Call +44 800 9755 164

Public tenders for defense in Poland

Find all Defense tenders in the world.
Finding business opportunities has never been easier.

Results for defense. Make a new search!
DefensePoland

Specialised boats

Inspektorat Uzbrojenia | Published March 23, 2017  -  Deadline May 8, 2017
cpvs
34521000

The contract is for delivery in the period 2017-2019 the boat reconnaissance LRM, in the amount of 204 sets.

Boats should meet the requirements and parameters contained in the terms of reference (TOR) - posted on the website of the Employer - http://www.iu.wp.mil.pl, in particular, they should be made in accordance with the manufacturer's documentation of the production taking into account the requirements of defense No. NO-19-A205: 2013 "boats military-General" Chapter 4 "Requirements for boat design elastic (pneumatic)" and Polish standards no PN-EN ISO 6185-2: 2005 "Inflatable boats Part 2: boats with motor with a maximum rated output of 4.5 kW to 15 kW. "

Bullet-proof vests

Komenda Główna Straży Granicznej | Published March 23, 2017  -  Deadline May 4, 2017
cpvs
35815100

The contract is for the supply of bullet-proof vests internal brand-new, manufactured no earlier than in 2017.

The contract is for the supply of bullet-proof vests external amounts:

1) 452 kpl. as part of the basic contract,

2) to 257 kpl. under the right option.

2. The required guarantee period:

- For soft ballistic vests for a minimum period of 10 years from the date of receipt of the order;

- On the skin, and a carrying bag for a minimum of three years from the date of receipt of the order.

The Contractor shall be obliged to deliver within 14 days from the date of the agreement, the prototype offered vest - size "L".

Object of the contract shall be evaluated in accordance with the Law of 17.11.2006, the conformity assessment system products for the needs of defense and national security OJ No. 235, item. 1700, as amended. d.) and the Regulation of the Minister of Internal Affairs and Administration of 18.03.2013 r. on the assessment of conformity of products designed for the needs of national security and the list of such products (OJ 2013 pos. 382).

Lędziny: Organization and carrying 5-five inter-Clubs Meeting (MCS) in the district Bieruń-Lędziny in the municipalities of Bieruń, Lędziny, Bojszowy, Imielin, Chelm Slaski for the project participants Fri. Active Support for the effective operation together with the environment, co-financed by the European Union from the European Social Fund under Regionanalnego Operational Programme of Silesia for 2014-2020 Priority Axis IX / 9.1 Measure / Sub-measure 9.1.6.

Powiatowe Centrum Pomocy Rodzinie | Published July 27, 2016  -  Deadline October 31, 2017
cpvs
80500000

Object of the contract includes a service consisting in organizing and conducting the 5-five inter-Clubs Meeting (MCS) in the district Bieruń-Lędziny in the municipalities of Bieruń, Lędziny, Bojszowy, Imielin, Chelm Slaski for the project participants Fri. Active Support for the effective operation and its surroundings. Within each of the five inter-led Clubs Meetings will be organized and conducted the following workshops: 1 workshop with a healthy diet - 40h teaching classes, 2 workshops of self-defense - 36h teaching classes, 3 workshops Sports Nordic Walking - 40h teaching classes, 4 - workshops with make-up (make-up, clothes, hairstyle) - 40h teaching classes, 5-modeling workshops - 36h teaching classes, 6-workshop with handicrafts - 40h teaching classes, 7 workshops floral - 40h teaching zajęć.Zamawiający will direct the workshop together 85 participants with a maximum of 170 people from their surroundings (max. 2 persons from the environment to 1 participant of the project, giving a total number of up to 255 people) ..

Gliwice: PROVISION OF PROPERTY PROTECTION IN THE FORM OF PHYSICAL PROTECTION AND EMERGENCY SERVICE REGISTRATION

Powiat Gliwicki | Published July 27, 2016  -  Deadline September 17, 2017
cpvs
79710000, 98341140

Employer requires the Contractor with the help of employees of those they performed: a) services for the protection of the property of the district office in Gliwice, including: building street Sigismund the Old (consisting of a three-storey segment A four-segment B, two-storey segment C) is 1 concierge, telephone communication and CCTV. The building will be guarded by one person, 24 hours a day and the adjacent area owned by the Employer, including real estate situated on plots 1075, 1076, 1077 - cadastral unit Gliwice, Gliwice old precinct. b) handling of emergency calls after office hours and on weekends and holidays involving: adoption of the telephone notification of the event on the emergency phone number 510-138-137, save the application in the book records events, transfer the event information relevant departments and entities according to their properties, on the basis of their list of contact details, informing the Members of the Board or employees of the department of crisis management for receiving signals or passwords associated with the defense readiness of the state and introduced degrees of alarm. In special cases, the Contracting Authority foresees the possibility to introduce additional security staff. Working time additional employee may not exceed during the term of the contract 240 h ..

Construction work for water and sewage pipelines

Łódzka Spółka Infrastrukturalna Sp. z o.o. | Published April 8, 2017  -  Deadline May 16, 2017
cpvs
45231300

Proceedings under the name: "Construction of sanitary sewage system in the departures side streets: Rąbieńska, Defense, Czwartaków, Grenadier in Lodz", broken down into tasks:

Rąbieńskiej in Lodz, length

L = 804.22 m DN 200 mm and leaving lateral

L = 104.90 m DN 200 mm and leaving lateral

L = 317.10 m DN 200 mm and leaving lateral

L = 248.06 m DN 200 mm and leaving lateral

Detailed information is contained in the Terms of Reference and the Project Documentation.

Deadline: up to 31.12.2018. From the date of the construction site including: the transfer of the construction site within 14 days of signing the contract; the completion of the works on 10.31.2018. (the term provides a possible break in period 15.12.2017-15.03.2018, which will not be a reason to change the date of implementation of the agreement); final acceptance transfer / admission to the operation of the task within two months from the date of completion (work not later than 31.12.2018)

3) of the PPA.

The scope of this contract will include the construction of:

a. The sanitary sewage system - extension of the section from the inclusion max.100 m

100 m

c. increase the number of works of replacement (to the extent necessary to restore the surface after the works basic and orders referred to in point. a., b.) the streets covered by the contract essential, in particular for developed properties or those for which the license was issued on construction or application.

The contract will be awarded under a separate agreement, which will be in accordance with the contract for the main contract, in the timing of receipt of payment, method of calculating fines.

* Supplement Information section II.2.5)

As part of the criterion of the warranty period, Purchaser will award points according to the rule:

- guarantee period 36 months - 0 points

- guarantee period 42 months - 5 points

- guarantee period 48 months - 10 points

- guarantee period 54 months - 15 points

- guarantee period 60 months - 20 points.

Gizycko: WORKS OF THE ROOF REPAIR, ELEVATION AND INTERNAL ROOMS BUILDING NO 2 IN JW. In 4222 GIŻYCKO STREET. MONIUSZKI 7 AND DEVELOPMENT OF TECHNICAL DOCUMENTATION

 | Published July 12, 2016  -  Deadline November 20, 2017
cpvs
45450000

The contract is: Moniuszki 7, 11-500 Giżycko - Renovation of a building for the repair of the roof, façade and internal spaces and the development of technical documentation. Building Description: The property equipped with all the facilities. GENERAL scope of works to be carried out: (detailed scope of work specified in the Bill of Quantities) Conditions of the task: The cost of such visits shall be borne by the Contractor. Work will be performed in the active plant. The scope of work to be performed in 2016, the development of project documentation: - the execution and design expertise to adapt the building No. 2 to fire regulations. - Execution of detailed design natural ventilation - performing detailed design of mechanical ventilation - the execution of the project executive heating system - performing as-built geodesic inventory of repair of the roof and facade work in the building 12 Scope of work to be performed in 2017 refurbishment of public internal work related to land development 6.19. In 2016 Contractor shall perform works in the range of 30%, while in 2017r. 70% of the works included in this task. A set of specific requirements concerning the organization of work, the standard and quality of workmanship, the use of the properties of building products and methods and how to assess the quality of execution of contracted work specified in the Technical Specification of performance and acceptance of works. A document confirming the effected disposal of demolition material should be attached to the documents on the day of delivery of the works. Location of work: work will be implemented in Military Unit No. 4222 in Giżycko. Protection of Confidential Information WOG 24, is the date of signing of the agreement: to provide a completed application for a pass (personal, car) for a group of people (according to the model attached as Annex 12 hereto). providing electronic images of people mentioned in the application. Pictures in electronic form can be delivered to the information carrier data or send e-mail to the following address: m.bulka@ron.mil.pl. Contractor, Subcontractor employing foreigners before their work is obliged to comply with the Decision No. 21 Defense Minister of National Defence of 10.02.2012 on the planning and development of projects of international cooperation

Information and promotion products

Ministerstwo Obrony Narodowej | Published April 20, 2017  -  Deadline May 30, 2017
cpvs
39294100

The contract is the execution and delivery of promotional materials -XII parts:

1) Part I - Fudge Advertisement - 1.040 kg

2) Part II - bear advertising in military dress GM 93 - 1200 units.

3) Part III - bag sports outfit WZ 93 - 6,050 units.

4) Part IV - Backpacks - 1,250 pcs.

5) Part V - USB - 1,090 pcs.

6) Part VI - Commemorative Plaques with the sign changes NEC VI Afghanistan - 50 pcs.

7) Part VII - Commemorative Plaques with the sign of Host Nation Support - 12 pcs.

8) Part VIII - Plaques greeting sign SG WP - 100 pcs.

9) Part IX - Commemorative Plaques with the symbolism of the Ministry of Defense - 700 pcs.

10) Part X - Commemorative Plaques with sign promotional WP - 100 pcs.

11) Part XI - commemorative medals - 870 pcs.

12) Part XII - memorial coins - 1,000 pieces.

Description of the order is attached as Appendix 3 to the Terms of Reference - A detailed description of the contract.

The contract is for manufacture and delivery of promotional materials - Part XII:

Part I - Fudge Advertisement - 1.040 kg.

Description of the order is attached as Appendix 3 to the Terms of Reference - A detailed description of the contract.

The contract is for manufacture and delivery of promotional materials - Part XII:

Part II - Teddy Bear advertising in military dress WZ 93 - 1,200 units.

Description of the order is attached as Appendix 3 to the Terms of Reference - A detailed description of the contract.

The contract is for manufacture and delivery of promotional materials - Part XII:

Part III - bag sports outfit WZ 93 - 6,050 units.

Description of the order is attached as Appendix 3 to the Terms of Reference - A detailed description of the contract.

The contract is for manufacture and delivery of promotional materials - Part XII:

Part IV - Backpacks - 1,250 pcs.

Description of the order is attached as Appendix 3 to the Terms of Reference - A detailed description of the contract.

...

Architectural design services

Stołeczny Zarząd Infrastruktury | Published March 30, 2017  -  Deadline May 9, 2017
cpvs
71220000, 71242000

The contract is to develop and Investment Program Documentation of the design-budget arrangements and obtaining necessary administrative decisions together with a description of the order and the author's supervision for the construction jobs for helicopters landing in Warsaw, covering a range of material:

The construction of landing sites for helicopters.

Demolition of buildings.

Construction of the fence.

Construction of the system of protection.

Construction of internal roads.

Construction of pedestrian.

The construction of squares and spaces.

Construction of transformer station.

The construction of the power connection.

Construction of cable lines for buildings and existing buildings and planned.

Construction of outdoor lighting.

Design of output at

The construction of the water supply connection.

The construction of the drain connection.

The construction of the power connection.

The construction of telecommunication connections.

The contract is to develop and Investment Program Documentation of the design-budget arrangements and obtaining necessary administrative decisions together with a description of the order and the author's supervision for the construction jobs for helicopters landing in Warsaw, covering a range of material:

The construction of landing sites for helicopters.

Demolition of buildings.

Construction of the fence.

Construction of the system of protection.

Construction of internal roads.

Construction of pedestrian.

The construction of squares and spaces.

Construction of transformer station.

The construction of the power connection.

Construction of cable lines for buildings and existing buildings and planned.

Construction of outdoor lighting.

Design of output at

The construction of the water supply connection.

The construction of the drain connection.

The construction of the power connection.

The construction of telecommunication connections

Characteristics of the facility:

Mars 80 on the land is a closed area on the basis of Decision No. 38 / MON of the Minister of National Defense of 10 February 2017r.oznaczonym as registration of plot No. 20/1 and 4/1 from within 3-00-75 in Warsaw, settled in the land register KW WA6M / 00183606 thirds and cadastral plot No. 20/2, precinct 3-00-75

In the area of ​​investment, there are numerous unused buildings and construction works, some of which in the construction of landing sites will be subject to demolition.

A detailed description of the order is included in the Terms of Reference

Object of the contract will be executed in three stages:

Stage I - Implementation of the investment program

Stage II - Implementation of project-estimate documentation, including:

Phase IIa - Implementation of the construction project.

Stage IIb - Implementation of the executive project and other studies.

Stage III - Performance of supervisions (initially planned to be around 30 supervisions).

Security services

Enea Operator Sp. z o.o. | Published April 15, 2017  -  Deadline May 22, 2017
cpvs
79710000

Malczewski 5/7 and guests staying at this property, through direct physical protection, exercised by the appropriate number of people included in the list of eligible employees of physical protection of confirming eligibility requirements to protect workers, providing the order of use of the facility installed in the system, burglary, robbery, fire and Employer video monitoring.

The contract scope includes the protection of persons and property provided continuously - 24 hours a day in two shifts (and the change - 12h, the second change - 12h) also on public holidays, Sundays and holidays (post 1) and traffic control and passenger traffic in the shift system in hours. from 6.00 to 16.00 days (post 2).

In terms of physical security services:

a) the immediate arrival of the intervention group to the protected object - a day to 15 minutes at night within a maximum of 10 minutes after receiving the signal of danger to person or property in the facility in order to eliminate the threat and secure facility until the arrival of the person authorized by the Employer or the relevant services

b) constant supervision over the safety and efficiency of operation of the facility

c) of combating burglary, theft and destruction of property

d) limiting access to the protected premises after working hours (entrance only to those with proper authorization)

e) closing the facility at the end of work by employees

f) constant supervision over the safety of employees and visitors

g) daily (after leaving the facility by employees) checking the buildings in terms of extinguishing the lights, close the windows, etc. events which could lead to property damage Employer

h) support for devices and alarm systems, fire., which is equipped with the object, and to comment on their operation

i) taking immediate action in the event of fire or other extraordinary negative random events (eg. acts of terrorism, sabotage, etc.).

j) immediately inform the authorized representative of the Employer, the police and other relevant departments of any incidents significant to safety in the facility no later than within one hour of the onset of this event

k) oversight of access to facilities, collection and taking the keys, as developed by the Employer Instructions

l) keeping records of personal passes, car authorizing entry and entry to the protected object Employer

m) ensure the functioning of the communication between worker protection and the position of armed intervention.

In terms of monitoring services:

a) a fixed clock monitoring by an employee armed protection position signals transmitted on the links:

- telephone contact ID

- radio frequencies for protected automatically switched

- the mobile (inner)

b) immediately, ie. a day later than 15 minutes at night within a maximum of 10 minutes, the arrival of the intervention group to a protected object after receiving a signal of danger to person or property in the facility - to eliminate the threat and secure facility until the arrival of the authorized person by the Purchaser or the relevant departments

Police, Fire Brigade, etc.) in order to take appropriate action

d) the maintenance of the existing system in the building alarm system in order to maintain the full technical efficiency and functional equipment and installations

e) provision of free of charge to the Employer's written request for information and signals adopted in connection with the events that caused damage to the protected object

f) providing free of the Employer's written request for extracts from the register of the local alarm system

The contractor should have:

a) the position of armed intervention

Szczecin

c) alarm systems using at least two transmission paths, one path radio

d) the frequency of dispatching and corresponding radio licenses.

Malczewski 5/7 in Szczecin is located in the "List of areas, facilities and equipment are important for national defense, economic interests of the state, public security and other vital interests of the State subject to mandatory protection by specialist armed security or appropriate safety technology."

4.Szczegółowy description of the order is in Chapter II of the Terms of Reference.

  • 1