520m2 350m2 1'000m2 1'900m2

Construction work

Schweizerische Bundesbahnen SBB Immobilien Development, Bahnproduktion | Published May 31, 2016  -  Deadline July 6, 2016
cpvs
45000000

New conservation and Intervention Center (EIC) in the focus of development of the municipality of Ostermundigen

New office building in energy standard

1. + 2.Untergeschoss: Various stores, archives, equipment rooms and dressing rooms and equipment rooms

Ground floor: workshops, storage and reception

1 +. 2 Upper floor: office and meeting rooms, cafeteria

3rd floor: barracks (residential) as well as ventilation station

Construction: Walls and ceilings in reinforced concrete

Compact perforated facade with 240 mm insulation and clinker facing. The flat roofs are extensively planted

New outbuildings unheated

Ground floor: goods receipt and garages

Construction: steel construction, facade with metal panels and expanded metal, trapezoidal roof, hoist and crane to storage areas in 2.Untergeschoss

Surroundings: Open storage and handling areas between remuneration and outbuildings, Outdoor Parking

BKP 230 Electrical installations;

- Main distribution measurement in 1.UG, distribution boxes on each floor (equipment on site).

- Foundation earth and potential equalization.

- Cable tray resp. Hollow floor installations in offices 1st + 2nd floor.

-.-Body lighting lighting installations, including delivery and installation in general areas (backlight).

- Electricity, heat and installations such as cables for lifts, crane installation, cables and connectors for heating, ventilation and sanitation.

- Supply lines for electric blinds (control site).

- Installation fire alarm system (equipment on site).

- Installations for access and Schliess system.

- Empty pipe installation Radio and TV 1st floor (cafeteria) and 3rd floor (residential) as well as conduits for cameras and the like.

- Required temporary.

F4 materialization RBBS.

Bundesamt für Straßen ASTRA, Abteilung Straßeninfrastruktur Ost, Filiale Winterthur | Published March 22, 2016  -  Deadline April 28, 2016
cpvs
34928470

The benefits of this procurement includes the supply and installation of label plates from spatial base reference frame RBBS, the kilometer signs and distance markers on the national road perimeter of ASTRA Filiale Winterthur. The perimeter is divided in the territorial unit VI with the cantons GL / SG / TG ​​and the territorial unit VII with the cantons SH / SZ / ZH.

The services to be provided concerning the manufacture, supply and installation of:

- Kilometer signs (about 370 pcs.), Replacing the kilometer signs to current standards, where necessary,

- Hektometerfafeln (approx 2000 pcs.), Changing the distance markers on current norm where necessary,

- RBBS panels (about 3 500 pcs.), Total renovation to current standard,

- Necessary assembly parts.

The label panels need to be sorted before delivery and collected in packages:

- Sort by section and each section according to the kilometer signs, distance markers, RBBS panels stem axis, RBBS panels ramps and RBBS panels connecting lines,

- Packages:

- Sections 28 pcs.

- Factory farms 12 pcs.

- Family axes 6 pcs.

- Connectors 130 pcs.

- Connecting lines 200 pcs.

The delivery and installation is carried out in stages based on these packets

Dismantling and disposal are no longer required label plates.

ZEB Bern Wylerfeld, unbundling - Railway Technology

Schweizerische Bundesbahnen SBB Infrastruktur, Projekte Region Mitte | Published January 31, 2015  -  Deadline April 24, 2015
cpvs
45000000

Scope of Work Railway Technology Department of roadway - Decommissioning of tracks and switches - Removal of upgraded track and switches in the Railway Technology Center Hägendorf - construction of new tracks and switches - Installation of track and switches largely on an existing Vorschotterung. - The return and reconstruction of tracks and switches are mainly outside or adjacent to the existing rail operations. Department cables - Decommissioning of cable systems in the area of ​​sidings - Decommissioning of cable in the stop Wankdorf South - Supply and laying of new high-voltage, low voltage, Sicherungsanlagen- and telecommunication cables in the track area - Supply and laying of all cables for the new station Wankdorf South - Intrusion and testing of high voltage, low voltage, Sicherungsanlagen- and telecommunication cables in the track area - Intrusion and check all cables in the station Wankdorf South Department of backup systems - Installation and connection of the elements of the security system in the exterior (main signals, eurobalises, dwarf signals , switches, axle counters, track circuits) - Examine the outdoor area - Commissioning of Exterior view - dismantling of the outdoor area of ​​the existing "old" security system - The elements of the security system (signals, axle counters ..) will be provided by the SBB AG. - The indoor unit is not part of this procurement. Department of Points Heating - All work on the cable connectors point heating are carried out by the SBB IH. - The delivery and assembly / disassembly of the cable / busbar elements contained in the performance of departments roadway and cable and executed by the general contractor. - Consultation with the execution SBB (SBB IH) to ensure a smooth construction process. Main quantities (approximate values) road - Decommissioning tracks = 14,400 m - Decommissioning points = 55 St - New tracks = 13'100 m - new points = 35 st - Delivery ballast = 26'200 t cable Li ...

Gesamtsanierung Schulanlage Bäumlihof in Basel, BKP 23 Power plant

Bau- und Verkehrsdepartement des Kantons Basel-Stadt, Fachstelle für Submissionen | Published July 2, 2014  -  Deadline August 14, 2014
cpvs
45214200

In the school system Bäumlihof in Basel is planned to renew all electrical installations. The development of the electrical equipment is carried out via vertical and horizontal cable channels, which connect all the building wings together. The electrical main distribution will be renewed and for each floor, a sub-distribution is provided in separate electrical rooms. As a building and system protection potential equalization, internal lightning protection with Blitzstromüberspannungsableiter and an external lightning protection with ring earth and mesh are installed on the flat roofs. In the planned building automation lighting, the external sun protection and various windows are integrated. This different circuits and operating functions of these plant components can be realized. The prescribed emergency lighting via a central battery and individual LED lights escape. Smoke and heat extraction systems are located in the Atrium, the individual staircases and in the auditorium, which are controlled by different smoke ventilation units. A full protective fire alarm system is not prescribed by the building insurance. However, to realize the various fire control systems of doors, lifts, ventilation systems, access to personal safety equipment, etc., a small fire alarm system is installed for it. About the new watch and Pausengong system of emergency or evacuation is controlled simultaneously. Outdoors various doors to the different tracts are monitored with reed contacts and partly by means of the access badge reader. The existing IT and telephone network is dismantled and replaced by a new UCT network. The two networks DANEBS (data network of Basel-Stadt) and ICT (Educational school network) are cleanly separated by the new UCT principle of a Direction. Telephony will also be realized through the UCT wiring. Due to the planned Bauetappierung must be built several temporaries for power, network connectors, watches and Gong plant, etc., to ensure uninterrupted operation of the school. The decommissioning of old electrical installations is made by an abort company.

PA Network Cable

Post CH AG / F7 / Konzerneinkauf CC-WTO - Projekt "PA Netzwerk-Kabel" | Published October 20, 2015  -  Deadline December 11, 2015
cpvs
31224400

2021. The integration of the procured components and cabling accepts PA. With ISA in particular to the following objectives: • Reducing the complexity of today's system environment • Reduction of dependency on suppliers • reduce operating costs • modernize systems • Easy addition of new functionalities to be procured by the present tender components are part of an overall architecture, which is to be rolled out and used for a long period of time on the fleet (security of supply Initialausrollung and equipment of new vehicles in the ongoing renewal of the fleet). Based on the results of the pilot phase decides PA about ordering optional supplies for the basic equipment of its own fleet (Initialrollout), as well as additional tranches for equipping new own vehicles and vehicles of other carriers (customer of PA) during the following years. Basic order: There is an additional cost for a basic job of network cables "solid": • 56 piece Network cable, fitted with M12 connector à 5 meters • 35 pieces Network Cable Assembly with M12 plug of 10 meters • 21 pieces network cable, fitted with M12 plug of 15 meters and a network cable "flexible": • 7 piece Network cable, fitted with M12 plug of 15 meters 4 vehicles at the most economical offer. Option 1: Pilot support services with the successful tenderer will be carried out a pilot phase. Objectives of this pilot phase: • Verify the supplier and its components in a realistic vehicle environment • Verify the interaction of ISA hardware components (including wiring) among themselves • System integration with the PostBus Software Only upon successful deployment of network cable under the pilot phase to those for the entire fleet be be -schafft (Option 2). Option 2: equipping the bus fleet Following successful completion of the pilot phase, carried out orders for equipping the bus fleet. It reserves adjustment of those volumes explicitly. The maximum amount to purchase volumes during the contract period: M12 connector: 290,000 meters M12 connector: 15'000 meters M12 connector for the assembly on the vehicle by the buyer: 10'000 pieces torque tool for M12 connectors: 50 piece tool for the assembly of M12 connector on the vehicle: 50 pieces Also after calling one or more tranches exists on the part of the successful tenderer no right to call further installments or to exploit the entire optional ordering. Option 3: Extended Warranty must be exercised this right shall be communicated to the successful tenderer in writing before the deadline each Option 4: extension of the contract