New to set up a full-day school at the school site of Lothar von Kübel-Realschule in
Garbage Hofener 17, Sinzheim.
The construction of the school building is planned in 2 phases from March 2016 until May 2018th
The site for the new school building is located north of the main building. After creation of the new building
carried out the partial demolition of the stock, followed by connecting building.
- 1 drawer space chemistry complete, equipped with power columns (no sink) and cabinet line;
- 1 Preparation Chemistry complete with laboratory work table, hatch fume cupboard, ventilated safety cabinets
and cabinet block;
- 1 drawer space physics completely, equipped with media-ceiling system and cabinet line;
- 1 Preparation Physics;
- 1 supplementary subject area Biology with 2 power columns with sink.
New to set up a full-day school at the school site of Lothar von Kübel-Realschule in the garbage Hofener 18, Sinzheim.
The construction of the school building is planned in two phases from March 2016 until May 2018th
The site for the new school building is located north of the main building. After creation of the new building of the partial demolition of the portfolio is followed by connecting building.
Events:
1. BA (beginning school construction project):
March / April 2016 to July 2017, construction of the three-story classroom wing (north wing), together with the administration, (one storey)
Moving the school in July 2017
August + Sept 2017, demolition of the current main building,
2.BA Oct 2017 to about April 2018 supplement of the entrance area and the completion of the outdoor space.
Construction of new buildings:
North Wing: EG + 1.OG + 2nd floor as reinforced concrete structure with concrete exterior walls and concrete flat slab with flat sloped, solid roof.
The building receives a thermal insulation system on the facade.
The interior walls are made of sand-lime bricks and concrete.
The windows are designed as wood-aluminum construction.
The north wing has a volume of 7180 cubic meters.
Establishment of the north wing and the 1st phase of the management on foundation rust on concrete piles.
The management area is on one level, as a reinforced concrete structure with columns / flat ceiling construction with flat, solid roof.
The interior walls are made of sand-lime bricks and concrete.
Facades as wood aluminum mullion-transom construction.
Founding on foundation rust on concrete piles in 1. BA
Founding on supporting bottom plate in the 2nd BA
Volume of 1. BA management 2,700 cbm
Volume of 2. BA management 2,200 cbm
The crash of the stock is approximately 18,000 cubic meters of enclosed space.