Public tenders for education in Zalaegerszeg Hungary

Find all Education tenders in the world.
Finding business opportunities has never been easier.

Results for education. Make a new search!
EducationHungaryzalaegerszeg

Pannon Alapítvány- Development Expert Information service award

Pannon Fejlesztési Alapítvány | Published March 9, 2015
Winner
Pannon Novum Nyugat-dunántúli Regionális Innovációs Nonprofit Kft.
cpvs
79400000

Pannon Development Foundation for the provision of professional services in the context of mechatronics engineering research and education network designated as co-TÁMOP 4.1.1.C-12/1 / KONV-2012-0010 project with code • Web interface and database development, the "list of topics associated with the development of mechatronic" c. • Supplement specific tasks related to R & D strategy, in line with the new higher education strategy contractor will document describing the web interface, as well as a study activity forms. CPV code: 79400000-8 Business and management consultancy and related services

Information on the contract amendment - Pannon Development Foundation - Promotion Service

Pannon Fejlesztési Alapítvány | Published December 9, 2015
Winner
Zalaegerszegi Városfejlesztő Zrt.
cpvs
79416000

Pannon Development Foundation for providing promotional services under the "Strengthening the social and economic role of the West Pannon's regional higher education, building on the experience of dual training 'NAMES TÁMOP4.1.1.F14 / 1 / Konv20150011 project with code: 1. Technical engineering profession and has long been active in the region Organization of engineering education promotion program to identify and disseminate 2. Best practices 3. The project, the partners and showing the implementation of the project materials preparation 4. Technical engineering profession and the region develop the implementation of long-established engineering education promotion program 5. Cooperation in the area of ​​post-secondary engineering training institutions 6. Technical Working Group meetings 7. Public events on the results of the project specifically related professional event organization 8. The dual training Bidder job promotion (project specific issues and promotion) is organizing activities and events for the target group. CPV Code: 794160003 Public relations services

PFA Pannonia Foundation for Development Promotion Service Information nyújtása- award

Pannon Fejlesztési Alapítvány | Published July 31, 2015
Winner
Zalaegerszegi Városfejlesztő Zrt.
cpvs
79416000

Pannon Development Foundation for providing promotional services under the "Strengthening the social and economic role of the West Pannon regional higher education building on the experience of dual training 'NAMES TÁMOP 4.1.1.F-14/1 / Conversion Project with code-2015-0011: first Technical engineering profession and organization in the area of ​​long-established engineering education promotion program to identify and disseminate good practices in the second third of the project, the partners and the implementation of demonstration projects 4. Building Engineering Materials engineering profession and the region has long been operating in engineering education promotion program design implementation 5. Working with the region's post-secondary engineering training institutions 6. Professional Working Group meetings 7. Public events on the results of the project - the organization of specific events explicitly 8 related to the dual training for the target group Bidder job promotion (specific projects and themes publicity) and event organization activities is . CPV code: 79416000-3 Public relations services

Pannonia Zalaegerszeg Science Park-Process results

Zalaegerszeg Megyei Jogú Város Önkormányzata | Published May 29, 2015
Winner
Zalaegerszegi Városfejlesztő Zrt.
cpvs
79314000, 79952000

"Development" Pannon Knowledge Park "Pannon Growth Zone knowledge transfer activities in higher education, local government and the industrial sector in cooperation c. Preparation and organization of events required TÁMOP 4.2.1C-14/1 / Conv ID No. 2015-0006-implementation of the project studies' subjects, procurement proceeding with effect conditional tasks of the consultant: • Development of a regional industry survey of regional knowledge management strategy • • Incubation Development Services • Development of concepts related to the development of the organization of dual training system operational processes of urban • Research main directions of events Estimated value: £ 23.6 million net of the main task parameters, the detailed specifications in the tender documentation.

Zalaegerszeg preparation and Events "Pannon Knowledge Park" megszervezése- Information Studies award

Zalaegerszeg Megyei Jogú Város Önkormányzata | Published September 23, 2015
Winner
Hétfa Kutatóintézet Kft.
cpvs
79314000, 79952000

"Development" Pannon Knowledge Park "Pannon Growth Zone knowledge transfer activities in higher education, local government and the industrial sector in cooperation c. Preparation and organization of events required TÁMOP 4.2.1C-14/1 / Conv identification numbers 2015 to 0006, implementation of the project studies "adopted by the contractor procurement process Responsibilities: • Develop a regional industry surveys • Development of regional knowledge management strategy concept development services • Incubation • Dual organization of training related to the development of urban operating system processes • Research main directions of events Estimated value: £ 23.6 million net of the task main parameters of the detailed technical specifications in the tender documentation. CPV codes: 79952000-2, 79314000-8

Results of the procedure -. The implementation of Rethink Training International Transport Ltd et al in the framework of a contract in accordance with the technical specifications

Réthi Intertrans Kft. | Published November 5, 2014
Winner
VEZETEK Vezetéstechnikai Továbbképző Központ Korlátolt Felelősségű Társaság
cpvs
80000000, 80530000

The subject of public procurement: Implementation of Programs to Rethink International Transport Ltd staff of a contract under the technical specifications according to volume. Conducting economical and environment-friendly transport-themed training motorists - for a total of 45 people to 35 hour / period of the specification discloses that i content and accident-free driving themed conducting training for drivers - for a total of 45 people to 35 hour / s content, duration of training must meet to be organized in 2013 LXXVII in force on the date of transmission of the call for proposals, adult education, the technical specifications. Act and the designation "Supporting Workplace training for large enterprises in the convergence regions" TÁMOP-2.1.3.C 12/1 number of applications requirements. For more information about the competition are available on the following website: http://palyazat.gov.hu/doc/3438

. The framework of a contract to supply cleaning services at the premises of the County Water Co. - Contract award notice

Észak-zalai Víz- és Csatornamű Zrt. | Published March 23, 2015
Winner
S-Group Közép-európai Zrt.
cpvs
90910000

The object of the procurement: As part of a contract to supply cleaning services to the County Water Company premises Total quantity. Contractor is responsible for the following locations, office buildings, cleaning services supply: 1. Central Office Building (8900 Zalaegerszeg, Balaton route 8) 2. Main site A, B C buildings (8900 Zalaegerszeg, Balaton route 8 / A). 3. Main site, Water Purifier building (8900 Zalaegerszeg, Balaton route 8 / A.) 4. Sewage Treatment Plant (8900 Zalaegerszeg, 74 Bypass Road Periphery u .: 0940 / 7) 5. Customer service Zala Plaza (8900 Zalaegerszeg, u Stadium. 6) was sixth AQUA ZALAERDŐ Ltd. office building (8790 Zalaszentgrot, 27th Field Francis) 7. Education Center (highway 74) locations involved cleaning Horizontal surface (floor) Carpet Window total Central Office Building ~ 1050 m2 ~ 230 m2 ~ 400 m2 ~ 1680 m2 Main site A, B, and C buildings ~ 240 m2 - ~ 40 m2 ~ 280 m2 Main site, Water purification is located ~ 290 m2 - ~ 60 m2 ~ 350 m2 Wastewater Treatment Plant ~ 1050 m2 - ~ 250 m2 ~ 1300 m2 Customer service Zala Plaza ~ 100 m2 ~ 40 m2 ~ 25 m2 ~ 165 m2 Education Center was ~ 140 m2 ~ 60 m2 ~ 30 m2 ~ 230 m2 AQUA ZALAERDŐ Office Building + 400 m2 warehouse ~ - ~ ~ 50 m2 to 450 m2 total of ~ 3270 m2 m2 ~ 855 ~ 330 ~ 4455 m2 m2 Zalaegerszeg Plaza customer service office cleaning is expected to be carried out due to moving only a half year of 2015. Ensure necessary to carry out the cleaning cleaning supplies / tools Bidder's responsibility. They provide an opportunity to store on-site contracting. Needed for different reservoirs filling toilet paper, paper towels, soap, trash bags in the Contracting ensure they are outsourcing contractor's responsibility.

Information on the outcome of the proceedings. - Within the framework of a contract to supply cleaning services at the premises of the County Water C

Észak-zalai Víz- és Csatornamű Zrt. | Published February 2, 2015
cpvs
90910000

The object of the procurement ". For everyone under a contract cleaning services to the County Water Company premises" Total Amount: Contractor responsible for the following locations, office buildings, cleaning services supply: 1. Central Office Building (8900 Zalaegerszeg, Balaton route 8) 2. Main site, the A, B, C buildings (8900 Zalaegerszeg, Balaton route 8 / A). 3. Main site, Water Purifier building (8900 Zalaegerszeg, Balaton route 8 / A.) 4. Sewage Treatment Plant (8900 Zalaegerszeg, 74 Bypass Road Periphery u. . 0940/7) 5. Customer service Zala Plaza (8900 Zalaegerszeg, u Stadium 6) 6 was AQUA ZALAERDŐ Ltd. office building (8790 Zalaszentgrot, 27th Field Francis) 7. Education Center (74 Main Street) involved cleaning. location of horizontal surfaces (floors) Carpet Window total Central Office Building ~ 1050 m2 ~ 230 m2 ~ 400 m2 ~ 1680 m2 Main site A, B, and C buildings ~ 240 m2 - ~ 40 m2 ~ 280 m2 Main site, Water purification is located ~ 290 m2 - ~ 60 m2 ~ 350 m2 Wastewater Treatment Plant ~ 1050 m2 - ~ 250 m2 ~ 1300 m2 Customer service Zala Plaza ~ 100 m2 ~ 40 m2 ~ 25 m2 ~ 165 m2 Education Center ~ 140 m2 ~ 60 m2 ~ 30 m2 ~ 230 m2 AQUA ZALAERDŐ Office Building & Warehouse ~ 400 m2 to 50 m2 to 450 m2 in total ~ ~ 3270 m2 m2 ~ 855 ~ 330 ~ 4455 m2 m2 Zalaegerszeg Plaza customer service office cleaning is expected to be carried out due to moving only a half year of 2015. Ensure necessary to carry out the cleaning cleaning supplies / tools Bidder's responsibility. They provide an opportunity to store on-site contracting. Needed for different reservoirs filling toilet paper, paper towels, soap, trash bags in the Contracting ensure they are outsourcing contractor's responsibility.

Information on the contract amendment - Pannon Development Foundation - Expert Service

Pannon Fejlesztési Alapítvány | Published December 9, 2015
Winner
Illés Produkt Kft.
cpvs
79400000

Pannon Development Foundation for the provision of expert services within the framework of the "Strengthening the social and economic role of the West Pannon regional higher education building on the experience of dual training 'NAMES TÁMOP4.1.1.F14 / 1 / Konv20150011 project with code: 1. Benchmark exploration experience in Europe, industry-oriented economic regions able to I 5 with the other institutions to cooperate in Zalaegerszeg - Exploring I 2. Benchmark experience in Europe, industry-oriented economic regions - - II 3. Expert tasks of the foreign experience pilot, small-scale testing of students, involving the development of the fourth operation of the ability to more institutions to cooperate in Zalaegerszeg dual engineer training center Development of the operation of the dual engineer training center - 6 Expert II pilot jobs abroad experience, try the small sample 3.1 7 Expert tasks of the foreign experience pilot, try the small sample 02.03 8. Expert tasks of the foreign experience pilot, try the small sample 03.03 Bidder task-specific experts (relating to the further development of dual training in engineering) is a service activity. CPV Code: 794000008 Business and management consultancy and related services

PFA for Pannon Development Foundation Expert Information Service nyújtása- award

Pannon Fejlesztési Alapítvány | Published July 31, 2015
Winner
Illés Produkt Kft.
cpvs
79400000

Pannon Development Foundation for the provision of expert services within the framework of the "Strengthening the social and economic role of the West Pannon regional higher education building on the experience of dual training 'NAMES TÁMOP 4.1.1.F-14/1 / Conversion Project with code-2015-0011: first Finding Benchmark experience in Europe, industry-oriented business areas - Exploring I 2. Benchmark experience in Europe, industry-oriented business areas - II 3. Expert tasks of the foreign experience pilot, capable of small-scale testing of students, involving 4 with the other institutions to cooperate in Zalaegerszeg dual engineer training center Development of the operation - the development of the operation of the fifth I be able to work with several institutions in Zalaegerszeg dual engineer training center - 6 Expert II pilot jobs abroad experience, try the small sample 3.1 7 Expert tasks of the foreign experience pilot, try the small sample 03.02 8. Expert Tasks foreign experience pilot, try the small sample 03.03 Bidder expert task-specific (related to the development of the dual training engineering) is a service activity. CPV code: 79400000-8 Business and management consultancy and related services

"Zalaegerszeg MJV solid waste management system of urban park development tool" organize educational and awareness-raising events and through a project-oriented switch. supply of marketing services (TOP-1.1.1 / C / 13-2013-0016)

Zalaegerszeg Megyei Jogú Város Önkormányzata | Published October 10, 2014
Winner
IMRO-DDKK Nonprofit Kft.
cpvs
79000000, 79952000, 79340000

The subject of the public procurement: a contract EEOP 1.1.1 / C / 13-2013-0016 identification number, the "Zalaegerszeg County Town of municipal solid waste management system development tool park" project organized under subject-oriented educational and awareness-raising events and related marketing services to supply the quantity of purchases: The EEOP 1.1.1 / C / 13-2013-0016 identification number, the "Zalaegerszeg County Town of municipal solid waste management system for park development tool" related projects within the framework of the organization of educational and awareness-raising purposes, events and related marketing services, with particular regard to the following: • Event management: public awareness-raising action city events and the city center - 12 times • Event management: the organization of the project area educational institutions, educational oriented programs to students and teachers, demonstration of practical application - the organization of 39 times • Company visits - five times • Implementation of complex local media campaign newspaper, radio, television, involving the technical specifications.

Zalaegerszeg County Town city marketing support related news, publishing programs

Egerszegi Sport és Turizmus Szolgáltató és Üzemeltető Kft. | Published April 1, 2015
Winner
Pannon Lapok Társasága Kiadói Kft.;Pannon Lapok Társasága Kiadói Kft.
cpvs
79810000, 79553000

Zalaegerszeg County Town city marketing support related news, programs, publishing the first sub-tasks: tourist offer Zalaegerszeg the presentation, so the first line: Tourism marketing; Investment promotion; Economic opportunities, business presentation; Keeping young people at home; Festivals markets; TOP developments related marketing programs (Lower Forest, Village Museum, etc ..); Craft products to market, local homemade products, Zala products - Zala Workplace Initiative; Presentation of the local art scene; local vocational and higher education supply more popular. Release Date: 21 times the second sub-tasks: a) local products, producers publications about the contents of this publication: Local producers, products, contacts, presentations farmers' markets - calendar of local products shops selling guide to Call information local products, development-related sources of short supply chains, e government for the purpose of communication. The publication parameters: Size A / 5 Paper quality: Cover: Galerie Fine Gloss 115 g; Inside: LWC - NorCote gloss 70g Length: Minimum 24 + 4 pages Copies: eg 45000. b) Art Series The aim of the project: a quality, to the extent such a typography and graphic solutions for which it is not possible in a traditional setting. The selection of artists presented: the creative Zalaegerszeg John Nemeth Kossuth prize worth ceramic artist, a member of decorative arts and design arts department of the Hungarian Academy of Arts in collaboration because of his previous work, his reputation would really credible list of selected artists. 2500 for example. Data indicating quantity: 4 Estimated time of the procedure: 1. For sub-tasks: 14,000,000, -EUR for Lot 2: 2535000, -EUR

"Preparation and execution of a contract for work at Zalaegerszeg, Kazinczy u fourth space construction design documentation under the EEOP 5.6.0 / Project ID No. 12-2013-0037. Building during 3172 "

Zala Megyei Kormányhivatal | Published November 5, 2015
Winner
BMT Mérnöki Kft. és Z-Service Kft. Közös Ajánlattevők (Vezető: BMT Mérnöki Kft. (1023 Budapest, Ürömi utca 48.), Tag: Z-SERVICE Kft. (1137 Budapest, Szent István krt. 2. V/30.))
cpvs
45000000, 09331000, 45320000, 45311100, 45350000, 45421132, 71245000

Building under paragraph 3172 "§ 124 (9) in accordance with the relevant circumstances at hand due to the conclusion of a public contract or is unable to fulfill. In view of the contracting authority for the contracting of the entry into force of the procurement process as a result of the agreement with suspensive condition stipulates. A task that subsequent thermal insulation of the poor thermal insulation capacity and front walls, replacement, resulting in outdated and front doors and energy saving, the attic floor thermal insulation, upgrading the lighting system of the outdated lighting fixtures energy-efficient luminaires by replacing, upgrading the mechanical systems, the development of renewable energy utilizing solar system and all of them need to perform all the additional and supplementary works. Contractor is also responsible for preparing the detailed design documentation. Part of the construction plan is a technical specification documentation for the execution of works, the unpriced itemized budget, as well as the safety and health plan. Reserve for 0%. These include particularly, but not limited to the following items: Completion of the transfer of work areas • On the job done, such as: preparation and transfer o transfer documentation o construction completion of the restoration of the staging area for the intended / planned state to carry out the conduct o trial run • Technical management duties and proper personal care and providing technical leadership roof construction. • Performing On-site health and safety (advance quality planning, quality education, while implementing continuous quality control, final quality control for each working part is finished for the working parts, the successive working parts quality co-ordination, quality control and documentation of materials used) business areas. • On-site health and safety architectures, systems and equipment creation, acquisition, providing on-site, as well as to ensure proper co-ordination of health and safety legislation and safety management. The tenderer Main tasks and schedule winner: In connection with the preparation of detailed design documentation is not required priced budget. How to realize the full acquisition of licenses - if necessary. Making implementation documentation. The budget to be applied on the basis of a special mark to be specified by the Contracting Authority (Client) list of items, or for items not included in the items used in accordance with TERC-VIP (or equivalent) program budget making system. Without requiring the winning bidder to be royalty to say all the intellectual property right of copyright which is the outcome of tasks completed as a result of this procedure. The contractor acknowledges that it has drawn up plans right of use without territorial restrictions, indefinite, exclusive and transferable to a third party obtains the order, which also includes the recasting of creation. The plans and be prepared all the documents belonging to Hungarian. The number of copies to be delivered the expected plans and documentation of: o Construction design, 4 unpriced budget for example. printed + digital delivery (editable format) Tender calls a tender Dear Invited economic operators note that during the term of the building work going on continuously in office.

"A contract under the EEOP 5.6.0 / 12-2013-0037 identification number of project preparation and construction work at Keszthely, Kossuth u detailed design documentation. 42. u. Building under 774/9 "

Zala Megyei Kormányhivatal | Published November 5, 2015
Winner
Szabadics Építő Kft - Szabau Invest Kft. Közös Ajánlattevők (Vezető: SZABADICS - ÉPÍTŐ Építőipari és Ingatlanforgalmi Kft. (9700 Szombathely, Fő tér 24.), Tag: SZABAU INVEST Építőipari és Ingatlanforgalmi Kft. (H-8900 Zalaegerszeg, Sütő u. 4. II/1.))
cpvs
45000000, 09331000, 45320000, 45311100, 45350000, 45421132, 71245000

Building under paragraph 774/9 "§ 124 (9) in accordance with the relevant circumstances at hand due to the conclusion of a public contract or is unable to fulfill. In view of the contracting authority for the contracting of the entry into force of the procurement process as a result of the agreement with suspensive condition stipulates. A task that subsequent thermal insulation of the poor thermal insulation capacity and front walls, replacement, resulting in outdated and front doors and energy-saving, padlás- and cellar ceiling heat insulation, upgrading the lighting system of the outdated lighting fixtures energy-efficient luminaires by replacing, upgrading heating systems, renewable energy utilization PV system construction and completion of all of these and all associated ancillary works necessary. Contractor is also responsible for preparing the detailed design documentation. Part of the construction plan is a technical specification documentation for the execution of works, the unpriced itemized budget, as well as the safety and health plan. Reserve for 0%. These include particularly, but not limited to the following items: Completion of the transfer of work areas • On the job done, such as: preparation and transfer o transfer documentation o construction completion of the restoration of the staging area for the intended / planned state to carry out the conduct o trial run • Technical management duties and proper personal care and providing technical leadership roof construction. • Performing On-site health and safety (advance quality planning, quality education, while implementing continuous quality control, final quality control for each working part is finished for the working parts, the successive working parts quality co-ordination, quality control and documentation of materials used) business areas. • On-site health and safety architectures, systems and equipment creation, acquisition, providing on-site, as well as to ensure proper co-ordination of health and safety legislation and safety management. The tenderer Main tasks and schedule winner: In connection with the preparation of detailed design documentation is not required priced budget. How to realize the full acquisition of licenses - if necessary. Making implementation documentation. The budget to be applied on the basis of a special mark to be specified by the Contracting Authority (Client) list of items, or for items not included in the items used in accordance with TERC-VIP (or equivalent) program budget making system. Without requiring the winning bidder to be royalty to say all the intellectual property right of copyright which is the outcome of tasks completed as a result of this procedure. The contractor acknowledges that it has drawn up plans right of use without territorial restrictions, indefinite, exclusive and transferable to a third party obtains the order, which also includes the recasting of creation. The plans and be prepared all the documents belonging to Hungarian. The number of copies to be delivered the expected plans and documentation of: o Construction design, 4 unpriced budget for example. printed + digital delivery (editable format) Tender calls a tender Dear Invited economic operators note that during the term of the building work going on continuously in office.

"Preparation of detailed design documentation under the EEOP 5.6.0 / 12-2013-0037 identification number of projects and a contract to perform construction works Zalaegerszeg, Mártírok 42-44. u. Building during 3226/5 "

Zala Megyei Kormányhivatal | Published November 5, 2015
Winner
Szabau Invest Építőipari és Ingatlanforgalmi Kft.
cpvs
45000000, 09331000, 45320000, 45311100, 45350000, 45421132, 71245000

Building under Regulation 3226/5 "§ 124 (9) in accordance with the relevant circumstances at hand due to the conclusion of a public contract or is unable to fulfill. In view of the contracting authority for the contracting of the entry into force of the procurement process as a result of the agreement with suspensive condition stipulates. A task that subsequent thermal insulation of the poor thermal insulation capacity and front walls, replacement, resulting in outdated and front doors and energy-saving, flat roof heat insulation, upgrading the lighting system of the outdated lighting fixtures energy-efficient luminaires by replacing, upgrading the mechanical systems, the development of renewable energy utilizing solar system and all of them need to perform all the additional and supplementary works. Contractor is also responsible for preparing the detailed design documentation. Part of the construction plan is a technical specification documentation for the execution of works, the unpriced itemized budget, as well as the safety and health plan. Reserve for 0%. These include particularly, but not limited to the following items: Completion of the transfer of work areas • On the job done, such as: preparation and transfer o transfer documentation o construction completion of the restoration of the staging area for the intended / planned state to carry out the conduct o trial run • Technical management duties and proper personal care and providing technical leadership roof construction. • Performing On-site health and safety (advance quality planning, quality education, while implementing continuous quality control, final quality control for each working part is finished for the working parts, the successive working parts quality co-ordination, quality control and documentation of materials used) business areas. • On-site health and safety architectures, systems and equipment creation, acquisition, providing on-site, as well as to ensure proper co-ordination of health and safety legislation and safety management. The tenderer Main tasks and schedule winner: In connection with the preparation of detailed design documentation is not required priced budget. How to realize the full acquisition of licenses - if necessary. Making implementation documentation. The budget to be applied on the basis of a special mark to be specified by the Contracting Authority (Client) list of items, or for items not included in the items used in accordance with TERC-VIP (or equivalent) program budget making system. Without requiring the winning bidder to be royalty to say all the intellectual property right of copyright which is the outcome of tasks completed as a result of this procedure. The contractor acknowledges that it has drawn up plans right of use without territorial restrictions, indefinite, exclusive and transferable to a third party obtains the order, which also includes the recasting of creation. The plans and be prepared all the documents belonging to Hungarian. The number of copies to be delivered the expected plans and documentation of: o Construction design, 4 unpriced budget for example. printed + digital delivery (editable format) Tender calls a tender Dear Invited economic operators note that during the term of the building work going on continuously in office.

"Preparation and construction work at Zalaegerszeg, Kazinczy topographical map of the fourth amendment of a contract for detailed design documentation. Building during 3172 "

Zala Megyei Kormányhivatal | Published December 4, 2015
Winner
BMT Mérnöki Kft. és Z-Service Kft. Közös Ajánlattevők (Vezető: BMT Mérnöki Kft.); Tag: Z-SERVICE Kft.
cpvs
45000000, 09331000, 45320000, 45311000, 45350000, 45421132, 71245000

Building under paragraph 3172 "§ 124 (9) in accordance with the relevant circumstances at hand due to the conclusion of a public contract or is unable to fulfill. In view of the contracting authority for the contracting of the entry into force of the procurement process as a result of the agreement with suspensive condition stipulates. A task that subsequent thermal insulation of the poor thermal insulation capacity and front walls, replacement, resulting in outdated and front doors and energy saving, the attic floor thermal insulation, upgrading the lighting system of the outdated lighting fixtures energy-efficient luminaires by replacing, upgrading the mechanical systems, the development of renewable energy utilizing solar system and all of them need to perform all the additional and supplementary works. Contractor is also responsible for preparing the detailed design documentation. Part of the construction plan is a technical specification documentation for the execution of works, the unpriced itemized budget, as well as the safety and health plan. Reserve for 0%. These include particularly, but not limited to the following items: Completion of the transfer of work areas • On the job done, such as: preparation and transfer o transfer documentation o construction completion of the restoration of the staging area for the intended / planned state to carry out the conduct o trial run • Technical management duties and proper personal care and providing technical leadership roof construction. • Performing On-site health and safety (advance quality planning, quality education, while implementing continuous quality control, final quality control for each working part is finished for the working parts, the successive working parts quality co-ordination, quality control and documentation of materials used) business areas. • On-site health and safety architectures, systems and equipment creation, acquisition, providing on-site, as well as to ensure proper co-ordination of health and safety legislation and safety management. The tenderer Main tasks and schedule winner: In connection with the preparation of detailed design documentation is not required priced budget. How to realize the full acquisition of licenses - if necessary. Making implementation documentation. The budget to be applied on the basis of a special mark to be specified by the Contracting Authority (Client) list of items, or for items not included in the items used in accordance with TERC-VIP (or equivalent) program budget making system. Without requiring the winning bidder to be royalty to say all the intellectual property right of copyright which is the outcome of tasks completed as a result of this procedure. The contractor acknowledges that it has drawn up plans right of use without territorial restrictions, indefinite, exclusive and transferable to a third party obtains the order, which also includes the recasting of creation. The plans and be prepared all the documents belonging to Hungarian. The number of copies to be delivered the expected plans and documentation of: o Construction design, 4 unpriced budget for example. printed + digital delivery (editable format) Tender calls a tender Dear Invited economic operators note that during the term of the building work going on continuously in office.

"The preparation and carrying out construction works Keszthely, Kossuth u modification of a contract for detailed design documentation. 42. u. Building under 774/9 "

Zala Megyei Kormányhivatal | Published December 4, 2015
Winner
Szabadics Építő Kft - Szabau Invest Kft. Közös Ajánlattevők (Vezető: SZABADICS - ÉPÍTŐ Építőipari és Ingatlanforgalmi Kft.), Tag: SZABAU INVEST Építőipari és Ingatlanforgalmi Kft.
cpvs
45000000, 09331000, 45320000, 45311000, 45350000, 45421132, 71245000

Building under paragraph 774/9 "§ 124 (9) in accordance with the relevant circumstances at hand due to the conclusion of a public contract or is unable to fulfill. In view of the contracting authority for the contracting of the entry into force of the procurement process as a result of the agreement with suspensive condition stipulates. A task that subsequent thermal insulation of the poor thermal insulation capacity and front walls, replacement, resulting in outdated and front doors and energy-saving, padlás- and cellar ceiling heat insulation, upgrading the lighting system of the outdated lighting fixtures energy-efficient luminaires by replacing, upgrading heating systems, renewable energy utilization PV system construction and completion of all of these and all associated ancillary works necessary. Contractor is also responsible for preparing the detailed design documentation. Part of the construction plan is a technical specification documentation for the execution of works, the unpriced itemized budget, as well as the safety and health plan. Reserve for 0%. These include particularly, but not limited to the following items: Completion of the transfer of work areas • On the job done, such as: preparation and transfer o transfer documentation o construction completion of the restoration of the staging area for the intended / planned state to carry out the conduct o trial run • Technical management duties and proper personal care and providing technical leadership roof construction. • Performing On-site health and safety (advance quality planning, quality education, while implementing continuous quality control, final quality control for each working part is finished for the working parts, the successive working parts quality co-ordination, quality control and documentation of materials used) business areas. • On-site health and safety architectures, systems and equipment creation, acquisition, providing on-site, as well as to ensure proper co-ordination of health and safety legislation and safety management. The tenderer Main tasks and schedule winner: In connection with the preparation of detailed design documentation is not required priced budget. How to realize the full acquisition of licenses - if necessary. Making implementation documentation. The budget to be applied on the basis of a special mark to be specified by the Contracting Authority (Client) list of items, or for items not included in the items used in accordance with TERC-VIP (or equivalent) program budget making system. Without requiring the winning bidder to be royalty to say all the intellectual property right of copyright which is the outcome of tasks completed as a result of this procedure. The contractor acknowledges that it has drawn up plans right of use without territorial restrictions, indefinite, exclusive and transferable to a third party obtains the order, which also includes the recasting of creation. The plans and be prepared all the documents belonging to Hungarian. The number of copies to be delivered the expected plans and documentation of: o Construction design, 4 unpriced budget for example. printed + digital delivery (editable format) Tender calls a tender Dear Invited economic operators note that during the term of the building work going on continuously in office.

"Preparation and modification of a contract to perform construction works construction plan documentation alaegerszeg, Mártírok 42-44. u. Building during 3226/5 "

Zala Megyei Kormányhivatal | Published December 4, 2015
Winner
Szabau Invest Építőipari és Ingatlanforgalmi Kft.
cpvs
45000000, 09331000, 45320000, 45311100, 45350000, 45421132, 71245000

Building under Regulation 3226/5 "§ 124 (9) in accordance with the relevant circumstances at hand due to the conclusion of a public contract or is unable to fulfill. In view of the contracting authority for the contracting of the entry into force of the procurement process as a result of the agreement with suspensive condition stipulates. A task that subsequent thermal insulation of the poor thermal insulation capacity and front walls, replacement, resulting in outdated and front doors and energy-saving, flat roof heat insulation, upgrading the lighting system of the outdated lighting fixtures energy-efficient luminaires by replacing, upgrading the mechanical systems, the development of renewable energy utilizing solar system and all of them need to perform all the additional and supplementary works. Contractor is also responsible for preparing the detailed design documentation. Part of the construction plan is a technical specification documentation for the execution of works, the unpriced itemized budget, as well as the safety and health plan. Reserve for 0%. These include particularly, but not limited to the following items: Completion of the transfer of work areas • On the job done, such as: preparation and transfer o transfer documentation o construction completion of the restoration of the staging area for the intended / planned state to carry out the conduct o trial run • Technical management duties and proper personal care and providing technical leadership roof construction. • Performing On-site health and safety (advance quality planning, quality education, while implementing continuous quality control, final quality control for each working part is finished for the working parts, the successive working parts quality co-ordination, quality control and documentation of materials used) business areas. • On-site health and safety architectures, systems and equipment creation, acquisition, providing on-site, as well as to ensure proper co-ordination of health and safety legislation and safety management. The tenderer Main tasks and schedule winner: In connection with the preparation of detailed design documentation is not required priced budget. How to realize the full acquisition of licenses - if necessary. Making implementation documentation. The budget to be applied on the basis of a special mark to be specified by the Contracting Authority (Client) list of items, or for items not included in the items used in accordance with TERC-VIP (or equivalent) program budget making system. Without requiring the winning bidder to be royalty to say all the intellectual property right of copyright which is the outcome of tasks completed as a result of this procedure. The contractor acknowledges that it has drawn up plans right of use without territorial restrictions, indefinite, exclusive and transferable to a third party obtains the order, which also includes the recasting of creation. The plans and be prepared all the documents belonging to Hungarian. The number of copies to be delivered the expected plans and documentation of: o Construction design, 4 unpriced budget for example. printed + digital delivery (editable format) Tender calls a tender Dear Invited economic operators note that during the term of the building work going on continuously in office.

"A contract under the EEOP 5.6.0 / 12-2013-0037 identification number of project preparation and documentation to carry out construction works construction plan Lenti, 11 hrsz Temple Square. Building during 1084/3 "

Zala Megyei Kormányhivatal | Published November 9, 2015
Winner
LE-KO Építőipari Kft.
cpvs
45000000, 09331000, 45320000, 45311100, 45350000, 45421132, 71245000

Building under Regulation 1084/3 "§ 124 (9) in accordance with the relevant circumstances at hand due to the conclusion of a public contract or is unable to fulfill. In view of the contracting authority for the contracting of the entry into force of the procurement process as a result of the agreement with suspensive condition stipulates. A task that subsequent thermal insulation of the poor thermal insulation capacity and front walls, replacement, resulting in outdated and front doors and energy saving, the attic floor and a flat roof heat insulation, upgrading the lighting system of the outdated lighting fixtures energy-efficient luminaires by replacing, upgrading the mechanical systems, renewable energy utilizing solar building systems, and perform all of these and all associated ancillary works necessary. Contractor is also responsible for preparing the detailed design documentation. Part of the construction plan is a technical specification documentation for the execution of works, the unpriced itemized budget, as well as the safety and health plan. Reserve for 0%. These include particularly, but not limited to the following items: Completion of the transfer of work areas • On the job done, such as: preparation and transfer o transfer documentation o construction completion of the restoration of the staging area for the intended / planned state to carry out the conduct o trial run • Technical management duties and proper personal care and providing technical leadership roof construction. • Performing On-site health and safety (advance quality planning, quality education, while implementing continuous quality control, final quality control for each working part is finished for the working parts, the successive working parts quality co-ordination, quality control and documentation of materials used) business areas. • On-site health and safety architectures, systems and equipment creation, acquisition, providing on-site, as well as to ensure proper co-ordination of health and safety legislation and safety management. The tenderer Main tasks and schedule winner: In connection with the preparation of detailed design documentation is not required priced budget. How to realize the full acquisition of licenses - if necessary. Making implementation documentation. The budget to be applied on the basis of a special mark to be specified by the Contracting Authority (Client) list of items, or for items not included in the items used in accordance with TERC-VIP (or equivalent) program budget making system. Without requiring the winning bidder to be royalty to say all the intellectual property right of copyright which is the outcome of tasks completed as a result of this procedure. The contractor acknowledges that it has drawn up plans right of use without territorial restrictions, indefinite, exclusive and transferable to a third party obtains the order, which also includes the recasting of creation. The plans and be prepared all the documents belonging to Hungarian. The number of copies to be delivered the expected plans and documentation of: o Construction design, 4 unpriced budget for example. printed + digital delivery (editable format) Tender calls a tender Dear Invited economic operators note that during the term of the building work going on continuously in office.

In the context of a project called "Zala County Government Office buildings for energy efficiency investments," the preparation and carrying out construction work on the detailed design documentation 8800, Eötvös Square building at number 16

Zala Megyei Kormányhivatal | Published February 11, 2015
Winner
UNIFORM Építőipari és Szolgáltató Kft - SZABAU INVEST Építőipari és Ingatlanforgalmi Kft
cpvs
71245000, 45000000, 09331000, 45262630, 45320000, 45331110, 45350000, 45421132, 42511110

The object of the procurement: Preparation of detailed design documentation (CPV code: 71245000 Approval and implementation plans, and specifications) and works (CPV code: 45000000-7, 09331000-8, 45262630-6, 45320000-6, 45331110-0, 45350000-5, 45421132-8, 42511110-5). The key objective of the project is decentralized, environmentally friendly, renewable energy systems spread or spread encouraging. The works shall be carried out on the basis of technical documentation prepared to be issued export plan will be used as part of the documentation. Preparation of 8800, Eötvös Square building at No. 16 detailed design documentation, construction investment. The main parameters of the design: the energy renovation includes subsequent thermal insulation of the poor thermal insulation capacity and front walls, replacement of obsolete and front doors, upgrading the lighting system with energy-efficient luminaires by replacing the outdated lighting, renewable energy solar deployment of renewable energy utilizing solar system building, and all of them and all associated ancillary works to perform. These include in particular, but not limited to the following items: • On completion of transfer work areas of work, such as: the preparation and delivery Delivery # documentation. # Execution completion of the restoration of the staging area for the intended / planned state. Completion of the course # Test run • Technical leadership responsibilities and professional, careful construction management staff and equipment to ensure • on-site quality assurance (advance quality planning, quality education, while implementing continuous quality control, final quality control after each working part is finished for the working parts, working parts consecutive quality coordinating, quality control and documentation of materials used) to carry out work areas, • the fieldwork defense architectures, equipment and establishment, acquisition, on-site to ensure and guarantee the right to legal requirements OSH coordination and safety management. DESIGN forms part of the detailed design documentation for the technical description of the works, the itemized budget priced and unpriced. Main tasks and schedule of the contractor: content, implementation plans set out in the contract to make the draft documentation, preparing itemized budget priced and unpriced. Purchase the full implementation of the necessary permits - if necessary, preparation of documentation Implementation. 15) provides that, subject to the relevant Call for proposals and specifications; The budget to be applied on the basis of a special mark to be specified list of items provided by the Contracting Authority (Customer), or for items not included in the items used in accordance with TERC-VIP (or equivalent) budget maker software system. Without requiring the winning bidder to be royalty to give the author the right to intellectual property which is the result of all the tasks carried out as a result of this process. 23.) Government Regulation Section 5 (5)) of all plans and documents to be prepared for the Hungarian language. The expected number of copies to be delivered Plans and Documentation: - Export plan, budget priced 4 for example. print + digital delivery (editable format)