Public tenders for cables in Sweden

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Power distribution cables

Borås Elnät AB | Published June 24, 2016
cpvs
31320000, 31321300, 44321000

NKT Cables AB

Cables and wire rope for research vessel (EUI 14 067)

Göteborgs universitet | Published July 6, 2015  -  Deadline July 22, 2015
cpvs

Cables and wire rope for research vessel (EUI 14 067)

Power distribution cables

Vattenfall Aktiebolag (publ) | Published July 19, 2013
Winner
Celeca ABTorshamnsgatan 23Stockholm SE-164 83 +46 0107130352
cpvs
31320000, 31321200, 31321300

The objective of the contract is the purchase of cables for the voltage range of 0,6/1 - 145 kV cables over a framework agreement between the contracting entity (Vattenfall AB, including some of its subsidiaries) and the supplier (Ericsson AB) (the "Contract"). The Contract has previously been subject to a procurement procedure in accordance with Directive 2004/17/EC of the European Parliament and of the Council of 31 March 2004 coordinating the procurement procedures of entities operating in the water, energy, transport and postal services sectors (the "Directive"), notice number 2012/S 134-223235 of the OJEU. The Contract will be transferred from Ericsson AB to Celeca AB (a company wholly-owned by NKT Cables Group A/S).

Optical-fibre cables

Försvarets materielverk | Published April 19, 2013
cpvs
32562000

Optical-fibre cables

Power distribution cables

Härryda Energi Aktiebolag | Published March 16, 2013  -  Deadline April 18, 2013
cpvs
31320000, 31321200, 31321700

Power distribution cables

Optical-fibre cables

Älmhults kommun | Published March 23, 2012  -  Deadline April 10, 2012
cpvs
32560000, 32562000, 44320000, 44321000, 44322000

Optical-fibre cables

optical-fibre cables

Älmhults kommun | Published March 23, 2012  -  Deadline April 10, 2012
cpvs
32560000, 32562000, 44320000, 44321000, 44322000

optical-fibre cables

Power distribution cables

Borås Energi och Miljö AB | Published May 20, 2015  -  Deadline June 22, 2015
cpvs
31320000, 31000000

Delivery of cables.

EMC Cables (15/11)

Borås Energi och Miljö AB | Published May 15, 2015
cpvs
31320000, 31000000

Supply of cables

40kV cables (2014/5)

Lidköpings kommun | Published January 24, 2014  -  Deadline March 10, 2014
cpvs
31320000, 44320000, 44321000

Refers to the procurement of 40kV cables as per the attached document. Be delivered to Lidköpings grids.

Cables and adapters (RJL 2016/2437)

Region Jönköping | Published September 30, 2016  -  Deadline November 10, 2016
cpvs
44320000, 31000000, 31111000, 31321600, 44321000, 44322000

This contract relates Cables and adapters

Power distribution cables

Borås Elnät AB | Published April 5, 2016  -  Deadline May 23, 2016
cpvs
31320000, 31321300, 44321000

Boras Electric Networks AB will during 2016-2018 to perform the installation of 145 kV cables. The positioning will occur between the receiving stations Sobacken-vine, receiving terminals Sobacken-Sjöbo and in the field Viaredi Boras.

This request includes the supplying 145 kV cable for the above projects.

Power cables

IS-Hankinta Oy | Published January 11, 2017
cpvs
31321300

The purpose of this letter is to inform about potential players in the future supranational acquisition. Competitive bidding will pursue a number of contract suppliers. All of this acquisition phases prepared in cooperation with the IS-Procurement Ltd and VÄRMEK: in between. the legal implementation of the contract is responsible for VÄRMEK. VÄRMEK will publish a call for tenders and the awarding of the decision. Contracting entities signing of the agreements own shareholders / behalf of its members. During the procurement, the Swedish national procurement rules apply. Both parties receive access to framework agreements on the basis of the acquisition. Details IS-Procurement Ltd and VÄRMEK: in the shareholders / members can be found on the website of contracting entities. Power cables of this information letter is intended to inform potential actors in the future supranational acquisition. Competitive bidding will pursue a number of contract suppliers. All of this acquisition phases prepared in cooperation with the IS-Procurement Ltd and VÄRMEK: in between. the legal implementation of the contract is responsible for VÄRMEK. VÄRMEK will publish a call for tenders and the awarding of the decision. Contracting entities signing of the agreements own shareholders / behalf of its members. During the procurement, the Swedish national procurement rules apply. Both parties receive access to framework agreements on the basis of the acquisition. Details IS-Procurement Ltd and VÄRMEK: in the shareholders / members can be found on the website of contracting entities.

2013/2035 Marine Route Survey Sealand cables.

Svenska Kraftnät | Published December 18, 2013  -  Deadline January 31, 2014
cpvs
71351900, 34513550

Procurement documents can be downloaded into Mercell.se. Link: http://se.mercell.com/m/mts/Tender/42408660.aspx The procurement ice Regarding a marine route survey. Swedish Kraftnät (SvK) and Energinet.dk of Denmark (ENDK) are the transmission system owners and operators of a 400 kV High Voltage AC cable systems across the Sound, between Sweden and Denmark. Due to its age and Because of environmental concerns, the cable system will be Exchanged. The new cable system will reuse the Existing cable corridor. The exact procedure of Replacing the old cables with new ones has not yet been DECIDED. The route crosses the northern Sound, Which is a Heavily trafficked area. Water depth ranges from seashore to a maximum of 40 meters of depth. The area is known for a pronounced halo cline / thermo cline. Find enclosed procurement documents under the 'files' Submission of application, According To ch. 7-in Invitation to Tender. Support Mercell: +46 313606000 Questions Regarding the procurement documents Shall be in writing to: Dagnielo Sanchez, Telephone: +46 84758225, E-mail: dagnielo.sanchez @ svk.se 'Questions and Answers' will be distributed through this site in Mercell . The purchaser is using Mercell Sourcing Services for this tender. To notify your interest and get access to any documents, you must copy and paste the link below into the address-party on your browser. http://permalink.mercell.com/42408660.aspx Then choose the relevant tender.

Framework agreement troubleshooting and repair of submarine cables.

Sjöfartsverket | Published February 5, 2016  -  Deadline March 16, 2016
cpvs
44321000, 31320000, 45231400, 45453000, 50000000

Maritime Administration (SjöV) invites you to submit tenders for a framework agreement to perform troubleshooting and repair of submarine cables and associated abutments.

Submarine cables are located with a wide geographic spread along the entire coast of Sweden, from Strömstad to Haparanda and Vänern, Mälaren and Gotland.

SjöV intends to sign a framework agreement with several suppliers.

New 110 kV cables from Beckomberga to Spångavägen Field.

Fortum Distribution AB | Published December 19, 2013  -  Deadline January 17, 2014
cpvs
65300000, 65310000

Fortum will replace three old 110 kV oil cables with a rough stretch of about 4 km. The contract extends from Beckomberga station to Spångavägen Field where the cables will be spliced ​​to existing XLPE cables. At Beckomberga be outdoors trades used. The contract includes the delivery of planning, services and materials on terrestrial and electrical works (including 36 km 110 kV XLPE cable), testing and technical documentation for the facility. Removal of oil cables included to a lesser extent in the works. Contract conditions based on ABT 06. Tenders must be submitted in Swedish. Execution of the works planned for May 2014 to September 2015.

Rebuilding new dishes and main cables (discontinues / 2016: 70)

Telge Inköp AB | Published December 5, 2016  -  Deadline December 30, 2016
cpvs
45231000, 45231100, 45231113

Hälleforsnäs mill, rebuilding new dishes and main cables according to the attached documents

Construction work for electricity power lines

Ellevio AB | Published March 16, 2017  -  Deadline April 14, 2017
cpvs
45231400, 31320000, 65300000, 45112000, 31321000, 31321300

The Project includes the delivery and installation of five (5) new XLPE 220kV underground cables between the terminal locations Fisksjöäng and Ekhagen in ‘Nationalstadsparken-NSP’ (Stockholm region). The total cable length is approx. 45km (1 phase XLPE) underground cables. Cables and accessories must be tested together. Total route length approx. 3km.

The Tender documents will be communicated in April.

Preliminary installation start Fall 2017.

Optical-fibre cables for data transmission

Mora kommun | Published May 16, 2017
Winner
Kringdata AB
cpvs
32562300, 32560000, 32562000, 32562100, 44164300, 44164310, 44322000

Mora municipality's Purchasing Center invites to tender in the procurement of framework agreements regarding ductile material for the construction of fiber networks for local network and area networks in most Mora, Orsa and Älvdalen villages.

This procurement is divided into 2 parts, with the following definitions.

Ducting:

- Cable protection tube - 110 mm,

- Standard channelization: 16 - 40 mm,

- Accessories for pipes and standard channeling,

- Cords for fiber cables,

- Micro channelization - 3 mm to 14 mm,

- Accessories for microchannelization,

- Wells.

Cabinet:

- passive cabinet

- cabinet for active equipment.

Power distribution cables

Härryda Energi Aktiebolag | Published March 13, 2013  -  Deadline April 18, 2013
cpvs
31320000, 31321200, 31321700

:Gemensamt ramavtal för Härryda Energi, Kungälv Energi, Lerum Energi, Mölndal Energi nät samt Ale elförening. Ramavtal för signal- och kraftkabel. Spänningsnivåer 0,4kV-24kV