Call +44 800 9755 164

Public tenders for electrical in Quevy-le-petit Belgium

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!
ElectricalBelgiumquevy-le-petit

Invitation to submit offers - Warnings compliance of building of the Technical Board - Negotiated procedure with direct advertising

Commune de Quévy | Published November 23, 2015  -  Deadline December 16, 2015
cpvs
45331100, 35111000, 45261900, 45311000, 45312000

Brought into electrical fire compliance and buildings of the Technical Board; replacing the oil-fired boiler with a condensing gas boiler; Installation of regulation coupled with a remote management system and repairs to the roof and gutters bins.

qualification system for the selection of low voltage electrical energy suppliers (400 V and 230 V) required for the operation of the metro and trams of the STIB

Société des Transports Intercommunaux de Bruxelles - Procurement & Logistics Department | Published February 26, 2016
cpvs
09310000

qualification system for the selection of low voltage electrical energy suppliers (400 V and 230 V) required for the operation of the metro and trams of the STIB

Invitation to submit offers - Improved and implemented in accordance with the local school Quévy-le-Petit - Negotiated procedure with direct advertising

Commune de Quévy | Published November 7, 2014  -  Deadline December 2, 2014
cpvs
45214200

Subsidized work within the Priority Program Works and 2013. Including exceptional UREBA including: - Asbestos - Replacement of exterior joinery - Replacement of roof and insulation - Installation of a gas condensing boiler - Installation of centralized technical management - Commissioning electrical compliance - Set Fire Compliance - Repairs to court

STIB network - Supply of equipment (electricity, data, fiber optic)

Société des Transports Intercommunaux de Bruxelles-Infrastructure | Published November 10, 2016  -  Deadline December 22, 2016
cpvs
45311000

The Framework Agreement is to achieve electrical connection work and Telecom of equipment located on the STIB network (underground and surface).

As required, the work will include:

- Excavation work for anchoring a vending machine, a pole, an electrical cabinet ... ..

- Of trenches and / or road crossings by boring, directional drill.

- Laying various sheaths, fiber blown tubes, tours bedroom, cable ladders ...

- Electrical Connections and Telecom assisted by dealers

- Complete electrical installation (supply of cabinet, drums, energy meter, lighting, realization of land, receptions by approved organizations)

- Establishment of permit applications to the competent authorities according to the legislation applied

- Technical coordination of work

- Preparation of as-built record

The framework agreement will be for a period of 3 years with the possibility of annual termination on the anniversary reserved for 2 Party by giving 9 months.

Acquisition of a complete transportation set of standard bus "low floor" of type "overnight charging" exclusively with electric motors and electrical charging system including the design, supply, installation, commissioning and Maintenance to perform an experiment of this equipment in a commercial operating environment

Société des Transports Intercommunaux de Bruxelles - Procurement & Logistics Department | Published June 24, 2016  -  Deadline August 1, 2016
cpvs
34120000

Acquisition of a complete transportation set of standard bus "low floor" of type "overnight charging" exclusively with electric motors and electrical charging system including the design, supply, installation, commissioning and Maintenance to perform an experiment of such equipment in the operating environment.

A comprehensive guarantee of minimum 2 years for buses and the electrical charging system is required

In mandatory options:

• a service contract for the vehicle and the charging system.

• a contract to supply spare parts for the vehicle and the charging system.

Mandatory variant:

• Acquisition with recovery of all equipment after the experimental phase

This contract is for an amount of about five buses bus with their charging systems.

Acquisition of a full midi transport all type "overnight charging" exclusively with electric motors and electrical charging system including the design, supply, installation and commissioning to achieve such an experiment equipment in a commercial operating environment

Société des Transports Intercommunaux de Bruxelles - Procurement & Logistics Department | Published June 22, 2016  -  Deadline July 25, 2016
cpvs
34120000

Acquisition of a full midi transport all type "overnight charging" exclusively with electric motors and electrical charging system including the design, supply, installation and commissioning to achieve such an experiment equipment in a commercial operating environment.

A minimum of 2 years global warranty for buses and electric recharging system is requested.

In mandatory options:

• a service contract for the vehicle and the charging system.

• a contract to supply spare parts for the vehicle and the charging system.

Mandatory variant:

• Acquisition with recovery of all equipment after the experimental phase.

This contract is for an amount of about 8 midi with their charging systems

Framework agreement for the supply and installation of electrical equipment and the draw and connection of different cables required for 900V operation of the future deposit Erasmus Metro STIB

Société des Transports Intercommunaux de Bruxelles (STIB) | Published March 17, 2015  -  Deadline April 27, 2015
cpvs
31170000, 31214500, 31680000, 45311000, 45317000, 51110000

The subject of the contract consists of the conclusion of a framework agreement for the supply and installation of electrical equipment and the draw and connection of different cables required for 900V operation of the future deposit Metro Erasmus. Are particularly concerned by this contract the supply and installation of the following: - The transformer-rectifier for the production of 900 VDC traction. - Tables "feeders" 900 VDC. - Tables "minima" 900 VDC. - The table of "returns". - Table of land. - Control cabinets and relay control. - Contactors tables for the track power. - Transformers - 50 kVA rectifiers for power sockets 900 V DC. - Enclosures made 900 Vdc, including media and signaling relay systems and power. - The 900 VDC power systems and mobile power rails 900 VDC air. - Control and Signaling Boxes. - The presence of signaling equipment voltage 900 V DC, as well as contacts and security related servo - Switching / Trigger 900 Vdc. - Equipment cathodic protection. - Any other equipment to the proper operation of the repository Erasmus. Are also included in this market - The draw of all power cables (11 kV, 900 V) positive and negative. - Installation of all power cables from devices. - The supply and the realization of cable heads. - The supply and placement of any other cables necessary for the proper functioning of the deposit. Supply and placement of ladders and cable trays been another market. The supply cables, besides the small wiring, not part of the contract but will be under the care of the STIB.

Renewal and / or adaptation of electrical equipment HV / LV six interconnection substations STIB 36kV / 11kV and 11kV

Maatschappij voor het Intercommunaal Vervoer te Brussel - Procurement & Logistics Department | Published April 28, 2016  -  Deadline June 6, 2016
cpvs
31200000, 31300000, 31670000, 31680000, 31700000

The market consists of the following:

- The study, supply, installation and connection of 11kV HT tables with redundant protection relay incorporating IEC61850 communication protocol (one table per substation).

- The study, supply, installation and connection of auxiliary tables 3x230V to redundant power source (one table per substation).

- The study, supply, installation and connection of auxiliary tables 110Vdc source redundant power (one table per substation).

- The study, supply, installation and battery-charger connection 110Vdc (two systems substation).

- The study, supply, installation, adjustment and connection of HT cable connection boxes on existing distribution transformers 25MVA with a view to connect type terminal "Plug connectors".

- The study, supply, installation and connection of meters for each 11kV circuit interconnection substations.

- The study of selectivity for establishing settings and paramétries transformer protection relay 36kV / 11kV and parameterization of distribution transformers regulating relay following the operating mode (parallel ON / OFF). The control relays are suitable for controlling setters current load distribution transformers.

- The study, supply, installation and connection of protective enclosures, monitoring and control of distribution transformers 36kV / 11kV for three interconnecting substations (SST LESSINES INTER, INTER Esseghem SST, SST INTER WOLUWE) in respect of taxes Elia.

- The design, supply, installation and connection of 11kV cells on the table HT existing INTER SCHAARBEEK to allow its extension.

Acquisition of a complete transportation set of articulated buses "low floor" of type "opportunity charging" exclusively with electric drive

Société des Transports Intercommunaux de Bruxelles - Procurement & Logistics Department | Published June 27, 2016  -  Deadline August 4, 2016
cpvs
34121200

Acquisition of a complete transportation set of articulated buses "low floor" of type "opportunity charging" exclusively with electric motors and electrical charging system including the design, supply, installation and commissioning for to perform an experiment of this equipment in a commercial operating environment.

The charging system should include recharging points at terminals and conduction-type deposits.

A minimum of 2 years global warranty for buses and electric recharging system is requested.

In mandatory options:

• a service contract for the vehicle and the charging system

• a contract to supply spare parts for the vehicle and the charging system.

Mandatory variant:

• acquisition with recovery of all equipment after the experimental phase.

This contract is for an amount of about 25 buses with their charging systems

Qualification system for the selection of high-voltage electrical energy suppliers (11 kV and 36 kV) required to operate the metro and tram STIB

Société des Transports Intercommunaux de Bruxelles (STIB) | Published December 9, 2014
cpvs
09310000

Système de qualification pour la sélection de fournisseurs d’énergie électrique haute tension (11 kV et 36 kV) nécessaire à l’exploitation du réseau de métro et de tramways de la STIB

Performing risk analysis "health & safety" for different electrical installations operated by STIB (TS / Infra) based on the Royal Decree of 4 December 2012.

Société des Transports Intercommunaux de Bruxelles - Achat et Logistique | Published May 13, 2015
cpvs
71317000, 71700000, 71600000, 22349611

Réalisation d’analyses de risques « health & safety » pour différentes installations électriques exploitées par la STIB (TS/Infra) sur base de l’arrêté royal du 4 décembre 2012.

Assistance to electric energy supply contracts

Société des Transports Intercommunaux de Bruxelles - Achat et Logistique | Published July 27, 2015
cpvs
71314000, 71314100, 71314200, 22349611

Assistance aux contrats de fourniture d’énergie électrique

Making appropriate, adapt and expand classes - electricity

Architectenbureau lannoy | Published February 24, 2015  -  Deadline April 3, 2015
cpvs
45000000

Making appropriate, adapt and expand classes - electricity

AC - Création et Modification d'installations électriques-Métro et immeubles diverse

Maatschappij voor het Intercommunaal Vervoer te Brussel (MIVB) | Published March 2, 2015  -  Deadline April 9, 2015
cpvs
45311200, 45310000, 45311000, 45311100, 45317000, 45316000

The framework includes the construction or modification of low voltage electrical installations (study, supply, implementation, completion and updating the file as built) in the metro and pre-metro of the Brussels-Capital Region, as well as in various buildings of the STIB. These systems cover the lighting, sockets, data, pulling cables, ... The framework contract will be concluded for a period of 4 years, with the possibility of termination after one year, at any time, taking into account a notice period of 9 months by registered letter. STIB is not required to place orders for the estimated amount of the framework agreement.

Training related to prevention and safety

Maatschappij voor het Intercommunaal Vervoer te Brussel - Procurement & Logistics Department | Published April 24, 2015  -  Deadline June 2, 2015
cpvs
80500000, 80531000

STIB looking for a provider who can provide recurrent training related to the prevention and safety and which may accompany the STIB in the development of customized training. The provider should be able to organize the following courses: Basic -Secourisme -Secourisme (recycling) -Assistance Consultant's office electrical incidents prevention Level 3 -Amiante - -Amiante prevention - loads -Manutention -Awareness Removal of the hierarchy to security - Safety signs for road projects in industrial accident -Analysis -Animer a toolbox meeting -VCA -VOL VCA electric -Risks (BA4-BA5)

Framework agreement for the deployment of HVAC installations and low voltage in the local ICT and GIS different subway stations of the Brussels Region

Société des Transports Intercommunaux de Bruxelles - Service Spécial d'Etudes | Published September 22, 2016  -  Deadline November 17, 2016
cpvs
45331200, 45310000

The market covered by this special specification includes all supplies, services and works contained in their principles in this specification and defined in the descriptive bill of quantities, and in any other contractual document.

This business is to work and supplies needed for the installation of HVAC and low voltage in the local ICT and GIS in various metro stations of the Brussels Region.

This is among other things:

- From the supply, installation, connection and commissioning of low voltage electrical equipment, HVAC and fire detection and renewal of existing facilities of local ICT and GIS in various metro stations network of the Brussels Region -Capital city

- Replacing the existing lighting by a lighting system;

- The establishment of point lighting apparatus;

- The renewal of distribution boards;

- Small rearrangements of premises (masonry, painting, walls);

- A local access control.

At the request of the contracting authority, this work may have to be made in various metro stations of metro and pre-metro Brussels-Capital Region. The bidder takes account of this aspect in its offer.

The tenderer's attention is drawn to the need to ensure continuity of business service and to respect the accessibility of facilities of the station (see Article 79 - Organization of construction of this specification).

Civil Engineering Study and the completion of the transformation of ALBERT station and construction of a tunnel

Maatschappij voor het Intercommunaal Vervoer te Brussel - Speciale studiedienst | Published July 15, 2015  -  Deadline September 22, 2015
cpvs
71000000

The market covered by this special specifications is to complete Mission Project author on the study of civil engineering and the completion of the transformation of ALBERT station (tram and underground levels) and construction a tunnel under the Forest Park. The project therefore includes: o The redevelopment of -2 level of the station to accommodate the metro there (enhances and building docks, local development ...); o The development of a tram terminus at level -1 of the station (Jupiter side); o Adaptation of Jupiter hopper with the construction of tram tracks on level -1 and subway station back on level -2 o The adaptation of Albert hopper with the construction of tram tracks at -1; o The inclusion of two 6 lifts from the surface of which at -1 and 4 connecting the -1 and -2; o The layout of the station crossing station (with stop) in the east-west axis at -1; o Expanding the -1 level access on the Albert slab; o Construction of a tunnel under the Forest Park between the level -1 of the station and a hopper located on the street Wielemans Ceuppens; o The full completion of the station and the integration of any work of art; o The study of integration of all electrical and electromechanical and thermal equipment.

MISSIONS D'ENGINEERING

Maatschappij voor het Intercommunaal Vervoer te Brussel - Procurement & Logistics Department | Published June 16, 2015  -  Deadline July 13, 2015
cpvs
79620000

The STIB is looking for companies that have people who can carry out tasks of engineering expertise, technical assistance, assistance for drawing, management of projects (studies or implementation), and management of sites. The contract is divided into 3 areas: - Electrical engineering (MS and HS electricity), mechanics, electronics and techniques of buildings - Railway techniques (laying of tracks, overhead lines and signaling) - The telecommunications and industrial computing Tenderers may bid submit one or more domains. After making any award of the contract and when the STIB a need known to support one of the targeted missions of the mission, the beneficiary will firms, classified according to the results of the evaluation of the award criteria, an application for execution of engineering job gain in the order of award. The best placed successful tenderer in this ranking will deliver one or more curriculum vitae which, in terms of the required experience, to meet the specific requirements of the relevant contract (s) and specify the availability. If the beneficiary is best placed for the searched item can not answer the task requested, the next recipient in the list will be written and this is paid to the question.

Marconi dépôt the tramways - Installation de signalisation ferroviaire & système de gestion et de supervision des tramways - SSU 1987/2015

Société des Transports Intercommunaux de Bruxelles-Infrastructure | Published May 21, 2015  -  Deadline June 22, 2015
cpvs
45234115, 34942000, 72212140

Administrative and social building is intended for starting the service of the directors, the mechanics and administrative staff that deals with the control and operation of the site. The "Marconi" is organized as follows: - a preliminary stage for the realization of the temporary placement of 6 tracks for parking trams; This aims to allow the early garage of 30 trams from the T3000 to the realization of future depot "Marconi"; -. A general contractor (i) will build the buildings, halls and parking lots of the depot, (ii) will supply the equipment for the maintenance of rolling stock and places, (iii) will supply the equipment of the electrical substation and places, (iv) will provide access tracks and the immediate area, (v) will put the tracks and switches, (vi) other assignments will coordinate taking place on the site and will ensure the site logistics of the whole; These various contractors must work with the general contractor (mentioned in the previous paragraph) to coordinate the entire project "Marconi". Today the previous phase has been completed and the general contractor will be appointed in early 2015; FORECAST the duration of the construction is 22 months. Of the aforementioned various contractors is the point (b) relating to this assignment.

ACCORD CADRE POUR LE NEZ Renforcement DES QUAIS THE DANCE LESSON THE SUBWAY STATIONS BRUXELLES

Maatschappij voor het Intercommunaal Vervoer te Brussel - Speciale Studiedienst | Published March 11, 2015  -  Deadline April 16, 2015
cpvs
45262300, 45262310

By the present special specifications regular assignment includes all supplies, services and works listed in the present special specifications in their principles, which are more fully put into descriptive measuring state, as in all other contract documents. The mission, whose boundaries are indicated on the procurement plans, aims to strengthen the platform noses in the Brussels metro stations Very important: As part of the computerization program of the Brussels metro one will equip the stations on Line 1 and 5 with glass walls over their entire length. It will strengthen the platform noses to bear the burden of these glass walls. Since one must not disrupt the operation of the subway, the work can only take place outside the operating hours (1:15 am and 4:30 pm) or in exceptional closures during the weekend (Saturday to Monday at 1h30 to 4h30 = 51u). STIB will replace two bills per year, this will be closures during the weekend (decommissioning of the stations) plans. The Special Study (SSD) would like to take this opportunity to work to strengthen the platform noses in the stations in question, simultaneously perform the work to replace the aforementioned changes. It is useful to clarify that, by the simultaneous implementation of these works, the STIB nor carriages own work, or any other means or tools for loading and unloading can be made available to the tenderers. The works include: Work before the closure during the weekend: • supplying and storing the materials; • Charge the ballast and remove; • Create support for the ballast; • Perform the chemical anchoring in the bed; • Create the walls of shuttering blocks; • the platform noses saw et partial cutting Working during the weekend closure: • saw the platform noses, cutting and clearing away; • Perform the chemical anchoring in the platform plate; • placing the precast reinforced concrete or stable elements; • Insert the connection concrete or concrete two-phase; • place a provisional floor; Working after closure during the weekend: • the corner of the platform gutters noses places; • make the coating; • the work associated with finishing (tiles, contact plates ...). The adoption does not include: • the electrical, electromechanical and thermal equipments of the art, unless it is stated otherwise in the descriptive or summary of quantities;