Technical secondary education services

Gemeinde Sinzheim | Published October 8, 2016
cpvs
80211000

Construction of Lothar von Kübel Realschule in Sinzheim.

Technical secondary education services

Gemeinde Sinzheim | Published October 17, 2015
cpvs
80211000

Neubau der Lothar-von-Kübel Realschule in Sinzheim.

Technical secondary education services

Gemeinde Sinzheim | Published December 16, 2015  -  Deadline January 25, 2016
cpvs
80211000, 45223220

New to set up an all-day school at the school site of Lothar von Kübel-Realschule in the garbage Hofener Straße 17, Sinzheim. The construction of the school building is planned in two phases, from March 2016, the construction site for the new school building is until May 2018. located north of the main building. After creation of the new building of the partial demolition of the portfolio is followed by connecting building. Dates: 1. BA (beginning school construction project): March / April 2016 to July 2017, construction of the three-story classroom wing (north wing), together with the administration, (one storey). Moving the school in July 2017. August + September 2017, demolition of the current main building. 2.BA: Oct. 2017 to about April 2018 supplement of the entrance area and completion of the outdoor facilities. Construction of new buildings: the north wing: EG + 1.OG + 2nd floor as reinforced concrete structure with concrete exterior walls and concrete flat slab with flat sloping, massive roof. The building receives a thermal insulation composite system on the facade. The interior walls are made of sand-lime brick and concrete. The windows are designed as wood-aluminum construction. The north wing has a capacity of 7 180 m³. Establishment of the north wing and the 1st phase of the administrative foundation on rust on concrete piles. The management area is on one level, as a reinforced concrete structure with columns / flat ceiling construction with flat, solid roof. The interior walls are made of sand-lime brick and concrete. Facades as wood aluminum mullion-transom construction. Founded on foundation rust on concrete piles in 1 BA; Founded on supporting base plate in 2nd BA; Volume of 1. BA management almost 2 700 m³; 2. volume of BA management about 2 200 m³; The demolition of the stock is about 18 000 cubic meters of enclosed space.

Construction work for buildings relating to education and research

Gemeinde Sinzheim | Published February 25, 2017
Winner
Hohenloher Spezialmöbel Schaffitzel GmbH + Co. KG
cpvs
45214000

New to set up a full-day school at the school site of Lothar von Kübel-Realschule in

Garbage Hofener 17, Sinzheim.

The construction of the school building is planned in 2 phases from March 2016 until May 2018th

The site for the new school building is located north of the main building. After creation of the new building

carried out the partial demolition of the stock, followed by connecting building.

- 1 drawer space chemistry complete, equipped with power columns (no sink) and cabinet line;

- 1 Preparation Chemistry complete with laboratory work table, hatch fume cupboard, ventilated safety cabinets

and cabinet block;

- 1 drawer space physics completely, equipped with media-ceiling system and cabinet line;

- 1 Preparation Physics;

- 1 supplementary subject area Biology with 2 power columns with sink.

Construction work for buildings relating to education and research

Gemeinde Sinzheim | Published October 29, 2016  -  Deadline December 16, 2016
cpvs
45214000

New to set up a full-day school at the school site of Lothar von Kübel-Realschule in the garbage Hofener 18, Sinzheim.

The construction of the school building is planned in two phases from March 2016 until May 2018th

The site for the new school building is located north of the main building. After creation of the new building of the partial demolition of the portfolio is followed by connecting building.

Events:

1. BA (beginning school construction project):

March / April 2016 to July 2017, construction of the three-story classroom wing (north wing), together with the administration, (one storey)

Moving the school in July 2017

August + Sept 2017, demolition of the current main building,

2.BA Oct 2017 to about April 2018 supplement of the entrance area and the completion of the outdoor space.

Construction of new buildings:

North Wing: EG + 1.OG + 2nd floor as reinforced concrete structure with concrete exterior walls and concrete flat slab with flat sloped, solid roof.

The building receives a thermal insulation system on the facade.

The interior walls are made of sand-lime bricks and concrete.

The windows are designed as wood-aluminum construction.

The north wing has a volume of 7180 cubic meters.

Establishment of the north wing and the 1st phase of the management on foundation rust on concrete piles.

The management area is on one level, as a reinforced concrete structure with columns / flat ceiling construction with flat, solid roof.

The interior walls are made of sand-lime bricks and concrete.

Facades as wood aluminum mullion-transom construction.

Founding on foundation rust on concrete piles in 1. BA

Founding on supporting bottom plate in the 2nd BA

Volume of 1. BA management 2,700 cbm

Volume of 2. BA management 2,200 cbm

The crash of the stock is approximately 18,000 cubic meters of enclosed space.