Call +44 800 9755 164

Public tenders for defense in Belgium

Find all Defense tenders in the world.
Finding business opportunities has never been easier.

Results for defense. Make a new search!
DefenseBelgium

multi-year contract (2016-2019) supplies to price schedule for the purchase and replacement of interactive multimedia means classrooms, meeting rooms and conference rooms of Defense (16SD835)

MRMP-S/AD - Algemene Directie Material Resources - Divisie Overheidsopdrachten - Section "Support Systems" - Ondersectie Corporate Support Systems | Published November 18, 2016
multi-year contract (2016-2019) supplies to price schedule for the purchase and replacement of interactive multimedia means classrooms, meeting rooms and conference rooms of Defense (16SD835)

BOOK SPECIAL CHARGES MRMP-L / A No. 17LA102 in 8 lots relating to (a) multi-year contract (s) (2017 to 2020) for the delivery, maintenance and disposal of fire means on rolling stock in Defense

MRMP-L/A - Direction Générale Material Resources - Division Marchés Publics - Section "Land Systems" - Sous-section "Acquisition" | Published October 24, 2016  -  Deadline December 6, 2016
public market MRMP-L / A No. 17LA102 in 8 lots relating to (a) multi-year contract (s) (2017 to 2020) for the delivery, maintenance and disposal of fire means on rolling stock in Defense

Coastal-defence works

Agentschap voor Maritieme Dienstverlening en Kust — Afdeling KUST | Published December 2, 2016  -  Deadline December 18, 2016
coastal defense works

Accord-cadre de fournitures pour l'acquisition pluriannuel the boucliers balistiques défensifs au profit des unités spéciales lde a Police Fédérale

Federale Politie Dienst Procurement | Published October 28, 2016  -  Deadline January 11, 2017
Multiannual framework of supplies for the purchase of defense arms with ballistic protection for the benefit of the special units of the Federal Police

No cutlery WBK-BB1102: Albert - City Antwerpen (Merksem) Refresh left up IJzerlaan Bridge.

NV De Scheepvaart, afdeling Waterbouwkunde | Published October 27, 2016  -  Deadline December 2, 2016
The works include the construction of a new bank defense trailing (= on the landward side of) the existing bank protection on the left bank of the Albert Canal in Antwerp (Merksem), to approx. 260 m up the IJzerlaan Bridge, the demolition of the old bank protection and removal of land species between the old and the new bank protection. The bank protection must be adjusted as part of the modernization and deepening of the Albert Canal. This floor works are not part of this contract. The towpath surface shall be reconstructed behind the bank protection.

Construction work for water projects

NV De Scheepvaart | Published November 2, 2016  -  Deadline December 5, 2016

The works include the construction of a new bank defense trailing (= on the landward side of) the existing bank protection on the left bank of the Albert canal in Schoten, thv the companies Gosselin and Depré, the demolition of the old bank protection and the removal of the soil mortar between the old and new bank protection. The bank protection must be adjusted as part of the modernization and deepening of the Albert Canal. Also, a re-laid pavement behind the bank protection.

The works are carried out in four phases. For connecting the realized final foreshores of the old existing bank protection at some stage is always provided with a temporary construction (temporary sheet piling).

WBK-BB1086: Albert - Place Shots: Refresh left thv Gosselin and Depré

NV De Scheepvaart | Published October 28, 2016  -  Deadline December 5, 2016

The works include the construction of a new bank defense trailing (= on the landward side of) the existing bank protection on the left bank of the Albert canal in Schoten, thv the companies Gosselin and Depré, the demolition of the old bank protection and the removal of the soil mortar between the old and new bank protection. The bank protection must be adjusted as part of the modernization and deepening of the Albert Canal. Also, a re-laid pavement behind the bank protection.

The works will be carried out in four phases. For connecting the realized final foreshores of the old existing bank protection at some stage is always provided with a temporary coonstructie (temporary sheet piling).

  • 1