Public tenders for cable-trays in Hungary

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Information on the procedure erdményéről "Deutsche Bühne Ungarn - Szekszárd complete renovation of the building, structural reinforcement and replacement of technical equipment" project-related supplies

Magyarországi Németek Országos Önkormányzata | Published March 18, 2016
Winner
AVA-PACK Ipari, Kereskedelmi és Szolgáltató Kft.
cpvs
39111200

Object:
"Deutsche Bühne Ungarn - Szekszárd complete renovation of the building, structural reinforcement and replacement of technical equipment" project-related supplies
Quantity:
The exact quantitative data included in the budget.
- Supply and installation of 80 pieces of quality stalls theater chairs
- Delivery of 30 fixed chairs
- Cable trays, cables, lighting, theater hall main distribution, transportation director board cabinet, installation
- Sound technical cables, speakers Delivery and installation
- Pótszínpad, mechanical drawing set

Track construction works

Budapesti Közlekedési Zártkörűen Működő Részvénytársaság | Published November 25, 2016
cpvs
45234116, 45223220, 45234125, 45221248, 45210000, 45223000, 45231400, 45231300, 45231600, 45232332, 45234115, 45311000, 45312100, 45312200, 45314000, 45316000, 71245000, 45234124

track and tunnel construction works construction contract for the reconstruction of the Budapest metro line M3; interlocking and automatic train control system (AVR) renovation and modernization of railways and implement telecom and central dispatching system.

Track construction; Improving Drainage tunnels;

Other tunnel works:

- Cable trays;

- Tunnel lighting;

- Backbone network grounding, grounding probes;

- Tunnel fire water network;

- Demolition line artifacts and structural engineering insulation repair works.

Depot works;

- Demolition and construction of third rail;

- Concentration sínalátámasztások.

- Improving career Concrete;

- Drainage gutters cleaning, repair, solve drainage;

Related electrical and mechanical works:

- Tápkábelkötések positive, negative sínátkötések;

- Tunnel lighting;

- Line wiring;

- Tunnel grounding backbone network;

- Points heating;

- Mechanical ber. line structures with insulation, renovation;

- Tűzívízellátás;

- Water supply, drainage.

Rail communications systems and central dispatchers, safety equipment and preparing the AVR's plans. Facilities, equipment renovation and modernization.

Biztosítóber. AVR and reconstruction work.

Reconstruction of railway telecommunications and central dispatchers managing systems.

Contract award on Dunakeszi-XVII. No construction works of the building

Készenléti Rendőrség | Published May 18, 2016
Winner
Neovill-Bau Szolgáltató és Kereskedelmi Kft.
cpvs
45213220

Dunakeszi XVII. No construction works of the building
The building has a total floor area of ​​522 m2.
Architecture:
- Complete breakdown of roofing with the necessary structures 604.5 m2
- Interior demolition of structures (walls, ceilings) 659.1 m2
- Structural reinforcement of buildings - built on the site stiffen 3
- Strengthening Oszloptalpak 98 pc
- Building metal constructions of complete surface treatment (mechanical cleaning, rust clearance, foundation, top coat 978.1 m2
- Create a new partition brick walls porotherm 10 48 m2
- Required areas bordering the old structures, replacement, repair 1 set
- Preparation of facade insulation system for protecting the structures of 5 cm, thickness 190 m 2
- Creating a new roof support structure is needed, Lindab LTP 45-0.6 Classic trapezoidal elements and accessories, gutter system 609 m2
- Preparation of the new support structure kennelsornál 1 set
- After cleaning the concrete surface preparation of new and different types of flooring 393.4 m2
- Doors and windows - replacing entrance doors, according consignation 6
- 4 new doors interior doors made from two pieces of the renovation done
- Kennel doors will finish renovation 20
- Windows will be renovated according consignation 10, will be discontinued 4
- Developing Watershed ditch system and the need to carry out landscaping 1 set
Electrical work:
- Creating a new betápszekrény fittings 1 dklt
- Creating a new electrical installation mounted outside with copper core cable trays and wall 1 set
- Building new lighting and network socket 1 set
- Construction of a new lightning protection network 1 set
- Preparation of the documentation required measuring 1 set
Engineering: - Development of garden hose attached to the construction of drainage 1

Information on the "Development of Győr-Moson-Sopron County Government Office window of the Government of Sopron, the accessibility of the context of SIOP 3.3.1 / A-12 / 2-2013-0002 project" amending the contract award procedure result subjects

Győr-Moson-Sopron Megyei Kormányhivatal | Published October 21, 2015
Winner
Fertődi Építő és Szolgáltató Zrt.
cpvs
45000000

Within the framework of a contract for the "Development of Győr-Moson-Sopron County Government Office window of the Government of Sopron, the accessibility of the context of SIOP 3.3.1 / A-12 / 2-2013-0002 project" as follows: the size of the affected area listed building construction investment of 633.26 m2 on which the following works are performed: architectural and structural works: architectural and structural demolition, temporary extension facilities, organizational and other costs, Scaffolding, Cleaning, Earthworks, on-site concrete and reinforced concrete work, Masonry and bricklaying, plastering the interior, the courtyard facade renovation, dry construction, coatings indoors, outdoors Flooring, Front doors, interior doors, Metal Structures, Colour, insulation, shading, frames, Toiletry items. Building installation works: Masonry and bricklaying, plastering and rabicolás, General building insulation, building services installation of pipes, fittings and building services equipment installation, ventilation equipment, air-conditioning. Electrical works: Pipes, casing, cable trays, pipes, cables, fittings 1-4, Luminaires light source, grid and distribution equipment, additional work, documentation, transmission, Demolition work.. Electrical Services - Fire Network: Protecting pipes, conduits, wires, cables, Fire Alarm Equipment (PROMATT) Additional operations. Contracting Authority draws the attention of the bidders that additional work arising from the project to cover the amount of net entrepreneurial award provides a margin of 5% of GDP. A detailed technical description and the specific amount of the applicable documentation.

Disabled SIOP 3.3.1 / A Szombathely, Bejczi u. 1-3.

Vas Megyei Kormányhivatal | Published August 26, 2015
Winner
Inter-Alp Kft.
cpvs
45215222

Subject: "Creating equal access to public services: accessibility of the Iron County Government Office," within the framework of SIOP 3.3.1 / A-12 / 2-2013-0020 number one research project at Szombathely, Istvan utca Bejczy 1-3.sz. Government construction window below accessibility works. Quantity: - civil engineering work - Architectural and structural breakdowns: 1,320.80 m², m³ 204.66, 2nd place - Temporary facilities costs by 2 klt - Scaffolding: 1 klt - Cleaning: 520 m², 1 klt --site concrete work and Vb: 299.15 m², 2.6 m - Masonry and other stonework: 3.4 m², 2 m³ - Plastering: 1,337.57 m² - Drywall: 284.29 m², 10, 97.35 m - Siding indoor: 953.70 m², 296.55 m - Covering outer space: 22.8 m², 4.9 m³ - Front doors: 4 - Internal doors: 16 - Metal structures: 4.32 m - Glass constructions: 1 - Colour: 3,058.36 m² - Insulation: 31.33 m² - Shield: 172.95 m² - frames: 32, 9,22 m² - Vanity Items: 31, 3,66 m² - Custom built furniture: 2, 1 65 m² - Construction debris container removal, disposal of 12 m³ - Work depóniából construction debris container loading by hand 12 m³ - demolition of reinforced concrete wall, C16 / 20 concrete grade: 3.65 m³ - building engineering works - Masonry and other Masonry: 0.2 m³, 3, 75 m - Plastering and rabicolás: 75 m - General building insulation: 73 m - Building services tubing assembly: 106 m, 12 - Building services fittings and equipment installation: 61 pieces, 14 hours - Central Heating installation: 49 pcs, 5 hours, 24 m - for ventilation equipment: 7 pieces, 7 m - BUILDING ELECTRICAL WORK - strong current - Protective pipes, cable trays: 3734 m, one klt - Wires, Cables: 6915 m - Fittings: 424 pieces - Luminaires Light sources , support structure 174 ks - distribution b ...

Government developing Sellye Window 7960, Dózsa Gy. U. Located at the first building in the complex accessibility, as well as offices for registration offices were renovated.

Baranya Megyei Kormányhivatal | Published August 3, 2015
Winner
O és R Építőipari, Kereskedelmi és Szolgáltató Kft.
cpvs
45000000, 45262500, 45262650, 45430000, 45421130

At No. 1 (u .: Sellye, 70/4.), Located in the building, complex accessibility, as well as offices for registration offices were renovated. Principal Amount: The amount of principal Procurement: architectural works: • 28.43 m3 container construction debris removal • Disconnect Disconnect 87.53 m2 59.59 m2 • flooring • drywall partition structures 41.35 m2 wood paneling, wooden radiator grille • Disconnect 597.6 Making m2 of plaster repair sidewall • 60.44 m2 mounted in plaster ceilings construction • 87.85 m2 gres pavement leveling jack • 683.73 m2 dispersion paint engineering work main working grounds of sex: general building insulation, plumbing pipe fitting, placing plumbing fixtures, building-heating installation , building engineering, HVAC, ventilation installation, building-conditioning installation, electrical installation works main job currencies: conduits, cable trays, conduits, cables, fittings contrasting frame and mounting box, lighting fixtures light source, grid and distribution equipment, building construction Security System Access Control Video Surveillance System Building a Fire Warning System full implementation and realization of qualitative and quantitative standards for the main job is not to set out in detail in the bidding documentation. The particular make and model, frequency, type of thing, process, activity, person, or patents or trade marks will also make reference to the unequivocal identification of the subject, the contracting authority may accept an equivalent product. In case of equivalent type megajánlása the equivalence of a tender in an appropriate manner, by any appropriate means to prove that the solutions which he proposes an equivalent manner the requirements set out in the tender specification. [310/2011. Government Decree § 26 (3) (XII.23.). - Paragraph (6)]. No technical content is not supported. The contracting authority shall inform tenderers to reserve funding is not available. Complete and detailed description of the project, the documentation must contain

Information on the "Development of Gyor-Moson-Sopron County Government Office window of the Government of Sopron, the accessibility of the context of SIOP 3.3.1 / A-12 / 2-2013-0002 project" the result of a public procurement procedure subject

Győr-Moson-Sopron Megyei Kormányhivatal | Published July 3, 2015
Winner
Fertődi Építő és Szolgáltató Zrt.
cpvs
45000000

Within the framework of a contract for the "Development of Gyor-Moson-Sopron County Government Office window of the Government of Sopron, the accessibility of the context of SIOP 3.3.1 / A-12 / 2-2013-0002 project" as follows: the size of the affected area listed building construction investment of 633.26 m2 on which the following works are performed: architectural and structural works: architectural and structural breakdowns, temporary extension facilities, organizational and other costs, Scaffolding, Cleaning, Earthworks, in-situ concrete and reinforced concrete work, Masonry and other stonework, rough interior, courtyard facade renovation, dry construction, coatings indoors, outdoors Flooring, Front doors, interior doors, Metal Structures, Colour, insulation, shading, frames, Toiletry items. Building installation works: Masonry and bricklaying, plastering and rabicolás, General building insulation, building services installation of pipes, fittings and building services equipment installation, ventilation equipment, air-conditioning. Electrical work: Pipes, casing, cable trays, pipes, cables, fittings 1-4, Luminaires light source, grid and distribution equipment, works, Delivery documentation, Demolition work.. Electrical Services - Fire Network: Protecting Pipes, conduits, wires, cables, Fire Alarm Equipment (PROMATT) Additional operations. Contracting Authority draws the attention of the bidders that additional work arising from the project to cover the amount of the fee provides corporate net margin of 5% of GDP. A detailed technical description and the specific amount of the applicable documentation.

Accessibility government Körmend window SIOP 3.3.1 / A-12 / 2-2013-0020

Vas Megyei Kormányhivatal | Published June 17, 2015
Winner
ZÁÉV Építőipari Zrt.
cpvs
45215222

Subject: "Creating equal access to public services: accessibility of the Iron County Government Office," within the framework of SIOP 3.3.1 / A-12 / 2-2013-0020 number one research project at Körmend, No. 7 Liberty Square. Government construction window below accessibility works. Quantity: - civil engineering work - Architectural and structural breakdowns: 518.81 m², 60 m³, 48.02 m, 1 klt - Temporary facilities costs by 3 klt - Cleaning: 463 m², 3 klt - On-site concrete work and Vb: 1klt, 0.22 m³ - Plastering: 216.6 m², 5.48 m - Drywall: 294.84 m², 9 pieces - Siding indoor: 405.61 m², 193.81 m, 1klt - Front doors and windows wrapping: 12.17 m² - Interior doors: 15 - Metal structures: 2 - Colour: 1,257.64 m² - Insulation: 3.77 m² - Shielding: 11 pieces - frames: 18 pieces - Vanity Items: 11 x - - building engineering works - and Masonry Other masonry: 7 piece, 8m - Plastering and rabicolás: 8 m - Building Services Piping installation: 8m - General building insulation: 5 m² - Building services tubing assembly: 4 - Technical building fittings and equipment installation: 5, 26 hours - Heating Installation: 14, 6 hours, 5 m - Ventilation equipment: 25 pieces, 59 m, 0.3 m² - Air conditioning: 60m, 3 - - BUILDING ELECTRICAL WORK - Protective pipes, cable trays: 599 m - Wires, Cables: 2338 m - Hardware: 177 pieces - Luminaries light source support structure 75 pieces - Distribution Equipment: 1 klt - Additional works: Lot 5, SLC 1, 100 pieces - Delivery Specifications: 4 items - Demolition work: 2 lots

Window design of government (u .: Sellye, 70/4.) Complex accessibility, as well as the agency's offices Reconstruction Act was

Baranya Megyei Kormányhivatal | Published March 25, 2015
Winner
O és R Építőipari, Kereskedelmi és Szolgáltató Kft.
cpvs
45000000, 45262500, 45262650, 45430000, 45421130

At number 1 (u .: Sellye, 70/4.), Located in the building, complex obstacles, as well as the offices of office document was launched. The main quantity principal amount of Procurement: architectural works: • 28.43 m3 of container construction debris removal Ending Ending • Flooring • 59.59 87.53 m2 m2 drywall partition structures • 41.35 m2 wood paneling, wooden radiator grille • Disconnect 597.6 Making m2 plaster repair sidewall • 60.44 m2 installed drywall ceiling construction • 87.85 m2 gres jacket matched substrate • 683.73 m2 dispersion paint engineering works major job German: general building insulation, HVAC piping installation, placement plumbing fittings, building-heating installation building services engineering ventilation, ventilation installation, building, air repair, electrical installation work major job German: conduits, cable trays, conduits, cables, fittings contrasting frame assembly boxes, lamps light source, grid and distribution equipment, building construction Security System Access Control Video Monitoring System Building Fire Warning System and the realization of the full implementation of quality and quantity requirements for the main job is not listed in detail in the RFP documents. The particular make and model, frequency, type of thing, process, activity, person, or patent or trademark will also make reference to the unequivocal identification of the subject, the contracting authority may accept an equivalent product. When an equivalent type megajánlása the equivalence of the tender in an appropriate manner, by any appropriate means to prove that the solutions it proposes an equivalent manner the requirements specified in the procurement specification. [310/2011. Government Decree § 26 (3) (XII.23.). - Paragraph (6)]. No technical content is not supported. The contracting authority shall notify the bidders to reserve funding is not available.

IT and educational technology and transportation components.

Budapesti Gazdasági Főiskola | Published September 6, 2013
Winner
Smart Info Kft.Bartók Béla u. 2/A. A. ép. fsz.3.Nagytarcsa 2142
cpvs
30200000, 30230000, 39162000

IT and educational technology equipment and spare parts supply - Annual budget: min 5 million HUF + VAT - up to 22 million HUF + VAT. (Access terminal, adapter, battery, battery charger, an active audio devices, motherboard, socket, converter, voice microphone, keyboard, BNC adapter, expansion cards, connectors, screw kit, digital thermometer, digital cards, document camera, plug, dual-layer DVDs , DCD burner, mouse, battery, battery tester, distribution, headset, clamp, solder, drill / screwdriver, cable ties, quick charger, speaker, audio cable, HDD, HDD docking station, headset microphone, extension, server power supply, glowing jack , cables, cable trays, cable management, cable ties, cable tester, camera, hand-held antenna and microphone, kiosk components, Sprays, crimping pliers, laser pointer, memory, memory card, memory card reader, hard drive, measuring, microSD card slot, microphone, microphone cable, micro dust, mini- SD Card, Mini Disc, monitor cleaning spray, mono dibox magnifying lamp lens, side cutter, pen mouse, pen drive, glue, presenter, Rados cassette CD player, tape, RAID controller, SATA controller, SD card, spray, SSD, compressed air, switch, computer case, tool kit, duct tape, power supply, adapter, strain relief, solder cream-lens reflex digital camera, finger mouse, USB HUB, glass fuses, fans, vetítőváaszon, VGA Matrix, video card, video capture, video distribution system, video distribution, video editing, voltmeter, bar code reader, webcam, hard drive).

Sound, light and vizuáltechn. sense. Purchasers. conn. exportation, supply installation fa.-k., and also in respect thereof conn. realization - and the preparation of detailed plans CHOP-3.1.1 / E-12's, No. 2012-0001. the "Castle Garden Bazaar development" c. within the framework of the project landscape. authors. mode.

Várgondnokság Közhasznú Nonprofit Kft. | Published January 15, 2016
Winner
Animative Kft.
cpvs
45314300, 79930000, 80511000, 45350000

Subject: "sound, light and visual acquisition of the related construction and installation tasks that anything related to the realization - and the preparation of detailed plans for the number of CHOP-3.1.1 / E-12-K-2012 to 0001 the" Castle Garden Bazaar "within the framework of the project entitled" Development of Quantity: Technological construction, construction jobs in three main groups can be identified: to be expressed within the framework of implementation of sound devices / installation tasks: Kivitelezendőek a multifunctional hall ceiling and sidewall contact surfaces (18 units), floor connection assembly of floating floor through fix and restoration 22 pieces of a closed box two-way coaxial ceiling speaker installation of cabling and connector installation, mikronrendszer installed wireless components (8 units), hall 3 DSP-controlled active speaker console interface, wall-mounted control panel installation, sound technical center complete with 88-piece interfaces; 28 pieces of broadband and sub speakers riggelve, processors, cabling etc, remote wireless installation, wired conference system control panel installation chairman and delegate unit installation, analog intercom systems center, 3 analog communication station and a 15-installed speakers, power amplifier assembly of local staff theoretical and practical training, mobile system test runs and training, shipped to a detailed trail, export and as-built plans, frequency allocation plan, acoustic surveys and setting, ambient acoustic noise expert advice, installation, tuning, to be performed within the framework of implementation of wiring Lighting Tools / Installation Tasks audio devices: Lighting Panel installation of high-voltage matrix system installation, 94 pieces of various passive and active floodlight installation, wiring, rigging, supplies safety equipment, theatrical steel scaffolding, hanging hooks and safety wire rope assembly of electrical additions construction (26 pcs Harting, 23 pieces explaining Boxing, 186 db HT hosszabbítóés 50 HT extension (HT3 distribution), 180 DMX-512 signal cable assembly of 9 pieces of high-current power supply cable installation, multi-purpose hall mobile proszceneum függönyözés installation complete with stage skirt Installation of theoretical and practical training local staff, mobile system trial operation and training, AV technological engineering elements (mounting brackets, cable trays, covers, etc) Installation and construction of nyomvonal- detail, preparation of as-built Export and plans. Visual equipment to be performed within the framework of implementation / installation tasks:

Sound, light-ésvizuáltechn. Dev. To obtain a conn. exportation, supply installation of wood-k., and also in respect thereof conn. megvalósulási- and the preparation of detailed plans for the CHOP-3.1.1 / E-12's, No. 2012-0001. "Castle Garden Bazaar development" c. táj.elj.eredm the framework of the project

Várgondnokság Közhasznú Nonprofit Kft. | Published November 13, 2015
Winner
Animative Kft.
cpvs
45350000, 45314300, 79930000, 80511000

Subject: "sound, light and visual acquisition of the related construction and installation tasks that anything related to the realization - and the preparation of detailed plans for the number of CHOP-3.1.1 / E-12-K-2012 to 0001 the" Castle Garden Bazaar "within the framework of the project entitled" Development of Quantity: Technological construction, construction jobs in three main groups can be identified: to be expressed within the framework of implementation of sound devices / installation tasks: Kivitelezendőek a multifunctional hall ceiling and sidewall contact surfaces (18 units), floor connection assembly of floating floor through fix and restoration 22 pieces of a closed box two-way coaxial ceiling speaker installation of cabling and connector installation, mikronrendszer installed wireless components (8 units), hall 3 DSP-controlled active speaker console interface, wall-mounted control panel installation, sound technical center complete with 88-piece interfaces; 28 pieces of broadband and sub speakers riggelve, processors, cabling etc, remote wireless installation, wired conference system control panel installation chairman and delegate unit installation, analog intercom systems center, 3 analog communication station and a 15-installed speakers, power amplifier assembly of local staff theoretical and practical training, mobile system test runs and training, shipped to a detailed trail, export and as-built plans, frequency allocation plan, acoustic surveys and setting, ambient acoustic noise expert advice, installation, tuning, to be performed within the framework of implementation of wiring Lighting Tools / Installation Tasks audio devices: Lighting Panel installation of high-voltage matrix system installation, 94 pieces of various passive and active floodlight installation, wiring, rigging, supplies safety equipment, theatrical steel scaffolding, hanging hooks and safety wire rope assembly of electrical additions construction (26 pcs Harting, 23 pieces explaining Boxing, 186 db HT hosszabbítóés 50 HT extension (HT3 distribution), 180 DMX-512 signal cable assembly of 9 pieces of high-current power supply cable installation, multi-purpose hall mobile proszceneum függönyözés installation complete with stage skirt Installation of theoretical and practical training local staff, mobile system trial operation and training, AV technological engineering elements (mounting brackets, cable trays, covers, etc) Installation and construction of nyomvonal- detail, preparation of as-built Export and plans. Visual equipment to be performed within the framework of implementation / installation tasks:

Establishment of government Window 7754 Boly, u. At number 5 (u: Boly, 8) property located in the expansion of complex obstacles, as well as the agency's offices Reconstruction Act was

Baranya Megyei Kormányhivatal | Published March 27, 2015
Winner
HVS-BAU Kft.
cpvs
45000000, 45262500, 45262650, 45430000, 45421130

At number 5 (u: Boly, 8) property located in the expansion of complex obstacles, as well as the offices of office document was launched. Principal amount of Procurement: Key quantity: 1 Schedule: architectural works: • 15.47 m3 of container construction debris removal Ending Ending • Flooring • 22.50 25.64 m2 m2 concrete or concrete pavement basalt sheet without formwork • 36.46 m2 wreath ledge • 76.89 m3 site preparation, humuszleszedés • 52.50 m3 trench excavation • 149.10 m2 reinforced concrete substrates ironing Ø 15/08/15 • 556.99 kg of steel mesh reinforcement • 42 on-site installation. • Making under preparation loaded immediately after placement of prefabricated nyílásáthidaló • 158.91 m2 and load-bearing masonry infill 257.64 m2 • Roof lathing notched tiling • oldalfalvakolat 257.64 138.05 m2 m2 single coverage drawn grooved roof tiles, roof pitch of 40 ° further engineering work The main work of sex: demolition, temporary side facilities, szaluzás-scaffolding, excavation, síkalapozás, on-site concrete and reinforced concrete work, placing structures prefabricated masonry and bricklaying, carpentry, plastering, dry construction, roofing, flooring, tinning, placement of doors and windows, finishes Insulation, Mechanical works: • 35 m PVC drain pipe installation RAUTITAN stable five-layer pipe PE-X / Al / PE) times. • 15. Placing threaded fittings factory RAUTITAN flex conduit • 10. Placing compact steel panel radiators, wiring, engineering works main currencies of the work: general building insulation, plumbing pipe fitting, plumbing fittings, building-heating installation, building, HVAC, ventilation installation, building climate-fitting. Electrical work major job German: conduits, cable trays, conduits, cables, fittings contrasting frame assembly boxes, lamps light source, grid and distribution equipment, building construction Security System Access Control Video surveillance building construction system Fire alarm system 2. Schedule: architectural works: • 279 plastering m2 and 45 m2 • dispersion paint window painting of Networks: • 24 pcs. end of the building full implementation and realization of qualitative and quantitative standards for the main job is not listed in detail in the RFP documents. The particular make and model, frequency, type of thing, process, activity, person, or patent or trademark will also make reference to the unequivocal identification of the subject, the contracting authority may accept an equivalent product. When an equivalent type megajánlása the equivalence of the tender in an appropriate manner, by any appropriate means to prove that the solutions it proposes an equivalent manner the requirements specified in the procurement specification. [310/2011. Government Decree § 26 (3) (XII.23.). - Paragraph (6)]. No technical content is not supported. The contracting authority shall notify the bidders to reserve funding is not available.

Information Notice - supply of IT spinal cord construction of the "Infrastructure development in health poles" in "Andrew Block Jósa Hospital Project" as part of the project marked SIOP-2.2.7-07 / 2F / 2-2009-0009 ID Law

Állami Egészségügyi Ellátó Központ | Published January 6, 2016
Winner
RutinSoft Számítástechnikai Kft.
cpvs
45314300

Building the IT backbone cable "Infrastructure development in health poles" in "Andrew Block Jósa Hospital Project" as part of the project marked SIOP-2.2.7-07 / 2F / 2-2009-0009 identifying subjects, as follows: 1. General description of the hospital grounds development of new advanced high capacity optical backbone connections planned to be implemented in existing buildings based on the supplied "Low voltage backbone page." Planned backbone connections: - Infusion laboratory fiber optic backbone cable - Boiler House backbone fiber optic cable - Pathology class backbone fiber optic cable - Érközpontba backbone fiber optic cables - Institutional pharmacy fiber optic backbone cable - paving the relevant resolutions to restore housing areas. Based on a preliminary survey of the trails impassable infúzióslabor and clinic, as well as the Boiler House building section between Oncology and concerns. Because of the mud washed into damaged sections of floor structure. These sections work price should be explored with the errors of the substructure and the contractor cleaned professionally to improve, to develop interoperability and repair the opened road sections. The existing connections, provided data on hospital employees. 2. New backbone cabling Optical fibers usually explain: The installed cables needed to run fiber optic patch cords and optical interface modules to be delivered, against which the minimum requirement of 1Gbps speed. Infusion laboratory fiber optic cable backbone of the clinic main rack of OM3 multimode fiber in an 8-dragging as fiber optic cable, terminating the infusion rack placed in a laboratory. Boiler House building fiber optic backbone cable Oncology deep space ground floor RK weak current host of OM3 multimode fiber in an 8-as fiber optic cable pulling, termination, boiler-house rack in the closet. Here, replacing the existing outdated cabinet is required, min 9U size. Pathological class fiber optic cable backbone of the logistics center rack of OM3 multimode fiber in an 8-pulling fiber optic cable as the pathology building. Érközpontba CVC) fiber optic cable backbone of the telephone exchange building surgery of room (Information II.) OM3 multimode fiber with a 12-pulling fiber optic cable as the ground-floor main building Érközpont rack cabinet, sufficient fiber termination 12.. Hospital pharmacies OM3 multimode fiber in an 8-pulling fiber optic cable as the central administration building main rack cabinet. (Information Technology I). In order to maintain the homogeneity of the AMP should also kiváltásoknál the materials to build the IT network. The execution of general information alépítményes before carrying out the work of the technical department to match. Maintenance work must be carried out to take care of the existing substructure wires. Recommended for manual digging. After road works required to restore the original state task. The main cables kiváltásokkal established locations (kábelaknába arrival and departure from, departing and arriving place) compulsory clearly marked for later identification. The cable markings as-built documentation shall be included. The work to be performed, shall be agreed with the hospital. The cable trays must be connected with the ground. A hard copy documentation 3. The established networks of at least 5 years of warranty. The amount of purchases in detail: Financial notice Annex.

Supply, installation fast electric car charging stations

Budapest I. kerület Budavári Önkormányzat | Published July 17, 2015
Winner
SWR Bauconsulting Kft.
cpvs
31158000

Within the framework of the "Royal Castle and surrounding transport development" in KÖZOP- 5.5.0-09-11-2011-0027 identification number of EU projects Supply, installation (commissioning) meeting the following conditions fast electric car charging stations. The task Overview of the service stations in Europe the types currently available in Japanese types, as well as the AC charging is suitable for cars can be filled capable electric cars, this must have connectors according to the following standards: • CHAdeMO DC fast charger charging cable, standard: CHAdeMO V1.0 • CCS Combined Charging System DC fast charger charging cable, standard: EN61851-23 / DIN 70121 • Type2 AC charging cable, AC AC electric cars to charge. Installation locations: • Budapest, I. district Lovas street parking (under Murad bastion) • Castle Garden Bazaar lower level garage Bidder Other tasks: the testing activities, protocols preparation checks, as well as to carry out the following tasks on site. District of Budapest, I. Horse-street parking (under Murad tower) to be performed additional tasks: • Preparation of the electric charging placement plan • The plan prepared traffic technology licensing, • The electrical charging location for the purchase of Monument Protection Authority's contribution, • placement of traffic control signals • Placing the device users to use information board. Castle Garden Bazaar garage lower level to be performed additional tasks: • Preparation of the electric charging placement plan • The development of electric charging energy supply in the Castle Garden Bazaar electrical switchboard of the charger (if possible the cables to be routed to the existing cable trays) • The construction of the charging device structured network endpoints (using the existing network) • Placing the traffic control signs, information boards • Placing users to use the device. Rechargeable car types: • European standard charging models (eg BMW i3 .: Volkswagen E-Up, Volkswagen E-Golf), Nissan LEAF, Nissan e-NV200, Mitsubishi i-MiEV, Mitsubishi Outlander PHEV, Peugeot iOn, Peugeot Partner Electric Citroen C-Zero and Citroen Berlingo Electric), Smart ED (22kW option), Tesla S (twin-charger option), Renault Zoë) the technical characteristics of the filling equipment: • Charging Modes: o DC-DC fast charging mode, o AC AC normal charging mode. • Charging protocol: CHAdeMO o, o CCS, p Type2 Mode3 • Power: 50kW, • Provides display the charge status display. • Operating Temperature: -10C - + 50C • Power supply voltage: 400V, 50Hz, 3P + N + PE • Provides RFID identification and authorization systems • Protection: IP54 • Remote management of network connections: GSM / CDMA / 3G modem / Base-T Ethernet • Low operating noise • Maximum weight: 500 kg integration and monitoring features: In addition to the filling station must have open to OCPP existing software systems integration interface connectivity (eg .: ERP system, parking system, payment system). Data and statistics about the charge has not been fixed, cloud-based access should be granted to any computer with an Internet connection. Be assured of mobile SIM card and wired connectivity over the Internet. Charging station construction, expandability: The Power Module must be individually replaceable to. RFID authorization way beyond the charging station must be future expansion modules from the bank card payment (Visa, MasterCard) as suitable. Expectations about the presentation: in terms of material is stainless steel, and to ensure the best possible resistance to environmental influences (eg .: rust, salt, gravel). The charging station complies with EMC IEC 61000-6-3 for residential, commercial and light-industrial environments Emission standard. Warranty: Contracting Parties agree that the warranty period of 60 months from the date of transport undertaken by the technical handover procedure was successfully completed date.

Government developing Windows 7754 Boly, u. Property is located at the fifth enlargement of the complex accessibility, as well as registration offices were renovating offices

Baranya Megyei Kormányhivatal | Published July 31, 2015
Winner
HVS-BAU Kft.
cpvs
45000000, 45262500, 45262650, 45430000, 45421130

At No. 5 (u: Boly, 8) Property located in the expansion of complex accessibility, as well as offices for registration offices were renovated. The main volume of Procurement: Key quantity: 1 Time: architectural works: • 15.47 m3 container construction debris removal • Disconnect Disconnect 25.64 m2 22.50 m2 • Concrete floors or concrete basalt flagstones • No 36.46 m2 wreath cornice formwork • 76.89 m3 site preparation, humuszleszedés • 52.50 m3 trench excavation • 149.10 m2 ironed ironing socket Ø 15/08/15 • 556.99 kg of reinforcing steel mesh reinforcement • 42 on-site installation. • Preparation under preparation loaded immediately after placement of prefabricated nyílásáthidaló • 158.91 m2 and load-bearing masonry infill 257.64 m2 • Roof lathing notched tiling 138.05 m2 257.64 m2 • oldalfalvakolat single coverage drawn, grooved roof tiles, roof pitch 40 additional civil engineering work The main job currencies: demolition, temporary extension facilities, szaluzás, scaffolding, excavation, síkalapozás, in-situ concrete and reinforced concrete work, Installation of building structures prefabricated walling and masonry, carpentry, plastering, dry construction, roofing, tiling, tinning, placing doors and windows, finishes , insulation, engineering works: • 35 m PVC drain pipe installation RAUTITAN stable five-layer pipe (PE-X / Al / PE) times. • 15 pcs. Placing threaded fittings factory RAUTITAN flex conduit • 10. Placing a compact sheet steel panel radiators, wiring, Engineering works major currencies of the work: general building insulation, plumbing pipe fitting, plumbing fittings, building-heating installation, building engineering, HVAC, ventilation installation, building-conditioning installation. Electrical installation main job currencies: conduits, cable trays, conduits, cables, fittings contrasting frame and mounting box, lighting fixtures light source, grid and distribution equipment, building construction Security System Access Control Video surveillance building construction system Fire alarm system 2. Schedule: architectural works: • 279 • fairing m2 and 45 m2 doors dispersion paint painting of Networks: • 24 pieces. Building endpoint of overall implementation and realization of qualitative and quantitative standards for the main job is not to set out in detail in the bidding documentation. The particular make and model, frequency, type of thing, process, activity, person, or patents or trade marks will also make reference to the unequivocal identification of the subject, the contracting authority may accept an equivalent product. In case of equivalent type megajánlása the equivalence of a tender in an appropriate manner, by any appropriate means to prove that the solutions which he proposes an equivalent manner the requirements set out in the tender specification. [310/2011. Government Decree § 26 (3) (XII.23.). - Paragraph (6)]. No technical content is not supported. The contracting authority shall inform tenderers to reserve funding is not available.

Photovoltaic system design lump, a lump sum contract for keretében- informational award

Miskolci Semmelweis Kórház és Egyetemi Oktatókórház | Published July 31, 2015
Winner
ASIANET HUNGARY Kft.
cpvs
45310000, 09332000

The MISEK aims to produce electricity using renewable energy sources, thereby reducing the development of the sites affected by the amount of electricity purchased from power company. The design and construction will be sought during the placement of the buildings previously designated location best suited to develop technical solutions to the venue geometry, location, taking into account shading and other features. 1) The main electricity generating equipment features: The main distributor visszwatt site protection installation is required. The present technical description of the solar power plant to be built in inverters, solar cells and other types of installation materials were named solely in order to achieve the task, with technically equivalent products megajánlhatóak by the contractor. Internal connection point 2) Production Unit: A photovoltaic system fire safety disconnection of the buildings existing fire protection master switch operation done, as in the case of AC synchronous cessation (supply interruption) of the inverters immediately detach from the network, short circuit is not fed, isolated can not operate. The cable cross-section should be sufficient to secure the transmission of energy generated by the solar panels. The completed solar cell power generation system must be capable to be that the solar panels generated electricity transformer station and the hospital site to ensure the produced electricity use (access to) all the buildings at the site, electrical energy consumer, through an internal electrical system! 3) the development of the productive apparatus: structural roof reinforcements and lightning protection Supporting structure required for installation - any necessary modifications - design and construction of the photovoltaic project tender, these costs are borne by the successful tenderer for execution. Photovoltaic Modules Manufacturer Warranty minimum of 20 years, at least 80% power. Strings protection equipment (RoHS DC-side voltage, DC-side fuse disconnectors) the location and technical parameters should be selected accordingly, taking into account the requirements of the relevant standards and regulations! Inverters The inverters are to be connected to the EPH network. Connection and power distribution box placed in the same place into the side AC load disconnecting switch. Be installed in the same place a load disconnecting switch, with which the entire solar system disconnects from the network. The connector closet generated by the solar energy system in the user network of buildings under development reach through the main distribution equipment, through appropriately sized copper cable types. According to the IEC 60364-7-12 standard HD track must be the same string, AC wiring, EPH-spine or connecting cables to install! Solar systems Locations on top of buildings implemented systems installed output are as follows: o Infectious diseases building: 100 kWp o Internal Medicine building: 80 kWp o Central warehouse: 30 kWp Infectious Diseases building through the south side of the cserépfedésű Ground floor + high roof design building substructure total of 400 pieces each. at least 250 Wp module to be placed in that building through the main distributor of the inverters connected. Department of Medicine building on the south side of the cserépfedésű five-storey high roof design building support structure through a total of 320 pieces each weighing more than 250 Wp module to be placed in that building through the main distributor of the inverters connected. Central warehouse roof of the warehouse contains szinteltolást mezzanine with a shielding effect must be considered when designing the solar system! 4) Production unit failure protection (ingress protection) of the DC-side contact / fault protection requirements of the solar panels will be placed in the building (s) on top of an unauthorized person can not go there, near the tetőfeljáró warning sign must be placed. AC-side shock protection: TN-S system, 3P + N + PE, complete with EPH network. The solar system tartószerkezeteit metal, and each facility within the large expanse of metal objects (cable trays, etc) must be connected to the EPH network. The test report shall be attached to the minutes of the technical handover. Placing fifth) Warning signs 8 mm) in the following locations, with the following inscriptions: Near the tetőfeljáró SOLAR ELECTRIC GENERATING SYSTEM SPECIALIST IN THE PRESENCE OF ELECTRIC ENTRY ONLY! Inverter, AC-boxes, DC gyűjtőszekré
  • 1