Call +44 800 9755 164

Public tenders for education in Rosenheim Germany

Find all Education tenders in the world.
Finding business opportunities has never been easier.

Results for education. Make a new search!

Education and training services

Landkreis Rosenheim | Published June 18, 2016  -  Deadline July 19, 2016
cpvs
80000000

Implementation and monitoring of expected 19 Berufsintegrationsvorklassen (BIK / V) with a focus on language integration and 9 vocational integration classes (BIK), and a two-year integration measure in various professional schools in Rosenheim.

The partners shall inform the Berufsintegrationsvorklassen (BIK / V), among other in German as a second language (DAZ) - differentiated by knowledge and performance level in close coordination with the respective vocational school. Students receive 20 teachers lessons linguistic skills. The partners created a sharing-oriented and within differentiated approach to the exchange of oral and written language skills and learning support. The partner is responsible for an appropriate socio-educational care concept in the weekly amount of 10 hours per BIK / V class, which are equally distributed among the school week. He also ensures the socio-educational handover management to the local school social work.

The partner brings in the professional integration classes (BIK) at least 25 clock hours for audience-related support and integration of the participants and to prepare for vocational and specialized practical training - usually through work placements a. A socio-educational care concept must be ensured by the cooperation partner. The social counseling is to promote the professional orientation, social advancement and finding a training place.

The cooperation partners informed in the two-year integration measure at the business school a priority in the subject German as a foreign language differentiated according to knowledge and student performance / inside and bringing at least 20 teacher hours a week. A socio-educational care concept must be ensured by the cooperation partner in the amount of at least 10 clock hours.

Modernization of equipment at the training center Rosenheim - Digitisation

Handwerkskammer für München und Oberbayern, Max-Joseph-Straße 4, 80333 München | Published December 8, 2016  -  Deadline January 13, 2017
cpvs
80530000

Equipment for workshops and theory rooms at the Education Centre Rosenheim.

Modernization of equipment at the training center Rosenheim

Handwerkskammer für München und Oberbayern, Max-Joseph-Straße 4, 80333 München | Published November 17, 2016  -  Deadline December 23, 2016
cpvs
80530000

Find Out for workshops and theory rooms at the Education Centre Rosenheim.

Architectural, construction, engineering and inspection services

Staatliches Bauamt Rosenheim | Published November 7, 2015
Winner
Duschl Ingenieure
cpvs
71000000, 71300000, 71320000

Between the Technische Universität München (TUM) and the Forschungszentrum Jülich GmbH (FZJ), a cooperation agreement on the common scientific use of the research neutron source at the research reactor Munich II (FRM II) was closed. To meet the increased space requirements for the implementation of the cooperation agreement do justice, to a new central building created at the research neutron source research reactor Munich II of the Technische Universität München. There are 2 four-story components are built. On the upper floors offices and seminar rooms will be created. The building part of FZJ experimental work and laboratory spaces are provided on the ground floor and first floor, work surfaces in the building part of the TUM building. Owner of the section TUM is the Bayer. State Ministry of Education and Culture, Science and Art, represented by the State Building Authority Rosenheim; Owner of the construction phase is FZJ Forschungszentrum Jülich GmbH (Member of the Helmholtz Association) represented by the State Building Authority Rosenheim.

Architectural, construction, engineering and inspection services

Staatliches Bauamt Rosenheim | Published November 7, 2015
Winner
Ottitsch GmbH & Co. KG
cpvs
71000000, 71300000, 71320000

Between the Technische Universität München (TUM) and the Forschungszentrum Jülich GmbH (FZJ), a cooperation agreement on the common scientific use of the research neutron source at the research reactor Munich II (FRM II) was closed. To meet the increased space requirements for the implementation of the cooperation agreement do justice, to a new central building created at the research neutron source research reactor Munich II of the Technische Universität München. There are 2 four-story components are built. On the upper floors offices and seminar rooms will be created. The building part of FZJ experimental work and laboratory spaces are provided on the ground floor and first floor, work surfaces in the building part of the TUM building. Owner of the section TUM is the Bayer. State Ministry of Education and Culture, Science and Art, represented by the State Building Authority Rosenheim; Owner of the construction phase is FZJ Forschungszentrum Jülich GmbH (Member of the Helmholtz Association) represented by the State Building Authority Rosenheim.

Load-bearing structure design services

Staatliches Bauamt Rosenheim | Published November 7, 2015
Winner
Bewerbergemienschaft Wetzel & von Seht/Bracher Bock Ingenieure
cpvs
71327000

The museum should be a place of history, culture and fate of the Sudeten Germans keeps alive in the consciousness - including its benefits for the European understanding and build bridges in Europe - a place of encounter and dialogue, particularly with our Czech neighbors. The building project consists of several parts: - construction of the Sudeten Germans Museum - extension of Alfred Kubin Gallery in Sudeten house, - remediation of Adalbert Stifter hall in Sudeten house - reconstruction of office space for the Museum management in Sudeten house. New construction and expansion of Alfred Kubin Gallery. The restaurant, a part of the building with ground floor and 2 basement levels (built into the sloping edge of the slope into Isar) and a floor has to be demolished in the course of the construction work, to make room for the cultivation of the museum. 380 m2 exhibition space in the old building needed NF1-6 (260 m2 Space available + 120 m2 expansion area plan). In the old building more areas are for the museum use upgraded (Administration Museum, auditorium and space for museum education); these plans are not subject to the VOF method, but are carried out in parallel structurally. Task of the VOF method is the development of a structural design for the museum, welcoming the complex boundary conditions such as: - cultivation of the museum to the Foundation building from 1980 with adjustments in inventory - partially underpinning the backlog and foundations by piles (new construction), - complex demolition of the Isar slope into built building part (slope protection, protection of the foundation building), - functional distribution of museum space in new and old buildings, - cramped, sloping building plot, EnEV 2009 - 30%), - land in throwing power of the Protected Landscape Area "Isar slope edge" (protected habitat) - connection to the rear gear is located "House of the German East" and on the basis of the space program and museum concept a viable and functional building design.

Mechanical and electrical engineering services

Staatliches Bauamt Rosenheim | Published November 7, 2015
Winner
Duschl Ingenieure
cpvs
71334000

The museum should be a place of history, culture and fate of the Sudeten Germans keeps alive in the consciousness - including its benefits for the European understanding and build bridges in Europe - a place of encounter and dialogue, particularly with our Czech neighbors. The building project consists of several parts: - construction of the Sudeten Germans Museum - extension of Alfred Kubin Gallery in Sudeten house, - remediation of Adalbert Stifter hall in Sudeten house - reconstruction of office space for the Museum management in Sudeten house. The restaurant, a part of the building with ground floor and 2 basement levels (built into the sloping edge of the slope into Isar) and a floor has to be demolished in the course of the construction work, to make room for the cultivation of the museum. 380 m2 exhibition space in the old building needed NF1-6 (260 m2 Space available + 120 m2 expansion area plan). In the old building more areas are for the museum use upgraded (Administration Museum, auditorium and space for museum education). Task is the electrical design for the museum, welcoming the complex boundary conditions such as: - cultivation of the museum to the Foundation building from 1980 with adjustments in inventory - partially underpinning the backlog and foundations by piles (new construction), - complex demolition of the Isar slope in-built part of the building (slope protection, protection of the foundation building), - functional distribution of museum space in new and old buildings, - cramped, sloping building plot, EnEV 2009 - 30%), - land in throwing power of the Protected Landscape Area "Isar slope edge" (protected biotope), - connection transition to the rearward location "House of the German East". This results on the basis of the space program and museum concept a viable and functional building design.

Mechanical and electrical engineering services

Staatliches Bauamt Rosenheim | Published November 7, 2015
Winner
WSP Deutschland AG
cpvs
71334000

The museum should be a place of history, fate and Kulturder Sudeten keeps alive in the consciousness - including its benefits for the European understanding and build bridges in Europe - a place of encounter and dialogue, particularly with our Czech neighbors. The building project consists of several parts: - construction of the Sudeten Germans Museum - extension of Alfred Kubin Gallery in Sudeten house, - remediation of Adalbert Stifter hall in Sudeten house - reconstruction of office space for the Museum management in Sudeten house. The restaurant, a part of the building with ground floor and 2 basement levels (built into the sloping edge of the slope into Isar) and one upstairs has abgerissenwerden in the course of the construction work, to make room for the cultivation of the museum. 380 m2 exhibition space in the old building needed NF1-6 (260 m2 Space available + plan m2Erweiterungsfläche 120). In the old building more surfaces for dieMuseumsnutzung upgraded (Administration Museum, auditorium and space for museum education). Task is the HVAC-planning for the museum, welcoming the complex boundary conditions such as: - cultivation of the museum to the Foundation building from 1980 with adjustments in inventory - partially underpinning the backlog and foundations by piles (new construction), - complex demolition of a in the Isar slope into built building part (slope protection, protection of the foundation building), - functional distribution of museum space in new and old buildings, - cramped, sloping building plot, EnEV 2009 - 30%), - land in throwing power of the Protected Landscape Area "Isar slope edge" (protected biotope), - connection passage to the rear located "House of the German East". This results on the basis of the space program and museum concept a viable and functional building design.

New Sudetendeutsches Museum in Munich - Electrical planning.

Staatliches Bauamt Rosenheim | Published October 15, 2014  -  Deadline November 12, 2014
cpvs
71334000

The museum should be a place of history, culture and fate of the Sudeten Germans keeps alive in the consciousness - including its benefits for the European understanding and building bridges in Europe - a place of encounter and dialogue, especially with our Czech neighbors. The construction project consists of several parts: - construction of the Sudeten Germans Museum - Expansion of Alfred Kubin Gallery in Sudeten house - renovation of the Adalbert-Stifter-hall in the Sudeten house - renovation of office space for the museum administration in the Sudeten house. The restaurant, part of a building with a ground floor and two basements (built in the falling edge of the slope into Isar) and one upstairs has to be demolished as part of the construction project, to make way for the cultivation of the museum. 380 m² NF1-6 special area in the old building needed (260 m² surface + available to plan 120 sqm Extension area). In the old building more areas are for the use of upgraded Museum (Museum administration, auditorium and space for museum education). Task is the electrical design for the museum, welcoming the complex boundary conditions such as: - growing of the museum at the Foundation building from 1980 with adjustments in inventory - partly underpinning the stock and foundations using piles (new construction), - complex demolition of the Isar slope in-built part of the building (slope stabilization, protection of the Foundation building) - Function distribution of the museum space in new and old buildings, - cramped, sloping plot, Energy Saving Ordinance 2009-30%) - property in the throwing power of the Protected Landscape Area "Isar slope edge" (protected habitat), - links course at the rear location "House of the German East". thus results based on the space program and museum concept a viable and functional building design.

New Sudetendeutsches Museum in Munich - HVAC planning.

Staatliches Bauamt Rosenheim | Published October 15, 2014  -  Deadline November 12, 2014
cpvs
71334000

The museum should be a place of history, culture and fate of the Sudeten Germans keeps alive in the consciousness - including its benefits for the European understanding and building bridges in Europe - a place of encounter and dialogue, especially with our Czech neighbors. The construction project consists of several parts: - construction of the Sudeten Germans Museum - Expansion of Alfred Kubin Gallery in Sudeten house - renovation of the Adalbert-Stifter-hall in the Sudeten house - renovation of office space for the museum administration in the Sudeten house. The restaurant, part of a building with a ground floor and two basements (built in the falling edge of the slope into Isar) and one upstairs has to be demolished as part of the construction project, to make way for the cultivation of the museum. 380 m² NF1-6 special area in the old building needed (260 m² surface + available to plan 120 sqm Extension area). In the old building more areas are for the use of upgraded Museum (Museum administration, auditorium and space for museum education). Task is the HVAC design for the museum, welcoming the complex boundary conditions such as: - growing of the museum at the Foundation building from 1980 with adjustments in inventory - partly underpinning the stock and foundations using piles (new construction), - complex demolition of a in the Isar slope in-built part of the building (slope stabilization, protection of the Foundation building) - Function distribution of the museum space in new and old buildings, - cramped, sloping plot, Energy Saving Ordinance 2009-30%) - property in the throwing power of the Protected Landscape Area "Isar slope edge" (protected habitat), - connection passage to the rear located "House of the German East". thus results based on the space program and museum concept a viable and functional building design.

New Sudetendeutsches Museum in Munich - Structural design.

Staatliches Bauamt Rosenheim | Published October 14, 2014  -  Deadline November 12, 2014
cpvs
71327000

The museum should be a place of history, culture and fate of the Sudeten Germans keeps alive in the consciousness - including its benefits for the European understanding and building bridges in Europe - a place of encounter and dialogue, especially with our Czech neighbors. The construction project consists of several parts: - construction of the Sudeten Germans Museum - Expansion of Alfred Kubin Gallery in Sudeten house - renovation of the Adalbert-Stifter-hall in the Sudeten house - renovation of office space for the museum administration in the Sudeten house. Construction and expansion of Alfred Kubin Gallery. The restaurant, part of a building with a ground floor and two basements (built in the falling edge of the slope into Isar) and one upstairs has to be demolished as part of the construction project, to make way for the cultivation of the museum. 380 m² NF1-6 special area in the old building needed (260 m² surface + available to plan 120 sqm Extension area). In the old building more areas are for the use of upgraded Museum (Museum administration, auditorium and space for museum education); these plans are not subject to the VOF method, but are executed in parallel structurally. Task of the VOF method is the development of a structural design for the museum, welcoming the complex boundary conditions such as: - growing of the museum at the Foundation building from 1980 with adjustments in inventory - partly underpinning the stock and foundations using piles (new construction), - complex demolition of the Isar slope in-built part of the building (slope stabilization, protection of the Foundation building) - Function distribution of the museum space in new and old buildings, - cramped, sloping plot, Energy Saving Ordinance 2009-30%) - property in the throwing power of the Protected Landscape Area "Isar slope edge" (protected biotope), - connection speed results to the rear located "House of the German East" and based on the space program and museum concept a viable and functional building design.

Architectural, construction, engineering and inspection services

Staatliches Bauamt Rosenheim | Published November 7, 2015
Winner
pmp Architekten GmbH
cpvs
71000000, 71200000

The competition process is anonymous. The museum should be a place of history, culture and fate of the Sudeten Germans keeps alive in the consciousness - including its benefits for the European understanding and build bridges in Europe - a place of encounter and dialogue, particularly with our Czech neighbors. The embossing and development of this cultural area, which was the spiritual and cultural center of Europe for many centuries, is to be shown the future museum visitors multimedia. To further promote the dialogue with the Czech neighbors and recover the history of the Germans together, the existing close cooperation between the Sudeten German Museum with the Collegium Bohemicum in Usti nad Labem in the form of temporary exhibitions, lectures and discussions will be expanded in the future. The promoter expects from the competition a museum design that: - implementing the aim of the museum in a prominent and attractive architectural quality and taking into account the urban and historic preservation concerns is its own architectural highlight in the sensitive environment Isar edge of the slope, - the exhibition concept is a reasonable and supportive framework , - the aspect of economy, both for the construction as, also takes into account the operation of the building in a particular degree, - the budget set complies. The building project consists of several parts: - construction of the Sudeten Germans Museum - extension of Alfred Kubin Gallery in Sudeten house, - remediation of Adalbert Stifter hall in Sudeten house - reconstruction of office space for the Museum management in Sudeten house. New construction and expansion of Alfred Kubin Gallery. The restaurant, a part of the building with ground floor and 2 basement levels (built into the sloping edge of the slope into Isar) and a floor has to be demolished in the course of the construction work, to make room for the cultivation of the museum. 380 m2 exhibition space in the old building needed NF1-6 (260 m2 Space available + 120 m2 expansion area plan). In the old building more areas are for the museum use upgraded (Administration Museum, auditorium and space for museum education); these plans are not the subject of the competition, but are executed in parallel structurally. Competition task is to develop a plan for the museum, the welcoming of the complex boundary conditions such as: - cultivation of the museum to the Foundation building from 1980 with adjustments in inventory - partially underpinning the backlog and foundations by piles (new construction), - complex demolition of a in the Isar slope into built building part (slope protection, protection of the foundation building), - functional distribution of museum space in new and old buildings, - cramped, sloping building plot, EnEV 2009 - 30%), - land in throwing power of the Protected Landscape Area "Isar slope edge" (protected biotope), - connection gear results in the backward location "House of the German East" and on the basis of the space program and museum concept a viable and functional building design. The handover of the finished building should take place in the summer 2018th
  • 1