Public tenders for education in Darmstadt Germany

Find all Education tenders in the world.
Finding business opportunities has never been easier.

Results for education. Make a new search!

Adult and other education services

Zentrale Auftragsvergabestelle des Landkreises Darmstadt-Dieburg | Published June 2, 2016
cpvs

Adult and other education

Adult and other education services

Zentrale Auftragsvergabestelle des Landkreises Darmstadt-Dieburg | Published December 2, 2015
Winner
USS GmbH
cpvs
80400000

Public invitation to tender pursuant to § 1 EC, para. 3 i. V. with § 3 para. 2 VOL / A the District Employment Agency Darmstadt-Dieburg for the design and implementation of integration measures in accordance with § 16 SGB II i. V. with § 45 SGB III Darmstadt in space with 300 seats per month. A written request for the documents is not necessary. These are exclusively digitally and available free of charge www.subreport-elvis.de/E75213598. All other information, please visit: http://www.ladadi.de/ausschreibungen

Adult and other education services

Zentrale Auftragsvergabestelle des Landkreises Darmstadt-Dieburg | Published February 12, 2015
Winner
Bildungswerk der Hessischen Wirtschaft
cpvs
80400000

Public invitation to § 1 EC para. 3 VOL / A i. V. with § 3 para. 2 VOL / A the circle Agency for Employment Darmstadt-Dieburg for the design and implementation of a switching action "activation and vocational integration of people with disabilities," according to § 16 a no. 3 SGB II i. V. with § 45 no. 1 SGB III in the Darmstadt with max. 25 measure places.

Special-purpose road passenger-transport services

Zentrale Auftragsvergabestelle des Landkreises Darmstadt-Dieburg | Published April 15, 2015
Winner
Köhler Transfer GmbH & Co. KG
cpvs
60130000

The Contractor conveys the students from the communities of the district Darmstadt-Dieburg at the Gustav-Heinemann School in Dieburg and back. In the aforementioned school that it was completed special education with a focus on physical and mental development. The buses used must be equipped with safety belts. The proposed allocation period runs from 13.04.2015 up to the summer holidays 2018 (07/31/2018), ie about 625 school days. An accompanying person shall be submitted per vehicle.

Socio-educational support and advice and the organizational operation of a woman transitional apartment building

Magistrat der Wissenschaftsstadt Darmstadt - Amt für Soziales und Prävention | Published March 31, 2017  -  Deadline May 9, 2017
cpvs
85300000, 85311000

Machining centre

Technische Universität Darmstadt | Published April 13, 2016  -  Deadline May 31, 2016
cpvs
42612000

For the production of complex components for research and teaching in the field of cutting and forming special machines a machining center is to be procured, that the 5-sided and 5-axis simultaneous machining allows. At the same time, the machine is an integral part of practice-oriented engineering education in the field of engineering design and production-oriented constructing. Through the use of a modern 5-axis machining center, the possibility should be created that the students and academic staff realize their constructive designs z. T. independently or with the assistance of skilled personnel in the mechanical workshop. By previously learning the possibilities of such a machine should be taught as suitable for production drawings are to be compiled and beyond CAD / CAM strategies are used for complex 5-axis machining.

Architectural services for buildings

Hochschule Darmstadt University of Applied Sciences | Published September 27, 2016  -  Deadline October 25, 2016
cpvs
71221000

Under the Higher Education Pact 2020 Invest Phase III the Hochschule Darmstadt realized the construction of a student house incl. Underground car park with 93 spaces. The construction site is located on the campus Schöfferstraße in Darmstadt, northeast of the tower, and is currently used as a parking lot. The space program closes with an area of ​​about 4 000m 2 from and includes areas for seminar rooms, a learning center with lounge, a Mensaria, study close service facilities such as SSC, Examination Office, Career Center, International Office, the Language Centre and the ASTA. Gross construction costs (KGR 300 and 400) are estimated at 16 400 000 EUR. For this is a design competition to RPW 2013 will be carried out in the anonymous method preceded by the application process. This implementation desWettbewerbs are the RPW 2013 based on the 31.1.2013 issued by the BMVBS amended and made famous with the introduction of Decree of 11/07/2013 HMdF clues.

Architectural and related services

Zentrale Auftragsvergabestelle des Landkreises Darmstadt-Dieburg | Published December 19, 2015  -  Deadline January 18, 2016
cpvs
71200000

The Max-Planck-Gymnasium in Groß-Umstadt is composed of various buildings together on a 6,848 square meter plot in a central city location. Due to the changed requirements of the school and teaching operation (full day, education, inclusion, etc.). there is an urgent need for further classrooms. A new building with classrooms for secondary education to be built in modular design as a bolt along the Schulstraße (= northern boundary) and include 1 000 m2 NF. Furthermore, the following buildings are to be renovated: 1) the central main building, which was built around 1890 and today is a listed building, 2) an erected in the 1960s, growing with a flat roof, in the projectiles EC to the 2nd floor via corridors direct connections has at the old building. The building to be rehabilitated include an area of ​​2 700 m2 of NF. When renovating, it refers mainly to a fire restoration, particularly the upgrading of blankets, HBO-compliant stairwell degrees and the ventilation supply of classrooms. The renovation and the construction of the new building to be implemented in stages and must take place during operation. As the first phase of construction of the new building is to be built, the renovation of the stock is to be implemented following it in two phases. There is a total cost budget (KG 300 + 400) of approximately 4,000,000 EUR gross provided. The aim is to fully implement the action (new construction and rehabilitation) by the end of the summer vacation in 2018, so that all classrooms can be used without restriction from the beginning of the school year 2018/2019. All necessary documents for the current process status and further explanations about the project will be made available to tenderers with the invitation to tender are available. It is a gradual commissioning reserved. A legal claim to an overall commission does not exist.

Load-bearing structure design services

Land Hessen, Ministerium für Wissenschaft und Kunst, vertreten durch die Hochschule Darmstadt – University of Applied Sciences | Published February 25, 2017  -  Deadline March 27, 2017
cpvs
71327000

Under the Higher Education Pact 2020 INVEST Phase III the Hochschule Darmstadt realized the construction of a student house incl. Underground car park with 93 spaces. The construction site is located on the campus Schöfferstraße in Darmstadt, northeast of the tower and is currently used as a car park. The space program closes with an area of ​​about 4 000m 2 from and includes areas for seminar rooms, a learning center with lounge, a Mensaria, study close service facilities such as SSC, Examination Office, Career Center, International Office, the Language Centre and the ASTA.

Gross construction costs (KGR 300 and 400) are estimated at 16 400 000 EUR.

Specialized design services structural design in accordance with § 49 and § 51 HOAI py with plant 14.1.

Work phases 2 to 6 and Special Services.

Benefits of structural engineering, Phases 2-6 §§ 49 ff. HOAI and Special Services, for the construction of a student house with underground parking.

The appointment is in stages. First commissioning of Phases 2 and 3 and the special is power "Proof of earthquake safety" provided.

The presentation of the draft plan is scheduled for the end of 12/2017.

Engineering design services

Wissenschaftsstadt Darmstadt – Eigenbetrieb Immobilienmanagement | Published August 19, 2015  -  Deadline September 14, 2015
cpvs
71320000

The city of Darmstadt intends to entrust with this North VOF method, the benefits of structural design for the renovation of the vocational training center. In parallel VOF method, the benefits of the Building design and technical equipment will be awarded. The Berufsschulzentrum is adjacent to the north to the city center and consists of 3 vocational schools: Heinrich Emanuel Merck school (built in 1985), Friedrich-List-Schule (1983) and Martin-Behaim School (1978). The somewhat dated Berufsschulzentrum with approximately 30 000 m2 gross floor area and more than 3 000 students is facing 30 years to life considerable need for rehabilitation. The structural, functional and energetic refurbishment will take place in phases during operation. The guiding concept "of 3 into 1" thereby provides the center thoughts by forming an organizational unit, taking into account synergies. The restoration should take place while respecting the stock, so that the characteristics and structural features of the building are preserved, this concerns for example the spacious school roads for internal development as well as the shed roofs and courtyards in favor of natural lighting and ventilation, etc. The 2014 completed feasibility study is in the Phase 2 provided. In the area of ​​vocational training center there are more schools and gymnasiums and sports fields. The schools and education institutions together form a college campus. The Berufsschulzentrum North takes up a one parent position. This central function will be reinforced by a planned new building with a cafeteria and auditorium; this takes place alongside an interdisciplinary competition.

Architectural and related services

Wissenschaftsstadt Darmstadt – Eigenbetrieb Immobilienmanagement | Published August 19, 2015  -  Deadline September 14, 2015
cpvs
71200000

The city of Darmstadt intends to commission building for the rehabilitation of the vocational training center north with this VOF procedure the achievements of the project planning. In parallel VOF method, the provision of technical equipment and structural engineering will be awarded. The Berufsschulzentrum is adjacent to the north to the city center and consists of 3 vocational schools: Heinrich Emanuel Merck school (built in 1985), Friedrich-List-Schule (1983) and Martin-Behaim School (1978). The somewhat dated Berufsschulzentrum with approximately 30 000 m2 gross floor area and more than 3 000 students is facing 30 years to life considerable need for rehabilitation. The structural, functional and energetic refurbishment will take place in phases during operation. The guiding concept "of 3 into 1" thereby provides the center thoughts by forming an organizational unit, taking into account synergies. The restoration should take place while respecting the stock, so that the characteristics and structural features of the building are preserved, this concerns for example the spacious school roads for internal development as well as the shed roofs and courtyards in favor of natural lighting and ventilation, etc. The 2014 completed feasibility study is in the Phase 2 provided. In the area of ​​vocational training center there are more schools and gymnasiums and sports fields. The schools and education institutions together form a college campus. The Berufsschulzentrum North takes up a one parent position. This central function will be reinforced by a planned new building with a cafeteria and auditorium; this takes place alongside an interdisciplinary competition.

Engineering services

Wissenschaftsstadt Darmstadt – Eigenbetrieb Immobilienmanagement | Published August 19, 2015  -  Deadline September 14, 2015
cpvs
71300000

The city of Darmstadt intends to entrust with this North VOF method, the provision of technical equipment for the rehabilitation of the vocational training center. In parallel VOF method, the benefits of the project planning are building and structural engineering awarded. The Berufsschulzentrum is adjacent to the north to the city center and consists of 3 vocational schools: Heinrich Emanuel Merck school (built in 1985), Friedrich-List-Schule (1983) and Martin-Behaim School (1978). The somewhat dated Berufsschulzentrum with approximately 30 000 m2 gross floor area and more than 3 000 students is facing 30 years to life considerable need for rehabilitation. The structural, functional and energetic refurbishment will take place in phases during operation. The guiding concept "of 3 into 1" thereby provides the center thoughts by forming an organizational unit, taking into account synergies. The restoration should take place while respecting the stock, so that the characteristics and structural features of the building are preserved, this concerns for example the spacious school roads for internal development as well as the shed roofs and courtyards in favor of natural lighting and ventilation, etc. The 2014 completed feasibility study is in the Phase 2 provided. In the area of ​​vocational training center there are more schools and gymnasiums and sports fields. The schools and education institutions together form a college campus. The Berufsschulzentrum North takes up a one parent position. This central function will be reinforced by a planned new building with a cafeteria and auditorium; this takes place alongside an interdisciplinary competition.
  • 1