Public tenders for education in Paks Hungary

Find all Education tenders in the world.
Finding business opportunities has never been easier.

Results for education. Make a new search!

Uninterruptible power supplies

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published October 11, 2017
Winner
EXTOR Elektronika Kft.
cpvs
31154000, 31158100, 71240000, 45310000, 71245000

18 Units of at least 100 kVA power supply (inverter and battery charger).

Transport of 17 earth leakage battery chargers.

17 installation and commissioning of uninterruptible power supplies (inverter and battery charger) and 16 earth leakage battery chargers.

Breakdown of currently operating systems.

Preparation of implementation plans, implementation plans and licensing documentation in Hungarian.

Two-level (service engineering and engineering, maintenance level) education.

18 Units of at least 100kVA power supply (inverter and battery charger).

Transport of 17 earth leakage battery chargers.

Up to 17 uninterruptible power supplies (inverter and battery charger) and 16 earth leakage battery chargers installed and commissioned.

Breakdown of currently operating systems.

Preparation of implementation plans, implementation plans and licensing documentation in Hungarian.

Two-level (service engineering and engineering, maintenance level) education.

Paragraph 8 (Billing) of the Treaty is amended as follows:

17) 3 Units of Block 3 Uninterruptible System (Y, X, W) Export Permit Design Documentation Quantitative Transfer: 10.9.2017. instead of 30.11.2017.

21) 3 Block Units of Block 3 (Y, X, W) export and approval design documentation quality delivery: 30.10.2017 * instead of 10.1.2018 *

25) 3 Units of Block 4 Uninterruptible Security System (Y, X, W), Authorization Design Documentation Quantitative Transfer: 30.4.2018. instead of 11.7.2018.

28) 3 Units of Block 4 Uninterruptible Security System (Y, X, W), Certificate Design Documentation Quality Delivery: 31.7.2018. instead of 30.9.2018.

Changed to the billing point.

Machines and apparatus for testing and measuring

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published November 30, 2017
Winner
CORWELD PLUS Kereskedelmi és Fővállalkozó Korlátolt Felelősségű Társaság
cpvs
38540000

Block 1-4 1st. development, production, supply and maintenance of equipment for the visual inspection of pipelines of 10-40TG04 (** TG04B001), for the management of the equipment for contracting entities (minimum 4 persons).

Piping can be tested from this room and pipelines are not accessible from the other side.

The test equipment (s) must be capable of demonstrating the general state of the internal surfaces of the piping systems (tubes, bends, weld seams) and of the local material continuity deficiencies causing concupiscence or potentially causing concupiscence.

The equipment (s) must meet the following conditions:

- it must be suitable for the entire length of the pipelines (both horizontal and vertical) to move forward and backwards,

- the equipment can be fitted to the video system already in existence at MVM Paksi Atomerőmű Zrt., Or the elements necessary to record the recordings,

- can be completely removed from the pipeline in case of failure,

- the equipment (s) shall be equipped with a system capable of indicating the dimensions of detected faults (eg measuring software or laser pairs),

- rotate the camera 360 ° and min. +/- 100 ° should be tiltable,

- the equipment (s) must be equipped with cold light LED lighting,

- the camera must be able to set itself to a certain position (horizontally aligned with a horizontal orientation, ie a portrait image), which function can be cyclic or operative, but can be suspended,

- be suitable for underwater testing,

- the equipment (s) must be suitable for its spatial position (distance traveled) and the camera must be capable of displaying its angularity,

150 μGy / h in a radiation dose environment.

Details of pipelines to be examined:

10 (20,30,40) TG04 pipelines:

Size: Ø108x5 mm.

Material quality: austenitic steel.

Block 1-4 1st. development, production, supply and maintenance of equipment for the visual inspection of pipelines of 10-40TG04 (** TG04B001), for the management of the equipment for contracting entities (minimum 4 persons).

Piping can be tested from this room and pipelines are not accessible from the other side.

The test equipment (s) must be capable of demonstrating the general state of the internal surfaces of the piping systems (tubes, bends, weld seams) and of the local material continuity deficiencies causing concupiscence or potentially causing concupiscence.

The equipment (s) must meet the following conditions:

- it must be suitable for the entire length of the pipelines (both horizontal and vertical) to move forward and backwards,

- the equipment can be fitted to the video system already in existence at MVM Paksi Atomerőmű Zrt., Or the elements necessary to record the recordings,

- can be completely removed from the pipeline in case of failure,

- the equipment (s) shall be equipped with a system capable of indicating the dimensions of detected faults (eg measuring software or laser pairs),

- rotate the camera 360 ° and min. +/- 100 ° should be tiltable,

- the equipment (s) must be equipped with cold light LED lighting,

- the camera must be able to set itself to a certain position (horizontally aligned with a horizontal orientation, ie a portrait image), which function can be cyclic or operative, but can be suspended,

- be suitable for underwater testing,

- the equipment (s) must be suitable for its spatial position (distance traveled) and the camera must be capable of displaying its angularity,

150 μGy / h in a radiation dose environment.

Details of pipelines to be examined:

10 (20,30,40) TG04 pipelines:

Size: Ø108x5 mm.

Material quality: austenitic steel.

Original contract: Section 5 (Education).

The duration of the training shall last until the deadline for the delivery of the Goods, agreed by the Supplier with the Client, but not later than the deadline specified in Section 3.7 of the Contract. "

No. contract amendment: point 5 (Education).

In the above case, the Customer may actually use the Equipment. "

Original contract: 7.2 (Delivery of goods, delivery of goods):

Subsection 7.2.16 was not included.

No. Modification of contract: Section 7.2 (Transfer of goods, delivery of goods):

  • 1