Call +44 800 9755 164

Public tenders for electrical in Sofia Bulgaria

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Supply of surge arresters for electrical installations

ЕЛЕКТРОЕНЕРГИЕН СИСТЕМЕН ОПЕРАТОР ЕАД | Published December 16, 2016  -  Deadline January 24, 2017
The contract is for the supply of surge arresters designed to protect equipment in electrical installations including: - In Lot №1: delivery of 108 pcs. surge arresters designed to protect equipment MV - In Lot №2: delivery 39br. Valve arresters designed to protect equipment VN

Repair and maintenance services of electrical distribution equipment

„КонтурГлобал Марица Изток 3“ АД | Published December 24, 2016

The qualification system for the design, supply and replacement of electrical installations comprise items:

1. Design, supply and replacement of existing systems for 6,3 kV AC, traction equipment for 1,65 kV DC and boards 0,4 kV. Rehabilitation and modernization of electrical systems and equipment 1,65 kV DC of traction substation.

2. Design, supply and replacement of existing systems for 6,3 kV AC and liquid starters of 6 kV motors with wound rotor.

Electrical relays

„Електроенергиен системен оператор“ ЕАД | Published December 22, 2016  -  Deadline January 30, 2017

Delivery of digital relay protection (CTA) intended to act as a backup and overload current protection of power transformers, protection equipment rails in MV / LV, selective and fast acting current protection and short-earth compounds conclusions. Digital relay protection on connection will work in networks with neutral, grounded in active resistance, arcing reactor or combined grounding. They are designed for installation on the doors of predkiliynite Switchgear cabinets / switchgear or relay panels in substations of power system.

Purchase of:

Digital relay protection for transformer input MV - 30;

Digital relay protection for conclusion MV - 283;

Digital relay protection reserve land protection to active resistance of power transformer 110 / MV - 19 units;

Cable to connect your laptop PC keyboards - 18 pieces;

Software job setup and configuration of devices - 18 pieces.

The scope and requirements of the contract are detailed in the tender documentation.

Electrical installation work of electrical distribution apparatus

„ЧЕЗ Разпределение България“ АД | Published January 21, 2017  -  Deadline February 16, 2017

"CEZ Distribution Bulgaria" held a negotiated procedure with prior call for awarding a public procurement contract "Partial reconstruction of lowering distribution substation" Festival "110/20 / 10.5 kV based on the approved investment project and authorized construction, including the dismantling of existing, procurement and installation of new machinery and equipment ", Ref. № PPC 16-118.

The contract is not divided into lots.

"CEZ Distribution Bulgaria" held a negotiated procedure with prior call for awarding a public procurement contract "Partial reconstruction of lowering distribution substation" Festival "110/20 / 10.5 kV based on the approved investment project and authorized construction, including the dismantling of existing, procurement and installation of new machinery and equipment ", Ref. № PPC 16-118.

Cleaning and sanitation vehicles (trams and trolleybuses) and separate routes "Electrical Capital" LLC.

Столичен електротранспорт ЕАД | Published December 22, 2016  -  Deadline February 8, 2017
"Cleaning and sanitation vehicles (trams and trolleybuses) and separate routes" Sofia Public Electrical Transport "JSC" cleaning daily, mainly including garage space as follows: Lot 1) Cleaning of vehicles in the depot "Krasna Polyana" about 116 trams; for Lot 2) Cleaning of vehicles in the depot "Banishora" and Cleaning of vehicles in troleybusno depot "Hope" around 113 trams and 84 trolleybuses; for Lot 3) Cleaning of vehicles in the depot "Iskar" and trolley depot "Iskar" about 122 trams and 74 trolleybuses; for Lot 4) Cleaning of separate tracks, platforms and stops reversing wow: Total length of the separate tracks-42 895 m; Total length of the tram and trolley wow 4875 m.

Design, supply and replacement of electrical installations

КонтурГлобал Марица Изток 3 АД | Published December 27, 2016

Electricity

Народно събрание на Република България | Published January 10, 2017  -  Deadline February 9, 2017

The subject of the contract is delivery of electricity and execution role of coordinator of standard balancing group for the needs of the National Assembly.

In the subject Lot include supply of net electrical power medium voltage and coordinating balancing group with a place of execution until 1 piece object - a building of the National Assembly, Sofia, Sq. "Knyaz Alexander I" № 1 (3 pcs. Measuring points) for medium voltage (MV).

In the subject Lot includes delivery of a net amount of electricity low voltage and coordinating balancing group with place of performance up to 4. objects (4 pcs. measuring points) for low voltage (LV) - the building of the National Assembly Square. "National Assembly" № 2; food complex - bul. "Alexander Dondukov" № 2; garage - ul. "Iskar" № 2; Police booth - boulevard. "Alexander Nevski".

Electrical machinery, apparatus, equipment and consumables; lighting

„ЧЕЗ Разпределение България“ АД | Published December 8, 2016  -  Deadline January 26, 2017

The Management Board of "CEZ Distribution Bulgaria", opens and conduct "open" types of procedure for awarding a public procurement contract "Supply of disconnectors," Ref. № PPD 16-094.

55.

300.

55.

150.

10.

30.

106.

500.

50.

150.

70.

150.

2.

106.

300.

150.

300.

90

150

5.

156.

500.

155.

300.

90.

150.

15.

156.

500.

120.

450.

75.

45.

215.

500.

105.

300.

65.

15.

100.

300.

120.

300.

90.

150.

200.

500.

40.

40.

Electrical machinery, apparatus, equipment and consumables; lighting

„ЧЕЗ Разпределение България“ АД | Published December 8, 2016  -  Deadline January 24, 2017

The Management Board of "CEZ Distribution Bulgaria", as sectoral contracting procurement within the meaning of Art. 5 para. 4 pt. 2 of PPL performing sector activity under Art. 123 pt. 2 in conjunction with Art. 125, para. 1 pt. 1 of the Public Procurement Act and § 2 pt. 60 of the Additional PPL basis of special or exclusive rights within the meaning of § 2 pt. 47 of the Public Procurement Act, detect, and held an "open" types of procedure for the award of procurement contract "Supply of fittings for AC wires, namely terminals, gourds, butterfly earrings and bolts" Ref. № PPD 16-095.

The subject of the contract is not divided into lots. Participants must quote all kinds of goods from the subject of the contract.

№ Name of the material measure Orient. Quantity.

1. Strive for a tension bolt terminal aluminum-steel conductors from 35 to 95 mm? no. 3100.

2. Bolts a tension clamp for aluminum - steel wires from 35 to 95 mm? no. 1220.

3. Bolts torsion terminal complete with stirrups for aluminum-steel conductors from 35 to 95 mm? no. 2000.

4. carrier terminal (boat), complete with stirrups for aluminum-steel conductors of 35? 95 mm? no. 3400.

5. U-shaped hinged bracket insulator chains MV (butterfly) P50 issue. 14,000.

6. Gourd for insulator chains MV type Kr-16 pcs. 14,200.

7. Earring for insulator chains MV type O-16 pcs. 12,000.

8. U-shaped connecting bracket (U-bolt) M16x120 complete with plate issue. 14,200.

Electrical machinery, apparatus, equipment and consumables; lighting

„ЧЕЗ Разпределение България“ АД | Published December 15, 2016  -  Deadline January 30, 2017

The Management Board of "CEZ Distribution Bulgaria", as sectoral contracting procurement within the meaning of Art. 5 para. 4 pt. 2 of PPL performing sector activity under Art. 123 pt. 2 in conjunction with Art. 125, para. 1 pt. 1 of the Public Procurement Act and § 2 pt. 60 of the Additional PPL basis of special or exclusive rights within the meaning of § 2 pt. 47 of the Public Procurement Act, detect, and held an "open" types of procedure for the award of procurement contract "Supply of rectangular plastic cover for cable shafts class B125, sizes (900/600/80)", Ref. № PPD 16-103.

"Supply of rectangular plastic cover for cable shafts, Class C 125 sizes (900/600/80)."

The subject of the contract is not divided into lots and includes the following items:

1. Polymer cover in 125, (900/600/80) mm pcs. 6400.

2. Tool lift (key) of polymer cover in 125 pieces. 96.

Supply through the purchase of building materials, plumbing, electrical., Ventilation and others. parts and consumables for maintenance and repair of buildings, premises, plant and equipment of the National Assembly

Народно събрание /НС/ на Република България /РБ/ | Published January 17, 2017  -  Deadline January 26, 2017
Tenders must be submitted to the National Assembly Square. "Bk. Alexander I" № 1 Department "General Office" - clerk, tel. 02 / 939-30-59. Date and time of opening of tenders: 01/27/2017 d ., 10:00. Place of bid opening: the National Assembly Square. "Bk. Alexander I "№ 1, room 132.

Electricity meters

„ЧЕЗ Разпределение България“ АД | Published December 9, 2016  -  Deadline January 24, 2017

"Open" on the type of procedure for procurement purposes concluding a framework agreement for a period of 8 (eight) years for the supply of necessary equipment and specialized software (also called central system or software) installation, commissioning and maintenance " system for remote reading of meters. " The subject of procurement is divided into 2 (two) lots.

Electricity

Национален осигурителен институт — ТП на НОИ — София област | Published January 21, 2017  -  Deadline February 23, 2017

The object of this contract is to be carried out selection of a contractor for delivery of net electricity for the needs of the territorial division of the National Social Security Institute - Sofia region (NSSI's - Sofia region) by a contractor, coordinator of standard balancing group full administration of the information flow to the Electricity system operator (ESO) and defraying the imbalances for a period of 4 (four) years.

The estimated consumption of contracting for 48 months is 336,800 kWh, and the same is calculated based on annual consumption for the period 2012 - 2016

The object of this contract is to be carried out selection of a contractor for delivery of net electricity for the needs of the territorial division of the National Social Security Institute - Sofia region (NSSI's - Sofia region) by a contractor, coordinator of standard balancing group full administration of the information flow to the Electricity system operator (ESO) and defraying the imbalances for a period of 4 (four) years.

The estimated consumption of contracting for 48 months is 336,800 kWh, and the same is calculated based on annual consumption for the period 2012 - 2016 estimated consumption refers to the three sites included in the scope of this contract.

Electricity supply and choice of a balance group coordinator for objects of ESO

Електроенергиен системен оператор ЕАД | Published December 16, 2016  -  Deadline January 23, 2017
Electricity supply and choice of a balance group coordinator for objects of ESO

Electricity supply and implementation role of coordinator of standard balancing group for the needs of the National Assembly

Народно събрание на Република България | Published January 9, 2017  -  Deadline February 10, 2017
The subject of the contract is delivery of electricity and execution role of coordinator of standard balancing group for the needs of the National Assembly

Perform technical support for 5 years of diesel multiple units series 10 and series electric multiple units 30 and 31 owned by "BDZ Passenger Transport" Ltd.

БДЖ - Пътнически превози ЕООД | Published January 6, 2017
The subject of the contract is: "Perform maintenance for 5 years of diesel multiple units series 10 and series electric multiple units 30 and 31 owned by" BDZ Passenger Transport Ltd '. " The subject of the contract is a service within the meaning of Art. 3, para. 1 pt. 3 of the PPA. The contractor will have to provide service maintenance and repair of multiple units owned by the Employer. Currently "BDZ Passenger Transport" Ltd. has 22 pieces of diesel multiple units (DMUs) Series 10, which is currently in operation are 17 pieces. "BDZ Passenger Transport" Ltd. has a further 24 electric multiple-unit (ESA), of which 14 pieces trivagonni electric multiple units (ESA) series 30 and 10 pieces chetirivagonni ESA series 31. goreizpbroenite ESAs in operation at the time are 20 number ESA, 9 chetirivagonni 31-series and 11-series trivagonni 30.

"Supply of 256 pcs. rough bandages size? 1255? 1090h143 mm of rolled alloy steel and internal marking electric lock. Series 40 and 46 needed to "BDZ-TP" Ltd for 1 period "

БДЖ-Товарни превози ЕООД | Published January 9, 2017  -  Deadline February 3, 2017
Public procurement: "Supply of 256 number rough bandages size? 1255 x? 1090 x 143 mm of rolled alloy steel and internal marking of electric locomotives series 40 and 46 needed to" BDZ - Freight services "for one year" .

Cleaning services of transport equipment

„Столичен електротранспорт“ ЕАД | Published December 22, 2016  -  Deadline February 3, 2017

"Cleaning and sanitation vehicles (trams and trolleybuses) and separate routes" Sofia Public Electrical Transport "JSC" cleaning daily, mainly including garage space as follows: Lot 1) Cleaning of vehicles in the depot "Krasna Polyana" about 116 trams; for Lot 2) Cleaning of vehicles in the depot "Banishora" and Cleaning of vehicles in troleybusno depot "Hope" around 113 trams and 84 trolleybuses; for Lot 3) Cleaning of vehicles in the depot "Iskar" and trolley depot "Iskar" about 122 trams and 74 trolleybuses; for Lot 4) Cleaning of separate tracks, platforms and stops reversing wow: Total length of the separate tracks-42 895 m; Total length of the tram and trolley wow 4 875 m.

Total number of trams in depot "Krasna Polyana" about 141 railcars. Daily cleaned and adjacent garage space.

Around 113 trams and trolleybuses number about 84, detailed in tender documentation of the contract. Daily cleaned and adjacent garage space.

Around 112 trams and trolleybuses number about 74, detailed in tender documentation of the contract. Daily cleaned and adjacent garage space.

1 .Tramvayni separate routes with a total length (two-way) 42,895 m .; 2. Tramvayni reversing wow with a total length - 4055 m .; 3 trolley reversing wow with a total length - 935 m.

Architectural, construction, engineering and inspection services

„ЧЕЗ Разпределение България“ АД | Published January 21, 2017  -  Deadline February 23, 2017

"CEZ Distribution Bulgaria" held an open procedure with subject "Preparation of complete project documentation for connection of new customers, reconstruction, renovation and construction of new power stations, and cable networks MV and LV on the territory of Destination Sofia region and Pleven," Ref . № RRS 16-110.

The subject of the contract is divided into 3 lots, as follows:

1. Preparation of a comprehensive design documentation for connecting new consumers, reconstruction, renovation and construction of new power stations, cable and render. lines MV and LV-area "Pernik, Kyustendil"

2. Preparation of complete project documentation for connection of new customers, reconstruction, renovation and construction of new power stations, cable and render. lines MV and LV-area "Vratsa, Lovech"

3. Preparation of a comprehensive design documentation for connecting new consumers, reconstruction, renovation and construction of new power stations, cable and render. lines MV and LV-region "Vidin-Montana."

Preparation of complete project documentation for connection of new customers, reconstruction, renovation and construction of new power stations, and cable networks MV and LV on the territory of "Pernik, Kyustendil."

The main types of activities and approximate amounts as follows:

- Rab. Projects range in part "Electric" part "Construction" part "Architecture" - 8. Construction of a new substation 1h800 kVA and 3 pcs. to build a new power station 2x800 kVA;

- Rab. Projects section "Electric": Connection to the busbars to 1 kV existing trafopost- 5 pcs., Joining busbars 1 kV up to 35 kV an existing substation-5 pcs., Reconstruction of part Electrical MV and LV with replacement / installation of power transformer existing substation-25 pcs., cable lines MV-8000 m-route Skyway LV-5000 m-route Skyway MV with AC wiring for 1 triplet-1000 m-route Skyway MV with AC wires 2 triples 1-pole line 500 m-track, on ...

Fire-brigade services

ДП „Национална компания Железопътна инфраструктура“ | Published December 24, 2016  -  Deadline January 30, 2017

Fire service at the premises of SE NRIC for a period as follows:

Develop and update documents for sites under the requirements of Regulation 8121z-647 / 10.1.2014, the

Keeping in good condition to control the condition and performance of maintenance, recharging and hydrostatic testing of pressure resistance of fire.

Maintenance and service (IPR) (PGS).

Keeping in good condition evacuation and emergency lighting in accordance with the regulations.

Simulation of operating fire apparatus, evacuations and performing periodic instructional staff as required by the Ordinance 8121z-647 / 10.1.2014, the

Activities marking of fire hydrants, fire extinguishers and access roads to them on fire equipment, fire hydrants, ladders for fire and rescue operations Device alarm or disclosure.

Maintenance and servicing fire extinguishers and hydrants.

Fire service at the premises of SE NRIC as follows:

1 and 2 of the Ordinance 8121z-647 of 01.10.2014, as well as other documents meet the requirements of the rules and regulations for DB.

Create organization to ensure fire safety (DB) and to maintain facilities in good technical condition.

21 and 23 of the Ordinance 8121z-647 from 01.10.2014, the

22 of the Ordinance 8121z-647 from 10.01.2014, the

2 of Ordinance 8121z-647 from 10.01.2014, the

Develop plans to ensure the DB in organizing events and activities, which temporarily changes the level of fire danger in the sites.

Making control maintenance in good condition of fire hydrants and ponds and prepare them for operation at low temperatures before the onset of winter.

Development measures, supply and execution of events to maintain in good condition the insured passive and active protection measures and technical solutions adopted to ensure fire safe use of the facility throughout the lifetime, according to Ordinance Iz-1971 of 2009 on constructional-technical rules and standards for ensuring fire safety.

26 of the Ordinance 8121z-647 from 10.01.2014, the

Controlling the maintenance in good condition locks of suction installations serving explosive technological facilities (where available) and other devices to ensure DB at work (respiratory and safety valves Flame Arresters, etc.).

Controlling maintenance of roads for firefighting purposes with unfettered access to all sites and water sources.

Create organization for immediate notification of the Regional Service "Fire Safety and Population Protection" (RSPB3N) closing certain sections of roads for firefighting, repair works related to off sections of water mains, the occurrence of faults and failures in pumping stations, IPR and civil engineering, leakage of water from fire ponds or their draining.

Perform instruction and conduct drills and training of staff to work with firefighting equipment, simulation of evacuations teaching and performing periodic instructional staff as required by the Ordinance 8121z-647 from 01.10.2014, the

Controlling maintenance in good condition heating equipment and supplies, checks their condition, repair and cleaning prior to the autumn-winter period and periodically to ensure their fire safety.

Notification Employer necessary measures for troubleshooting electrical installations and equipment.

  • 1