Call +44 800 9755 164

Public tenders for electrical in Vienna Austria

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Electrical services

ÖBB-Infrastruktur AG | Published December 30, 2016

The services include initial sample type test (admission test) and the recurring tests (skin tests) of the following at the ÖBB approved work equipment - safety equipment in 15kV traction power installations (except power plants, heat exchanger and Umrichterwerke and traction current lines) within the meaning of the test instruction OL 001: - grounding devices (DB 929, ED 5461) and related Insulating (ED 6460); - Telescopic grounding devices (ED 5460); - Hot Sticks (DB 929, ED 6421); - Voltage tester for high voltage equipment 16.7 / 50 Hz (ED 6461); - Hooks (ED 6462; in accordance with DIN VDE 0681-1 "bridging and firmly mounted Hooks in electrical operating areas).

Electrical engineering installation works

Arbeitsmarktservice Österreich Bundesgeschäftsstelle | Published December 15, 2016  -  Deadline February 9, 2017

The authority intends at its existing location in 1220 Vienna, 58 Prandaugasse an internal conversion and the renewal of the TGA to perform as follows: waiting room, offices and meeting rooms on the ground floor are transformed into social, educational and multi-purpose rooms. Offices on floors 1-5 will each open-plan offices, offices for Temleiter and retreat offices rebuilt. The sanitation of the building will be renovated and arranged partly new. Through openings in the ceiling from the 2nd to the 5th floor, the exposure of the building is improved. In the 5th floor terrace is made.

Electrical installation work (see tender documents).

Electrical signalling equipment for railways

ÖBB-Infrastruktur Aktiengesellschaft | Published December 29, 2016

Inspection system, planning, delivery and assembly of axle counting systems.

Electrical signalling equipment for railways

ÖBB-Infrastruktur Aktiengesellschaft | Published December 30, 2016

Test system for the supply of railway signals in LED technology.

Electrical machinery, apparatus, equipment and consumables; lighting

ART for ART Theaterservice GmbH | Published December 8, 2016  -  Deadline January 31, 2017

Supply and installation of Digital Audio Mixing System.

Engineering design services for mechanical and electrical installations for buildings

Österreichische Post AG | Published December 29, 2016  -  Deadline January 27, 2017

See participant application.

Lower Austria East, Vienna, Burgenland Nord.

Styria, Upper Austria, Lower Austria West, South Burgenland, Carinthia.

Salzburg, Tyrol, East Tyrol, Vorarlberg.

Electrical Installations - Gasgasse 6, 1150 Wien

Magistrat der Stadt Wien - Magistratsabteilung 56 | Published January 17, 2017  -  Deadline February 13, 2017

Overhead electrical equipment

ÖBB-Holding AG sowie die mit ihr im Sinne des § 189a Z 8 UGB verbundenen Gesellschaften, alle vertreten durch die ÖBB-Infrastruktur AG | Published January 10, 2017
Object of the test system is the selection of companies for the supply of high-voltage fixtures for traction current lines for the customer ÖBB-Holding AG and the companies 8 UGB affiliated within the meaning of § 189a Z.

Electrical supplies and accessories

ÖBB-Holding AG sowie die mit ihr im Sinne des § 189a Z 8 UGB verbundenen Gesellschaften, alle vertreten durch die ÖBB-Infrastruktur AG | Published January 10, 2017
Object of the test system is the selection of companies for the manufacture and supply of components for return circuit and grounding path in ÖBB catenary systems for customer ÖBB-Holding AG and the companies 8 UGB affiliated within the meaning of § 189a Z.

Supply of electricity meters

WIENER NETZE GmbH | Published January 14, 2017
Supply of electricity meters

Lighting equipment and electric lamps

Stadt Wien – Wiener Wohnen Haus- & Außenbetreuung GmbH | Published January 18, 2017  -  Deadline February 22, 2017

Object of the procurement procedure is to conclude a framework contract for the supply of lamps. The framework agreement has a definite term until 02.28.2018. The client has a one-sided, two-time option to extend the contract for a further year (to February 28), thus up to a maximum duration until 28.02.2020.

The client is based on the framework contract during the term of the framework agreement (including renewal options) expected quantities, order the in the bill and price sheet. The bulbs must meet the specifications according to the service specifications and price sheet.

Installation of signalling equipment

ÖBB-Infrastruktur Aktiengesellschaft | Published December 30, 2016

Planning, delivery, installation and commissioning of railway crossing safety systems (electrical / electronic light signals and light signals with barriers) with Safety Integrity Level SIL. 4

Locomotive-substations construction works

ÖBB-Holding AG sowie die mit ihr im Sinne des § 189a Z 8 UGB verbundenen Gesellschaften, alle vertreten durch die ÖBB-Infrastruktur AG | Published January 10, 2017
Object of the test system is the selection of companies for the design and construction of a 110 kV / 15 kV substation (electrical engineering part) for the Client ÖBB-Holding AG and the companies 8 UGB affiliated within the meaning of § 189a Z.

Electric motors

ÖBB-Holding AG sowie die mit ihr im Sinne des § 189a Z 8 UGB verbundenen Gesellschaften, alle vertreten durch die ÖBB-Infrastruktur AG | Published January 10, 2017
Object of the test system is the selection of companies for the manufacture and supply of motor drives for overhead line switches for the customer ÖBB-Holding AG and the companies 8 UGB affiliated within the meaning of § 189a Z.

Ancillary works for electricity power lines

ÖBB-Holding AG sowie die mit ihr im Sinne des § 189a Z 8 UGB verbundenen Gesellschaften, alle vertreten durch die ÖBB-Infrastruktur AG | Published January 10, 2017
Object of the test system is the selection of companies for overhead line installation work for the customer ÖBB-Holding AG and the companies 8 UGB affiliated within the meaning of § 189a Z.

Energy and related services

ÖBB-Infrastruktur AG | Published January 4, 2017

The earthing systems in power plants, substations, heat exchanger and switching stations and traction power line poles of the division railway systems must meet certain requirements. According to ÖVE / ÖNORM E8383 (power installations with nominal voltages above 1 kV) and ÖVE EN50341 (Overhead electrical lines exceeding AC 45 kV) to the fault currents occurring in the plants are derived such that the legally prescribed contact voltage is not exceeded. This requires the periodic inspection of the impedances of grounding / bonding systems.

Parts of electricity distribution or control apparatus

ÖBB-Holding AG sowie die mit ihr im Sinne des § 189a Z 8 UGB verbundenen Gesellschaften, alle vertreten durch die ÖBB-Infrastruktur AG | Published January 10, 2017
Object of the test system is the selection of companies for the manufacture and supply of electric separators for ÖBB catenary systems for customer ÖBB-Holding AG and the companies 8 UGB affiliated within the meaning of § 189a Z.
  • 1