Public tenders for cable-trays in France

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Electrical machinery, apparatus, equipment and consumables; lighting

Commune de Saint-Nazaire | Published January 21, 2017
Winner
CGE distribution
cpvs
31000000, 44321000

16s0030 - acquisition of supplies and electricity equipment control group between the City of Saint-Nazaire and Carina.

Son, cables, bare copper grounding, telephone cables, coaxial cables, computer cables, security cables.

distribution cabinets, residential and service protection, automation of the building, terminal equipment, building accessories, industrial switchgear, cable trays and accessories, moldings, ducts and accessories, electric heaters, energy management, hand dryers, air conditioning, ventilation .

security lighting, fire alarm technology, building automation (home automation), sound system, audio / video device, batteries and battery.

light sources, decorative lighting, indoor lighting, outdoor lighting, lighting equipment.

Electrical equipment for public lighting.

Telecommunications facilities

RATP | Published December 23, 2016
Winner
Spie IDF Nord-Ouest
cpvs
32523000, 45314000, 32000000

Within the metro renewal project (MNC), this contract is to provide and integrate radio broadcast systems RATP and GSM-3G-4G in several metro stations Parisien.

The expected benefits are:

- The preparation, monitoring and end of construction,

- Creation, removal or replacement of cable trays,

- Installation or removal of radiating coaxial cables radio and non-radiating,

- The installation and removal of radio equipment (couplers, antennas, repeaters, filters, multi couplers, loads, etc.)

- Installation, removal, or replacement of cabinet or rack (and related equipment). Removing network cabinets, windows, etc.

- Installation of antennal structures with associated calculation notes,

- Various arrangements,

- Electrical,

[...]

- Acceptance of the work,

- The presentation of the qualification application executed + book folder.

This contract is a multi-awarded market. It is part of the Metro renewal project (MNC) and is to complete and integrate radio broadcast systems RATP and GSM-3G-4G in 28 stations of the Paris metro.

This is a market controls including minimum and maximum benefits.

The 28 stations are to be assigned to four holders.

Under minimum:

- 16 stations

Each holder will be given a minimum of 4 stations.

Under the maximum:

- The minimum + 12 stations.

Electrical installation work

RATP | Published December 23, 2016
Winner
SPIE Batignolles Énergie IDF
cpvs
45310000

This contract involves removal of lighting bands, the provisional application of existing cables and temporary facilities for construction of stations of Metro Line 4.

This is a framework agreement for purchase orders with a minimum value of the contract fixed at 20% of the nominal amount and a maximum amount fixed at 20% of the nominal amount.

This framework agreement is for the execution of works and removal of provisional interim low voltage equipment and facilities of construction of stations of Metro Line 4.

The work required for the nominal amount include:

- Temporary installations site,

- Installation of distribution cabinets and enclosures area,

- Cable laying

- Mounting brackets and cable trays,

- Installation tunnel pipes.

Electrical wiring work

Sytral | Published April 8, 2017
Winner
Spie Sud-Ouest
cpvs
45311100, 39134000

This consultation concerns the work of redevelopment of the central command post metro dieu (CPC) to be conducted in order to integrate a new place to control the line B, due to the full automation of the latter.

The contract performance period is 10 months off completion guarantee period.

This applies to the control points of the ABC line, the shift supervisor and other elements of the CCP environment.

The electrical work involved in this lot are:

- design studies and file the executed works, update documents Sytral heritage,

- complete electrical renovation of existing stations (regulators and watch leader) and wiring of the new posts,

- creation of new low voltage start as needed,

- supply of new equipment,

- creation of underfloor cable trays,

- removing a vent pipe out of service,

- moving a computer rack,

- moving computer CPUs and creating bays to house (including network brewing)

- change fire detection and possible resumption of suspended ceiling tiles,

- modification of the optical / optical connection network,

- removal of unnecessary cables.

the specific contract duration: 10 months.

The work involved in this lot are:

- design studies and file the executed works, update documents Sytral heritage,

- supply and installation of furniture for new jobs for regulators and the shift supervisor's office,

- supply and installation of new furniture for the environment CPC (filing storage cabinet box the internal correspondence of letters, buffet storage, personal lockers, etc.)

- removal and recycling of all furniture items which are not kept,

- closing a technical pit

- producing a false floor,

- Replacement of technical floor slabs.

Structural shell work

Ville de Marcq-en-Barœul | Published November 15, 2017
Winner
Mot de Passe
cpvs
45223220, 44316500, 45442100, 45310000, 30238000, 39155000

This contract relates to the project of partial development of the media library "La Corderie" of Marcq-en-Barœul for the implementation of the RFID device. The purpose of the services covers all the work necessary for the development and adaptation of the premises of the media library to enable the implementation of the RFID device, the provision and implementation of RFID equipment and furniture.

Realization of structural work, tiling and stone as part of the partial redevelopment of the building of the media library for the implementation of the RFID device.

Realization of the works of locksmithing and mirrors in the context of the partial redevelopment of the building of the media library for the implementation of the RFID device: modification of the entrance gate, creation of a metal and glass canopy and supply and installation of a sliding door.

Realization of fixtures, painting and ceiling slab for the partial remodeling of the media library including the layout of the central reception, the cyber center and the information point in the reading room.

Realization of electrical works, strong and weak currents and SSI, including piping and associated cable trays, as part of the partial redevelopment of the building of the media library for the implementation of the RFID device.

Supply and installation of RFID equipment from the media library.

Supply and installation of furniture for the project of partial redevelopment of the building of the media library for the implementation of the RFID device.

Underground railway station

SMAT | Published April 4, 2017
Winner
Artel société nouvelle
cpvs
45234125, 45223220, 45262210, 45431000, 45431100, 45261000, 45310000, 45311000, 45311100, 45311200, 45443000, 45421140

Doubling the line capacity - Basso Cambo station Mirail (MBC) - work related to the achievement of improvements in the way station to operate with reams of 52 meters long.

The following amounts are given for guidance:

- Wall échiffres and exterior walls: 354 square meters

- false ceiling outside: 186 square meters

- paving screed 194 square meters

- opaque stain coatings: 909 square meters.

The following amounts are given for guidance:

- anti-corrosion treatment: 58 tons

- primary framework coverage: 16 tons

- backbone failures: 8 tons

- solid slab floor 124 square meters.

The following amounts are given for guidance:

- earth cable 50 mm section 2 : 200 ml

- cable trays: 400 ml

- laying of light beams: 100 ml

- extract manifold: 2u

- ceiling: 186 m2.

The following amounts are given for guidance:

- supply and implementation of smoke opening 20 u

- supply and implementation of curtain walls: 115 m2

- cladding and perforated sheet: 226 m2

- supply and implementation of cantonments screens: 33 ml.

Electrical installation work

Cofiroute | Published November 29, 2017
Winner
Citeos
cpvs
45310000, 31121000, 31527000, 32223000, 32560000, 32570000, 34927000, 34928320, 34928500, 35125300, 42512300, 44320000, 45233280, 45341000, 63712210, 31527200, 34928510, 34928530

Equipment work on the toll station and the operating building as part of the development of the A10 / A85 junction

The market is broken down into 2 lots:

- lot 1: works station and building equipment,

- lot 2: public lighting works.

Lot 1 includes the following services:

In firm tranche:

- Supply, installation, wiring connection of:

Equipment for (x2) toll lanes,

Set of railings (x76), posts (x24), chain (14ml), hunting mirror post (x6).

Centralized technical management station: (x1) box and wiring, except software,

Building Access Control: (x1) cabinet and wiring, excluding software,

Building surveillance video: (x4) concrete rack masts + (x4) cameras and (x4) massive video + GC distribution cabinets);

(x1) Centralized inverter,

(x1) Generator Set,

(x1) TGBT,

(x2,025 ml) CFO and (x1 310 ml) Cfa wiring for building and station, (x1) data bay,

(x210 ml) cable trays, (x1) technical room air conditioning, (x6) outdoor lighting fixtures, (x8) local building lighting, (x) 19 sockets, (x18) computer sockets,

- Spare parts for maintenance (x1) camera, (x1) transmitter and receiver video on FO, (x1) exterior lighting building, (x1) building local lighting,

- Tests and receptions: in factory and on site;

- Project management, studies, documentation, installations and follow-up, participation in tasks managed by the Project Management

Optional Slice # 1 "Toll Equipment":

- Supply, installation, wiring connection of:

Equipment for (x2) toll lanes

Radio barrier edge control (x2)

Set of railing (x68), posts (x24), chain (x14ml), post hunting mirror (x6).

(x640ml) CFO Wiring, (x440 ml) Cfa Cabling,

Optional Slice # 2 "Free-Flow Gantry":

- Supply, installation, wiring connection of:

Shoot ...

Construction work for communication lines

Métropole Rouen-Normandie | Published April 8, 2017  -  Deadline May 9, 2017
cpvs
45231600

Construction of telecommunications fiber networks very high speed on the entire territory of the Metropolis Rouen Normandy.

The work to be performed include:

- preparatory work (soil studies, applications for licenses, road permissions, DT / DICT for the owner, ...)

- earthworks, roads, coverings, borders, and green spaces (mechanized trenches traditional trenches, directional drilling, repairs of roads, laying of ducts and drawing rooms, tritubage, ...)

- openings of work, core drilling and sealing,

- the establishment media (cable ducts, cable trays, ...)

- supply and laying of buildings like "shelters"

- the work of drawing and connecting optical cables, splice enclosures, optical drawers, ...

- supply plans, recipe files, optical reflectometry,

- maintenance work.

All these works comprise the supply, delivery and installation of all materials.

Sound equipment

Commune d'Ablis | Published March 2, 2017
Winner
SAS Lagoona Strasbourg
cpvs
32342410, 42416300, 31518100, 38652120, 39515200

Supply contract for services and the scenic construction of cultural facilities Lot 1: stage equipment Lot 2: scenic lift.

Providing scenic and lifting equipment Service carrier stage and hall.

Supply and stage equipment Service:

Cable trays, sound, sound recording, lighting (desk and projectors), video, platforms, stage curtains and options.

Deconstruction of decanter factory Joinville (94). Lot 2: déséquipement work. Removing cables and existing cable trays. Removal of the appliances and electrical and automation (cabinets and boxes) equipment. Loosening and removing metal grating walkways, mobile metal walkways, ladders with safety cage, metal stairs, metal railings (excluding railings on bridges), hatches and access buffers. Removing supply raw water pipes, steel (DN 100 mm and DN 300 mm), extraction pipes and drain sludge, steel DN 100 mm) of all devices associated with lines such as valves (DN 80 mm to DN 300 mm). Removing honeycomb dismantling joint DN 1000 mm, pumps, various equipment (brackets, metal shutters pipes Eternit)

Eau de paris | Published August 19, 2014
cpvs
45111100

Déconstruction du décanteur de l'usine de Joinville (94). Lot no 2: travaux de déséquipement. Dépose des câbles et chemins de câbles existants. Dépose des appareils et équipements d'électricité et d'automatisme (armoires et coffrets électriques). Descellement et démontage des passerelles métalliques en caillebotis, des passerelles métalliques mobiles, des échelles à crinoline, des escaliers métalliques, des garde-corps métalliques (hors garde-corps sur les passerelles), des trappes et tampons d'accès. Dépose des canalisations d'alimentation en eau brute, en acier (DN 100 mm et DN 300 mm), des canalisations d'extraction et de vidange des boues, en acier DN 100 mm), de tous les appareils associés aux conduites tels que les vannes (DN 80 mm et DN 300 mm). Dépose des nids d'abeilles, des joints de démontage DN 1000 mm, des pompes, des équipements divers (équerres de fixation, obturateurs métalliques des tuyaux Eternit)

Electrical wiring and fitting work

RATP | Published December 20, 2016  -  Deadline January 19, 2017
cpvs
45311000

The consultation concerns a works contract of deposit, preliminary layout, and rests strengthening tunnel cable tray and low wall on lines 4 and 12 of the metro in the context of the modernization of Line 4 operation.

This contract is a framework agreement for purchase orders with a minimum and a maximum.

The benefits are intended and providing the following work:

- Removal, provisional and installing low walls in cable trays for civil works to strengthen the line of docks 4 for the quays facades of installation,

- Strengthening tunnel cable supports inter Station Line 4 and Line 12 for cable management needs related to the modernization of Line 4.

The amounts of the minimum amount are approximately the following:

- 1470 ml of deposits, provisional and installing cable trays by low walls,

- 650 ml of hooks strengthening inter station on route 1 between Montparnasse and Raspail Line 4

- 605 ml of hooks strengthening inter station on route 1 between CPC and Marcadet Duhesme line 12.

The amounts of the maximum amount are approximately the following:

- 2 520 ml of deposits, provisional and installing cable trays by low walls,

- 650 ml of hooks strengthening inter station on route 1 between Montparnasse and Raspail Line 4

- 1 210 ml of hooks strengthening inter station on 2 lanes between CPC and Marcadet Duhesme line 12

- 4220 ml building cable support on other inter stations of Line 4.

The amounts are given for information only and will be detailed in the tender documents.

Works for complete or part construction and civil engineering work

SNCF Réseau | Published January 6, 2017  -  Deadline January 23, 2017
cpvs
45200000

This contract is the construction and equipping half a dock before laying the adjacent track.

This market includes all work necessary for the completion of half dock or civil engineering specialties, wet networks, art work, energy and telecoms.

The main quantities below are for information only:

Creating a railway crossing:

Excavation and landfilling: 26 m 3 .

Cable tray embedded in the concrete (3 beds 8 sheaths 110): 13 ml.

free opening room 1.19 x 1.78. 1.50 m deep with metal pads C250: 1 u.

Wharf confection:

Controlled demolition: 10 m 3 .

Wharf Demolition body: 20 m 2 .

excavation of evacuation: 10 m 3 .

prefabricated boxes laying quayside: 325 ml.

Supply and implementation of materials for dock body constitution: 1350 m 3 .

F and P grave cement: 150 m 3 .

Supply and installation of tiles awakening vigilance: 450 ml.

Cable trays: 375 ml.

Drawing Room: 42 u.

Removing and installing the fence: 510 ml.

Primer coat: 1600 m 2 .

Mix 68 tons.

Massive equipment and furniture for shore:

Massive concrete masts candelabra: 30 u.

Massive concrete support poles: 10 u.

massive concrete pier for furniture: 45 u.

Safety mast installation: 10 u.

bench installation: 6 u.

trash laying: 16 u

Laying technique furniture: 4 u.

Tiles with integrated cover:

Supply and installation of hatches 600 x 600 mm: 8 u.

Concrete for BA: 0.5 m 3 .

HA steel: 60 kg.

Formwork: 14 m 2 .

Chronométrie:

Pose and clock connection: 4 u.

Supply, installation and connection of a cable C1 SYT2 SH 2 pairs: 1 000 ml.

Supply, installation and connection of a power cable 3x6 * C1 SH (2 cores +): 1 000 ml.

Telephony:

Installation and connection of phones like TEX - laying on dock furniture: 10 u.

Supply, installation and 3 pairs cable connection SYT2 armed 9/10 C1 SH: 1 000 ml.

Supply, installation and cable connection 5 Pairs SYT2 armed 6/10 C1 SH: 2000 ml.

PA:

Supply and cable laying rigid 2x4 mm * CR1-C1-SH: 1 000 ml.

Supply and laying cable 2x1.5 mm stiff * CR1-C1-SH: 620 ml.

Installation and orientation of the speakers with hanging device and grid: 62 u.

8. Electric power:

Cables of all types: 10 800 ml.

Laying Safety mats: 9 u.

Installation of lighting masts: 31 u.

Lighting 217 u.

300 mm: 950 ml.

Water System:

Pipelines: 600 ml.

circulation pump: 1 u.

Note that this work is to achieve with implementation constraints, the main are:

- In urban areas,

- Operated on railway site,

- On restricted construction allowances,

- Partly day,

- Partly at night under temporary interception of movement (ITC)

- Consignment under catenary,

- In co-activity with other sites (including the work of the Grande Halle Voyageurs).

Building installation work

SEMTCAR | Published February 1, 2017  -  Deadline March 14, 2017
cpvs
45300000, 45310000, 45330000, 85312510

Achieving line b automatic metro includes the construction of three parks relay superstructure. This concerns the AAPC Park Relay Gayeulles.

Park Relay Gayeulles is a parking lot of 402 places of 62 m approximately 35 m, superstructure, with 5 levels above the ground floor to a height of about 20 meters, well-ventilated area. This is a post structure reinforced concrete beams, with flagstone floors alveolar BA concrete and facades perforated stainless steel sheet. This relay Park, partially located above the future subway station The Gayeulles (line b automatic metro) and operates as opening hours of the station.

Lot 102 subject of this consultation concerns the BT electrical works and HVAC Relay Gayeulles Park (see description of benefits Ii-2-4 below).

Lot 102 focuses on electrical distribution wiring yellow tariff, LED lighting all local (500 points of light around - including signage), electric heating in local personnel, and for precautionary measures in terms of electricity distribution infrastructure charging electric vehicles (EVRI) (cable trays and ducts for the CFO and the CFA).

This lot also covers the installation of plumbing and sanitary equipment and ventilation and air conditioning for the development of certain premises.

The market will include provisions to promote the employment of people with special difficulties of integration and the fight against unemployment. The implementation modalities of this integration approach will be indicated in the tender documents of companies.

Fire-detection systems

RATP | Published March 31, 2017  -  Deadline April 28, 2017
cpvs
31625100

This notice is part of the project: Reduction of evacuation time of the Invalides station; Creating additional access to Marne-la-Vallée-Chessy.

It aims to conclude a purchase orders to alloti framework agreement with a minimum and a maximum amount for the design, supply and installation of the Fire Safety System (IMS) in limited Invalides station escalators and device Fume Brake and design, supply and installation of the Fire Safety System (IMS) of Marne-la-Vallée-Chessy station.

Benefits include the design, supply, installation, commissioning, preventive maintenance and training of future operators and maintainers of the ISS.

This lot concerns the establishment of the IMS of the limited Invalides subway station escalators and Smoke brake device.

The services included in the minimum amount of Lot 1:

- achievement of design studies and project monitoring,

- providing SSI equipment

- installation, installation, connection and commissioning of the WSIS equipment

- monitoring services, testing and commissioning,

- the provision of DOE (of executed work record)

- preventive maintenance during the warranty period (12 months)

- the provision of maintenance items,

- training in the use of SSI.

The services included in the maximum amount of Lot 1:

- the services included in the minimum amount,

- laying cable trays,

- completion of services provided in subsection 4

- a variation of 15% of the minimum amount.

This lot covers the establishment of the SSI of Marne-la-Vallée-Chessy station.

The services included in the minimum amount of Lot 2:

- achievement of design studies and project monitoring,

- providing equi ...

Low-voltage installation work

RATP | Published March 22, 2017  -  Deadline April 20, 2017
cpvs
45315600

The minimum amount is set at 20% of the nominal amount and the maximum amount to 15% of the nominal amount.

The work aims to allow the unwinding of large cables for the above project.

The lots will result in separate markets and the candidate will be given a single 2 lots.

The work of this lot include (indicative amounts):

- Supply Iron-C (20,000 pieces), hooks or harrows (80 000 units), marine and composite slabs (2km), gutters and covers (20m);

- The delivery of iron-C (20,000 pieces), hooks or harrows (80 000 units), marine and composite slabs (2km), gutters and covers (20m);

- Removal and interim cables (10 linear km);

- Tracing, drilling for new lines of slabs cable trays;

- Laying irons C equipped with hooks or harrows;

- The earthing irons C (10 km linear);

- The withdrawal of the site;

- Public dumping of rubble.

The work of this lot include (indicative amounts):

- Supply chains-C (20,000 pieces), hooks or harrows (80 000 units), marine and composite slabs (2km), gutters and covers (20m);

- The delivery of iron-C (20,000 pieces), hooks or harrows (80 000 units), marine and composite slabs (2 km), gutters and covers (20m);

- Removal and interim of the cables (10 linear km);

- Tracing the old lines of cable trays;

- A pose irons C equipped with hooks or harrows;

- The earthing irons C (10 linear km);

- The withdrawal of the site;

- Public dumping of rubble.

Road bridge construction work

APRR | Published January 26, 2017  -  Deadline February 23, 2017
cpvs
45221111

Upgrade work 5 OA located on A6 direction P / L for the following works:

PICF 309 + 870.

PICF 312 + 180.

PICF 313 + 350.

PIBA 314 + 250.

Preliminary operations:

- Cleaning of the area around the work.

Work done on work:

- Complete reconstruction of the seal including statements sealing,

- Demolition and reconstruction of the GBA,

- Jacking of OA apron 314 + 250,

- Replacement of bridge bearings,

- Repair pavement joints,

- Strengthening vis-à-vis the impact of the top cross by shotcrete,

- Replacement or repair cornices,

- Removal / installation of GC S8,

- Implementation of an SEL on eaves and cornices-cons,

- Delivery / installation cable trays.

Work carried out under item:

- Implementation of barbicans

- Treatment of cracks,

- Recovery degraded concrete beams and abutment OA 314 + 250,

- Uncoupling and re-coupling hitch 2 aprons device

- Repair corrosion protection coupling devices.

Facilities, construction and folding means of access (including scaffolding, etc) 4 u.

Placing two cofferdams and driving diarrhea Creek 4 u.

execution of studies and methods (EQUIP, PPSPS, gluing folder, etc.) 4 u.

Diarrhea networks binding 2 u.

trial tests and control 4 u.

Cleaning of the area around the work 4 u.

Media Preparation including statements 800m 2 .

Supply and implementation of the asphalt layer 8 + 22, including the impregnation layer 790 m 2 .

Removing gutter 30m.

Recovery gutter by concreting including PVC sleeves 30m.

Supply and implementation including statements sealing protection mortar fence 80 m.

planing floor including sawing and waste disposal 550 m 2 .

F ...

53The-14D09304-TRX | REPAIR OF NETWORKS CRAWL BUILDINGS A AND B at A SCHOOL LAVOISIER MAYENNE

Conseil Régional des Pays de la Loire | Published February 10, 2017  -  Deadline March 13, 2017
cpvs
45331000

This contract is for the rehabilitation of the crawl space systems for buildings A and B of Lavoisier school in Mayenne. The work planned in crawlspace (VS) concern: terracing of VS to improve future maintenance operations the establishment of electric cable trays in VS the renovation of part of the EU / EV networks beneath the kitchens changes

Sound equipment

Commune d'Ablis | Published December 7, 2016  -  Deadline January 5, 2017
cpvs
32342410, 42416300, 31518100, 38652120, 39515200

Supply contract and services for the scenic and cultural facility development. Lot 1: Stage Equipment. Lot 2: Lifting stage.

Providing scenic and lifting equipment Service:

Carrier stage and hall.

Supply and stage equipment Service:

Cable trays, sound, sound recording, lighting (desk and projectors), video, platforms, stage curtains and options.

Construction work for railways and cable transport systems

Société du Grand Paris | Published November 23, 2016  -  Deadline December 23, 2016
cpvs
45234000, 45234160, 35111200, 34946200

The market includes education services, supplies, works, testing and commissioning associated with the following facilities: - the concrete railway track equipment 60E1 rail monobloc sleepers with vibration device and track equipment with their operating systems - the PAC type of overhead line equipment (Air profile Contact) in 1500v - cable trays fixed on segments, evacuation gateways attached to the segments comprising all the specific parts and track crossings - dry columns tunnel fixed on segments along the tracks - the tunnel lift pumps and associated cables to the cabinets / local technical Ht / Bt. section work exclusively in underground stretches of Noisy-Champs station in Vitry-Sur-Seine (Arrighi fallow) and maintenance and storage site (Smr) Champigny.

The description of services is described in the appendix to this notice, downloadable (s) via the procedure described in Section VI.3) of this notice.

2016PN028 | 2016PN028 - Equipment and work Voie Ferree and Catenary eastern sector for the realization of the 15 South line of the Grand Paris Express network

Opérateurs de l'Etat | Published November 21, 2016  -  Deadline December 23, 2016
cpvs

The works contract << facilities and work Voie Ferree and Catenary eastern sector for the realization of the 15 South line of the Grand Paris Express >> network includes educational services, supplies, works, testing and commissioning service associated with the following facilities: The concrete railway track equipment 60E1 rail monobloc sleepers and track devices with their operating systems, PACs type of catenary equipment (Air profile Contact) 1500V in cable trays fixed on segments, evacuation gateways attached to the segments comprising all the specific parts and track crossings dry columns tunnel fixed on segments along the tracks the sump pumps in the tunnel and associated cables to the cabinets / equipment rooms HV / LV. section work exclusively in underground stretches of Noisy-Champs station in Vitry-sur-Seine (Arrighi fallow) and maintenance and storage site (SMR) of Champigny.