1601428 | of structural work execute work in the interests of the construction of the International School Differdange - secondary education

PMP.LU / A MDDI / ABP - Administration des btiments publics | Published October 28, 2016  -  Deadline December 12, 2016
- Excavation in installments: 1.800 m Embankment in concass of career: 1400 m Embankment in recycled materials: 2100 m sticks arms: 11.900 m concrete formwork ordinary: 12.000 m concrete formwork apparent: 18.000 m prefabricated concrete facings : 3.700 m reinforcementThe concrete: 1,800,000 non kg-bearing masonry: 1.300 m Etanchit: 1,000 m Insulation: 600 m Frame mtallique: 48.000 Kg-buried pipes: 1300m- Gaines install electric in the concrete: 15.000 m Installing grounding: 1500m execute for the new construction of school infrastructure for secondary education of about 800 works are lves.Les adjugs in price unitaires.La block of hard work on the job site is 210 days working dbuter aware Q2 2017

1300764 | Building a home and school rooms for basic education at 19, rue Charles IV Luxembourg-Belair

PMP.LU / C VLUX / DASB - Direction de lArchitecte Service Btiments | Published July 11, 2013  -  Deadline July 7, 2023
construction of a school and a school btiment home 3 floors (RdCh + 2 floors) Cration 13 rooms for cycle 1 and 9 living room rooms school foyer and adjoining premises (rhythm room, craft room , Concierge housing) Volume of work prvus: 27,200 Total net m3Surface of work: 5.400 m2

Cleaning services

Athénée de Luxembourg | Published October 29, 2016  -  Deadline December 12, 2016

The market will be the performance by the winner of the contract for all service delivery and provision of equipment to cleaning the premises of the School including:

Structure of education in the South Wing: 22 regular classrooms, 1 audiovisual room, 2 meeting rooms, bathrooms, hallways, stairs

Lodging: courtyard, resource center and library, village hall

Caution: Cleaning the entire kitchen, restaurant, cafeteria and distribution corridor will be managed separately by the department of school restaurants

Sports facilities: sports hall 3 units, changing rooms, toilets, multipurpose room, hallways and technical rooms.

Structural shell work

Administration des bâtiments publics | Published November 2, 2016  -  Deadline December 12, 2016

- Excavation in trenches 1 800 m 3 ,

- Career crushed embankment: 1400 m 3 ,

- Embankment recycled materials: 2100 m 3 ,

- Reinforced concrete: 11,900 m 3 ,

- Plain concrete formwork: 12 000 m 2 ,

- Exposed concrete formwork 18 000 m 2 ,

- Precast concrete facings: 3700 m 2 ,

- Reinforcement of concrete 1 800 000 kg

- Non load bearing masonry: 1300 m 2 ,

- Sealing: 1000 m 2 ,

- Thermal insulation: 600 m 2 ,

- Metal frame: 48 000 kg

- Buried pipelines: 1300 m,

- To install electrical conduits in concrete: 15 000 m,

- Installation of ground: 1500 m.

To run for the new construction of school infrastructure for secondary education to about 800 students.

The works are auctioned block unit price.

The duration of work on the project is 210 days to start the current 2 e quarter of 2017.