Public tenders for electrical in Arlon Belgium

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Works partial refresh of the old courthouse

Ville d'Arlon | Published October 25, 2016  -  Deadline December 2, 2016
cpvs
45400000

Some areas of the old courthouse are regularly occupied for socio-cultural activities, including exhibitions.

To successfully meet the demands of occupation, more and more, it is necessary to undertake renovation work and improvement.

The work includes:

• demolition of walls and partitions

• modification of the electrical system, sockets, switches, lighting

• Soil and tiles renovation

• paint (walls and ceilings)

• creation of new health

• Development of a PMR access

Invitation to submit offers - Compliance of electrical installations according to the RD of 04/12/12 - Direct Negotiated procedure with advertising

AIVE | Published September 21, 2016  -  Deadline November 21, 2016
cpvs
51112000, 50116100, 50532400, 51110000

This contract is for the renovation of electrical installations of wastewater treatment plants to bring them into line with the Royal Decree of 04/12/12

ATHUS AR STREET Neuve, 32-6791 ATHUS. Replacement of two boilers restaurant block

CF_MCF_SG_DGI Direction régionale Arlon | Published June 17, 2016  -  Deadline August 18, 2016
cpvs
45331110

This works contract, the CPV code / NACE is 45.33 (Annex I of the Law of 15.06.2006), is to the works, supplies, transportation, hand Work and all means necessary to execute: the replacement of two boilers block restaurant ATHUS AR Rue Neuve, 32-6791 ATHUS. Description of the building and the current technical situation: The hydraulic distribution network consists of a primary collector with 5 circuits. In more detail, the work includes: - the supply and installation of two new boilers with a minimum total power output of 400 KW system in 80 ° / 60 ° condensing gas; - Connection to city water facilities; - Placement of new chimneys for boilers; - The gas connection from the expectation provided in the boiler room of the main building; - The connection of all electrical equipment of the successful bidder to existing HVAC electrical panel in the boiler room; - The supply, placement and connection of all necessary appliances for a complete installation, in perfect working order and meet the conditions and results required by the tender documents and the accompanying plans; - Execution according to the best rules of art of all the digging, sealing and repair related to the placement of various devices and accessories; - All openings (openings or reservations) in the masonry, walls, slabs, ....; Cleaning of equipment: regular removal of rubbish and worthless materials and unemployed from the company's work and re-clean state of the various premises where work was performed; These costs are borne by the contractor without the customer having to intervene in any charges of any kind whatsoever; Any improvements to the facility and equipment by the contractor during the warranty period, shall be deemed acquired customer, without the latter having to indemnify the Contractor under this head; - All other works, supplies, services, etc ... not provided for in the preceding articles and recognized however needed by the customer for the full establishment and proper functioning of the installation, nothing omitted or excepted; -Reception By an approved body;

Invitation to submit offers - Administrative Centre MARLOIE - Elevator Repair the result of water damage - direct Negotiated procedure with advertising

Province de Luxembourg | Published June 3, 2016  -  Deadline June 28, 2016
cpvs
50750000

Following the flooding of the electrical part, it is also planned to carry out the removal and replacement of electrical conduits and all the elements prevents the compliance of the work of the elevator.

The replacement of the control panel and the elevator controls are provided in this specification.

He also requested a receipt and commissioning by an approved body.

Invitation to submit offers - CHINY - Realization of a pumping to Suxy - Installing a booster and a UV sterilizer / LOT C24 - Negotiated procedure with direct advertising

AIVE - Alimentation en eau | Published May 10, 2016  -  Deadline June 2, 2016
cpvs
41110000

- Installation of pumping groups to the pumping station and reservoir.

- Main Low Voltage electrical modifications, automation, communications and supervision.

- Installation of instrumentation and detection measures to the pumping station and reservoir.

- Hydraulic development, replacing pipes in the pumping station and the tank.

- Installation of a water sterilization by ultraviolet starting on the gravity of the tank.

HABAY EFACF refurbishment of the electrical installation

CF_MCF_SG_DGI Direction régionale Arlon | Published April 11, 2016  -  Deadline June 1, 2016
cpvs
45311000

- Complete disassembly of the existing installation of two blocks - connecting the power cables to the new cabinets, - replacing all the wiring of the building - distribution boards - divisional circuits - the small low voltage switchgear sets on plans, - the replacement of all lighting sets of plans, - the connection and programming of ringtones end of the course - the main equipotential connections - connections and the realization of a grounding - receipt and testing of the electrical installation by an approved body.

MARTELANGE EFACF - Internat, Rue de la Poste, No. 10-6630 MARTELANGE. Replacement of the electrical installation.

CF_MCF_SG_DGI Direction régionale Arlon | Published March 18, 2016  -  Deadline May 26, 2016
cpvs
45310000

The replacement of the electrical installation. In more detail, the works include: - Complete disassembly of the electrical installation; - The connection of the power cables to the new cabinets; - Replacement of all building wiring; - The distribution board; - The divisional circuits; - The small low-voltage switchgear sets of plans; - The replacement of all lighting sets of plans; - Table equipment moving outdoor lighting in the new table; - The connection and promulgation of end of course ringtones; - The main equipotential connections; - The connections and the realization of a ground connection; - Reception and testing of the electrical installation by an approved body.

ATHUS AR Rue du Centre, 29/31 in 6791 ATHUS development works attic

CF_MCF_SG_DGI Direction régionale Arlon | Published March 29, 2016  -  Deadline May 24, 2016
cpvs
45000000

- Site Installation - Demolition / large Work - frame and frame - works of zinc works - cover / seal - electrical work - HVAC - sanitary installation - screed works - plaster work - walls, floor and acoustic linings - coating floor and walls in linoleum - interior carpentry work

ARLON - FEDERAL POLICE - Replacing an electric water heater 100l

REGIE EDS BATIMENTS | Published May 10, 2016  -  Deadline May 24, 2016
cpvs
39715100

ARLON - FEDERAL POLICE - Replacing an electric water heater 100l

central market for the supply of electricity and natural gas for the needs of the Province of Luxembourg and the other contracting authorities concerned of the Province of Luxembourg

Province de Luxembourg | Published March 30, 2016  -  Deadline May 19, 2016
cpvs
09310000, 09123000

central market for the supply of electricity and natural gas for the needs of the Province of Luxembourg and the other contracting authorities concerned of the Province of Luxembourg

Electricity

Province de Luxembourg | Published April 2, 2016  -  Deadline May 19, 2016
cpvs
09123000

central market for the supply of electricity and natural gas for the needs of the Province of Luxembourg and the other contracting authorities concerned of the Province of Luxembourg.

Invitation to submit offers - Appointment of a project applicant to solve the problems at the pool of the Spetz - Negotiated procedure with direct advertising

Ville d'Arlon | Published April 25, 2016  -  Deadline May 18, 2016
cpvs
71000000

This market is divided into slices:

- A firm phase: Study phase consisting of:

- Poses specific diagnostics to identify the nature and origin of each issue (sealing, insulation, defective coatings, ...)

- Proposed solutions to them

- Diagnostic electrical compliance based on the report made available to the author of the project

- A conditional phase: Implementation of the solutions, establishing preliminary draft to the monitoring of the performance of work

Construction of a wastewater treatment plant 2200 EH in Attert

Association Intercommunale pour la protection et la Valorisation de l'Environnement | Published January 21, 2016  -  Deadline April 12, 2016
cpvs
45252100

Construction of a biological treatment plant by activated sludge in Attert 2200 EH. Preparatory work - Connection to distribution networks (water, electricity, telephone) - Earthworks - Roads to access and internal roads - Area landscaping (planting, turfing, fencing) - Implementation of wastewater treatment works (lift, bar screen, sand trap, flow limiter, selector, aeration basin, secondary clarifier, silo for storing sludge, flow measurement) - Creation of a technical building -Connection to collectors under pressure and gravity - Various works: electrical, automation , supervision, ...

HOUFFALIZE BASTOGNE-(The Cherry Internat), Avenue Station, 12-6600 BASTOGNE. Compartmentalization of rooms.

CF_MCF_SG_DGI Direction régionale Arlon | Published December 15, 2015  -  Deadline February 2, 2016
cpvs
45310000

In more detail, the works include: general description: - Carrying out of construction documents. - The participation in site meetings. - The supply of necessary equipment, as well as useful constraints to the perfect realization of the work according to these requirements. - The need to hand and all necessary constraints to the perfect realization of the work according to these requirements. - The installation, connection, commissioning of equipment. - The tightening of openings, paint touch-ups and crunches fireproof. - The cleaning of the site being local and thorough cleaning of the premises at the end of construction. - Participation in the provisional acceptance tests. - Control by an approved body BELAC electrical installation completed and transformation fire detection installation. - Production and supply of end of construction documents and drawings AS-BUILD. - Benefits of interviews and repair during the warranty period. Description block 1. Block boy: - Supply and installation of smoke outlets. - Supply and installation of fire doors (rooms, stairwells, mechanical rooms). - Creation of fire partitions. - Compliance of security lighting. - Servo doors fire - the fire detection. 2. Central Block: - Supply and installation of fire doors (kitchen). - Creating partitions and ceiling fire -. - Compliance of security lighting. - Servo doors fire - the fire detection. - Supply and installation of fire escape. - In accordance Getting emergency exits (kitchen).

Invitation to submit offers - Province of Luxembourg-Centre Hosting and Leisure Mirwart (St Hubert) - Creation of a heating network - Chapter 2: Special Techniques - Negotiated procedure with direct advertising

Province de Luxembourg | Published November 13, 2015  -  Deadline January 8, 2016
cpvs
45232141

The project envisages the construction of a pellet boiler operating exclusively (no extra oil) that will feed four existing buildings on the site to residential and leisure Mirwart (ie: CHL, ICPS, CDN, Workshop / Garage) The construction of the boiler building is part of the file Chapter 1: Structural work. A storage silo with a capacity of about 25 tons will also develop in the local appendix to the boiler room. The main boiler installation will include two pellet boilers in cascade, two batteries and a collector buffer tanks feeding the four buildings into heat. Boiler currently in operation in 4 buildings become substations. CHL: Removing the entire boiler (piping, boiler, electrical panel) and installation of a new collector 4 circuits supplying radiators, kitchen impulse group circuit and a hot water circuit supplying a new boiler. ICPS: Replacing the boiler with a 1000 liter buffer tank connected to the centralized boiler and adaptation of the heating circuit. A 100 liter boiler Elec is scheduled in order to completely stop this branch of the heating network. CDN Establishment of a new collector circuits supplying two radiators. Workshop / Garage: Removal and replacement of the pellet stove with a radiator and radiator connection circuit on the heating network. Electricity / Control: This control will be coupled with software to manage any remote installation via an associated program. They will also be communicating with the regulation. Heating network: Connecting the different buildings via underground pipes with all electricity needs, water, communications passing sheath in the same trenches. Oil tankers: The underground tanks of CHL and CDN will be emptied, cleaned and neutralized while the tank ICPS will be neutralized and cut.

ARLON FITC EL Modernization of electric lifts in workshops 1 and 2

Ministère de la Communauté française | Published November 5, 2015  -  Deadline December 15, 2015
cpvs
45313000

ARLON FITC EL Path Weyler, 2-6700 ARLON Modernization of electric lifts workshops 1 and 2 and omnium contract for a period of 10 years, renewable every year.

Stock ELECTRICITY

Direction Générale de l'Infrastructure Service Général des Infrastructures Scolaires Direction Régionale du Luxembourg - Société Publique des Bâtiments Scolaires du Luxembourg - Infrastructures Administratives, du Sport, de la Santé et de l'Aide à la Jeunesse - Infrastructures de la Culture | Published September 1, 2015  -  Deadline October 20, 2015
cpvs
45310000

Troubleshooting efforts, renewal, extension and maintenance of installations ELECTRICITY performing in schools and boarding of the French Community in the territory managed by the Regional Directorate of the Directorate General of Luxembourg in the Infrastructure, as part of the mission of this department, as well as in office buildings occupied by individual seats that direction and the PMS centers (2 lots).

ON-BOMAL AR, Rue du Nofiot, 6941 1 BOMAL. Renovation of the electrical installation.

Direction Générale des Infrastructures - Service général des Infrastructures scolaires de la Fédération Wallonie-Bruxelles - Direction régionale du Luxembourg | Published September 2, 2015  -  Deadline October 15, 2015
cpvs
45310000

ON-BOMAL AR, Rue du Nofiot 1, 6941 BOMAL. Renovation of the electrical installation. The replacement of electrical panels and lighting. Additions electrical outlets and circuits compliance of the existing electrical installation, and miscellaneous.

NEUFCHATEAU-BERTRIX and VIRTON AR "Nestor Outer" Modernization of electric lifts.

CF_MCF_SG_DGI Direction régionale Arlon | Published July 6, 2015  -  Deadline September 29, 2015
cpvs
45313000

Modernization of electric lifts.

Supply of electric generating LV and MV for sites SVP of the IAEC from 2016 to 2018

AIVE | Published September 4, 2015  -  Deadline September 28, 2015
cpvs
09310000

This contract for the supply of electricity for industry sites Valuation and cleanliness of the IAEC powered medium voltage (MV) and low voltage (BT). The low voltage powered sites are mainly container parks. The medium voltage powered sites are two waste disposal sites (Habay and Tenneville) and a waste collection site (Manhay). Consumption of it is anecdotal. Special feature: the sales contract injecting electricity, green certificates and LGO. On the sites of Habay and Tenneville installed cogeneration engines (400 kVA and 1500 kVA) powered by biogas from the organic matter contained in household waste. These two sites are partially autonomous thanks to this production, the electricity balance is injected on the network. The Contracting Authority (PA thereafter) informs the bidder in the same window of time that this procurement, the PA must enter into an electricity sales contract injected into the medium-voltage network and a sales contract green certificates and guarantees of origin labels. Any interested company and meet the regulatory criteria should contact the PA to receive the appeal document to submit a bid.