Call +44 800 9755 164

Public tenders for electrical in Bulgaria

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!
ElectricalBulgaria

Supply of surge arresters for electrical installations

ЕЛЕКТРОЕНЕРГИЕН СИСТЕМЕН ОПЕРАТОР ЕАД | Published December 16, 2016  -  Deadline January 24, 2017
The contract is for the supply of surge arresters designed to protect equipment in electrical installations including: - In Lot №1: delivery of 108 pcs. surge arresters designed to protect equipment MV - In Lot №2: delivery 39br. Valve arresters designed to protect equipment VN

Repair and maintenance services of electrical distribution equipment

„КонтурГлобал Марица Изток 3“ АД | Published December 24, 2016

The qualification system for the design, supply and replacement of electrical installations comprise items:

1. Design, supply and replacement of existing systems for 6,3 kV AC, traction equipment for 1,65 kV DC and boards 0,4 kV. Rehabilitation and modernization of electrical systems and equipment 1,65 kV DC of traction substation.

2. Design, supply and replacement of existing systems for 6,3 kV AC and liquid starters of 6 kV motors with wound rotor.

Electrical relays

„Електроенергиен системен оператор“ ЕАД | Published December 22, 2016  -  Deadline January 30, 2017

Delivery of digital relay protection (CTA) intended to act as a backup and overload current protection of power transformers, protection equipment rails in MV / LV, selective and fast acting current protection and short-earth compounds conclusions. Digital relay protection on connection will work in networks with neutral, grounded in active resistance, arcing reactor or combined grounding. They are designed for installation on the doors of predkiliynite Switchgear cabinets / switchgear or relay panels in substations of power system.

Purchase of:

Digital relay protection for transformer input MV - 30;

Digital relay protection for conclusion MV - 283;

Digital relay protection reserve land protection to active resistance of power transformer 110 / MV - 19 units;

Cable to connect your laptop PC keyboards - 18 pieces;

Software job setup and configuration of devices - 18 pieces.

The scope and requirements of the contract are detailed in the tender documentation.

Electrical materials

„Енерго-Про Мрежи“ АД | Published January 11, 2017  -  Deadline February 10, 2017

Настоящата поръчка предвижда доставка на арматура за усукан изолиран проводник за НН за нуждите на „Енерго-Про Мрежи“ АД по обособени позиции, както следва:

I. Обособена позиция — Изолирани отклонителни клеми.

II. Обособена позиция — Опъвателни и носещи клеми.

III. Обособена позиция — Изолирани пресови съединители.

IV. Обособена позиция — Изолирани пресови обувки.

V. Обособена позиция — Арматура за окачване.

VI. Обособена позиция — Крепежни елементи.

Настоящата поръчка предвижда да се доставят Изолирани отклонителни клеми според нуждите на „Енерго-Про Мрежи“ АД чрез покупка, като възложителят прогнозира, че за периода на действие на договора ще бъдат закупени следните количества:

1. Отклонителна клема за УО Al 10-95 / Cu 1,5-10 mm?-20 265 броя;

2. Отклонителна клема за абонати Al 16-95 / Al 2,5-35 mm?-91 695 броя;

3. Отклонителна клема за абонати Al 54-150 / Al 16-25 mm?-4008 броя;

4. Отклонителна клема за абонати Al 35-70 / Al 16-70 mm?п-534 броя;

5. Отклонителна клема Т-образна Al 25-95 / Al 25-95 mm?-8 931 броя;

6. Отклонителна клема Т-образна Al 35-150 / Al 35-150 mm?-2 412 броя;

7. Отклонителна клема за преносим заземител Al 16-150 mm?- 1 959 броя;

8. Отклонителна преходна клема неизолиран/усукан проводник Cu 6-35 mm? / Al 25-95 mm?-6 171 броя;

9. Отклонителна преходна клема неизолиран/усукан проводник Cu 7-95 mm? / Al 16-35 mm? -60 036 броя;

10. Отклонителна преходна клема неизолиран/усукан проводник Al 7-95 mm? / Al 25-95 mm?-10 602 броя;

11. Отклонителна преходна клема неизолиран/усукан проводник Al 16-95 mm? / 16-35 УИП mm?- 117 777 броя;

12. Отклонителна преходна клема неизолиран/усукан проводник Al 50-240 mm? / Al 35-150 mm?-2 037 броя;

Посоченият обем е ориентировъчен и в него може да настъпи промяна съобразно нуждите на възложителя.

Настоящата поръчка предвижда да се доставят Опъвателни и носещи клеми според нуждите на „Енерго-Про Мрежи“ АД чрез покупка, като възложителят прогнозира, че за периода на действие на договора ще бъдат закупени следните количества:

1. Опъвателна клема 54,6-70 mm?, 1 500 кг.-20 745 броя;

2. Опъвателна клема регулируема за абонати 4/16-25 mm?-256 530 броя;

3. Носеща клема с конзола комплект 54,6-70 mm?, 1 500 кг -13 767 броя;

Посоченият обем е ориентировъчен и в него може да настъпи промяна съобразно нуждите на възложителя.

Настоящата поръчка предвижда да се доставят Изолирани пресови съединители според нуждите на „ЕНЕРГО-ПРО Мрежи“ АД чрез покупка, като Възложителят прогнозира, че за периода на действие на договора ще бъдат закупени следните количества:

1. Изолиран съединител 16/6 mm?-270 471 броя;

2. Изолиран съединител 16/10 mm?-22 986 броя;

3. Изолиран съединител 16/16 mm?-17 451 броя;

4. Изолиран съединител 25/25 mm?-741 броя;

5. Изолиран съединител 35/35 mm?-1 008 броя;

6. Изолиран съединител 70/35 mm?-300 броя;

7. Изолиран съединител 70/70 mm?-1 020 броя;

8. Изолиран съединител 150/70 mm?-372 броя;

9. Изолиран съединител 150/150 mm? -225 броя;

10. Изолиран съединител 54,6/54,6 N mm?-561 броя;

11. Изолиран съединител 70/70 N mm?-225 броя;

12. Изолиран съединител 70/54,6 N mm?-114 броя.

Посоченият обем е ориентировъчен и в него може да настъпи промяна съобразно нуждите на възложителя.

Настоящата поръчка предвижда да се доставят Изолирани пресови обувки според нуждите на „Енерго-Про Мрежи“ АД чрез покупка, като възложителят прогнозира, че за периода на действие на договора ще бъдат закупени следните количества:

1. Изолирана обувка 16 mm? -26 607 броя;

2. Изолирана обувка 25 mm? -1 767 броя;

3. Изолирана обувка 35 mm? — 2 646 броя;

4. Изолирана обувка 54,6 mm?-1 005 броя;

5. Изолирана обувка 70 mm? -2 316 броя;

6. Изолирана обувка 150 mm?-186 броя;

Посоченият обем е ориентировъчен и в него може да настъпи промяна съобразно нуждите на възложителя.

Настоящата поръчка предвижда да се доставят Арматура за окачване според нуждите на „Енерго-Про Мрежи“ АД чрез покупка, като възложителят прогнозира, че за периода на действие на договора ще бъдат закупени следните количества:

1. Армирана фасадна клема с винт/дюбел Ф 12mm-20 007 броя;

2. Подложка за кабел с PVC лента? 15-50 mm — 863 484 броя;

3. Подложка за кабел с PVC лента? 50-90 mm — 65 121 броя;

4. Лента неръждаема 10/0,4 mm, 50 m-11 538 броя;

5. Лента неръждаема 20/0,4 mm, 50 m -1 458 броя;

6. Скоба за фиксиране на лента 10/0,4 mm -468 426 броя;

7. Скоба за фиксиране на лента 20/0,4 mm — 74 421 броя;

8. Тапа за изолиран проводник 10-35mm? -477 броя;

9. Тапа за изолиран проводник 35-70 mm? — 1 155 броя;

10. Тапа за изолиран проводник 70-150 mm? -291 броя;

11. Пристягаща PVC лента 9/250 mm, 100 бр./кут. -762 броя;

12. Пристягаща PVC лента 9/340 mm, 100 бр./кут. -6 903 броя.

Посоченият обем е ориентировъчен и в него може да настъпи промяна съобразно нуждите на възложителя.

Настоящата поръчка предвижда да се доставят Крепежни елементи според нуждите на „Енерго-Про Мрежи“ АД чрез покупка, като възложителят прогнозира, че за периода на действие на договора ще бъдат закупени следните количества:

1. Конзола за стълб или стена с отвори -5 874 броя;

2. Шпилка с цяла резба М 14/300 mm -11 421 броя;

3. Кука тип „свинска опашка“ за стълб с гайка и шайба М 12/300 mm- 31 656 броя;

4. Шпилка с ухо М 16/300 mm-12 462 броя;

Посоченият обем е ориентировъчен и в него може да настъпи промяна съобразно нуждите на възложителя.

Subscription service and support mechanical, electronics and electrical. Part of a video surveillance system.

Мини Марица-изток ЕАД | Published January 10, 2017  -  Deadline February 13, 2017
Subscription service and support mechanical, electronics and electrical. Part of a video surveillance system. The video surveillance system consists of the following devices: Analog camera - 82 units; IP camera - 135 units; HDCVR camera - 73 units; DVR - 7 units; NVR / HCVR - 52 units; PC - 12 pieces; Distribution cabinet - 28 units; Performance of the contract include: - monthly check-in mechanical, electronics and Electrical Part of the video surveillance system; - Readjustment and prevention systems; - Repair of defective products; - Remedy faults and emergency call from Principal; - Delivery of spare parts and materials needed to perform the services under the contract; - Replacement of spare parts and materials for new ones; Servicing is carried out monthly. Adjusting their systems and repairs are carried out when necessary.

Cleaning and sanitation vehicles (trams and trolleybuses) and separate routes "Electrical Capital" LLC.

Столичен електротранспорт ЕАД | Published December 22, 2016  -  Deadline February 8, 2017
"Cleaning and sanitation vehicles (trams and trolleybuses) and separate routes" Sofia Public Electrical Transport "JSC" cleaning daily, mainly including garage space as follows: Lot 1) Cleaning of vehicles in the depot "Krasna Polyana" about 116 trams; for Lot 2) Cleaning of vehicles in the depot "Banishora" and Cleaning of vehicles in troleybusno depot "Hope" around 113 trams and 84 trolleybuses; for Lot 3) Cleaning of vehicles in the depot "Iskar" and trolley depot "Iskar" about 122 trams and 74 trolleybuses; for Lot 4) Cleaning of separate tracks, platforms and stops reversing wow: Total length of the separate tracks-42 895 m; Total length of the tram and trolley wow 4875 m.

Reconstruction (overhaul) of the Professional School of Energy and Electrical Engineering (PHSEE) - Academic building and training workshops in the town. Galabovo, Building I, sq. 83

Община Гълъбово | Published December 27, 2016  -  Deadline January 30, 2017
"Reconstruction (overhaul) of the Professional School of Energy and Electrical Engineering (PHSEE) - Academic building and training workshops in the town. Galabovo, Building I, sq. 83" in connection with the execution of the project № № BG16RFOP001-3.002-0006-S01 for granting financial assistance under the "Regions for growth" 2014-2020, Priority axis 3 "Regional educational infrastructure" procedure № BG16RFOP001-3.002 "support for vocational schools in Bulgaria"

Electric switchboards

„ЕВН България Електроразпределение“ ЕАД | Published December 22, 2016

Delivery of power meters with metal casing type TEMOr (surface mounting for risk customers), rated voltage U0 / U 0,6 / 1 kV with approximate amounts for the duration of the qualification system:

- Electrical panels with metal casing type TEMOr with up to 10 meter and tariff switch / X / - 600 pcs.

- Electrical panels with metal casing type TEMOr with 11 to 20 meter and tariff switch / X / - 100 pcs.

- Electrical panels with metal casing type TEMOr with 21 to 30 meter and tariff switch / X / - 50 pcs.

- Electrical panels with metal casing type TEMOr with 31 to 40 meter and tariff switch / X / - 50 pcs.

- Electrical panels with metal casing type TEMOr over 41 meter and tariff switch / X / - 25.

Design, supply and replacement of electrical installations

КонтурГлобал Марица Изток 3 АД | Published December 27, 2016

Electricity

Народно събрание на Република България | Published January 10, 2017  -  Deadline February 9, 2017

The subject of the contract is delivery of electricity and execution role of coordinator of standard balancing group for the needs of the National Assembly.

In the subject Lot include supply of net electrical power medium voltage and coordinating balancing group with a place of execution until 1 piece object - a building of the National Assembly, Sofia, Sq. "Knyaz Alexander I" № 1 (3 pcs. Measuring points) for medium voltage (MV).

In the subject Lot includes delivery of a net amount of electricity low voltage and coordinating balancing group with place of performance up to 4. objects (4 pcs. measuring points) for low voltage (LV) - the building of the National Assembly Square. "National Assembly" № 2; food complex - bul. "Alexander Dondukov" № 2; garage - ul. "Iskar" № 2; Police booth - boulevard. "Alexander Nevski".

Electricity

Национален осигурителен институт, чрез ТП на НОИ- Търговище | Published December 28, 2016  -  Deadline February 20, 2017

Delivery of net active power. Energy level low voltage administrative building NSSI Targovishte, buildings Unified Insurance records to NSSI offices in the city. Popkiöj and the town. Municipality.

Delivery of the net, active electrical energy level low voltage, administrative buildings NSSI Targovishte, Unified Insurance archives and offices in the city. Popkiöj and the town. Omourtag; inclusion of sites Principal standard balancing group coordinator Contractor; providing service in anticipation of consumption; preparation and submission of hourly daily schedules by the coordinator of balancing group; taking responsibility for balancing and meeting the costs of imbalances for the duration of the contract; Perform a complete administration of the information flow with licensed electricity distribution companies (EDCs) in the territory in which they are located measuring points and Electricity System Operator (ESO) and all activities related to the participation of the Employer in the liberalized electricity market.

Estimated contract value for the 48 month period is 180 600 BGN without VAT, including: the value of the delivered net active electric power amounts for electricity transmission through the distribution system to sites of low voltage amounts for access to the distribution network amounts transfer and access to the electricity transmission network, excise and all other allowances and fees set by KEVR or under current legislation.

Electrical machinery, apparatus, equipment and consumables; lighting

„ЧЕЗ Разпределение България“ АД | Published December 8, 2016  -  Deadline January 26, 2017

The Management Board of "CEZ Distribution Bulgaria", opens and conduct "open" types of procedure for awarding a public procurement contract "Supply of disconnectors," Ref. № PPD 16-094.

55.

300.

55.

150.

10.

30.

106.

500.

50.

150.

70.

150.

2.

106.

300.

150.

300.

90

150

5.

156.

500.

155.

300.

90.

150.

15.

156.

500.

120.

450.

75.

45.

215.

500.

105.

300.

65.

15.

100.

300.

120.

300.

90.

150.

200.

500.

40.

40.

Electrical machinery, apparatus, equipment and consumables; lighting

„ЧЕЗ Разпределение България“ АД | Published December 8, 2016  -  Deadline January 24, 2017

The Management Board of "CEZ Distribution Bulgaria", as sectoral contracting procurement within the meaning of Art. 5 para. 4 pt. 2 of PPL performing sector activity under Art. 123 pt. 2 in conjunction with Art. 125, para. 1 pt. 1 of the Public Procurement Act and § 2 pt. 60 of the Additional PPL basis of special or exclusive rights within the meaning of § 2 pt. 47 of the Public Procurement Act, detect, and held an "open" types of procedure for the award of procurement contract "Supply of fittings for AC wires, namely terminals, gourds, butterfly earrings and bolts" Ref. № PPD 16-095.

The subject of the contract is not divided into lots. Participants must quote all kinds of goods from the subject of the contract.

№ Name of the material measure Orient. Quantity.

1. Strive for a tension bolt terminal aluminum-steel conductors from 35 to 95 mm? no. 3100.

2. Bolts a tension clamp for aluminum - steel wires from 35 to 95 mm? no. 1220.

3. Bolts torsion terminal complete with stirrups for aluminum-steel conductors from 35 to 95 mm? no. 2000.

4. carrier terminal (boat), complete with stirrups for aluminum-steel conductors of 35? 95 mm? no. 3400.

5. U-shaped hinged bracket insulator chains MV (butterfly) P50 issue. 14,000.

6. Gourd for insulator chains MV type Kr-16 pcs. 14,200.

7. Earring for insulator chains MV type O-16 pcs. 12,000.

8. U-shaped connecting bracket (U-bolt) M16x120 complete with plate issue. 14,200.

Electrical machinery, apparatus, equipment and consumables; lighting

„ЧЕЗ Разпределение България“ АД | Published December 15, 2016  -  Deadline January 30, 2017

The Management Board of "CEZ Distribution Bulgaria", as sectoral contracting procurement within the meaning of Art. 5 para. 4 pt. 2 of PPL performing sector activity under Art. 123 pt. 2 in conjunction with Art. 125, para. 1 pt. 1 of the Public Procurement Act and § 2 pt. 60 of the Additional PPL basis of special or exclusive rights within the meaning of § 2 pt. 47 of the Public Procurement Act, detect, and held an "open" types of procedure for the award of procurement contract "Supply of rectangular plastic cover for cable shafts class B125, sizes (900/600/80)", Ref. № PPD 16-103.

"Supply of rectangular plastic cover for cable shafts, Class C 125 sizes (900/600/80)."

The subject of the contract is not divided into lots and includes the following items:

1. Polymer cover in 125, (900/600/80) mm pcs. 6400.

2. Tool lift (key) of polymer cover in 125 pieces. 96.

"Supply of electricity. Materials and electrical. Spare parts for the needs of street lighting Kameno municipality in 2017"

Община Камено, област Бургас | Published January 19, 2017  -  Deadline January 27, 2017
Критерият за оценяване на офертите е „ИКОНОМИЧЕСКИ НАЙ-ИЗГОДНА ОФЕРТА“ – „ОПТИМАЛНО СЪОТНОШЕНИЕ КАЧЕСТВО/ЦЕНА”: 1. Показател 1 – “Предлагана цена” /Ц/ - с максимален брой точки – 60 и тежест на критерия – 60 %. Максималният брой точки получава офертата с предложена най-ниска цена за поръчката. Цената на поръчката се определя като сбор от единичните цени на прогнозните видове ел. материали и ел.резервни части, посочени в Техническите спецификации. Точките на останалите кандидати се опредeлят в съотношение към най-ниската предложена цена. При определяне на точките по този критерий, които ще получи съответния кандидат, се ползват следните формули: P min Ц= 60 х ------------, където P n Ц e символно обозначение на точките, които ще получи дадена оферта по Показател 1; 60 е максималният брой точки по Показател 1; Pn – цената, предложена от конкретния /n-ия/ кандидат; Pmin – най-ниската предложена цена. 2. Показател 2 – “Срок на доставка, но не по-малко от 1 (един) работен ден и не повече от 5 (пет) работни дни” /С/ - с максимален брой точки – 20 и тежест на критерия – 20 %. Максималният брой точки получава офертата с предложен най-кратък срок на доставка. Срокът се посочва в РАБОТНИ ДНИ и не може да бъде по-кратък от 1 (един) работен ден и не по-дълъг от 5 (пет) работни дни. Дните за доставка се борят от деня, последващ заявката, и изтичат до края на работното време на Възложителя на съответния ден. Работните дни се определят съобразно работното време на Възложителя. Кандидат, предложил срок, който не отговаря на по-горните изисквания, ще бъде отстраняван от процедурата и няма да бъде допускан до оценка и класиране. Точките на останалите кандидати се опредeлят в съотношение към най-краткия срок на доставка. При определяне на точките по този критерий, които ще получи съответния кандидат, се ползва следната формула: P min С= 20 х ------------, където P n С e символно обозначение на точките, които ще получи дадена оферта по Показател 2; 20 е максималният брой точки по Показател 2; Pn – срокът, предложен от конкретния /n-ия/ кандидат; Pmin – най-краткия предложен срок за доставка. 3. Показател 3 – “Отстъпката в % от цени в търговски обекти (не по-малка от 1 % и не по-голяма от 40 %) за стоки извън конкретно посочените в Техническата спецификация” /О/ - с максимален брой точки – 20 и тежест на критерия – 20 %. Максималният брой точки получава офертата с предложен най-голям процент на отстъпка. Отстъпката се посочва в % и съставлява число с най-много два знака след десетичната запетая. Отстъпката не може да бъде по-малка от 1 % и по-голяма от 40 %. Кандидат, предложил размер на отстъпката, по начин, различен от указаното по-горе, ще бъде отстраняван от процедурата и няма да бъде допускан до оценка и класиране. Точките на останалите кандидати се опредeлят в съотношение към най-дългия гаранционен срок. При определяне на точките по този критерий, които ще получи съответния кандидат, се ползва следната формула: P n О = 20 х ------------, където P max О e символно обозначение на точките, които ще получи дадена оферта по Показател 3; 20 е максималният брой точки по Показател 3; Pn – отстъпката, предложена от конкретния /n-ия/ кандидат; Pmin – най-голямата предложена отстъпка. Общият брой точки, който ще получи всеки кандидат се определят по следната формула: К = Ц + С + О К е общият брой точки, който ще получи всеки кандидат; Ц e символно обозначение на точките, които ще получи дадена оферта по Показател 1; С e символно обозначение на точките, които ще получи дадена оферта по Показател 2; О e символно обозначение на точките, които ще получи дадена оферта по Показател 3; Офертите ще бъдат отворени на 31.01.2017 год. от 10:00 часа в сградата на Община Камено.

Implementation of repair and electrical installation activities for primary and auxiliary equipment and systems in nuclear power units 5 and 6 at the time and / or associated with planned annual outages in 2017

АЕЦ Козлодуй ЕАД | Published January 6, 2017
Planned in 2017 activities mainly volume and ancillary equipment and systems of Units 5 and 6 at the time and / or associated with planned annual outages is intended to achieve the following EP-2 objectives: 1.Deynosti relating to extension operation of units 5 and 6, and general plant equipment. 2.Deynosti in carrying out planned repairs, according to the long-term schedule of Units 5 and 6 for the EP-2 does not have the necessary resources for implementation. 3.Deynosti on improving the operational status of SSCs in accordance with the criteria of WANO. Applications may be submitted for one, several or all lots.

Supply through the purchase of building materials, plumbing, electrical., Ventilation and others. parts and consumables for maintenance and repair of buildings, premises, plant and equipment of the National Assembly

Народно събрание /НС/ на Република България /РБ/ | Published January 17, 2017  -  Deadline January 26, 2017
Tenders must be submitted to the National Assembly Square. "Bk. Alexander I" № 1 Department "General Office" - clerk, tel. 02 / 939-30-59. Date and time of opening of tenders: 01/27/2017 d ., 10:00. Place of bid opening: the National Assembly Square. "Bk. Alexander I "№ 1, room 132.

"DELIVERY BY PURCHASE, INSTALLATION AND MAINTENANCE WARRANTY OF WHITE EQUIPMENT INCLUDING ELECTRICAL DEVICES FOR HEATING AND COOLING" FOR THE NEEDS OF TA "DGS- HISSAR"

ЮЦДП, ТП ДЪРЖАВНО ГОРСКО СТАПАНСТВО ХИСАР | Published December 19, 2016  -  Deadline January 24, 2017
"Supply by purchase, installation and warranty maintenance of appliances, including electric devices for heating and cooling" for the needs of TP "DGS Hisar", namely a number of inverter air conditioner • Capacity (BTU): 12 000 and a number of inverter air conditioner • Capacity (BTU): 18 000 technique is required to furnish forest home "Koshovitsa" managed by the farm in order to offer full service to visitors and to ensure normal working conditions during the summer months in rooms with sunny exhibition in the administrative building c. Hisar.

Modernization of electric cranes 5UQ13E02a, 5UQ13E02b, 6UQ13E02a, 6UQ13E02b with Q = 10t in IB Units 5 and 6, line B-B, elevation 42: Design ... Read more in II.2.14

АЕЦ Козлодуй ЕАД | Published January 11, 2017  -  Deadline February 15, 2017
Modernization of electric cranes 5UQ13E02a, 5UQ13E02b, 6UQ13E02a, 6UQ13E02b with Q = 10t in IB Units 5 and 6, line B-B, elevation 42: Design of mechanical and electrical parts of taps, supply and installation of 4 pieces of electric materials and equipment within the scope of the terms of reference included detailed design, procurement of necessary equipment and spare parts, dismantling the old equipment, installation, NDP and commissioning of newly delivered equipment.

Electricity

Национален Осигурителен Институт чрез ТП на НОИ — Шумен | Published November 25, 2016  -  Deadline February 2, 2017

Delivery of net electricity - low voltage contractor, coordinator of standard balancing group, with full administration of information flow with ESO and defraying the imbalances.

The estimated consumption in mWh of the contracting authority is specified in the documentation for participation.