Public tenders for electrical in Arlon Belgium

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

VIELSALM IESPSCF Construction of a boarding school and a kitchen-restaurant: electrical installation

Ministère de la Communauté française | Published January 9, 2015  -  Deadline February 10, 2015
cpvs
45311000

VIELSALM IESPSCF Construction of a boarding school and a restaurant kitchen: electrical installation. The work includes the completion of the electrical system, fire detection system, datas and a burglar alarm system (wiring only).

Procurement design and construction of two halls on the relay Vecmont EAP site at La Roche-en-Ardenne

Association intercommunale pour le développement économique durable de la province de Luxembourg | Published February 10, 2015  -  Deadline March 31, 2015
cpvs
45000000

All these halls will be accessible to disabled people and respect the General Regulations for the Protection of Workers. The tenderer's attention is drawn to the fact that the technique presented solution will be part of a lump sum of 570,000 Euro plus VAT envelope included design. These halls are divided as follows: 2 halls of 300 m² inside including administrative space. The use of these halls is not yet known, it is asked bidders to remain as flexible as possible, in the design and in the design of halls (fire codes, electrical installations, ... The balance of the plot should be managed with sustainable recovery and reuse of rainwater, oil separation system, planting native species and late mowing meadows. Apart from this, the site offers quick access to the water and the electricity. As part of its bid, the bidder contractually commits on advanced price.

VIELSALM IESPSCF - Construction and installation of a high-voltage transformer

Ministère de la Communauté française | Published February 19, 2015  -  Deadline March 31, 2015
cpvs
45300000

VIELSALM IESPSCF - Rue du Château, 19-6690 VIESALM construction and installation of high voltage cabin following the construction of a boarding school and various connection work with old electrical installation of the IESPSCF.

Repairing a sliding door and replacing an electric strike

Regie des Bâtiments - Wallonie Région Sud | Published March 2, 2015  -  Deadline March 16, 2015
cpvs
45420000, 45421000, 45421100

Arlon-132 Federal Street Repairs Neufchâteau-Police of a sliding door and replacing an electric strike

Invitation to submit offers - Renovation of the wastewater treatment plant in Sainte-Cécile - Negotiated procedure with direct advertising

AIVE | Published June 18, 2015  -  Deadline September 4, 2015
cpvs
45259100

The contract involves the renovation of the sewage treatment plant of Santa Cecilia, especially on the following work: • Replacement of the input bar screen; • Supply and installation of a new ventilation turbine; • The renovation of the electrical installation; The • supply and installation of a floating-back system to the secondary clarifier; • The supply and installation of a sludge storage tank.

NEUFCHATEAU-BERTRIX and VIRTON AR "Nestor Outer" Modernization of electric lifts.

CF_MCF_SG_DGI Direction régionale Arlon | Published July 6, 2015  -  Deadline September 29, 2015
cpvs
45313000

Modernization of electric lifts.

REPLACEMENT OF THREE GROUPS WORK SCHEDULES AND FRIDGE

IDELUX | Published August 28, 2015  -  Deadline September 22, 2015
cpvs
45300000

THREE GROUPS FRIDGE AND REPLACEMENT WORK SCHEDULES Works include: -The replacement 3 groups fridge -The piping system -The replacement of the cold battery GP Block C -The ventilos coil placement -The electrical work -The regulation -The all ancillary works

Stock ELECTRICITY

Direction Générale de l'Infrastructure Service Général des Infrastructures Scolaires Direction Régionale du Luxembourg - Société Publique des Bâtiments Scolaires du Luxembourg - Infrastructures Administratives, du Sport, de la Santé et de l'Aide à la Jeunesse - Infrastructures de la Culture | Published September 1, 2015  -  Deadline October 20, 2015
cpvs
45310000

Troubleshooting efforts, renewal, extension and maintenance of installations ELECTRICITY performing in schools and boarding of the French Community in the territory managed by the Regional Directorate of the Directorate General of Luxembourg in the Infrastructure, as part of the mission of this department, as well as in office buildings occupied by individual seats that direction and the PMS centers (2 lots).

ON-BOMAL AR, Rue du Nofiot, 6941 1 BOMAL. Renovation of the electrical installation.

Direction Générale des Infrastructures - Service général des Infrastructures scolaires de la Fédération Wallonie-Bruxelles - Direction régionale du Luxembourg | Published September 2, 2015  -  Deadline October 15, 2015
cpvs
45310000

ON-BOMAL AR, Rue du Nofiot 1, 6941 BOMAL. Renovation of the electrical installation. The replacement of electrical panels and lighting. Additions electrical outlets and circuits compliance of the existing electrical installation, and miscellaneous.

Supply of electric generating LV and MV for sites SVP of the IAEC from 2016 to 2018

AIVE | Published September 4, 2015  -  Deadline September 28, 2015
cpvs
09310000

This contract for the supply of electricity for industry sites Valuation and cleanliness of the IAEC powered medium voltage (MV) and low voltage (BT). The low voltage powered sites are mainly container parks. The medium voltage powered sites are two waste disposal sites (Habay and Tenneville) and a waste collection site (Manhay). Consumption of it is anecdotal. Special feature: the sales contract injecting electricity, green certificates and LGO. On the sites of Habay and Tenneville installed cogeneration engines (400 kVA and 1500 kVA) powered by biogas from the organic matter contained in household waste. These two sites are partially autonomous thanks to this production, the electricity balance is injected on the network. The Contracting Authority (PA thereafter) informs the bidder in the same window of time that this procurement, the PA must enter into an electricity sales contract injected into the medium-voltage network and a sales contract green certificates and guarantees of origin labels. Any interested company and meet the regulatory criteria should contact the PA to receive the appeal document to submit a bid.

ARLON FITC EL Modernization of electric lifts in workshops 1 and 2

Ministère de la Communauté française | Published November 5, 2015  -  Deadline December 15, 2015
cpvs
45313000

ARLON FITC EL Path Weyler, 2-6700 ARLON Modernization of electric lifts workshops 1 and 2 and omnium contract for a period of 10 years, renewable every year.

Invitation to submit offers - Province of Luxembourg-Centre Hosting and Leisure Mirwart (St Hubert) - Creation of a heating network - Chapter 2: Special Techniques - Negotiated procedure with direct advertising

Province de Luxembourg | Published November 13, 2015  -  Deadline January 8, 2016
cpvs
45232141

The project envisages the construction of a pellet boiler operating exclusively (no extra oil) that will feed four existing buildings on the site to residential and leisure Mirwart (ie: CHL, ICPS, CDN, Workshop / Garage) The construction of the boiler building is part of the file Chapter 1: Structural work. A storage silo with a capacity of about 25 tons will also develop in the local appendix to the boiler room. The main boiler installation will include two pellet boilers in cascade, two batteries and a collector buffer tanks feeding the four buildings into heat. Boiler currently in operation in 4 buildings become substations. CHL: Removing the entire boiler (piping, boiler, electrical panel) and installation of a new collector 4 circuits supplying radiators, kitchen impulse group circuit and a hot water circuit supplying a new boiler. ICPS: Replacing the boiler with a 1000 liter buffer tank connected to the centralized boiler and adaptation of the heating circuit. A 100 liter boiler Elec is scheduled in order to completely stop this branch of the heating network. CDN Establishment of a new collector circuits supplying two radiators. Workshop / Garage: Removal and replacement of the pellet stove with a radiator and radiator connection circuit on the heating network. Electricity / Control: This control will be coupled with software to manage any remote installation via an associated program. They will also be communicating with the regulation. Heating network: Connecting the different buildings via underground pipes with all electricity needs, water, communications passing sheath in the same trenches. Oil tankers: The underground tanks of CHL and CDN will be emptied, cleaned and neutralized while the tank ICPS will be neutralized and cut.

HOUFFALIZE BASTOGNE-(The Cherry Internat), Avenue Station, 12-6600 BASTOGNE. Compartmentalization of rooms.

CF_MCF_SG_DGI Direction régionale Arlon | Published December 15, 2015  -  Deadline February 2, 2016
cpvs
45310000

In more detail, the works include: general description: - Carrying out of construction documents. - The participation in site meetings. - The supply of necessary equipment, as well as useful constraints to the perfect realization of the work according to these requirements. - The need to hand and all necessary constraints to the perfect realization of the work according to these requirements. - The installation, connection, commissioning of equipment. - The tightening of openings, paint touch-ups and crunches fireproof. - The cleaning of the site being local and thorough cleaning of the premises at the end of construction. - Participation in the provisional acceptance tests. - Control by an approved body BELAC electrical installation completed and transformation fire detection installation. - Production and supply of end of construction documents and drawings AS-BUILD. - Benefits of interviews and repair during the warranty period. Description block 1. Block boy: - Supply and installation of smoke outlets. - Supply and installation of fire doors (rooms, stairwells, mechanical rooms). - Creation of fire partitions. - Compliance of security lighting. - Servo doors fire - the fire detection. 2. Central Block: - Supply and installation of fire doors (kitchen). - Creating partitions and ceiling fire -. - Compliance of security lighting. - Servo doors fire - the fire detection. - Supply and installation of fire escape. - In accordance Getting emergency exits (kitchen).

Construction of a wastewater treatment plant 2200 EH in Attert

Association Intercommunale pour la protection et la Valorisation de l'Environnement | Published January 21, 2016  -  Deadline April 12, 2016
cpvs
45252100

Construction of a biological treatment plant by activated sludge in Attert 2200 EH. Preparatory work - Connection to distribution networks (water, electricity, telephone) - Earthworks - Roads to access and internal roads - Area landscaping (planting, turfing, fencing) - Implementation of wastewater treatment works (lift, bar screen, sand trap, flow limiter, selector, aeration basin, secondary clarifier, silo for storing sludge, flow measurement) - Creation of a technical building -Connection to collectors under pressure and gravity - Various works: electrical, automation , supervision, ...

MARTELANGE EFACF - Internat, Rue de la Poste, No. 10-6630 MARTELANGE. Replacement of the electrical installation.

CF_MCF_SG_DGI Direction régionale Arlon | Published March 18, 2016  -  Deadline May 26, 2016
cpvs
45310000

The replacement of the electrical installation. In more detail, the works include: - Complete disassembly of the electrical installation; - The connection of the power cables to the new cabinets; - Replacement of all building wiring; - The distribution board; - The divisional circuits; - The small low-voltage switchgear sets of plans; - The replacement of all lighting sets of plans; - Table equipment moving outdoor lighting in the new table; - The connection and promulgation of end of course ringtones; - The main equipotential connections; - The connections and the realization of a ground connection; - Reception and testing of the electrical installation by an approved body.

ATHUS AR Rue du Centre, 29/31 in 6791 ATHUS development works attic

CF_MCF_SG_DGI Direction régionale Arlon | Published March 29, 2016  -  Deadline May 24, 2016
cpvs
45000000

- Site Installation - Demolition / large Work - frame and frame - works of zinc works - cover / seal - electrical work - HVAC - sanitary installation - screed works - plaster work - walls, floor and acoustic linings - coating floor and walls in linoleum - interior carpentry work

central market for the supply of electricity and natural gas for the needs of the Province of Luxembourg and the other contracting authorities concerned of the Province of Luxembourg

Province de Luxembourg | Published March 30, 2016  -  Deadline May 19, 2016
cpvs
09310000, 09123000

central market for the supply of electricity and natural gas for the needs of the Province of Luxembourg and the other contracting authorities concerned of the Province of Luxembourg

Electricity

Province de Luxembourg | Published April 2, 2016  -  Deadline May 19, 2016
cpvs
09123000

central market for the supply of electricity and natural gas for the needs of the Province of Luxembourg and the other contracting authorities concerned of the Province of Luxembourg.

HABAY EFACF refurbishment of the electrical installation

CF_MCF_SG_DGI Direction régionale Arlon | Published April 11, 2016  -  Deadline June 1, 2016
cpvs
45311000

- Complete disassembly of the existing installation of two blocks - connecting the power cables to the new cabinets, - replacing all the wiring of the building - distribution boards - divisional circuits - the small low voltage switchgear sets on plans, - the replacement of all lighting sets of plans, - the connection and programming of ringtones end of the course - the main equipotential connections - connections and the realization of a grounding - receipt and testing of the electrical installation by an approved body.

Invitation to submit offers - Appointment of a project applicant to solve the problems at the pool of the Spetz - Negotiated procedure with direct advertising

Ville d'Arlon | Published April 25, 2016  -  Deadline May 18, 2016
cpvs
71000000

This market is divided into slices:

- A firm phase: Study phase consisting of:

- Poses specific diagnostics to identify the nature and origin of each issue (sealing, insulation, defective coatings, ...)

- Proposed solutions to them

- Diagnostic electrical compliance based on the report made available to the author of the project

- A conditional phase: Implementation of the solutions, establishing preliminary draft to the monitoring of the performance of work