Call +44 800 9755 164

Public tenders for electrical in Bellinzona Switzerland

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

N2 Maroggia Gallery BSA, Lot 8510 Fire Detection

Ufficio federale delle strade USTRA Filiale Bellinzona Divisione Infrastruttura stradale Est | Published October 21, 2016  -  Deadline December 7, 2016
CPV: 31625100 - Fire detection systems,
45312100 - Electrical installation work of fire alarm systems,
45343000 - Installation work of fire-fighting equipment

N2 Maroggia Gallery, Lot 8530, several devices

Ufficio federale delle strade USTRA Filiale Bellinzona Divisione Infrastruttura stradale Est | Published November 14, 2016  -  Deadline January 20, 2017
CPV: 35113300 - Safety installations,
31711100 - Electronic components,
31720000 - Electromechanical equipment,
31731000 - electrotechnical supplies,
32571000 - communications infrastructure,
45311000 - Electrical wiring and fitting work connection,
48100000 - Industry specific software package

N2 Maroggia Gallery BSA, Lot 8520, Video Surveillance

Ufficio federale delle strade USTRA Filiale Bellinzona divisione Infrastruttura Stradale Est | Published October 21, 2016  -  Deadline December 14, 2016
CPV: 35113300 - Safety installations,
31711100 - Electronic components,
31731000 - electrotechnical supplies,
32323500 - Video surveillance system,
32571000 - communications infrastructure,
45311000 - Electrical wiring and fitting work connection,
48100000 - Industry specific software package

Construction work

Office fédéral des routes (OFROU), filiale de Bellinzone, division infrastructure routière Est | Published December 3, 2016  -  Deadline January 20, 2017
The project is divided into two areas: industry and Quinto Airolo sector. 

Description of objects lot 211.

Under the "Lot 211 - Sector Client Laboratory Airolo, Specialised works" are to perform tests on materials for the work described in the parts of work (TP) following where the list of benefits is split:

Implementation of the new system of walls ...

The project is divided into two areas: industry and Quinto Airolo sector.

Description of objects lot 211.

Under the "Lot 211 - Sector Client Laboratory Airolo, Specialised works" are to perform tests on materials for the work described in the parts of work (TP) following where the list of benefits is split:

New routes of cable lines: demolition of all electrical rooms and junctions of cable routing lines, realization (existing building) NS line on the track and construction of the new track on the way SN (including vias) to Ritom the transformer station (km 102 + 400).

TP 02 - structures: Clean 2 bridges (borders, waterproofing, substitutions seals, coatings); sanitation and waterproofing of 4 small structures such as manholes and underpasses; off interventions maintenance 3 manholes; achieving new technical underpass for a length of 50 m.

TP 05 - Tunnels: expanding the tube SN Stalvedro tunnel, construction of new SOS niches / hydrants and purge niches, construction of the new cross-connection between the two tubes of Stalvedro tunnel, completion of the new north and south portals expanded SN tube , sanitation and coatings allowance sidewalks and NS tube pipes, construction of new SOS / hydrants NS tube niches, closure of existing SOS niches, allowance of the slab and coatings, construction of new walls against recirculation fume portals, preparation and decommissioning of existing technical facilities.

TP 07 - operating and safety equipment:

Technical Building sanitation Stalvedro rest area;

Technical Building Lisera sanitation;

New technical building Piotta: construction of a new building technique SEA at km 103 + 750.

  • 1