Public tenders for education in Valtice Czech Republic

Find all Education tenders in the world.
Finding business opportunities has never been easier.

Results for education. Make a new search!

Centre of Excellence

Střední vinařská škola Valtice, příspěvková organizace | Published November 6, 2015
cpvs
45000000

The original building will be insulated contact system. NP. Above the original building will be left with a gabled roof hip. PP mainly warehouses and handling facilities for the preparation of tasting wine samples. In the attic will be built built offices. Operation Centre is designed to be convenient for the necessary administrative, storage of samples of wine, making wine tasting, as well as for training and cultural events. 232/2012 Coll .: a) description needs to be the fulfillment of public contracts fulfilled: The redesigned and built premises will be provided to the public service in the field of promotion and support of viticulture and enology. b) Description of public procurement: The original building will be insulated contact system. NP. Above the original building will be left with a gabled roof hip. PP mainly warehouses and handling facilities for the preparation of tasting wine samples. In the attic will be built built offices. Operation Centre is designed to be convenient for the necessary administrative, storage of samples of wine, making wine tasting, as well as for training and cultural events. c) A description of the relationship of the public contract and the client's needs: The implementation of the public contract authority reaches fulfillment needs to build a training center for initial and continuing education and banquet wine congresses, conferences and exhibitions of important nomination. d) Expected date of fulfillment of public contracts:

Centre of Excellence

Střední vinařská škola Valtice, příspěvková organizace | Published December 11, 2015
cpvs

NP including the implementation of new internal wiring, wiring, ventilation, drainage, water supply, new water connections and sewerage project documentation prepared by the commercial company OK.Atelier Ltd., Identification Number: 60744456, registered office The Zámkem 2881/5, 690 02 Breclav, at 11 / 2015 under a custom number: 2015/285 labeled entitled Excellency Center (annex tender documents) and the other conditions set out in the tender documentation and its annexes. Extension of the roofed flat roof. Operation Centre is designed to be convenient for the necessary administrative, storage of samples of wine, making wine tasting, as well as for training and cultural events. Part of the subject matter of public procurement is also making documentation of actual construction and manufacturing plat map. Continuation of the "II.1.6) Common procurement vocabulary (CPV) 'this form: 71250000-5 continuation of the" III.2.3) Technical capacity "of the form: 137/2006 Coll., On Public Procurement, as amended ( hereinafter the "Act"), point 3. a) Act, the Contractor shall submit a list of the works carried out by the supplier for the last 5 years and seller's certificate of proper performance of most of these works; This certificate must include cost, time and location of the works and shall indicate whether these works executed properly and professionally. This technical qualification requirement met by a contractor that submits: a) A list of works carried out by the supplier for the last 5 years in the form of an affidavit; b) A certificate orderers the proper implementation of most of these works, which will illustrate the fulfillment of defined below minimum level of qualification requirement. The submitted papers must make clear that the contractor for the last 5 years to get 1 point. d), e), i), j) of the Decree, with: CZK without VAT. From the submitted documents must be clear that the contractor works implemented at least to that extent even in the case where a contractor or subcontractor to another part of the association, or other connection suppliers, ie. share of the supplier must meet the minimum requirements of the relevant construction work. Subject matter and extent of the works (esp. Data on the nature of the buildings, etc.) Must follow a certificate orderers works, not only from a list of works, affidavit, suppliers or other documents (parts or extracts from technical reports, project documentation, inventories of works or similar documents), not if the information in these other documents confirmed the client works. 3 point. b) of Act 3 point. b) Act, the Contractor shall submit a list of the technicians or technical bodies which will participate in the performance of public contracts, especially the technicians or technical bodies ensuring quality control, regardless of whether they are employees, suppliers or any other person in relation to the supplier. This technical qualification requirement met by a contractor who submits a list of people who will participate in the performance of the public contract (hereinafter referred to as the "implementation team" or "team members") in the form of an affidavit from which it is apparent fulfillment of defined below minimum level this qualification requirement. The submitted papers must make clear that the supplier will be subject to the fulfillment of public contracts available implementation team comprised of the following persons: a) The construction site - 1 person; b) Deputy Chief of the site - 1 person. 3 point. c) of the Act 3 point. c) Act, the Contractor shall submit a certificate of education and professional qualifications of the supplier or contractor managerial employees or persons in similar positions and persons responsible for guiding the implementation of the works. This technical qualification requirement met by a contractor that submits documents certifying the educational and professional qualifications of the members of the team. The submitted papers must make clear that the supplier will be subject to the fulfillment of public contracts available implementation team meets the following requirements: a) The site manager 360/1992 Coll., On Professional Practice of Certified Engineers and Technicians active in construction, as amended ( the "Authorization Act") in Civil Engineering; 2. Minimum professional qualifications: length of at least 5 years experience on the position of the site; 1 point. d), e), i), j) of the Decree. b) Deputy Chief foreman first authorization: authorized engineer, engineer or builder according Authorisation Act in Civil Engineering; 2. Minimum professional qualifications: length of at least 3 years experience on the position of the site; 1 point. d), e), i), j) of the Decree.
  • 1