Call +44 800 9755 164

Public tenders for electrical in Brussels Belgium

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Electrical machinery, apparatus, equipment and consumables; lighting

Elia Asset N.V. | Published December 23, 2016  -  Deadline January 29, 2017

The notice consists of the supply of transmission towers made of steel to be delivered in Belgium. Construction on site is out of scope. Painting is out of scope for general project but Elia reserves the right to request if for exceptional projects. There are 3 lots based on the lowest mean angles of the lattice tower:

Lot one: lowest mean Angles

Lot two: L120< lowest mean Angels>L200

Lot three: lowest mean Angles > L200

A maximum of 5 candidates for each lot will be selected for the establishment of a framework agreement. After the establishment of a framework agreement minicompetitions will be organized to award the contracts per project (with an awarding score taking into account the commercial, price and technical scores). For all lots, if there are not at least 3 candidates fulfilling all selection criteria, the Contracting party reserves the right to either cancel the lot or to select the best ranked non-selected suppliers to reach 3 suppliers.

The contract consists of the supply of transmission towers made of steel to be delivered in Belgium. Construction on site is out of scope. Painting is out of scope for general project but Elia reserves the right to request if for exceptional projects. Framework agreements (maximum 5) will be established for the lot. After the establishment of a framework agreement a mini-competition will be established per project.

Transformers

Elia Asset s.a. | Published January 10, 2017

Transformers.

Liquid dielectric transformers.

Voltage transformers.

Instrument transformer.

Power supply transformers.

Electrical apparatus for switching or protecting electrical circuits.

Circuit breakers.

Overhead circuit breakers.

Switchgear.

Switches.

Outdoor switching installations.

Distribution switchboards.

Lightning conductors.

Insulated wire and cable.

Power distribution cables.

Electricity power lines.

Overhead power lines.

Low- and medium-voltage cable.

Medium-voltage cable.

High-voltage cable.

Insulated cable junctions.

Electricity supplies.

Overhead electrical equipment.

Overhead cable carriers.

Emergency power supplies.

Telecommunications cable.

Optical telecommunication cables.

Electricity meters.

Electrical insulators.

Towers, lattice masts, derricks and pylons.

Pylons, poles and pickets.

Pylons.

Electricity transmission pylons.

Poles for carrying overhead lines.

Electricity poles.

Lattice masts.

Cable.

Additional materials are listed in chapter II.2.4).

Continuation of the list in chapter II.1.4):

Cable accessories.

Meter housings.

Optical-fibre cables.

Electricity.

Rectifiers.

Primary batteries.

Lead batteries.

Instruments for measuring electrical quantities.

Energy meters.

Remote-control equipment.

Digital remote-control unit.

Installation services of diesel engines.

Analytical or scientific software package.

Electric switchboards.

Capacitor banks.

Power converters.

Insulated cable accessories.

Protection boxes.

Electrical apparatus for switching or protecting electrical circuits.

Quantities and scope will be described in the requests for quotation.

Electricity

Societé bruxelloise de gestion de l'eau | Published December 2, 2016  -  Deadline January 17, 2017

The contract is for the supply of electricity:

- High voltage:

• Brussels-South wastewater treatment plant (WWTP-SUD). This station of 360,000 population equivalent, collect urban waste water in the southern part of the Brussels-Capital Region and a part of the territory of neighboring Flemish municipalities;

• pumping station wastewater that is in the network of collectors that brings this water to the Brussels-South wastewater treatment plant;

• 5 storm basins of SBGE. These ponds have capacities ranging from 16 000 to 40 000 meters 3 . Equipped with pumps and hydro-ejectors, they protect the flood valleys during heavy rainfall.

- Low voltage for measurement and network monitoring of wastewater, surface water and rainfall in the Brussels-Capital Region.

Het van Voorwerp said opdracht is de levering van elektriciteit:

- Hoogspanning voor:

o waterzuiveringsinstallatie Brussel-Zuid (RWZI-ZUID): deze installatie puts 360,000 inwonerequivalenten, verzamelt het stedelijk afvalwater zuidelijke van het deel van het Brussels Hoofdstedelijk Gewest en een deel van het grondgebied van de Vlaamse aangrenzende gemeenten;

o installatie voor het van oppompen afvalwater die zich in het net bevindt van dat collectoren said water vervoert naar de waterzuiveringsinstallatie Brussel-Zuid;

o 5 stormbekkens van BMWB: deze hebben een bekkens capaciteit tussen 16,000 to 40,000 m 3 . Door middel van pompen in dompelejectorbeluchters beschermen ze bij vallei tegen Overstromingen hevige regenval.

- Laagspanning meet- voor het in het van bewakingsnet afvalwater to oppervlaktewateren in rainfall in het Brussels Hoofdstedelijk Gewest.

Power distribution cables

Elia Asset SA | Published January 11, 2017

Works (electricity, civil works and related activities) for the execution or adaptations or high voltage electrical installations (substations, aerial and underground lines) for the year 2017.

Electrical works and related activities in or for high voltage substations (demolition works included if applicable).

Civil works and related activities in or for HV substations (foundation and demolition works included if applicable).

Assembly and mounting or adaptation or HV towers or poles.

Installation or adaptation aerial lines or cables.

Civil works (foundations ...) and related works / activities for overhead power lines.

Groundworks, drillings, laying of cables ... and related activities for the execution of underground lines (energy or telecom cables).

Painting of towers, equipment and installations.

General remarks:

The execution of (preparing) studies May be part of the scope, as well as the delivery of material or equipment and the coordination of additional related works or activities, as well as the coordination of works in synergy with / for other public utilities companies ( energy sector).

Travaux (électriques, GC et activités apparentées) dans le cadre de réalisations adaptations ou d'installations électriques haute tension (postes, lignes aériennes, liaisons souterraines ...) - année 2017.

- Travaux / électriques activités dans ou pour des postes HT (travaux démolition inclus si d'application)

- Travaux / GC dance activités ou pour des postes HT (travaux Fondations et démolition inclus si d'application)

- Assembly and assembly adaptation ou ou the pylones poteaux HT

- Installation ou adaptation of the conductors lignes aériennes,

- Travaux GC (Fondations ...) et activités apparentées dans le cadre de lignes aériennes,

- Travaux (Terrassements, forages, tirage de câbles ...) pour la réalisation the liaisons souterraines (câbles ou d'énergie télécom)

- Travaux de peinture (pylones, équipements et installa ...

Petroleum products, fuel, electricity and other sources of energy

ARP — service technique | Published November 29, 2016  -  Deadline January 19, 2017
The notification to the approval of its offer Bidder therefore does not bind the agency to commission him for a minimum overall amount and the supplier does not acquire the right to provide these quantities by the fact of conclusion of the contract. 

This contract does not prejudice the possibility for the Agency to use another service provider for specific missions without exclusivity for the contractor for this contract.

From kennisgeving aan de inschrijver van goedkeuring van zijn het Agentschap offered verbindt due er niet toe om bij hem een ​​bestelling te plaatsen voor een globaal minimumbedrag into opdrachtnemer Verwerft niet het recht om deze te hoeveelheden leveren door toekenning van opdracht.

Deze opdracht doet aan de evenwel geen afbreuk mogelijkheid voor het om een ​​Agentschap beroep te doen op een andere voor dienstverlener punctuele opdrachten, zonder exclusiviteit voor deze van opdrachtnemer opdracht.

Lighting equipment and electric lamps

Régie des bâtiments | Published November 29, 2016  -  Deadline January 23, 2017

This contract includes one lot, repeating:

- Tubular fluorescent lamps with preheated cathode, operating with the help of a starter, starters and compact fluorescent lamps;

- LED lamps;

- Metal halide lamps with ceramic burner.

Opdracht puts 1 perceel, die bevat:

- Buisvormige fluorescentielampen puts voorverwarmde kathode, die met een starter werken compact fluorescentie lampen in starters,

- LED lampen,

- Metaaljodidelampen puts keramische brander).

Electricity distribution and related services

Service public régional de Bruxelles, Bruxelles Mobilité | Published December 21, 2016  -  Deadline February 2, 2017

This contract is for the supply of electric power and the making available of the necessary power, voltage sampling points managed by the Directorate projects and refurbishments of roadways, Brussels Mobility. reference profiles to establish the offer are included in this specification.

The market is divided into 3 lots:

Lot 1: High voltage sampling points list 1.

Lot 2: low voltage sampling points in list 2.

Lot 3: Low-voltage sampling points in the list 3.

Price reductions for lots of groups are prohibited.

Deze heeft als opdracht Voorwerp of levering van elektrische energy into terbeschikkingstelling van het voor de nodige vermogen spanningsafnamepunten beheerd die worden door Brussel Mobiliteit, Directie Projecten in Werken inzake Weginrichtingen. From referentieprofielen voor het zijn van opstellen offered opgenomen said in bestek.

From opdracht is verdeeld in 3 percelen:

Perceel 1: 1 lijst van hoogspanningsafnamepunten.

Perceel 2: laagspanningsafnamepunten lijst van 2.

Perceel 3: laagspanningsafnamepunten lijst van 3.

Petroleum products, fuel, electricity and other sources of energy

Direction générale des infrastructures | Published December 23, 2016  -  Deadline January 30, 2017

procurement of electricity and natural gas for school offices network of the Federation Wallonia-Brussels.

Notice of call for expressions of interest — list of external experts to support the monitoring of the implementation of projects financed under the European Energy Programme for Recovery (EEPR) (gas and electricity infrastructure projects)

Europa-Kommissionen, Generaldirektoratet for Energi, afdeling for regionale netværk og initiativer | Published September 12, 2015  -  Deadline May 28, 2018
Notice of call for expressions of interest — list of external experts to support the monitoring of the implementation of projects financed under the European Energy Programme for Recovery (EEPR) (gas and electricity infrastructure projects)

Notice of call for expressions of interest — list of external experts to support the monitoring of the implementation of projects financed under the European Energy Programme for Recovery (EEPR) (gas and electricity infrastructure projects)

Europa-Kommissionen, Generaldirektoratet for Energi, afdeling for regionale netværk og initiativer | Published September 18, 2015  -  Deadline May 28, 2018
Notice of call for expressions of interest — list of external experts to support the monitoring of the implementation of projects financed under the European Energy Programme for Recovery (EEPR) (gas and electricity infrastructure projects)

Building completion work

Office national de sécurité sociale | Published December 8, 2016  -  Deadline January 18, 2017

The project concerns the internal redevelopment of the building according to the principles of the "New way of working" NWOW. The project has the following main headings:

- Dismantling and disposal of the existing partition.

- Extension of existing sprinkler systems (currently covering the whole level P1 and P2 to P6 levels of the axis 9 to the axis 14) so ​​as to entirely cover the levels P2 to P5.

- Adaptations of electrical and HVAC installation of the new project.

- New silos and finishings.

- Complete renovation of areas of specific functions P1 (Front Office, Mess, central area "Village Square" and "Horta for You."

Het project betreft herinrichtingswerken in het gebouw van volgens principles of "New way of working" NWOW.

Het volgende project bevat of belangrijke posten:

- Dismantling van bestaande compartimentering.

- Uitbreiding van bestaande sprinklerinstallaties (die hele verdieping momenteel of P1 to P2 verdiepingen early as 9 P6 van 14 tot as dekken) zodat ze de volledige verdiepingen P2 to P5 dekken.

- Aanpassingen aan de elektrische installaties in HVAC in functie van het nieuwe project.

- Nieuwe compartimenteringen in afwerkingen.

- Volledige renovatie van areas puts specifieke functies op P1 (Front Office, Mess, central area "in het Plein Dorp" to "Horta for You").

Architectural, construction, engineering and inspection services

Le Logement Bruxellois | Published November 29, 2016  -  Deadline January 16, 2017

The contract is the appointment of a team of authors of multidisciplinary project, in charge of a complete design work and monitoring the implementation of the reconfiguration of the site Rampart Rampart Street sis Moines Des Moines in 1000 in Brussels sustainable and ecological vision.

The reconfiguration project includes:

- Asbestos removal of 314 existing homes,

- The demolition of 314 existing homes,

- The possible pollution of land,

- The construction of 210 social housing for the Housing Brussels,

- The construction of 140 housing means for the City of Brussels,

- The construction of a car park in the basement with a capacity potentially up to 300 seats,

- Building local associations, a day care center for senior citizens and infrastructure for early childhood,

- Demolition eventual reconstruction of the gym on this site,

- The development of private and public surroundings and roads.

The project site is bounded by the Monks Bulwark of the street, the rue du Houblon, the Great Oath Street and Notre Dame du Sommeil.

The site is located in an urban environment, functionally diverse and heterogeneous in terms of templates.

The site is included in the contract area "Garden Flower".

A reflection on these subjects should be conducted by the project author (cf. report analyzing the current situation which will be sent to selected candidates).

Great attention should be paid to:

- The urban setting in which the project falls,

- The co-existence on the site of the various functions provided,

- Dialogue with the existing fabric,

- The architectural quality of the built and non-built,

- The definition and status of private and public spaces.

Great attention should be paid as soon as the design, minimizing the operation of nuisance to the occupants of the site and nearby residents.

The full mission design and execution control under this contract includes:

- Complete architectural work, including in particular the detailed study of constructive knots

- Complete engineering stability mission

- Complete engineering tasks of special building techniques (HVAC, plumbing, sanitary, electrical, vertical transportation, acoustic)

- A mission of "landscape architecture,

- A mission of design of roads,

- A full mission to advise PEB,

- A mission of Geomatics Engineering,

- A mission of environmental impact studies.

The participatory process management mission will be a separate market to later pass by the contracting authority.

The contracting authority will subscribe an all-risk insurance (TRC) and a ten-year insurance. As such, the author of the project will work with the technical control office whose mission will be a separate market to later pass by the contracting authority.

BIM protocol will be attached to CSC which will be sent to applicants invited to submit offers.

The project author will advise and accompany the client in his efforts with regional governments.

Their reports will be attached to the CCS which will be sent to applicants invited to submit offers:

- An analysis of the existing situation, particularly in terms of urban context and building regulations,

- A condition of the soil reconnaissance survey, which allowed to "identify sources of pollution,

- A first general campaign of geotechnical drilling was conducted,

- Analyzes of steel and concrete of existing buildings,

- An inventory of asbestos.

The budget of the works is € 58 million excluding VAT, excluding revision and out fees.

  • 1