Call +44 800 9755 164

Public tenders for cable-trays

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!
Electricalcable trays

Supply of cable trays and mounts

ГОСУДАРСТВЕННОЕ КРАЕВОЕ БЮДЖЕТНОЕ УЧРЕЖДЕНИЕ #034;УПРАВЛЕНИЕ ПО ЭКСПЛУАТАЦИИ АДМИНИСТРАТИВНЫХ ЗДАНИЙ#034; | Published October 7, 2016  -  Deadline October 20, 2017
Tray cable, wire, galvanized 25.99.29.190 PCs 150,00 737,67 110 650,50 Plate for suspension wire tray 25.11.23.119 PCs 600,00 65,18 39 of 108.00 Set screw wire cable trays. 25.94.11.110 piece of 400.00 37,29 14 916,00 Stud threaded 25.94.11.140 300,00 PCs 83,53 25 059,00 Nut 25.94.11.130 600,00 PCs 4,52 2 712,00 Drop anchor (collet) with an internal expander cone metric 25.94.11.110 300,00 PCs 13,50 4 050,00 total: 196 495,50

Track Construction - Portal Pragstraße (060-2016-0015_TGg-b_Rosen2014_2-Stage 3A and 3B)

Offizielle Bezeichnung: Stuttgarter Straßenbahnen AG | Published December 18, 2016  -  Deadline February 7, 2017
Railway works, manufacturing of cable trays, mast foundations and construction of raised platforms with stops access

Electrical fitting work

Staatl. Bauamt Erlangen-Nürnberg | Published December 16, 2016  -  Deadline January 24, 2017

Power lines, cable lines, medium voltage switchgear, transformer, main distribution boards, lights.

Powerlines about 15 000 m; Cable trays about 450 m; Medium voltage switchgear 1 St .; Transformer 1 St .; Main distributions 4 St .; Lights 100 St.

Electrical fitting work

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Dresden 1 | Published January 24, 2017  -  Deadline February 14, 2017

Power plant Georgenburg.

Connection work to the building main distribution (Fortress network); Expansion prev emergency lighting system. about 78 Emergency and safety luminaires; 3 St subdistributions; 330 St buttons, switches, sockets, motion detectors and other installation equipment; Expansion existing KNX bus system by 1 line, DALI; 35 St underfloor boxes; about 2 000m cables and wires under plaster, including milling in masonry. about 7 000 m of cables and wires in protective pipe / conduit, in channel, on cable trays or ladders; 50 m cable trays or ladders; 170 indoor and outdoor luminaires (exhibition and office areas); Fire protection; partial renewal Blitzschutzringerder, complement external lightning protection.

GS Babenend, Energy renovation, building automation

Stadt Oldenburg (Oldb) | Published December 19, 2016  -  Deadline February 1, 2017
1x control cabinet with DDC automation station, outside sensor, 26 St immersion probes, temperature monitor, wall cabinet with power supply and lighting, engine assemblies and contactors, power recovery, phase monitoring, excess sludge trap, hook-up boiler, heat pump, externeStörmeldekontakte, locking on control room, commissioning and training. 700m sheathed cables to 7x 1.5mm2, 700m communication lines, 50m cable trays and cable trunking.

Construction work for electricity power lines

Staatl. Bauamt Erlangen-Nürnberg | Published December 24, 2016  -  Deadline January 26, 2017

University of Erlangen-Nuremberg,

New research building for an interdisciplinary center for nanostructured films (ICNF)

Award: 16E0939 - electrical installation.

- Electrical installation with about 20 sub-distributors, 1 700 m cable trays, 700 lights;

- Telecommunications with fire alarm system, smoke detectors 450, 10 data distribution, data 900 outlets;

- 1 UPS Power Rating 80 kVA, lightning protection system, site electricity, fire bulkheads.

Electrical installation Kreisbad Römerberg (035 / 152-038)

Kreisverwaltung Rhein-Pfalz-Kreis | Published December 22, 2016  -  Deadline August 10, 2018
High- and low-power technical equipment: 1 St sub-distribution, 23,000 m cables and wires, 485 m cable trays, 1,820 m conduits, 70 m cable channels, 190 St. switches and sockets, 200 St. lights, lightning protection and grounding system, implement PBX, clock system , electroacoustic system, fire alarm system, burglar alarm system networking

Installation of cable infrastructure

KASIG – Karlsruher Schieneninfrastruktur-Gesellschaft mbH | Published January 24, 2017  -  Deadline February 14, 2017

To improve traffic conditions through the project "Combined solution Karlsruhe" a rail tunnel is built with 7 underground stations as part of the subproject "City railway tunnel Kaiserstraße with Südabzweig".

The first stops are structurally complete early 2017th It will now start the expansion work therefore.

One of the first finishing trades are in the stops Durlacher Tor and convention center, the cable trays in preparation for the laying of cables in the not yet closed

Crawl are manufactured under the platforms.

The scheduled services include:

- Creating the workshop and assembly planning,

- Installation of cable trays,

- Creating the as-built drawings and review documents.

Creating the workshop and assembly planning

Installation of cable trays: 1 520 m

Sheet thickness 1 mm, dimensions 200 to 400 x 60 mm:

some with

- Ensure E90,

- Covers, dividers and edge protection strip.

Making the necessary wires / bars for

Earth connection and potential equalization

Creating inventory plans and documentation.

Creating the workshop and assembly planning

Installation of cable trays: 1 260 m

Sheet thickness 1 mm, dimensions 200 to 400 x 60 mm:

partly with:

- Ensure E90,

- Covers, dividers and edge protection strip.

Making the necessary wires / bars for

Earth connection and potential equalization

Creating inventory plans and documentation.

Abbey Brauweiler, Electrical & Telecommunications (Z2420-2016-0160)

Landschaftsverband Rheinland | Published October 17, 2016  -  Deadline April 30, 2018
Approximately 400ST. Cable u. Lines mainly relocated to creep, track u. Document for replacement installations outside the Creeper. about 7.000kg cables and wires, mostly laid in creep, dismantle u. Dispose 1 St. low voltage distribution in multi-field standing enclosure with 630A power switches, provide lightning arresters etc. and finished up. 4 St. Ring cable distribution in multi-field standing enclosure with 500A switch disconnectors u. Breakers in the disposals etc. provide u. Finished up 1 St. renovation building main distribution in Standgeh. with 160A switch disconnectors about 27.000m Cable / lines in prev. conduits or prev. Cable trays install approximately 1,500m cable trays, conduits u. cable trunking etc. cellars and. remaining creep Reroute. 7 St. equipment rooms with new electric installation and basic lighting equip. 75 St. mast lighting radio-controlled, u. Presence regulated with LED post top lights on prev. Foundations set up and ready to assemble. 12 St. Telecommunication distribution boxes with up to 1350DA provide u. 5 Connect the St. LAN cabinets 42U, mostly FOC u. Equipped CAT3 patch panels, supply and turnkey assembly 18 St. LAN wall-mounted enclosure up to 15U, equipped mainly with fiber optic patch panels, provide u. turnkey assembly

Major overhaul Haus der Wirtschaft IHK Nuremberg - award 406 - Electrical Installation

Raible + Partner GmbH Co. KG | Published January 18, 2017  -  Deadline February 27, 2017
UPS S = 75 kVA, central battery systems for emergency lighting Bemessungsbetriebsdauer3h, NSHV Rated current 1.250A, PFC systems 1St., Busbar system I = 1.250ALänge = 1.200m, Mailing 2pcs., Sub-distribution 35ST., Laying systems with mesh cable trays 2.150m, cable trays 750m, wide span trays 160 m, rising tracks 270m, conduits 580m, cable and Leitungen111.250m, installation equipment 2,500 St., building Control KNX installation bus system with 1.900St.Teilnehmer, interior lights 1.310St., security lights 300ST., outdoor lighting 14St., external lightning protection roof drip lines 450m, grounding / bonding, fire fighting equipment, fire bulkheads fürKabel and lines 230St., raised floors 20m², telecommunications / computer network with fiber optic 2.150m, Cat7 62.000m, computer ports 1.400St., 19 "floor distributor 11st., intercoms with 4pcs. Intercoms, fire alarm system mit580St. Detectors, fire alarm cables 13.000m, space observation system with 2pcs. Cameras, RWA Anlagen6St.

Electrical installation (16A50257)

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Dresden 2 | Published August 3, 2016  -  Deadline November 17, 2017
- 1 pc main distribution 5 fields, busbar 400A; - 5 St. distribution boards in AP and UP-execution; - 600 St. installing equipment; - 600 m cables and wires to 4 x 185 mm²; - 6,000 m cables and wires to 5 x 6 mm²; - 1,000 m Low power cables and conductors; - 350 m cable trays, cable ladders; - 900 m LF channels and conduits; - 250 St. lamps; Emergency lighting system; KNX - Building Management Systems for lighting, blind and dimming control;

127/16, swimming in Sinsheim, kiosk, electric (127/16)

Stadt Sinsheim | Published November 24, 2016  -  Deadline May 26, 2017
Approximately 9,500 m cables and wires (power) of approximately 9,500 m cables and wires (low power) 2,800 m conduits to M32 300m LF channels to 170x70mm 150 m cable trays to 400x60mm approx 500 pcs. Switchgear u. Junction boxes 90 pcs. Lights 2 pcs. RU - transformer test sets 1 pcs. Low voltage distribution 2 pcs. Low-voltage sub-distribution 1 x Passive data network with about 40 pcs. Data connection boxes and 4 pcs. data distributions

Construction work

OPG Offenbacher Projektentwicklungsgesellschaft mbH im Namen und auf Rechnung des Magistrates der Stadt Offenbach | Published December 24, 2016  -  Deadline January 27, 2017

Electrical installation high and low voltage.

Electrical engineering works in the course of the renovation of a school building. Execution in three sections.

8 St. wiring closet.

42 St. specialized class distribution.

2800 m cable trays and cable ladders.

3700 m power cable.

33 100 m installation cable power.

35 300 m installation cable Low power.

4300 St. switches, sockets and installation equipment.

Electrical fitting work

Vereinigte Pfründnerstiftungen | Published January 20, 2017  -  Deadline February 22, 2017

The client intends the demolition and reconstruction of Katharinenspital in Forchheim.

There are built barrier-free and suitable housing and a day care. The hospital consists of 3 buildings with different sizes and has a floor area of ​​approximately 1 100 meters 2 ,

Electrical installation work: 3 pcs. Meter boards / 60 pcs. Subdistributions /

120 m cable trays / approximately 13 000 m of empty pipes / about 32 000 m of cable /

approx 6000 pcs. Switches and sockets / 180 pcs. To shine /

1 pcs. Lightning protection system.

Electrical wiring and fitting work

Stadt Gunzenhausen | Published January 20, 2017  -  Deadline February 21, 2017

Electrical installation work.

Electrical installation work.

If the electrical installation is a general renovation.

about 1 low voltage distribution;

about 8 subdistributions;

about 5 000m installation cable;

10 000m Low power lines / computer network;

800m cable trays;

450 lights;

Computer network services;

about 3 RWA systems;

about 1 emergency lighting;

about 1 UPS blackout;

about 1 ELA facility with Induktiverhörunterstüzung;

ELT-work according to DIN 18382nd

Construction work

Spitalanlagengesellschaft Kantonsspital St. Gallen | Published December 15, 2016  -  Deadline February 10, 2017

When Kantonsspital St. Gallen, the energy center associated complex compounds and partly also the substations will be cleaned up. The technical building installations, especially the heat and steam generation will be renewed in full operation. In addition, the Kantonsspital St. Gallen is connected to the district heating of the city of St. Gallen.

Tenders are invited the related with the project adjustments and replacement of electrical installations, especially in the energy center Haus25 incl. integration CHP so-as in the substations of several houses on the site.

Electrical installations for technical infrastructure (including HLS. Cogeneration, steam + BWW)

UPS systems, potential equalization, cable trays, lighting installations, Notlichtinstallationen

Fire alarm installations, access / time recording installations, signal / remote control installations.

Electrical fitting work

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Chemnitz | Published December 13, 2016  -  Deadline January 24, 2017

Electrical installation.

Important Note:

For participation in the procurement process, it is recommended before downloading the tender documents log in (www.sachsen-vergabe.de). Only so you can receive the latest information and documents to the state in the procurement procedure.

16 O 30400 TUC TUC Zentr.Unibibliothek / Aktie- Electrical system:

- 1 pc UPS 168 kVA including batteries,

- 1 St. building main distribution General Power,

- 1 St. building main distribution safety supply,

- 1 St. building main distribution UPS,

- 20 St. entire ELT distributions ca. 432-576 PLE,

- Approximately 190 000 m cables and wires,

- Approximately 1 450 Installation Equipment,

- 20 St. KNX devices,

- Approximately 5 450 meters mesh cable trays, cable trays / ladders,

- Approximately 275 St. Floor Box,

- Approximately 1 810 m floor trunking,

- Approximately 7 800 m conduits for AP and UP-installation,

- Approximately 1 835 St. several lights inside and outside,

- 1 St. Central Battery System,

- 320 St. Si and escape sign luminaires,

- 2 St. gutter heating distributors each with about 370 m heating cable including temperature and humidity sensors,

- Lightning protection about 2 000m catch and derivatives,

- 20 St. data cabinets different HE, with internals,

- Approximately 74 600 meters data cable Cat 7A,

- About 4 300 meters FO male / female cable single- and multi-mode cables,

- 540 St. data outlets Cat 6A, 1x and 2x RJ45.

Any bidder inquiries are at least 6 working days before the expiry of the offer period (§ 12a EU para. 3 VOB / A 2016) to ask. Subsequent inquiries will not be answered.

Engineering services

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Universitätsbauamt Stuttgart und Hohenheim | Published January 21, 2017  -  Deadline February 17, 2017
30, University of Hohenheim, remediation Bio II (BT 31) 5.BA, engineering services according to Part 4, Section 2 HOAI. 

For water, wastewater and gas equipment:

Abklinganlagen for isotope laboratory.

For heating systems:

Dismantlement including pollutant disposal for KMF and asbestos.

For air-conditioning systems:

Dismantlement including pollutant disposal for KMF and asbestos.

For GA:

GA and MSR for AHU isotope laboratory and lecture halls, Abklinganlage, underfloor heating, heating distributor.

Locking on overarching GA (BackNet).

Dismantling existing cabinets; Electrical installation cable trays and accessories.

KG 410 - sewage, water and gas systems:

Adaptation, reconstruction and new installation of sanitary and media Installtion for drinking water, cold water, warm water and circulation, waste water, compressed air, natural gas and high-purity.

KG 420 - heating systems:

Exchange floor heating.

KG 430 - Ventilation systems:

HVAC systems for Isotopenlabor including Radionuklidfilterung and auditoriums.

Special achievement:

Insulation and Ventilation components) incl. The associated Schadstoffsanierung (KMF and asbestos).

KG 480 building automation

Locking on overarching GLT (BACnet).

Dismantling existing cabinets; Elektroinstlation cable trays and accessories.

The renovation of existing takes place during ongoing operation adjoining Institute.

Electrical wiring and fitting work

Industrie- und Handelskammer Nürnberg für Mittelfranken, Körperschaft des öffentlichen Rechts | Published January 21, 2017  -  Deadline February 27, 2017

The house of the economy was the principal office of the principal. It is located in a mutually exposed and cramped location in the center of bustling downtown Nuremberg. The ensemble originally consisted of 4 partially interconnected buildings, which were grouped around a courtyard. 2 buildings were demolished and rebuilt. 2 buildings are partially preservation orders and rebuilt or renovated. As a result, in turn, is an ensemble of four, partly interconnected buildings arise, which resumes the principal office of the contractor.

The work of the contract awarded to (electrical installations) include the following services (supply and installation including mounting - / workshop planning.): Electrical installation.

UPS S = 75 kVA, central battery systems for emergency lighting rated operating time 3h, NSHV Rated current 1.250A, PFC systems 1St., Busbar system I = 1 250A length = 1 200m, Mailing 2pcs., Sub-distribution 35ST., Laying systems with mesh cable trays 2 150m, cable trays 750m , wide span slots 160 m, rising tracks 270m, 580m conduits, cables and wires 111 250m, installation equipment 2,500 St., building Control KNX installation bus system with 1 900St. Participants, interior lights 1.310St., Security lights 300ST., Outdoor lighting 14St., External lightning protection roof drip lines 450m, grounding / bonding, fire fighting equipment, fire bulkheads for cables 230St., Raised floors 20m 2 , Telecommunications / computer network with optical fiber 2 150m, 000m Cat7 62, computer ports 1 400ST., 19 "floor distributor 11st., Intercoms with 4pcs. Intercoms, fire alarm system with 580ST. Detectors, fire alarm lines 13 000m, space observation system with 2pcs. Cameras, RWA systems 6St.

Secondary school construction work

Freie und Hansestadt Hamburg, FB SBH | Schulbau Hamburg | Published December 16, 2016  -  Deadline January 24, 2017

The Erich Kastner School is located in the district of Hamburg Farmsen. The construction project includes a four-storey plus replacement building with mezzanine (HP) with class and subject classrooms. In addition to rooms, areas of general management, a meeting area, a canteen with warm kitchen and a recreation hall on the ground floor.

The GFA of the building is approximately 5 100 meters 2 , The construction site is approached via the Hermelinweg.

Approximately 850 m Insulation for cold water pipe incl. Fittings, approx 130 m fire protection water pipe, about 35 m Fire sewer, 100m insulation inside rainwater pipe, about 2 200 meters insulation heating pipes incl. Fittings, approx 130 fire shells, 120 m 2 Insulation ventilation ducts, about 210 Firestop ELT, approximately 175 m 2 Fire protection cladding for cable trays, about 65 combination sealants.