Public tenders for cable-trays in Belgium

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Contract: Fire detection / Alarm system- Imec cleanroom project

IMEC VZW | Published November 28, 2014  -  Deadline January 13, 2015
cpvs
31625200, 35121700

Imec cleanroom project at the main Imec campus in Leuven - The Fire Detection & Alarm System Package lot includes delivery and installation of: Extension of the existing site wide fire detection and alarm system including the following parts: - a new fire alarm control panel with related I/O interface - different type of smoke detectors distributed over all areas - evacuation displays - acoustic alarms - push buttons - door magnets - integration to existing computer based control and monitoring system - integration into the existing backbone network - any related cabling - cable conduits, cable trays and supports A detailed specification, schematics, layout drawings, Interface list and bill of quantities will be provided with the tender pack

Refurbishment sector territory affairs - lot 3 electricity

Gemeente Tessenderlo | Published August 25, 2015  -  Deadline October 6, 2015
cpvs
51110000

- Electricity and data cabling - power outlets - cable trays - luminaries - WIFI installation - distribution boards and wiring closets

LS Installation Material

Eandis cvba | Published June 6, 2013  -  Deadline June 24, 2013
cpvs
45315600, 31682000, 31682100, 44141100, 45310000, 31200000

This file includes the purchase of small low voltage electrical installation materials such as sockets, small equipment for assembly of LS-boxes, plugs, clamps, cable straps, cable trays, ...

CSC 57/43/5/16/014 Monceau: supply, installation, testing and commissioning, maintenance for 15 years of the UPS system.

Infrabel - Zone de Charleroi | Published February 28, 2017  -  Deadline April 20, 2006
cpvs
31700000

The company includes major order: 1. The supply and installation of two UPS systems rated power 400 kVA whose characteristics are described in Chapter II of Part 3 - Technical Requirements - this special specifications; 2. The cabling required for connection and commissioning of equipment as well as internal connections in the No Breaks or battery cabinets 3. Supply and installation of all cables: • Supply, installation and cable connection between the main switchboard and the No Break and accessories installation, cable trays, mounting and connection; • Supply, installation and connection cables No Break and between the batteries and cable trays, accessories fixing and connection.4. Maintenance of UPS systems for 15 years

Electronic, electromechanical and electrotechnical supplies

Infrabel — Zone de Charleroi | Published March 2, 2017  -  Deadline April 6, 2017
cpvs
31700000

The company includes major order:

1. The supply and installation of two UPS systems rated power 400 kVA whose characteristics are described in Chapter II of 3 th part - technical requirements - this special specifications;

2. The wiring required for connection and commissioning of equipment as well as internal connections in the No Breaks or battery cabinets;

3. Supply and installation of all cables including:

- Supply, installation and connection cables between the main switchboard and the No Break and accessories installation, cable trays, mounting and connection,

- Supply, installation and connection cables between the No Break and batteries as well as cable trays, accessories mounting and connection.

4. The maintenance of UPS systems for 15 years.

Electro-mechanical components for a new cable route in the separate building BR2

SCKCEN | Published February 3, 2014  -  Deadline March 12, 2014
cpvs
31600000

Alternative route cable BR2: materials with this tender, SCK CEN will build a new road to separate inside the building BR2 cable. Firstly, this is done in the context of reducing the consequences of a fire in the funicular BR2. These components of cabling, and signal cables and power cables. Materials involved are cables, cable trays, mounting components, clamps, clips, brackets, etc..

Line 130 Namur - Charleroi South (Routes A and B electrified)

Infrabel - Zone de Charleroi | Published October 21, 2015  -  Deadline November 26, 2015
cpvs
45234116

Line 130 Namur - Charleroi South (Routes A and B electrified) Section between Auvelais and Charleroi South route Sanitation and installation of drains in Aiseau and Couillet Renewal of rails between Auvelais and Tamines Track renewal on a steel deck in Couillet various works in the vicinity of the track. This business mainly includes: • The establishment lane temporary slowdown; • The removal and installation channels to the crane; • Earthworks, Ballast implementation and form layers of roadbed under the tracks; • Performing drainage system along the track; • The renewal of rails; • The ways of renewal on steel deck to direct laying; • Achievement of thermite welds and adjusting stresses in the rails; • Treatment of cuttings site; • The provision of logistics services; • The rehabilitation of cable trays;

Contract: Basic Electrical - Imec cleanroom project

IMEC VZW | Published June 6, 2014  -  Deadline July 14, 2014
cpvs
45311000, 45314310, 45315100, 45317000

Imec cleanroom project on the main campus IMEC in Leuven - The plot Basic Electricity includes, but is not limited to, the following: Supply and installation, including all working drawings of all cable trays, cable ladders, piping, wiring, end interfaces, lighting, lighting control, switches , accessories, etc. The contractor shall cooperate with other contractors, together must demonstrate to have to work within a "clean" (clean room) environment experience and must complete execution documents. detailed study A detailed specification, quantity survey and drawings shall be provided to the selected candidates.

Csc 57/42/5/17/059 External wiring work for renewal of catenary switch remote control units on the South-West Area

Infrabel - Zone de Charleroi | Published June 16, 2017  -  Deadline August 20, 2016
cpvs
45311000

External wiring work for the renewal of remote control switches on catenary switches in the South-West Borough This project will mainly include: - Preliminary studies, precise measurement and preparation of work - Possible administrative procedures - Infrastructure works " Cable trays "including: - Installation of gutters - Intervention on existing gutters - Cleaning of gutters - Drawing of cables - Supply and installation of cage for remote control cables - Supply and installation of remote control box - Realization of Logistical support in connection with the equipment provided by Infrabel (transport from and to CLI de Luttre, storage at the contractor and protection against theft);

demolition work

Fluxys Belgium SA. | Published June 13, 2012  -  Deadline July 17, 2012
cpvs
45111100

:The project entails the partial demolition of decommissioned facilities at the Peak Shaving Plant in Brugge (Ramskapelle) in the inner port of Zeebrugge (Achterhaven Zeebrugge). NB: One of the three large liquefied Nitrogen (LIN) tanks - the most easterly positioned tank - and its accompanying facilities are to remain in service and are currently being overhauled within the framework of the Gas Quality project. Special emphasis will be placed on limiting disruption and debris caused by the demolition works. Demolition and disposal will focus on two liquefied natural gas (LNG) storage tanks and additional processing facilities and safety provisions (including pipe racks, vaporisers, above-ground and underground cables and cable trays, above-ground and underground piping and valves). Both LNG tanks (containing approximately 57 .000 m³) comprise an inner tank (alloy steel containing 9 % Ni) and an outer tank (carbon steel) between which insulating material (perlite, fibreglass sheets, foamglass, etc.) is fitted. These tanks are encased in a concrete retaining wall, which, in turn is protected by a bank of earth. The project also comprises demolition and disposal of some of the buildings and additional fittings and equipment, as well as the recommissioning of the embankments of the Southern Dock (Zuidelijk Insteekdok) at the site of the water supply point. All facilities and buildings as well as the small water treatment plant (reed bed and buffer basin) will be demolished to at least 1,5 m beneath the current ground level. The material removed must be reused, recycled or disposed of in accordance with the relevant regulations, standard specifications and waste legislation. The existing roadway (flexible pavement), fencing and utilities such as lighting, sewerage and drinking/extinguishing water must be protected.

CALL FOR APPLICATIONS - Liège Airport - Compliance Section of the closure of High Voltage Cable

SOWAER Service technique | Published January 27, 2017  -  Deadline February 20, 2021
cpvs
45231000

This contract is to: • create a new loop HT via the North to avoid that and return the loop HT follows the same path through the Tunnel Technique (TT in the following text) and renew loopback cable sections HT considered undersized. HT This loop will provide a direct connection between the B22 and B25 to enable including elimination of intermediate sleeves; • henceforth feed via this loop HT: - future antenna ground radar or SMR; - The defense flight simulator (currently supplied by the military SST HT C11); - Heli building & amp; Co (now powered by the C9 military HT SST); - The 4BIA building (pipeline entry point and currently powered by the SST HT C6); • henceforth feed via this loop excluding a number of military buildings still in operation; • proceeding with repairs of damaged cable trays TT (see §0); • Engage in various other works, namely (see §0): - installation in the TT, protective hoods shelves HT cables; - The identification of existing HV cables and stored as well as the identification of all the TT cable shelves; - Improving the lighting of TT; - Installation of access cooker CV to the TT with mechanical assistance; - The establishment of a TT evacuation signage. - Verification of the working condition of the TT lift pumps.

CSC n 57/42/4/15/009 - Gare de Namur - Connecting the electrical equipment of the switching station.

Infrabel -- Direction Asset Management -- Area South-East | Published August 24, 2016
cpvs
45234170

It concerns the connection of the electrical equipment of the switching station in Namur.Elle station comprises main order: • studies, the development of plans and documents in accordance with Article 36 of the Royal Decree of 14.01. 13 of the CSC; • the provision of all necessary equipment in accordance with the plans filed and according to the technical conditions of this tender documents; • the connection and the external wiring (3 kV, BT, control systems, ...) electrical equipment supplied by Infrabel under a separate supply contract (post 3 kV, ...) • the supply and installation of BT cabinets; • the supply and installation of the battery 110 V DC; • the completion of the installation of lighting, sockets, wiring fire and intrusion detection; • electrical connection BT different devices come with the building (heating, ventilation, ...) • electrical equipment ( cable trays, lighting, fire detection, ...) of a sluice under the tracks; • the installation of gutters, pipes and cables along railway tracks; • the realization of drawing rooms along railway ways; • testing, perfect readiness and commissioning of the switching station in collaboration with the company responsible for the supply of equipment delivered by Infrabel • all adjustments, checks and adjustments up 'final acceptance; • maintenance, parts, hours, benefits and travel costs during the warranty period • coordinating work with subcontractors and suppliers of various materials (§15 of the Article 79 in the second part of the CSC)

works contract by open tender. e25 - houffalize viaduct. replacement H4B retainer (bdoa 4367)

SOFICO | Published April 27, 2016  -  Deadline June 14, 2016
cpvs
45221119, 45233292, 45233200

The work shall include: - The demolition of slides, Banister Mailleux - Demolition of existing sidewalks, including siding skirts reinforced concrete - Moving existing grantee in cable trays under the cantilevers (to ask) - The installation of a traffic class 1, and precast concrete separators between the traffic and the construction area. Concrete separators will be moved back end of housing sidewalk edge. - The Verge developments outside the bridge to be able to place the ends of concrete separators - Demolition of road surfaces and screeds in small width BAU, to make connections correct screeds - the apron microrabotage in concrete Argex - patching the deck - anchors under the new sidewalks in the deck - a sealing resin screed projected on the apron - a reinforced concrete pavement C35 / 45 EEAA WAI (0.45) a - the railings classic kind J.12 - antisuicides of devices over the N860, adapted the classic railing J.12. - In floor drains with weep holes, new drains, protective screed mastic asphalt and elastomer coatings - some repair work under the viaduct, the PCC mortar, and a protective coating for the most visible and exposed faces . - Waste disposal; - Signaling the site; - Maintenance work during the warranty period.

Construction work

Infrabel — zone de Charleroi | Published October 17, 2015  -  Deadline December 10, 2015
cpvs
45000000

Line 117 Braine-le-Comte - Luttre (channels A and B electrified). Section between Ecaussinnes and Manage. Accompanying the work process of substitution of sleepers. Accompanying work of ballast screening process. Renewal of rails. Removal and Installation of turnouts. Track and laying of sewerage drains. Various works to track surrounding. The company comprises in main order: The white slope update; The establishment lane temporary slowdown; The implementation of pathways and characteristic points of the track layout; Accompanying Infrabel gear for the renewal of ballast and sleepers substitution; The removal and installation of the various docks and facilities thereon; The renewal of the crane tracks; The renewal of rails; The relining of crossings; The removal and installation of turnouts; Removal of accessory pathways; The adaptation of the layout of the tracks, the jam, leveling, straightening and being revised; The realization of thermite welds and stress adjustment in the rails; The rehabilitation of taxiways; The treatment of the cuttings of the site; The provision of logistics services; Drainage network to achieve along the tracks; 7 The removal and installation of signaling equipment and rehabilitation of cable trays; The removal and fencing.

CSC 57/52/5/14/026 - Line 117 Braine-le-Comte - Luttre (Routes A and B electrified)

Infrabel - Zone de Charleroi | Published November 26, 2015  -  Deadline December 10, 2015
cpvs
45000000

Line 117 Braine-le-Comte - Luttre (Routes A and B electrified) Section between Ecaussinnes and accompanying Works Manage the substitution train sleepers accompanying Works ballast screening Renewal train rails Removing and installing devices lane lane Sanitation and laying drains various works to track surrounding. The company comprises in main order: The white slope update; The establishment lane temporary slowdown; The implementation of pathways and characteristic points of the track layout; Accompanying Infrabel gear for the renewal of ballast and sleepers substitution; The removal and installation of the various docks and facilities thereon; The renewal of the crane tracks; The renewal of rails; The relining of crossings; The removal and installation of turnouts; Removal of accessory pathways; The adaptation of the layout of the tracks, the jam, leveling, straightening and being revised; The realization of thermite welds and stress adjustment in the rails; The rehabilitation of taxiways; The treatment of the cuttings of the site; The provision of logistics services; Drainage network to achieve along the tracks; 7 The removal and installation of signaling equipment and rehabilitation of cable trays; The removal and fencing.

Framework agreement for the supply and installation of electrical equipment and the draw and connection of different cables required for 900V operation of the future deposit Erasmus Metro STIB

Société des Transports Intercommunaux de Bruxelles (STIB) | Published March 17, 2015  -  Deadline April 27, 2015
cpvs
31170000, 31214500, 31680000, 45311000, 45317000, 51110000

The subject of the contract consists of the conclusion of a framework agreement for the supply and installation of electrical equipment and the draw and connection of different cables required for 900V operation of the future deposit Metro Erasmus. Are particularly concerned by this contract the supply and installation of the following: - The transformer-rectifier for the production of 900 VDC traction. - Tables "feeders" 900 VDC. - Tables "minima" 900 VDC. - The table of "returns". - Table of land. - Control cabinets and relay control. - Contactors tables for the track power. - Transformers - 50 kVA rectifiers for power sockets 900 V DC. - Enclosures made 900 Vdc, including media and signaling relay systems and power. - The 900 VDC power systems and mobile power rails 900 VDC air. - Control and Signaling Boxes. - The presence of signaling equipment voltage 900 V DC, as well as contacts and security related servo - Switching / Trigger 900 Vdc. - Equipment cathodic protection. - Any other equipment to the proper operation of the repository Erasmus. Are also included in this market - The draw of all power cables (11 kV, 900 V) positive and negative. - Installation of all power cables from devices. - The supply and the realization of cable heads. - The supply and placement of any other cables necessary for the proper functioning of the deposit. Supply and placement of ladders and cable trays been another market. The supply cables, besides the small wiring, not part of the contract but will be under the care of the STIB.

Town of Bastogne: Development of a reception / cafeteria / shop built in the canopy of the wing Van Geluwe Bastogne space and layout of the adjacent plot

Association intercommunale IDELUX Projets publics | Published September 17, 2014  -  Deadline October 9, 2014
cpvs
45300000, 45400000, 45450000, 39100000

The work includes: - preparatory works site installation, inventory, site coordination, cleaning the site and its surroundings, special items of the contractor maintain the condition of the works; - Chassis: preparatory work, installation frame and glazing, sills; - Plastering: plastering spot repairs; - Screeds and tiles: spot repairs of existing tiles; - Doors: installing a SAS (structure, windows, doors, false ceilings, partitions) and printed on canvas tubular frame; - Paintings: paintings on wood and paint spot repairs; - Furniture: manufacture of bespoke furniture and design control factory-made furniture; - Electricity: grounding and grounding connections, existing decommissioning, cable trays, plugs and connections, lighting, tables, smoke vents, telephony, fire detection, intrusion detection, video surveillance installations; - Heating: removal and disposal of existing heaters, installation of a generator hot / cold; - Health: Distribution cold / hot water, sanitary fitting, control axial power reels, extinguishers, pipes landfills; - Improvement area: solar blankets, furniture items, bins plantations.

AR OTTIGNIES: Replacement and adjustment of fire alarm / alarm (primary buildings, secondary, concierge and sports hall) facilities

CF_MCF_AGI_Direction régionale du Brabant Wallon | Published February 4, 2014  -  Deadline March 24, 2014
cpvs
35111400

This works contract relates to the supply, transportation, implementation and execution of all necessary means to carry out the following site: a) The removal of the existing fire detection system with backup paths cables and tubing if possible recovery following realignment, b) the implementation of a new installation of fire detection with renewal and extension of the existing installation of fire alarm and alert following the NBN S21-100, c) The establishing implementation plans site, monitoring the site and have to build reception by an approved organization. The site plans will be prepared by the tenderer, at the beginning of construction in accordance with decisions taken by mutual agreement for the choice and position equipment to implement and installation methods circuits and especially electrical infrastructure will most likely consist of PVC ducting and cable trays for local enamelled white, corridors in accordance with the architectural and aesthetic character of the building. The administration has plans pdf, adapt. The work of developing and updating plans is a position of surveying. Positioning of the equipment to be Work and all functions relating to precautions and fire safety, will be on site and by mutual agreement. It is therefore incumbent upon the bidder to establish implementation plans early in the project.

CSC No. 57/42/4/15/009 - Gare de Namur - Connecting the electrical equipment of the switching station

Infrabel – Direction Asset Management – Area South-East | Published June 24, 2016  -  Deadline September 5, 2016
cpvs
45234170

It concerns the connection of the electrical equipment of the switching station in Namur station.

It includes principal argument:

• studies, the development of plans and documents in accordance with Article 36 of the RD of 14.01.13 that CSC;

• providing all necessary equipment in accordance with the plans filed and according to the technical conditions of this tender documents;

• connecting and external wiring (3 kV, BT, control systems, ...) of electrical equipment supplied by Infrabel under a separate supply contract (post 3 kV, ...)

• the supply and installation of BT cabinets;

• the supply and installation of the battery 110 V DC;

• completion of the installation of lighting, sockets, wiring fire and intrusion detection;

• electrical connection BT different devices come with the building (heating, ventilation, ...);

• electrical equipment (cable trays, lighting, fire detection, ...) of a sluice under the tracks;

• the installation of gutters, pipes and cables along railway tracks;

• carrying out the manhole along the railway tracks;

• testing, the perfect setting state and the switching station commissioning in collaboration with the company responsible for the supply of equipment delivered by Infrabel;

• All settings, adjustments and controls until final acceptance;

• maintenance, parts, hours, benefits and travel costs during the warranty period;

• coordination of work with subcontractors and suppliers of various materials (§15 of article 79 in the 2nd part of CSC)

AR RIXENSART INTERNAT: Renewal of the installation of fire detection and all safety devices boarding building

CF_MCF_AGI_Direction régionale du Brabant Wallon | Published September 20, 2013  -  Deadline October 28, 2013
cpvs
35111400

This contract work is to supplies, transportation, implementation and execution of all necessary means to carry out the following site: a) The removal of the existing fire alarm system with backup paths cables and tubing if possible recovery following realignment, b) The implementation of a new installation of fire detection with renewal and extension of the existing installation of fire alarm and alert following the NBN S21-100, c) Renewal and additional security lighting as well as the improvement and adaptation of the lighting areas of emergency exits (inside and outside), d) The existing implementation of a facility holding fire doors , slaved to the fire control panel and power detection including adaptation, a fire door setting at 0, with friction preventing the closure of the latter (planing 5 mm maximum). An implementation recall door will be necessary on some doors Rf including obviously the timing of closing all fire doors in the rules of the art, e) The replacement of the door of the elevator (75kg) to all levels through a fire door including a certificate of deposit element pose Rf and the Agent shall be certified ISIB. f) The establishment of project implementation plans, monitoring and as-build project for reception by an approved organization. The construction plans will be prepared by the tenderer, at the beginning of construction on the basis of decisions taken by mutual agreement for the choice and position of equipment to implement and installation methods of electrical circuits and especially infrastructure will most likely consist of PVC ducts and cable trays for local white enamel, corridors in accordance with the architectural and aesthetic character of the building. The administration has plans pdf, adapt. The work of developing and updating plans is a position of surveying. The positioning of the equipment to implement and all functions relating to precautions and fire safety, will be on site and by mutual agreement. It is up to the tenderer to establish implementation plans at the beginning of the project, g) Replacement of the switch lighting the attic control (level 3) and boiler (level -1) located outside the corresponding light areas, a control switch to control LED, h-type) Lifting remarks last visit report control low voltage electrical installations written by the Notified Body attached .