Call +44 800 9755 164

Public tenders for electrical in Mol Belgium

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Call for application to participate - Electrical submersible pumping system for Geothermal Project Mol

VITO | Published July 18, 2016  -  Deadline August 18, 2016
cpvs
51541100, 42122000, 43131100

The purchase, delivery and commissioning of Electrical submersible pumping system for Geothermal Project Mol. (Min 1, max 4)

Delivery of electrical equipment

VITO | Published February 12, 2015  -  Deadline March 31, 2015
cpvs
31680000, 31681410

Supplying all kinds of electrical equipment and supplies for renovation, repair, maintenance and possible expansion of the existing electrical installations on the VITO domains. The awarding of this contract to the contractor provides no exclusivity.

Electrical supplies and accessories

VITO | Published February 17, 2015  -  Deadline March 31, 2015
cpvs
31680000, 31681410

Supplying all kinds of electrical equipment and supplies for renovation, repair, maintenance and possible expansion of the existing electrical installations on the Vito domains. The awarding of this contract to the contractor provides no exclusivity.

Installation services of mining machinery

VITO | Published July 19, 2016  -  Deadline August 18, 2016
cpvs
51541100, 42122000, 43131100

De aankoop, levering en indienststelling van een Electrical Submersible pumping system voor Geothermie Project Mol (min. 1, max. 4).

Framework contract for performing maintenance, reconstruction and adaptation works on electrical installations.

VITO | Published August 24, 2015
cpvs
45310000, 45311100, 45317000, 50711000, 51110000

This assignment must lead to a non-exclusive agreement with a single contractor for carrying out the works. The term of the framework contract is 4 years. The contracts based on framework contracts shall be further specified in the contract documents "year order." The term of a year order within the framework agreement is 12 months. Within the year, a work order will be placed an order on demand (service request) for effective implementation. No minimum offtake be guaranteed. All amounts are estimated amounts indicated in these specifications. Explanation: The command to run for the manual labor for the maintenance, renovation and adaptation works on electrical installations in the fields VITO in Mol and Berchem. The contractor is supposed to be in possession of the necessary tools and PPE for the execution of this contract. The materials needed to carry out maintenance, conversion and adaptation works on electrical installations are supplied by VITO.

Framework contract for performing maintenance, alteration and adaptation work on the electrical systems.

VITO | Published June 22, 2015  -  Deadline August 4, 2015
cpvs
45310000, 45311100, 45317000, 50711000, 51110000

This assignment must lead to a non-exclusive agreement with a single contractor for carrying out the works. The duration of the framework agreement is 4 years. The contracts based on framework contracts are named in the contract documents "year order." The term of a year order within the framework agreement is 12 months. Within the year a work order will be placed an order on demand (service request) for effective implementation. No minimum withdrawals be guaranteed. All amounts are estimated amounts indicated in these specifications. Explanation: The command to run as the manual labor for the maintenance, renovation and adaptation works on electrical installations in the fields VITO in Mol and Berchem. The contractor is supposed to be in possession of the necessary tools and PPE for the execution of this contract. The materials required for the execution of the maintenance, renovation and adaptation works on electrical installations are supplied by VITO.

Installation services of electrical and mechanical equipment

VITO | Published November 30, 2016  -  Deadline January 3, 2017
cpvs
51100000, 50000000, 51000000, 71300000, 76200000

Once available the product specifications of the chosen product and its contractor will be paid to the tenderer.

Electrical, electromagnetic and mechanical treatment

VITO | Published March 7, 2015
Winner
Netzsch Trockenmahltechnik GmbH
cpvs
33158000, 38425400

The purpose of this is to gain a purchase device that ceramic and metallic powders can grind dry. In the grinding, there may not be possible contamination of the powders to be ground.

Qualification System - Project Relocation of ETE laboratory VITO Mol to Energyville-Waterschei

VITO | Published November 4, 2015  -  Deadline December 14, 2015
cpvs
63710000, 45111300, 45255400, 98392000

Project Relocation of ETE laboratory VITO Mol to Energyville-Waterschei including disassembly, transport and assembly of (electrical) installations.

Electricity

Heilig Hartziekenhuis Mol | Published November 20, 2015
Winner
Electrabel SA
cpvs
09310000, 09123000

Supply of electricity and natural gas.

Electricity

Heilig Hartziekenhuis Mol | Published July 25, 2015  -  Deadline September 8, 2015
cpvs
09123000

Supply of electricity and natural gas.

Supply of electricity and natural gas

Heilig Hartziekenhuis Mol | Published November 17, 2015
cpvs
09310000, 09123000

Supply of electricity and natural gas

Supply of electricity and natural gas

Heilig Hartziekenhuis Mol | Published July 22, 2015  -  Deadline September 8, 2015
cpvs
09310000, 09123000

Supply of electricity and natural gas

Liquid filtering or purifying machinery and apparatus

VITO | Published July 8, 2016  -  Deadline August 23, 2016
cpvs
42912000, 51514100

Purchase and commissioning of a plant for nanofiltration ceramic membranes.

The plant consists of a number of separate, moveable parts which are to be connected with each other:

- 400 l of a storage tank having therein the liquid to be treated on slight nitrogen overpressure,

- A unit with pumps, heat exchangers, membranes built into a housing, control valves, etc.

- A control unit with electrical control cabinet and PC. Preferably, this control unit mounted on the unit with pumps, membranes and the like.

Purchase and commissioning of mobile solvent filtration plant

VITO | Published July 4, 2016  -  Deadline August 23, 2016
cpvs
42912000, 51514100

Purchase and commissioning of a plant for nanofiltration ceramic membranes.

The plant consists of a number of separate, moveable parts which are to be connected with each other:

- 400 l of a storage tank having therein the liquid to be treated on slight nitrogen over-pressure

- A unit with pumps, heat exchangers, membranes built into a housing, control valves, etc.

- A control unit with electrical control cabinet and PC. Preferably, this control unit mounted on the unit with pumps, membranes and the like

- ...

Mission complète d'étude et de suivi des travaux de rénovation des installations électriques 235 logements sociaux sis Square Jacques Franck 1 et 2, rue Egide Walschaerts 51 rue et Montenegro 56 à 1060 Bruxelles, dans une vision durable et écologique.

Foyer Du Sud scrl | Published September 23, 2015  -  Deadline November 3, 2015
cpvs
71000000

The mission is focused on the identification of a designer charged with the full contract for the study and monitoring of the works for the renovation of electrical installations of 235 social housing units located Jacques Franck Square 1 and 2, Egide Walschaertsstraat 51 and Montenegro Street 56 to 1060 Brussels within a sustainable and ecological vision and approach. The budget of the work amounts to 1,287,063.00 euros excl. VAT, fees, connection fees public utility companies and other miscellaneous expenses. For this contract, the contracting authority wishes to appoint an engineer special techniques.

Appel à demandes de participation - Study renovation of shaft 1

ESV EURIDICE GIE | Published October 10, 2016  -  Deadline November 10, 2016
cpvs
71300000

The design of the new collection system and the installation work will be the subject of a future contract (see below).

Object of the service is:

• Implement a stability study of the existing concrete shaft 1 and designs, if necessary, a remediation

(Possible hold point for the replacement of the pick-up plant and other equipment itself)

• listing of the following laws and regulations (Machinery Directive, risk analysis, permit requirements, KB's, ...) for the implementation (design and installation work).

• Support for the contract to design the new pick-up installation and placement works, comprising:

O Specifications for the retrieval system with shaft tower and shaft bottom platform based on performance specifications.

O Cutlery including design (as far as possible) for machine building / building utilities

O Cutlery including the design of the electrical equipment for the new plant and part of the underground laboratory HADES.

O Cutlery including design of the shaft equipment: cage ladder, ventilation tube, high pressure water, compressed air pipes, electrical wiring for the underground laboratory, lighting, ...)

• Support for the award of a public contract 'design and installation works "and supervise the works.

The different tasks are further described later in the technical provisions.

Engineering services

ESV Euridice GIE | Published October 15, 2016  -  Deadline November 10, 2016
cpvs
71300000

The design of the new collection system and the installation work will be the subject of a future contract (see below).

Object of the service is:

- Carrying out a stability study of the existing concrete shaft 1 and, if necessary, design a remediation (possible hold point for the replacement of the pick-up and installation of other equipment itself);

- Listing of the rules and regulations to follow (Machinery Directive, risk analysis, permit requirements, KB's, ...) for the implementation (design and installation work);

- Support for the contract to design the new pick-up installation and placement works, comprising:

O specifications for the retrieval system with shaft tower and shaft bottom platform based on performance specifications,

O specifications including design (as far as possible) for machine building / building utilities,

O specifications including design of the electrical equipment for the new plant and part of the underground laboratory HADES

O specifications including design of the shaft equipment: cage ladder, ventilation tube, high pressure water, compressed air pipes, electrical wiring for the underground laboratory, lighting, ...);

- Support in the award of a public contract 'design and installation works "and supervise the works.

The different tasks are further described later in the technical provisions.

Engineering services

ESV Euridice GIE | Published October 27, 2016  -  Deadline November 10, 2016
cpvs
71300000

The design of the new elevator installation and the installation work will be the subject of a future public contract (see below).

Service is subject to:

- Implement a stability study of the old concrete pit and, if necessary, propose remedial

(Possible stop point for the replacement of the elevator installation and other equipment)

- Prepare a report containing the laws and regulations to follow (Machinery Directive, risk analysis, requirement of permits, royal decrees, etc.) for the implementation (design and installation work)

- Make the management of the public contract to design the new elevator installation and monitoring of works, including:

- Specifications for the elevator installation with its head frame and the bottom platform on the basis of performance specifications;

- Specifications including design (where possible) for construction machinery and utilities;

- The specification including the design of electrical systems for the new installation of the elevator and part of the underground laboratory HADES;

- The specification including the design of equipment in the mine shaft: cage ladder, ventilation tube, water pipe high pressure compressed air line, electrical wiring for the underground laboratory, lighting, .. ..

- The auction management "design and construction" of a public contract and supervision of works.

The tasks are described in more detail in the technical conditions.

H. HART COLLEGE Tervuren - appointment mandatory for architectural commission

H.-HARTCOLLEGE TERVUREN VZW | Published May 22, 2015  -  Deadline July 1, 2015
cpvs
71000000

Integrated architecture assignment comprises construction (architecture and stability) and integrated engineering services (plumbing, HVAC, electrical, elevator, acoustics ,.) with respect to the realization of the rebuilding and EXTENSION WORK IN H. HART COLLEGE TERVUREN The contract includes 1) prior measuring and digitizing (dwg format) of the remodel and expand buildings (monastery and building D) 2) Integrated architecture assignment concerning a) the refurbishment of the monastery and appurtenances to - open classroom with ancillary facilities - auditorium for 150 people - on split into two auditoriums for 75 people. b) including the extension of the existing primary school (building D) - build an additional floor (with 5 classes, care premises.) - the addition of a sanitary block.