Public tenders for education in Neuendettelsau Germany

Find all Education tenders in the world.
Finding business opportunities has never been easier.

Results for education. Make a new search!
EducationGermanyneuendettelsau

Construction work for buildings relating to education and research

Evang.-Luth. Diakoniewerk Neuendettelsau, Baureferat | Published December 20, 2016  -  Deadline February 1, 2017

In construction phase III of Instandsetzungsmaßnehmen the old building of the central school building is generalized was set.

This is again in 3 sub-sections with the following measures:

Bauabschnitt A: Demolition and reconstruction work in 2/3 of the basement, adapt of 3 rooms for the resumption of classes in the east wing, the rest of the basement remains roadworks; of early installation of the new elevator with technology shaft on all floors of the old building. This section has already been completed.

Bauabschnitt B: general restoration of the eastern half of the old building from the ground floor to the 3rd floor. Continue work in the basement.

Construction phase C: general restoration of the western half of the old building from the basement to the 3rd floor, completion of the basement.

Work on the roof and facade done in sections across while section B and C.

- Ceiling media supply system 43 running meters,

- System Stands Wall Line 8 pcs.

- Worktops stoneware with substructure 24 pcs.

- Gas Cylinder Cabinets 2 pcs.

- Prints 2 pcs.

- Auditorium seating table number fixed 12 pcs.

- Auditorium seating substructure 2 pcs.

- Piping water, demineralized water, gases 300 yds,

- PVC cable ducts 290 running meters,

- PVC-sheathed cables 6500 running meters,

- Pylons-Interactive whiteboard 5 pcs.

- Countertops melamine table base 13 pcs.

- Mobile Tables Worktop laminated stoneware 34 pcs.

- Student tables melamine 62 pcs.

- Roll container 13 pcs.

- Tall cabinets with top cabinet 67 pcs.

- Students swivel chairs 109 pcs.

Construction work for buildings relating to education and research

Evang.-Luth. Diakoniewerk Neuendettelsau, Baureferat | Published December 20, 2016  -  Deadline February 2, 2017

The central school house in Neuendettelsau is expanded and generalized was set in several phases. Here the extension of the house of vocational schools, Wilhem-Lohe-Str. 21, 91564 Neuendettelsau. In this phase of construction, an extension will be created at the house of the vocational schools.

Site equipment, crane, construction fences, walls dust etc.

Topsoil expand 1100 m²,

Excavation, property ON, 3 000 m³,

Trenches, shafts 420 m³,

Drainage lines 220 m,

Planter blocks Lichtengraben 500 pcs.,

Baseplate WU, subbase 400 m²,

Foundation (tr) 60 m 3 and support wall (30 cm tr) 150 m 2 Lichtengraben,

Underpinning foundations inventory,

Reinforced concrete walls 1 000 sqm,

Stahlbetondecken, filigree tops 1 240 m²,

Tr-prefabricated stairs 4 pcs.,

Masonry walls 515 m²,

Flooring and tiling, 115 m²,

Painting 260 m²,

Demolition window and door surfaces 32 m 2 , Flooring 40 m²,

Demolition curtain concrete facade elements, WäDä 92 m².

Construction work for buildings relating to education and research

Evang.-Luth. Diakoniewerk Neuendettelsau | Published January 20, 2017  -  Deadline March 8, 2017

In construction phase III of Instandsetzungsmaßnehmen the old building of the central school building is generalized was set.

This is again in 3 sub-sections with the following measures:

Bauabschnitt A: Demolition and reconstruction work in 2/3 of the basement, adapt of 3 rooms for the resumption of classes in the east wing, the rest of the basement remains roadworks; of early installation of the new elevator with technology shaft on all floors of the old building. This section has already been completed.

Bauabschnitt B: general restoration of the eastern half of the old building from the ground floor to the 3rd floor. Continue work in the basement.

Construction phase C: general restoration of the western half of the old building from the basement to the 3rd floor, completion of the basement.

Work on the roof and facade done in sections across while section B and C.

Approximately 550 m Cu pipe 15x1-22;

about 7 000 m of steel pipe black, DN 15 - DN 150;

100 St. radiator steel;

1 St. district heating transfer station, including regulation.

1 St. loss header than 2 000 kW;

1 St. Heating distributor, 8 circles;

50 St. Pipe fittings DN 20 - DN 150;

14 St. Electronic circulators;

220 St. dismantling radiators;

about 7 000m dismantling pipelines;

200 St. dismantling fittings.

  • 1