Public tenders for electrical in Brazzaville Congo - Brazzaville

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

CG-Water, Electricity & Urban Dev. SIL - P106975

PEEDU | Published April 15, 2016  -  Deadline May 11, 2016
cpvs

Addendum No. 01 Related In Daoi-t001 / Peedu / 2015 For The Provision And The Realization Of Construction DE16 Feeders Underground Work 20 Kv Medium Voltage Brazzaville and Pointe-Noire ADDENDUM'S NOTICE OF PUBLICATION No. 01 CONCERNING DAOI- T001 / Peedu / 2015 fOR tHE SUPPLY AND tHE ACHIEVEMENT oF CONSTRUCTION oF 16 KV FEEDERS SOUTERRAINS20 MEDIUM VOLTAGE BRAZZAVILLE AND BLACK POINT as part of the implementation of additional sonfinancement the Peedu launched the call for International offers 001-T001 / Peedu / 2015 concerning the provision of sixteen and laréalisation construction (16) 20 KV underground feeder MT in Brazzaville etPointe Black. After the first tour of the sites with the buyers said Daoi then review withthe World Bank and finally the requests for clarification received from certain purchasers of Daoi, an addendum was developed Carl Zeiss: superb visibility audit file. This addendum quia been nonobjection the World Bank dated April 7, 2016, takes into account in particular: a) the change of the linear feeders in Brazzaville and Pointe-Noire; b) the equipment and facilities of the sources and despostesd'injonction positions; c) gains on installing electrical conduits for chaquefeeder; d) additional works at the Mongo Kamba 1 etTsiélampo substations; e) consideration of spare parts; f) the possibility for the contractor to underwrite contratsdesous contracting with the approval of the Project Manager; g) the need for the post of casspécifique A.Neto, to proceed with the construction and equipping of a new position at the same time that the filed work of the feeder to avoid carrying out work in two phases. Due to the minimum time required for lesentreprises get clarification, the new date for submissions is Wednesday 11 May 2016 to 12 heuresprécises (Eastern Time Brazzaville); and or ...

CG-Water, Electricity & Urban Dev. SIL - P106975

PEEDU | Published January 22, 2016  -  Deadline February 12, 2016
cpvs

Recruitment D? An Individual Consultant Realisation Charge De La D? A Plan D? From Resettlement Action (by) for The Construction Of Nine (9) A Departures Pointe Noire The Government of the Republic of Congo and AssociationInternationalede Development (IDA) have agreed to co-finance the project Urban Water Electricity anddeveloping (Peedu) and intend to use a decesressources part to finance the services of a consultant (Consultantindividuel) responsible for the preparation of Resettlement Action unPlan (PAR) in the Lecadre construction of nine (9) starts to Pointe Noire. Generally leconsultant select must support UCP-Peedu in collecting desdonnées on the establishment of a resettlement action plan (RAP) to ensure compensation and possible relocations despopulations susceptible loss of activity following the Peedu travauxengagés, as part of the construction of nine (9) starts. Manièrespécifique of the consultant will be responsible among other things to identify and prioritize different types of generating activities derevenus to relocate following the establishment of departures or feeders as well as potential for laréinstallation lessites traders during construction. The consultant will: hold a Master degree or equivalent general ensociologie, agricultural economics, environmental planning dudéveloppement and related fields. Having a solid experience of at least ten (10) years in the field of environmental and social laplanification ETDE project management. Have a sound knowledge of the problems of analysesocioéconomique, participatory management and implementing urban desinfrastructures and electricity. Sonexpérience must be supported by a bonneconnaissance problems related to urban development and problématiquede distribution of electrical energy in developing countries. The consultants intéressésdoivent provide information indicating that they are qualified pourexécuterles services (detailed CV with references concerning the execution decontrats analogueset letter). A consultant will be selected in accordance with procéduresdéfinies dansles Guidelines: Selection and Employment deConsultants by the Borrowers of the World Bank, janvier2011 edition. Lesconsultants interested can obtain further information ausujet reference documents to the address below from Monday to Friday DE09 hours to 16 hours. Expressions of interest must be delivered in sealed envelopes electronically àl'adresse outransmis below no later than February 12, 2016 at 14 hours: Project Water, Electricity and DéveloppementUrbain (Peedu) Republic of Congo Email: pedu_congo @ yahoo. fr /mbouesso@yahoo.fr Done at Brazzaville on 22 Janvier2016. The Peedu Coordinator

CG-Water, Electricity & Urban Dev. SIL - P106975

PEEDU | Published November 26, 2015  -  Deadline December 22, 2015
cpvs

Control And Monitoring Of Supplies And Construction Work Sixteen (16) Departures (feeders) Underground 20 Kv In Brazzaville and Pointe-Noire Republic DUCONGO PROJECT WATER ELECTRICITY anddeveloping URBAN (Peedu) Co Congo / WORLD BANK BP 2099 - Brazzaville Tel: [00 242 ] 05 556 87 87. Email: pedu_congo@yahoo.fr AMANIFESTATIONS NOTICE OF INTEREST N ° 001 / Peedu / 26 OF 2015 CONCERNING Novembre2015 Recruitment unIngenieur board for control and supervision of construction supplies and travauxDE 16 DEPARTURES ( feeders) UNDERGROUND 20 KV in Brazzaville etPointe Black. Demanifestations solicitation of interest follows the general procurement notice desmarchés 31 October 2014 published in the DevelopmentBusiness. The Government of theRepublic of Congo with co Labanque World Water Electricity Project and Urban Development (Peedu) and intends to use part of the proceeds of this financing payments poureffectuerles consultants under a service contract to perform the control and supervision desfournitures and construction of sixteen (16) starts (feeders) 20 kV underground in Brazzaville etPointe Black in favor of the National Electricity Company (SNE). The duration of the missionestde seventeen (17) months. The NIS is the public operator of generation, transmission and distribution of electricity in the Republic of Congo. To facilitate the implementation destravaux for the supply and construction of departures (feeders), SNE adélégué auMinistère its prerogatives of Infrastructure and Public Works represented by the Unit of deCoordination Peedu, through a master agreement of ouvragedéléguée (MOD) a copy of which will be made available to the Project Manager. The Consultant selected as Maîtred oeuvres, will access the CAD and design studies and any documentationannexe supplies and work object. He is responsible vis-à-vis the MOD and SNEsur the contractual and operational plans as well as the smooth running destravaux. For all the work of Brazzaville and PointeNoire, the consultant will provide the following benefits among others: Coordination, supervision and management ettravaux supplies, Technical inspection of étudesd'exécution; control, testing and reception during lafabrication d Control execution of works on lessites; Preparation of reports. As such, it will have the whole load lacoordination, monitoring and supervision during the execution desditstravaux together with SNE and Peedu, each in regard to, in particular: the gestionadministrative, technical and financial the associated markets auxfournitureset work, including the work and planningsd'exécution provisional and final acceptance; The desmesures application and environmental protectionsociales planned. Interested consultants doiventfournir information indicating that they are qualified to perform lesservices (brochures, description of similar assignments, experience in similar conditions, etc.). Interested consultants (consulting engineer) peuvents'associer to enhance their qualifications (enclose agreement unbundling). Serasélectionné a consultant in accordance with the procedures defined in the Guidelines: Selection and EmploideConsultants by the Borrowers of the World Bank, current edition. The consultantsintéresséspeuvent more information about dereference documents to the address below from Monday to Friday from 9:00 to 4:00 p.m.. The manifestationsd'intérêt must be delivered to the address below no later than 22 décembre2015 to 12:00 (local time). Project Coordination Unit Electrical & DéveloppementUrbain (UCP-Peedu) 2nd floor Ministryof Labour and Social Security (Boulevard Sassou Nguesso, Roundabout great job), BP 2099 Brazzaville / CONGO -Tel: [00242] 055 568 787 Email: pedu_congo@yahoo.fr /mbouesso@yahoo.fr Made àBrazzaville the 26novembre 2015 The Coordinator Maurice Bouesso Peedu

CG-Water, Electricity & Urban Dev. SIL - P106975

PEEDU | Published November 26, 2015  -  Deadline January 19, 2016
cpvs

Fournitures Et Travaux De Construction De Seize (16) Départs (feeders) Souterrains 20kv À Brazzaville Et Pointe-noire REPUBLIQUE DUCONGO PROJET EAUELECTRICITE ET DEVELOPPEMENTURBAIN (PEEDU) Cofinancement Congo/BanqueMondiale BP 2099 - Brazzaville Tél: [00 242] 05 556 87 87 -  Email: pedu_congo@yahoo.fr Crédit IDA N°5541-CG / PrêtBIRD8445-CG AVISD'APPEL D'OFFRES INTERNATIONAL N°AOI-T001/PEEDU/2015 relatifaux fournitures et travaux de construction  de 16départs (feeders) souterrains 20 KV a Brazzavilleet pointe-noire 1.          Le présent avis d'appel d'offres suit l'Avisgénéral de passation des marchés publié le31 octobre 2014. 2.        La Républiquedu Congo cofinance avec l'Association internationale de développement(IDA) pour couvrir le coût du Projet Eau-Electricité et DéveloppementUrbain(PEEDU), et entend affecter une partie du produit de ce cofinancementauxpaiements relatifs au no AOI-T001/PEEDU/2015 relatifaux fournitures et travaux de construction de 16départs (feeders) souterrains 20 KV a Brazzaville et Pointe-Noire. 3.        L'unité de coordination du Projet Eau Electricitéet Développement Urbain (UCP-PEEDU) invite les soumissionnaires éligibles etqualifiés à présenter leur soumission cachetée en vue de la réalisation des activitésdéfinies dans le présent appel d'offre International, à savoir: fournitures et travaux deconstruction  de 16 départs souterrains 20KV a Brazzavilleet pointe noire  en 2 lots distincts : Ø  Lot N°1 :Fournitures et construction de 7 nouveauxfeeders souterrains moyenne tension à Brazzaville Ø  Lot N°2 : Fournitures et construction de 9 nouveauxfeeders souterrains moyenne tension à  Pointe Noire NB: Les candidats sont autorisés à soumissionner pour unou plusieurs lots ; ces lotsseront attribués séparément. Le délai desfournitures et travaux est de seize(16) mois pour chaque lot. 4.        L'Appel d'offres sedéroulera conformément aux procédures d'Appel d'offres international tel quedéfini dans les « Directives: passation des marchés financés parles prêtsde la BIRD et les crédits de l'IDA, Edition de janvier 2011 », et estouvert à tous les soumissionnaires des pays qui répondent aux critèresd'éligibilité tels que définis dans le Dossier d'Appel d'offres. 5.        Les soumissionnairesintéressés éligibles peuvent obtenir de plus renseignements auprès del'unité decoordination du PEEDU, Email : mbouesso@yahoo.fr / pedu_congo@yahoo.fr, Tél (00242) 055568787 et examiner le Dossierd'Appel d'offres à l'adresse ci-dessous à partir de la date de publication duprésent avis d'appel d'offres), de 9 heures à 16 heures (heure locale). 6.        Les spécifications dequalification comprennent : le Chiffre d'affaires annuel (activités deconstruction au cours des cinq (05) dernières années), l'Expérience générale enmatière de fournitures et travaux de construction dans le domaine del'électricité, l'Expérience d'exécution des travaux similaires, les moyens en Personnelet Matériel suffisant. 7.        Une marge de préférenceau bénéfice des entrepreneurs/groupements d'entreprises nationales nes'appliquera pas. 8.        Le Dossier d'Appeld'offres complet en Français peut être acheté par les soumissionnairesintéressés à l'adresse ci-dessous contre paiement d'un montant non remboursablede Trois cent cinquante mille (350.000) FCFA. Le paiement sera effectuéobligatoirement par chèque certifié. Le Dossier d'Appel d'offres seraretiré àl'adresse ci-dessous à l'Unité de Coordination du PEEDU contre remised'unrécépissé. 9.        Les soumissions devrontêtre déposées en quatre (04) exemplaires dont un (01) original et trois (03)copies à l'adresse ci-dessous au plus tard le mardi 19 janvier 2016 à 12heures précises. Les dépôts électroniquesne seront pas admis. Les soumissions présentées hors délai seront rejetées. Les soumissions serontouvertes physiquement en présence des représentants des soumissionnaires quisouhaitent y assister à l'adresse ci-dessous, le mardi 19 janvier 2016 à 12 heures 30minutes. Elles devront scrupuleusement portées les mentions suivantes: Crédit IDA N°5541-CG /Prêt BIRD 8445-CG AVISD'APPEL D'OFFRES INTERNATIONAL N°AOI-T001/PEEDU/2015 relatifaux fournitures et travaux de construction  de 16départs (feeders) souterrains 20 KV a Brazzavilleet pointe-noire A N'OUVRIR QU'EN SEANCE DE DEPOUILLEMENT DU 19Janvier 2016 10.     Les soumissions doiventêtre accompagnées d'une garantie de soumission pour un montant de Cinq Millions(5 000.000) Francs CFA par lot. 11.        L'adresse mentionnéeci-dessus est: Unité de coordination du Projet Eau Electricité et DéveloppementUrbain (UCP-PEEDU) 2ème étage duMinistère du Travail et de la Sécurité Sociale (Boulevard SASSOU NGUESSO,Rond-point de la grande poste), BP 2099 Brazzaville/CONGO -Tél: [00242] 055568787 Email: pedu_congo@yahoo.fr/ mbouesso@yahoo.fr Fait àBrazzaville, le 26novembre 2015 Le Coordonnateurdu PEEDU Maurice BOUESSO

CG-Water, Electricity & Urban Dev. SIL - P106975

PROJET EAU ELECTRICITE ET DEVELOPPEMENT URBAIN | Published April 25, 2017  -  Deadline May 16, 2017
cpvs

  • 1