Public tenders for education in Neuss Germany

Find all Education tenders in the world.
Finding business opportunities has never been easier.

Results for education. Make a new search!

Engineering design services for mechanical and electrical installations for buildings

Stadt Neuss, Der Bürgermeister, Zentrale Vergabestelle | Published August 25, 2015
Winner
Planungsbüro Rohling AG
cpvs
71321000, 71315000, 71322100

The Comprehensive School North City is planned with a 5-sized secondary level and a 3-sized secondary education. Roofs, windows) therefore required: - Creation of a space available for inclusive education; Accessible bathroom all buildings and levels, - installation of 4 lifts, 2 lifts and 2 platform lifts; Expanding each one disabled toilet in each building, - expanding the kitchen and the stage area, expansion of the cafeteria, laying the concierge office, - expanding library and media center; Expanding centralized management area; Expanding demand toilets for each vintage, - expansion of an additional equipment room and a additional scientific space. Split 13 construction phases and is expected to be completed 2020th Within the KG 400, the estimated costs are distributed approximately evenly on the cost groups 410, 420, 430, 440 and 460. Subject of the contract to be awarded are specialist planning services Technical equipment for remediation and fire protection measures and for the development towards inclusive schools: Annex 15 to § 55 HOAI, Performance stages 1-8.

Architectural services for buildings

Stadt Neuss, Der Bürgermeister, Zentrale Vergabestelle | Published June 20, 2015
Winner
Planungsbüro Rohling AG
cpvs
71221000, 71223000

All three schools running in the next few years are as follows: full-time high school mountain to 07/31/2016, Mildred Scheel Realschule to 07/31/2016, Christian-Wierstraet school to 07/31/2018. The Comprehensive School North City is planned with a 5-sized secondary level and a 3-sized secondary education. The building management of the city of Neuss has created a corresponding planning that allows the spatial accommodation of the total school Nordstadt in the buildings of the full-time high school mountain, the Mildred Scheel Realschule and the Christian-Wierstraet School. Roofs, windows) thus necessary: ​​creating a space available for inclusive education; Accessible bathroom all buildings and planes, installation of 4 lifts, 2 lifts and 2 platform lifts; Expanding each one disabled toilet in each building; Expanding the kitchen and the stage area, expansion of the cafeteria, laying the concierge office; Expanding library and media center; Expanding centralized management area; Expanding demand toilets for each vintage; Construction of an additional equipment room and an additional scientific space. Split 13 construction phases and is expected to be completed in 2020. The total amounts to approximately 8,113,000 EUR gross (KG 200: 0 EUR, KG 300: 5.743 million EUR, 400 KG: 2,333,000 EUR, KG 500: 37 000 EUR). Subject of the contract to be awarded are architectural services for the renovation and fire protection measures and for the expansion towards inclusive schools:
  • 1