Call +44 800 9755 164

Public tenders for cable-trays

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!
Electricalcable trays

Supply of cable trays and mounts

Tray cable, wire, galvanized PCs 150,00 737,67 110 650,50 Plate for suspension wire tray PCs 600,00 65,18 39 of 108.00 Set screw wire cable trays. piece of 400.00 37,29 14 916,00 Stud threaded 300,00 PCs 83,53 25 059,00 Nut 600,00 PCs 4,52 2 712,00 Drop anchor (collet) with an internal expander cone metric 300,00 PCs 13,50 4 050,00 total: 196 495,50

Lot 12 - Electrical Installation

Service Achats Transports publics genevois | Published September 13, 2016  -  Deadline November 1, 2016
Electrical installation concerns the strong current. It includes cable trays, earthing, universal wiring, lighting and local emergency and taken the installation

Construction work

Service achats transports publics genevois | Published September 17, 2016  -  Deadline November 1, 2016

Electrical installation concerns the strong current. It includes cable trays, earthing, universal wiring, lighting and local emergency and taken the installation.

Braddock Dam Gate Control Upgrade

Department of the Army, U.S. Army Corps of Engineers | Published October 12, 2016  -  Deadline November 28, 2016
Synopsis:The U.S. Army Corps of Engineers, Pittsburgh District, has a requirement for gate control upgrades located at the Braddock Locks and Dam, located on the Monongahela River, Allegheny County, Pennsylvania. The general description of the work is as follows:The Braddock Dam Gate Control System Upgrade focuses on the migration from a Rockwell Automation (RA) SLC 500 based control system to an open architecture Rockwell Automation Logix based control system utilizing Ethernet communications. The existing dam gate control system consists of four Rockwell Automation SLC 5/04 processors, one per dam gate, communicating via Data Highway Plus (DH+) on fiber optic cable to one Human Machine Interface (HMI) personal computer (PC). Each individual dam gate SLC 5/04 processor communicates locally to two RA Remote I/O racks and a RA Dataliner display.Upon completion of the upgrade, the new dam gate control system shall consist of four RA CompactLogix PLC processors, one for each dam gate, and three HMI PCs communicating via Ethernet. The existing SLC 5/04 processors and Remote I/O modules shall be replaced with RA 1747-AENTR modules. A new RA CompactLogix PLC processor and Stratix managed Ethernet switch shall be mounted in a new enclosure mounted next to each existing local dam gate control station. The existing Dataliner and gate position LCD displays shall be replaced with a RA PanelView Plus 6 (700 Model) graphic display touch screen terminal with Ethernet communications.The existing Engineering laptop PC and dam gate control desktop PC shall be replaced with new government furnished PCs. All programming software, operator interface software, and communications shall be upgraded or provided as new to form a complete control system on a Windows 7 operating system installed by the Corps of Engineers on the Government furnished PCs. A total of three PCs shall be Government furnished equipment; one PC shall be connected to the Ethernet dam gate control network in the middle wall operations building, one PC shall be connected to the Ethernet dam gate control network via fiber optic cable in the land wall administration building, and one laptop PC shall be connected to the Ethernet dam control network in the middle wall operations building. Currently, only the middle wall PC is operating as a standalone RSView SE HMI operator interface terminal. The RSView SE software on the middle wall PC will have to be upgraded to the latest compatible version of FTView SE. The new PC on the land wall shall also be configured as a standalone HMI operator interface terminal and one new FTView SE license will be required.. The laptop PC shall be configured as an Engineering work station and shall contain new RSLogix5000 and Studio 5000 fully licensed programming software.The existing fiber optic cabling between the dam and the middle wall operations building shall be utilized for Ethernet communications. Two new 24-fiber fiber optic cables shall be installed, terminated, and tested between the land wall administration building and the second floor of the middle wall operations building. The new fiber optic cables shall be routed in existing raceways, cable trays, and conduits where available. The lock chamber crossover is normally flooded and shall be pumped out by site personnel. All existing copper DH+ and Remote I/O cables shall be removed. All new Ethernet cables and copper to fiber media converters shall be provided as necessary for communications between devices.Magnitude of the project is between $250,000 and $500,000. This procurement is 100% set aside for Women-Owned Small Business Concerns. All responsible offerors are encouraged to participate. The period of performance for this procurement is estimated to be 180 calendar days after written Notice To Proceed. The location where the work will be performed is at the U.S. Army Corps of Engineers, Braddock Locks and Dam, 11th Street, Braddock, PA 15104. The Invitation for Bid (IFB) will be issued approximately 27 October 2016, online through Federal Business Opportunities (, therefore, requests for hardcopies of the solicitation will not be honored. In order to receive notification of any amendments to this solicitation, interested vendors must register as an interested vendor on the Federal Business Opportunities website. If you are not registered, the Government is not responsible with providing notification of any changes to this solicitation. Contractors must be registered in the System for Award Management (SAM) before receiving a contract award (go to to register). The NAICS for this procurement is 541511 "Custom Computer Programming Services" and the small business size standard is $27.5 Million.

Low and medium voltage equipment

Verm��gen und Bau Baden-Württemberg | Published July 9, 2015  -  Deadline October 31, 2016
University of Freiburg: Gustav-Mie-house expansion cleanroom Prof. Jacob Type of service: low and medium voltage up to 36 kV (power installations) scope of services: 1 pcs. Wandverteiler, 1.200,00m NYM-J 3x2.5, 50 m cable trays , 30 pcs. Connecting supplied by the customer-set ceiling lights.

Electrical installation

Max-Planck-Gesellschaft, GV, Ref. VIII d - VOB | Published October 5, 2016  -  Deadline November 2, 2016
Disassembly Inventory installation, mains for construction and Baulichtversorgung, 2 St. subdistributions, 180m cable trays, 11.000 m cable and lines, 80 LED lights, 1 St. data distribution, fiber optic and copper cabling, connections to existing installations, fire barriers

Electrical installation - renewal data network VOIP

Max-Planck-Gesellschaft, GV, Ref. VIII d - VOB | Published October 18, 2016  -  Deadline November 3, 2016
MPI for Medical Research component of the measure is the renewal of the IT infrastructure in the Institute field. Dismantling and disposal of installation devices and various cables and wires within the Institute and the Max Planck Hauses.Neumontage of data cabling and installation of data cabinets: 4 pcs data cabinets, 35,000 m cables and wires, 100 m cable trays, 350 pcs Installation Equipment, 1 x flat rate fire protection measures

Abbey Brauweiler, Electrical & Telecommunications (Z2420-2016-0160)

Landschaftsverband Rheinland | Published October 17, 2016  -  Deadline April 30, 2018
Approximately 400ST. Cable u. Lines mainly relocated to creep, track u. Document for replacement installations outside the Creeper. about 7.000kg cables and wires, mostly laid in creep, dismantle u. Dispose 1 St. low voltage distribution in multi-field standing enclosure with 630A power switches, provide lightning arresters etc. and finished up. 4 St. Ring cable distribution in multi-field standing enclosure with 500A switch disconnectors u. Breakers in the disposals etc. provide u. Finished up 1 St. renovation building main distribution in Standgeh. with 160A switch disconnectors about 27.000m Cable / lines in prev. conduits or prev. Cable trays install approximately 1,500m cable trays, conduits u. cable trunking etc. cellars and. remaining creep Reroute. 7 St. equipment rooms with new electric installation and basic lighting equip. 75 St. mast lighting radio-controlled, u. Presence regulated with LED post top lights on prev. Foundations set up and ready to assemble. 12 St. Telecommunication distribution boxes with up to 1350DA provide u. 5 Connect the St. LAN cabinets 42U, mostly FOC u. Equipped CAT3 patch panels, supply and turnkey assembly 18 St. LAN wall-mounted enclosure up to 15U, equipped mainly with fiber optic patch panels, provide u. turnkey assembly

Electrical installation (16A50257)

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Dresden 2 | Published August 3, 2016  -  Deadline November 17, 2017
- 1 pc main distribution 5 fields, busbar 400A; - 5 St. distribution boards in AP and UP-execution; - 600 St. installing equipment; - 600 m cables and wires to 4 x 185 mm²; - 6,000 m cables and wires to 5 x 6 mm²; - 1,000 m Low power cables and conductors; - 350 m cable trays, cable ladders; - 900 m LF channels and conduits; - 250 St. lamps; Emergency lighting system; KNX - Building Management Systems for lighting, blind and dimming control;

Electrotechnical equipment

Hrvatski operator prijenosnog sustava d. o. o. | Published September 27, 2016  -  Deadline November 3, 2016

Procurement subject of this procedure is the supply of primary and secondary equipment with the installation of 110 kV TS Krk including:

1) replacement of secondary equipment in all fields:

- Water fields; replacements for worn-out equipment,

- Transformer feeders; substitute for the satisfaction of the conditions on the delimitation of HEP - DSO.

2) replacement of cellular computer:

- Existing cellular computer does not have the ability to communicate with a new numerical device protocol IEC 61,850th

3) replacement of the switch to the VP Losinj and overhaul switch to HR Omišalj:

- Replacement of the switch due to security of supply TS Losinj which is radially connected to the TS Krk,

- Overhauling switch to VP Omisalj for many years of use.

4) replacement of instrument transformers to water fields:

- Installed a new combined instrument transformers because the existing current and voltage transformers at the end of age.

5) replacement of disconnectors / earthing and electric drives to water fields:

- Installed new disconnectors / grounding electrodes to water fields because existing earth electrodes have electric motor and not remotely manageable.

6) replacement cable trays in cable ducts:

- Replacement of cable trays in cable ducts due to corrosion (the impact of the sea) and deterioration.

The warranty period for the delivered and installed equipment and performed the associated works must be at least 36 months following the successful takeover and the final settlement. The bidder shall submit a Statement of warranty to confirm that the warranty period for the delivered and installed equipment and performed the associated works at least 36 months after the successful takeover - or according to the form Declaration first

If the bidder submits a bid that is fully meets the needs of the client, and which offers goods that do not meet the requirements related to the characteristics of the subject, and thus fails to meet the requirements of DZN, the offer will be rejected.

Clinic construction work

Bezirkskliniken Mittelfranken | Published October 8, 2016  -  Deadline November 9, 2016

Electrical works for the construction of a new ward block with three stations and the 24 beds, in particular

Transformers 2 pcs., MS cable about 2 200m, power system 1St., Central battery system Sibel 1St., UPS 2pcs., Raised floor facility 150m 2 And cables about 30km, cable trays, about 1 500m, installation equipment 1200 St., Lighting Equipment 900 St., lightning catcher about 1 200m, light call with 3pc. Central processing units, the antenna system 60 St. Outlets, fire alarm system about 370 St. peripherals, camera monitoring system about 90st. Cameras, door monitoring system about 60st. Doors, fence detection system about 450m microphone cable, personal emergency signal system about 25St. Base stations and approximately 100pc. Location transmitter, key deposit system about 51St. Lockers, telecommunication cables about 38km, data cable about 26km, 10km fiber optic cable, outdoor lighting approx 40st, cable trench about 1 200m.

B 412 Viaduct Wehr

LBM Cochem-Koblenz Projektmanagement | Published October 21, 2016  -  Deadline December 1, 2016
Repair the viaduct Wehr ca.510 daily traffic backups, ca.3.100 m² Asphalt milling, record ca.4.600 m² seal cancel ca.840 m caps and restore, replace about 22 St. stock exchange approx.2 St. transition constructions on ca.4.600 m² concrete pavement about 800 defects repaired at ca.6.100 m² concrete surface of the superstructure (outer) set about 500 defects repaired at ca.4.600 m² concrete surface of the superstructure (s) about 70 defects repaired, ca. set 70 defects on substructures repaired, dispose ca.410 m³ demolition materials LAGA Z1.2, dispose of about 30 m³ demolition materials LAGA Z2, about 20 m³ demolition materials LAGA Z2 dispose larger ca.4.600 m² concrete surface seal, produced ca.3.200 m² asphalt layers exchange ca.810 m railings, replace ca.810 m protective devices. Subsequent electrification walk cavities: ca.3000 m Electric. Lines, ca.420 m cable trays, ca.37 St. switch, about 60 St. outlets, about 100 St. junction boxes, ca.58 St. lights.
  • 1